PROJECTS BY LOCATION The San Francisco Builders Exchange Friday, September 30, 2016 To view plans online go to www.bxofsf.com Location Plan Name Bid Date Bid Time # Of Addenda Plan # Alameda HISTORIC ALAMEDA HIGH SCHOOL MODERNIZATION - ABATEMENT/INTERIOR DEMOLITION CENTRAL/SCIENCE BUILDINGS (ONLINE) 10/4/16 10:00 AM 1 Online 10/6/16 10:30 AM 0 Paper & Online Plans Seismic rehabilitation and modernization of existing Historic High School facilities. Alameda ANIMAL CENTER ROOF REPLACEMENT Installation of IB Roof System that remains watertight, resists specified uplift pressures and exposure to normal weathering conditions without failure.Project Contact: Abdulla A hmed 510-747-7939Email: aahmed@alamedaca.govSpecs also available for review at Santa Clara Builders Exchange Alameda MAINTENANCE SERVICE CENTER ROOF REPLACEMENT 10/10/16 10:00 AM 0 Paper & Online Installation of 18 Roof System that remains watertight, resists specified uplift pressures and exposure to normal weathering conditions without failure.Project Contact: Abdulla Ahmed 510-747-7939Email: aahmed@alamedaca.govSpecs also available for review at Santa Clara Builders Exchange Alameda ELECTRIC METER INSTALLATION SERVICES- ALAMEDA MUNICIPAL POWER 10/10/16 3:00 PM 1 Paper & Online Provide electric meter installation services.Project Contact: Roger Yang 510-814-6420Email: yang@alamedamp.comSpecs also available for review at Santa Clara Builders Exchange Alameda BAR EXPANSION - HAMPTON INN (ONLINE) 10/11/16 10:00 AM 0 Online Building Demo, Site Concrete modifications, Utilities extended, Concrete Foundation, Rough Carpentry, Finish Carpentry, Lath/Plaster, Built-up Roofing, Windows, Storefront Doors, T-Bar Ceilings, Casework, Flooring, Painting, Plumbing, HVAC, Fire Sprinklers, Electrical, Fire Alarm, Food Service Equipment, etc.Plans available ONLINE ONLY Alameda HOME 2 SUITES (ONLINE) 10/18/16 10:00 AM 0 SF43-44 Online Site Demo, Grade/Pave, SWPPP's, Site Concrete, Utilities, Swimming Pool, Landscaping, Building Concrete, Masonry, Gypcrete, Structural/Misc. Steel, Rough Carpentry, Finish Carpentry, Casework, Lap Siding, Skylights, TPO Roofing, Sheet metal and Metal Siding, Insulation, Fire Caulking/Sealants, Windows, Auto Entry Doors, Storefront, Shower Doors, Doors/Frames/Hardware, Lath/Plaster, Drywall/Metal Studs, T-Bar Ceilings, Ceramic Tile, Painting, Flooring, HVAC, Fire Sprinklers, Electrical, Fire Alarm, LV Systems, etc.Plans available ONLINE ONLY ANTIOCH BLACK DIAMOND MINES REGIONAL PRESERVE BIG STAIRS IMPROVEMENTS (ONLINE) 10/20/16 2:00 PM 1 SFONLI Online NE INSIDE OF MINE: Install temporary and permanent ground control, including steel frames, rock anchors and shotcrete; remove existing wood stairs; fabricate and install new metal stairs; and install new lighting.OUTSIDE OF MINE: Regrade gravel road, install drainage and concrete retaining wall.Questions: Kim Warden, Design and Construction Department, at: kwarden@ebparks.orgPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Atascadero SOUTH ECR SIDEWALK ACCESSIBILITY AND SAN RAFAEL PEDESTRIAN RAMP REPLACEMENT / CDBG BARRIER REMOVAL 10/4/16 2:00 PM 0 Online Concrete sidewalk infill, ADA ramp and pedestrian push button replacement, and associated minor drainage improvements. DAVIS-BACON Avila Beach HOIST #4 FABRICATION AND INSTALLATION Berkeley 1499 UNIVERSITY HOTEL (ONLINE) 10/18/16 1:30 PM 0 Online Furnish all labor, materials, equipment and supplies to fabricate and install a jib cane (hoist) at the terminus of the Harford Pier. PREVAILING WAE 10/19/16 12:00 PM 0 SF60 Online Ground up hotel. Trades to include scaffolding, SWPPPs, surveying, earthwork, ground improvement piles, underground wet utilities, site concrete, fencing, landscaping, rebar, structural concrete, gypcrete, metal fabrications, handrails & railings, finish carpentry, architectural wood casework, exterior finish carpentry, closet shelving, solid surface counter tops, waterproofing, insulation, composite panels, roofing, sheet metal, roof pavers, smoke containment