Greg Repella, P.E., S.E. Mr. Repella is founder and president of Repella Consulting Engineers Inc (RCE)., a firm specializing in the structural design of environmental, industrial, commercial and governmental projects. Greg has more than 30 years experience in structural design and project management. .Founded in 1997, RCE is fully computerized in both design and drafting (AutoCADD Version 2008). For additional company information, please visit http://www.repellaconsulting.com/ Structural Assessments/Investigations Repella Consulting Engineers, Inc. has performed structural assessments and/or investigations that covered the following facilities in their entirety, unless otherwise noted: Messerly WWTP, City of Augusta, GA City of Louisville WWTP headworks building, Louisville, CO City of Louisville WWTP corbel investigation, bridge at A-Basin, Louisville, CO Glenwood Springs Hot Springs Pool, filter building, Glenwood Springs, CO Fremont WWTP headworks building channel evaluation, Fremont County, CO Town of La Junta WWTP, La Junta, CO Town of Walden WWTP, Walden, CO Town of Elko WWTP digester structure, Elko, NV Wastewater Projects with Frachetti Engineering Repella Consulting Engineers, Inc. performed structural engineering on the following projects as a sub-consultant working with Frachetti Engineering, Inc.: Kersey WWTP Expansion, Town of Kersey, CO Ute Lake Ranch WWRF, Ute Lake Ranch Water & Sanitation District, Logan, NM Lookout Mountain WTP Improvements, Lookout Mountain Water District, Jefferson County, CO St. Vrain WWTF Improvements, St. Vrain Sanitation District, Frederick, CO (2011) Georgetown WWTP Improvements, Town of Georgetown, CO Idaho Springs WWTF Improvements, City of Idaho Springs, CO Other Wastewater Projects as Structural Engineer City of Louisville WWTP Expansion, Louisville, Colorado: $2.8M expansion of treatment facility, increasing capacity from 2.5 MGD to 3.4 MGD and upgrading processes to meet stricter effluent standards. New structures include RAS/WAS building with a below grade pump gallery and an 80-foot diameter clarifier. A new effluent trough between circular walls of a clarifier and aeration basin was designed and existing post- tensioned concrete walls were checked for new piping penetrations at the outlet of the effluent trough. In addition, modifications were made to an existing chlorine contact basin to house a new UV Disinfection system. St. Vrain WWTP Expansion (2000), St. Vrain Sanitation District: Expansion of the existing wastewater treatment facility. New structures included an Operations building with a below grade level pump gallery and adjacent UV area and blower room, two 92) 60 foot diameter secondary clarifiers and a Headworks building with two below grade levels. Other miscellaneous work also included structural design of a sampling platform and flow splitter box. Plum Creek Wastewater Treatment Plant Addition, Plum Creek Wastewater Authority Castle Rock, CO.: $30M expansion of existing treatment plant, increasing capacity from 1.45 mgd to 3.55mgd. New structures include 3- 3.4M gallon oxidation ditches, selector basins, a 20 ft x 20 ft utility corridor beneath a service road, 3- 85 foot diameter clarifiers, a blower building, a centrifuge building, a filter building, a UV disinfection building and a maintenance building. Modifications and additions include conversion of existing aerobic digester basins to include a pump station, storage facility and walkway bridge. Also included are structural modifications to a headworks building and an addition to an administration building. Squaw Creek Wastewater Treatment Plant Expansion, Eagle River Water & Sanitation District, Edwards, CO.: $16M expansion of existing treatment plant, increasing capacity from 1.2 MGD to 2.95 MGD and upgrading processes in order to meet stricter effluent standards. New structures include Septage Receiving and Headworks building, Primary Clarifiers, Odor Control building, Secondary Clarifiers (2), Solids Processing and ATAD building, and Administration building. Work also included structural modifications to existing aeration basins, one of which house a new UV Disinfection building. Tri-Lakes WWTP Expansion, Tri-Lakes Joint Use Committee, Monument, CO: $2.5M expansion of existing treatment plant, increasing capacity from 2.8 MGD TO 4.2 MGD. New structures include a below grade pump gallery, a 50 foot diameter clarifier, a UV disinfection building over an existing chlorine contact chamber, and a sampling platform at the aeration basin lagoon. Pueblo West WWTP Expansion, Pueblo West Metropolitan District, Pueblo, CO.: $3.2M expansion of treatment plant, increasing capacity to 1.8 MGD. New structures include an Operations building with a blower room, UV disinfection area, and below grade pump gallery, two 50 foot diameter clarifiers, a Headworks building, flow splitter box, and a sampling platform at an aeration basin lagoon. City of Montrose WWTP Improvements, Montrose, CO.: $.8M improvement project to existing facility to upgrade treatment processes in order to meet stricter effluent standards. Design consisted of structural modifications and new construction to an existing chlorine contact basin, resulting in a new UV Disinfection building. RESUME ROD MCCOY, P.E. LEED