barriers, caulking, D/F/H, overhead doors, wood storefront, aluminum windows, glass canopies, plaster, tile, flooring, painting, toilet accessories, shower doors, fire alarm, elevators, vehicle lifts, fire protection, plumbing, HVAC, electrical, and data/telecom.Plans available ONLINE ONLY Brisbane 2016 COLD-IN-PLACE RECYCLING PROJECT 10/6/16 12:00 PM 0 Paper & Online Recycling of asphalt concrete pavement and the overlay of various street sections of asphalt. The work is to include all striping, street sweeping and traffic control.Project Contact: Karen KinserEmail: kkinser@ci.brisbane.ca.usPlans and specs also available for review at Santa Clara Builders Exchange Page 1 of 23 Location Plan Name Bid Date Bid Time # Of Addenda Capitola RFQ - ARCHITECT FOR CAPITOLA LIBRARY 10/7/16 3:00 PM Plan # 0 Plans Paper & Online The City of Capitola Public Works staff with the assistance of Bogard Construction as the Project Manager has prepared a Request for Qualifications (RFQ) for architectural design services for the new Capitola Branch Library. The selection of an architectural firm will be a key step in the project development. At this time, the City wishes to engage the services of an architectural firm. Carmel NOTICE INVITING LICENSED CONTRACTORS 12/30/16 5:00 PM 0 Online Notice is hereby given that the Board of Education for the Carmel Unified School District has elected to utilize the alternative bidding procedures set forth in Public Contract Code section 22032 et seq. and shall develop and maintain a list of qualified contractors, identified according to categories of work, in accordance with the provisions of Public Contract Code section 22034 and criteria that the California Uniform Cost Accounting Commission promulgates from time to time. Notice is further provided that District is inviting all licensed contractors to submit the name of their firm to the District for inclusion on the District’s list of qualified bidders for the 2016 calendar year.Persons or companies interested in being included on the District’s list of bidders for the 2016 calendar year shall provide the name and address to which a Notice to Contractors or Proposal should be mailed, a phone number at which the contractor may be reached, the type of work in which the contractor is interested in doing and currently licensed to do (earthwork, pipelines, electrical, painting, general building, etc.), together with the class of contractor’s license(s) held and contractor license number(s).Contractors interesting in being included on the District’s list of bidders for the 2016 calendar year may submit the above-described information in person or by U.S. Mail to:Carmel Unified School DistrictAttn: Dan PaulPO Box 222700Carmel, CA 93922It is the sole responsibility of the person submitting such information in person or by U.S. Mail to ensure that is delivered to the District and includes all requested information. Any contractor providing a submittal that lacks the information set forth herein will not be added to the District’s list of prequalified bidders for the 2016 calendar year. CASTRO VALLEY SOUTH RESERVOIR REPLACEMENT PROJECT - EBMUD 10/12/16 1:30 PM 0 SF191 Paper & Online Div 1-3, 5, 7-9, 22-23, 26-28, 31-33, 40 & 43. Work includes:1. Furnish and install 9-MG, partially buried, prestressed concrete tank, valve vault, and associated piping and appurtenances.2. Furnish and install approximately 615 feet of 42" and 48" Inlet-Outlet (IO) steel pipe, approximately 690 feet of 28" and 36" HOPE storm drain pipe in 48" steel casing via trenchless installation and approximately 500 feet of 15" to 36" HOPE profile-wall and steel storm drain pipe.3. Furnish and install site grading and paving; drainage improvements; electrical, instrumentation, control and telemetry systems; water quality cabinet; landscaping; irrigation system; fencing; and perform related work at the South Reservoir site in Alameda County, in accordance with the Drawings and Specifications.This Project will require multiple trades and types of work; for example (NOTE: this list is not all inclusive): demolition, hazardous materials handling, grading, excavation, fill, concrete, mechanical, electrical, pipeline, plumbing, fencing, trucking, hydroseeding, landscaping, paving, and other required work and trades. For additional description and information, see Document 00 41 02 - Bid Form, Section 01 11 00 - Summary of Work, and the remaining Contract Documents. Cayucos STRUCTURAL ENGINEERING SERVICES FOR GEN GOVT. - CAYUCOS - VETS HALL REPAIRS 10/13/16 3:00 PM 1 Online The Department of Public Works is seeking proposals from consultants for Architectural and Engineering services for the design and construction of the Gen Govt. - Cayucos - Vets Hall Repairs. Colma TOWN OF COLMA CAMPUS RENOVATION & ADDITION - INFILL & SITE BID PACKAGE (ONLINE) 10/20/16 2:00 PM 0 Online Interior modification to indicated existing spaces within the renovation; New Addition to the Town Hall.Questions: Mahan Bozorginia at (650) 757-8894Plans available ONLINE ONLY Colusa CITY OF COLUSA WWTP 2016 IMPROVEMENTS PROJECT 1 10/4/16 3:00 PM 4 SF192 Online Upgrades to the City of Colusa Wastewater Treatment Plant, including the construction of: a new circular secondary clarifier; two new aeration blowers; modifications to existing aeration basin diffusers and controls; a new RAS pump; installation of underdrain systems; addition of decanters at each sludge storage basin; modifications to existing daily equalization basin; and construction of a new earthen storage basin.This project will be partially funded by the Clean Water State Revolving Fund (SRF) and as such must satisfy the requirements of the disadvantaged business enterprise (DBE) outreach efforts. SRF requires Bidders to make information on forthcoming opportunities available to DBEs by posting solicitations for bids or proposals for a minimum of 30 calendar days before bid opening. CONCORD THE VERANDA NEW BUILDINGS F & H (ONLINE) 10/6/16 2:00 PM 0 SFONLI Online NE This Bid is now for Buildings F & H. Break out your bids per building. Scope of Work includes: Concrete, Some Tilt-Up Walls at Building H, CMU Masonry, Structural & Miscellaneous Steel, Rough Framing, Insulation, Single-Ply TPO & Clay Tile Roof, Sheet Metal, Fabric Awnings, Skylights, Doors & Hardware, Storefront Glass & Frames, Metal Studs & D-Wall, Plastering, EPS Foam, Plumbing, HVAC, & Electrical.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY CONCORD ELLIS LAKE PARK PLAYGROUND AND PARK IMPROVEMENTS (ONLINE) 10/13/16 2:00 PM 0 SFONLI Online NE The Work to be done consists of, in general, site demolition, earthwork, grading, storm drain pipe and inlets, installation of playground equipment and surfacing, concrete walks, temporary fence, permanent fence, erosion control, turf replacement, irrigation replacement, and lighting; as as wharf fence construction as additive bid items, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, or installed.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Page 2 of 23 Location Plan Name Bid Date CONTRA COSTA COUNTY 2016 ON-CALL TRUCKING SERVICES CONTRACT(S) FOR VARIOUS ROAD AND FLOOD CONTROL MAINTENANCE WORK (ONLINE) 10/4/16 Bid Time # Of Addenda Plan # 2:00 PM SFONLI Online NE 0 Plans General Work Description: A Contract to provide trucking services consisting of trucks and operators to support road and flood control maintenance repair work(“Work”), including transportation of, but not limited to, debris, aggregate, hot mix asphalt, and rock, on an as-needed basis, not to exceed $300,000 in various locations within Contra Costa County as requested by the Public Works Department.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY CONTRA COSTA COUNTY 2017 ON-CALL CONTRACT(S) FOR VARIOUS ROAD, FLOOD CONTROL, AND AIRPORT MAINTENANCE WORK (ONLINE) 11/1/16 2:00 PM 0 SFONLI Online NE General Work Description: The Work consists of various road, flood control, and airport maintenance work to provide support as needed to Public Works Maintenance crews for various routine road, flood control, and airport maintenance repairs, such as but not limited to, pavement repairs and replacement, crack seal, slurry seal, skin patching, asphalt concrete cold planing, pavement leveling, shoulder widening, hot mix asphalt paving, storm damage repair work, rock slope protection, slope stabilization, culverts, and concrete structures.