AP PRINCIPAL AE Associates, Inc. EDUCATION AS - EET, Colorado Technical University, 1982 BS - SET, Colorado Technical University, 1982 Magna Cum Laude REGISTRATION P.E., Mechanical Engineering, State of Colorado, State of Nebraska QUALIFICATIONS Rod has 30 years of extensive experience in HVAC and Plumbing design. In addition, he also has experience in medical gas and fire protection design. He has performed consulting engineering services for hospitals, assisted living centers, schools, military bases, county municipalities, office buildings, post offices and many industrial plants. Typical systems have included central plants (boilers/chillers), central station air handlers, water source heat pumps, VVT, two and four pipe systems, PATC, split systems, building exhausts, smoke evacuation, specialized exhaust systems, laundries, parking garages, snow melt systems, kitchen production ventilation, and heat recovery. PREVIOUS EMPLOYMENT RECENT EXPERIENCE Merritt Engineering-Local Consulting Firm, Monarch Mechanical- National Design/Build Mechanical Firm, Solardroniocs – Solar/mechanical Design/Build Contractor, and US Navy MEMORIAL HOSPITAL CAMPUS Colorado Springs, CO 21 years experience providing consulting continuous engineering services for hospital master plans, expansions, and renovations. New 1500 Car Parking Garage, North Tower Expansion: 219,000 square feet. Completed in 1998. Power Plant/Chiller Building Expansion/3,600 tons, 750 HP Summer Boiler, Underground Boiler/Fuel Storage Tanks, Laundry Expansion -Tunnelwasher system, Operating Rooms, Emergency Room/Trauma, Hyperbaric Chambers, Outpatient Surgery/GI Lab, Radiology, Labor and Delivery Radiology, Cancer Center, Nuclear Medicine, Med Surge Patient Rooms and Pharmacies PENROSE HOSPITAL – MAIN CAMPUS Colorado Springs, CO Over 12 years experience providing consulting engineering services for hospital master plans, expansions, and renovations. , Operating Rooms, Emergency Room/TraumaOutpatient Surgery/GI Lab, Radiology, Labor and Delivery,Radiology, Cancer Center, Nuclear Medicine, Med Surge Patient Rooms, Pharmacies and Kitchen/Dinning. SIGNIFICANT PROJECTS ST. THOMAS MORE HOSPITAL Canon City, Co 43,500 SF addition, which includes DOC Inmate Holding Area, 50,000+SF remodel projects. Design assist with Cobb Mechanical PAGOSA SPRINGS HOSPITAL 30,000 SF addition, Design Build with Cobb Mechanical Pagosa Springs, Co VA HOSPITAL Sturgis, SD 32,000 SF surgery addition, which includes 3 new Operating Rooms, PACU, Pre/Post Op, and areas for future Central Supply, and Administration Areas ST. FRANCIS HOSPITAL- Various department remodels PIKES PEAK HOSPICE REMODEL Colorado Springs, CO Colorado Springs, CO RESUME ST. VINCENT HOSPITAL - Major 20,000 SF addition COLORADO EYE ASSOCIATION - Clinic Remodel Leadville, CO Colorado Springs, CO ROD MCCOY, PE AE Associates, Inc. (Continued) MISCELLANEOUS SCHOOLS NEW AND RENOVATIONS Burlington High School, Middle School, Elementary School. Pueblo District 60 and 70 Schools. Fountain Valley Private School. District 8 - Fountain Fort Carson. District 2 - Harrison. CHURCHES Christ the King – Pueblo, Co – complete HVAC renovation !st Presbriterian Church – Colorado Sprigns, CO – Add Air Conditioning St. Rose Lima – Northborough Mass. Complete renovation/addition – new HVAC/Plumbing EL PASO COUNTY FACILITIES Miscellaneous Plumbing and HVAC Services. Boiler design/replacement at Health Department Chiller Replacements, Maintenance Building HVAC/Vehicle exhaust. Wild Fire headquarters and vehicle maintenance facility Parking Garage Expansion County IT Facility CRAC system Upgrade Extension of Downtown Central Plant utilites to Pikes Peak Center and Centennial Hall New CUP and Office renovations at Corporate Ridge (old Intel Buildings) Various Energy Retrofit projects PUEBLO COUNTY FACILITIES Pueblo County Public Works: Miscellaneous Plumbing and HVAC Services. Chiller and boiler Replacements, Maintenance Building HVAC/Vehicle exhaust APARTMENTS AND HOTELS Embassy Suites - Renovations Drury Inns New Construction Mineral Palace – Boiler system replacement, Minnequa Apartments – New construction Palmer House – Heating and Domestic water heater replacements COMMERCIAL BUILDINGS Library Plaza – Strip Mall, various tenants Executive Tower – Office High Rise, various floor remodels Holly Sugar Building – Office High Rise, various floor remodels Convenience Stores – New and Remodel Construction Municipal Projects Nederland Wastewater Treatment Facility Fountain Water and Wastewater Treatment Facilities RESUME PENAL/INCARATION FACILITES El Paso County High Custody 480 Bed Facility Colorado Springs, CO El Paso County Judicial West Building Tenant Finish of 3rd through 5th Floors Judicial South HVAC remove/replace to accommodate asbestos abatement and provide control upgrade. South Judicial Abatement (mechanical R/R) El Paso County Low Custody Overflow, and Metro Work Release El Paso County Tensile Building (currently Utilized as Detox Center) PARKING STRUCTURES El Paso County Parking Structure Addition Colorado Springs, CO Memorial Hospital 1200 car Structure Colorado Springs, CO MANUFACTURING FACILITIES BACH Industries – Wind turibine compoents, Fort Lupton, CO Goodrich Industries – Jet Liner Brake Mfg.