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY CORTE MADERA ETHAN ALLEN TENANT IMPROVEMENT PROJECT (ONLINE) Cupertino PARKING PROTECTION STRUCTURE AT PROSPECT ROAD STAGING AREA PROJECTFREMONT OLDER OPEN SPACE PRESERVE 10/4/16 1:00 PM 3 SFONLI Online NE Tenant improvement for new 11,947 sq. ft. Ethan Allen store. Construction to start mid October.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY 10/27/16 2:00 PM 0 Paper & Online Tree pruning and removal, debris removal, pole foundations and installation, net structure installation and application of erosion control measures.Project Contact: Dale GroganEmail dgrogan@openspace.orgPlans and specs also available for review at Santa Clara Builders Exchange DALY CITY DALY CITY YARD AND CIVIC CENTER HVAC UPGRADES - BART 11TJ-170 10/4/16 2:00 PM 1 SF309 Paper & Online Div 1-3, 5, 7, 9, 20, 22-23 & 26. The Work includes all materials, labor, tools, equipment and the hardware required to replace the existing HVAC equipment, the associated accessories, electrical components, and specified control systems more particularly described in the Contract Specifications, 01 11 00, Summary of Work.Questions: Steve Alva, Project Manager, at: salva@bart.gov DANVILLE CAMINO TASSAJARA/SYCAMORE VALLEY ROAD SOUND WALL MAINTENANCE PROJECT (ONLINE) 10/11/16 2:00 PM 0 SFONLI Online NE The Work generally includes, but is not limited to, removal and replacement of masonry block sound wall at locations along Camino Tassajara, Sycamore Valley Road, and as shown on the Plans in Danville, California. Included in the Work are demolition and removal of existing sound wall and concrete foundation, construction of new sound wall and foundations, protection and restoration of existing landscaping and irrigation, and other items that are required by the Plans, Standard Specifications, or these Special Provisions.Questions: Nader Salama, Associate Civil Engineer, at (925) 314-3348, or by email at: nsalama@danville.ca.govPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Davis TUPPER HALL ROOM 4452 & 4460 LABORATORY RENOVATION AND TUPPER HALL ROOM 4433 & 4435 LABORATORY RENOVATION 10/6/16 2:30 PM 6 SF23 Online Tupper Hall Room 4452 & 4460 Laboratory Renovation (approximately 1,610 sq. ft.) - Provide all labor, materials, equipment, tools, transportation, insurance, and services to construct a project that includes the full renovation of Room 4460 and finish upgrades to Room. The project will demolish all existing finish materials within the work areas. Hazardous materials (lead and asbestos) are known to exist in Tupper Hall. It is presumed that all demolition of existing finish material will be completed under hazardous materials management regulations. Demolition will include removal of casework, partial partition wall and door and frames, ceiling tiles, Lighting and controls and electrical outlets, plumbing fixtures, bench utilities, and mechanical grills and diffusers. The project will include all new architectural finish materials (floors, walls, & ceilings); new doors, frames, and hardware; new laser curtains and tracks; all new laboratory modular casework at the puller and microforge station; new cylinder rack; modifications to the existing HVAC mechanical and control systems to accommodate new room usage. All new plumbing services for high and low pressure laboratory air use will be added and a new sink with industrial water will be provided. Further work will include new electrical (power outlets & lighting); new telecommunications connections; new fire alarm systems device connections to existing fire alarm systems; modifications to the existing fire sprinkler system to accommodate the new room configurations; and new access compliance accommodations will be provided. All work will comply with all current and applicable CBC Regulations and UCD Design Campus Standards.Tupper Hall Room 4433 & 4435 Laboratory Renovation (approximately 850 sq. ft.) Provide all labor, materials, equipment, tools, transportation, insurance, and services to demolish all existing finish materials within the work areas. Hazardous materials (lead and asbestos) are known to exist in Tupper Hall. It is presumed that all demolition of existing finish material will be completed under hazardous materials management regulations. Demolition will include removal of casework, a fume hood, partition wall and door and frames, ceiling tiles, Lighting and controls and electrical outlets, plumbing fixtures, bench utilities, and mechanical grills and diffusers. The project will include all new architectural finish materials (floors, walls, & ceilings); new doors and hardware and frames, new window blinds, modifications to the existing HVAC mechanical and control systems to accommodate new room usage. All new plumbing services and a new sink with industrial water will be provided. Further work will include new electrical (power outlets & lighting); new telecommunications connections; new fire alarm systems device connections to existing fire alarm systems; modifications to the existing fire sprinkler system to accommodate the new room configurations; and new access compliance accommodations will be provided. All work will comply with all current and applicable CBC Regulations and UCD Design Campus Standards. East Palo Alto SAFE ROUTES TO SCHOOL FEDERAL CYCLE 3 PROJECT 10/6/16 2:00 PM 0 Remove existing and install new curb, gutter, sidewalk, bulb outs, curb ramps, textured crosswalks, signing and striping.Project Contact: Maziar BozorginiaEmail: mbozorginia@cityofepa.orgPlans and specs also available for review at Santa Clara Builders Exchange Page 3 of 23 Paper & Online Location Plan Name Bid Date EL CERRITO HANA GARDENS AFFORDABLE HOUSING PROJECT 10/5/16 Bid Time # Of Addenda Plan # Plans 2:00 PM SF160161 Paper & Online 1 Div 1-12, 14, 21-23, 26, 28 & 31-33. Hana Gardens is a 63-unit mixed-use senior affordable housing community within El Cerrito’s mid-town area, which includes civic, residential and commercial uses. The design follows the principles and guidelines of the San Pablo Specific Area Plan and includes a 15 feet high commercial ground floor. The development includes the renovation of an existing 1-story stone-faced building referred to as the floral Shop.PREVAILING WAGE EL CERRITO EL CERRITO DEL NORTE STATION MODERNIZATION PROJECT - BART 05HA-100 11/1/16 1:00 PM 0 SF205206 Paper & Online Div 1-3, 5-11, 13-14, 20-23, 26-28 & 31-34. The base Scope of Work includes expanding the paid area, upgrade the existing paid area, relocate and construct a new Station Agent Booth (bullet-proof), new staff break room/bathroom, relocate bike racks/bike lockers, construct two new elevators, new public bathrooms, upgrading station lighting, new ceiling and flooring inside the expanding and existing paid area, new seating areal new wind screens outside the paid area, improve wayfinding (Inside & Out of the Station) and new public art.Optional station work includes relocating the passenger drop off, new ceiling and flooring outside the paid area, new bus shelters, enhance the Ohlone Greenway/bicycle path/hardscaping and site lighting, and storm drain improvements. Optional work will also include procuring AFE equipment for other stations.Questions: sgunawa@bart.gov Emeryville D2 RE-ROOFING OF TRANSPORTATION BUILDING 10/26/16 1:00 PM 0 Paper & Online Replacement of the roofing, skylights and expansion joints between the Transportation Building and the adjacent parking garage at the Emeryville Division.Project Contact: Erica ElkingtonEmail: eelkington@actransit.orgPlans and specs also available for review at Santa Clara Builders Exchange Emeryville D2 STORM DRAIN RESTORATION & STORM WATER MITIGATION 11/10/16 1:00 PM 0 Paper & Online Services to include, but not be limited to, the replacement of all broken and substandard concrete along the storm drains, the recommission of all sumps and collectors, and refurbishment of the southwest corner of the storm water treatment facility.Project Contact: Erica ElkingtonEmail: eelkington@actransit.orgPlans and specs also available for review at Santa Clara Builders Exchange Fort Hunter Liggett TASS TRAINING CENTER 11/23/16 12:00 PM 1 Online Subcontractor agrees to furnish in strict accordance with the Contract Documents all labor, materials, equipment, installation, cartage, hoisting, supplies, insurance, equipment, tools & other facilities of every kind & description required for or incidental to the prompt & efficient execution of the following work including the below listed specifications, drawing & details:09 30 00 CERAMIC TILE09 65 00 RESILIENT FLOORING09 68 00 CARPETWork to include but not limited to submittals, Shop Drawings, Installation Drawings, Certifications, adhesives & relating preparation work, Local/Regional Materials; (LEED) Environmental Data, Warranty & inspections, provide & install all material including components required for the Wall & floor Ceramic tile, resilient flooring & Carpet. Confirm through an e-mail if interested to submit a bid to: quotes@barainfo.com Fremont TOGO'S 10/5/16 4:30 PM 0 Paper & Online Interior tenant improvements for a TOGO's sandwich shop. Scope of work includes; new non-load bearing interior walls, interior finishes, electrical. mechanical, and plumbing systems, and installation of equipment and furnishings. No changes proposed to the existing building shell or site.Plans also available for review at Santa Clara Builders Exchange Fremont INFORMATION TECHNOLOGY INFRASTRUCTURE UPGRADES (P2.2) GRIMMER ES, WEIBEL ES & IRVINGTON HS - FUSD (ONLINE) Fremont SITE SECURITY ATHLETIC FIELDS OHLONE COMMUNITY COLLEGE #6134 10/14/16 1:00 PM 1 Online 10/18/16 2:00 PM 4 Paper & Online Information technology infrastructure at (3) schools.Plans available ONLINE ONLY Procure and installation of emergency communications, access control systems, security cameras, intrusion detection, software for the security system and concrete foundations.Project Contact: Elaine Trujillo 510-979-7567Email: etrujillo@ohlone.eduPlans and specs also available for review at Santa Clara Builders Exchange Fremont FREMONT GEOTHERMAL GROUND LOOP OHLONE COLLEGE 10/18/16 2:00 PM 0 Paper & Online Provide vertical closed-loop Ground Loop system for connection to the Central Utilities Plant (CUP) for the Academic Core Buildings (ACB). Drill two hundred seventy-nine (279) 1 inch high density polyethylene vertical loops to a depth of 400 feet at 25-foot centers as required. The pilot hole drilled prior to construction shall be connected into the Ground Loop system at parking lot D for a total of two hundred eighty (280) vertical loops in Phase 1. Phase 1 constructs Ground Loops in parking lots A, D, E, K and bus Key B. Phase 2 is not included in this contract and onlyshown for reference.Project Contact: Elaine Trujillo 510-579-7567Email: etrujillo@ohlone.eduPlans and specs also available for review at Santa Clara Builders Exchange Fremont CDE-1,000KVA CP TRANSFORMER REPLACEMENT CA DEPARTMENT OF EDUCATION - 10/20/16 DGS 2:00 PM 0 Paper & Online Demolition, removal, of existing central Plant Transformer. Replacement of the existing 1,000KVA, 12KV-480/277 volt transformer within the Unit Substation No. 1 line up. New 1,000KVA transformer on concrete pad.Project Contact: Stuart Carter 916-375-4292Plans and specs also available for review at Santa Clara Builders Exchange FRENCH CAMP HOSPITAL PHASE 2 ACUTE CARE PATIENT WING EXPANSION PROJECT 11/23/16 2:00 PM 0 SF58-59 MANDATORY Pre-Bid Conference for all bidders is tentatively scheduled for 2 PM PST on October 5, 2016, at 500 West Hospital Road French Camp, Conference Room 1, Stockton CA. 95231. Bids will not be accepted from any Prime/General Contractor not attending the Pre-Bid Conference. for furnishing all labor, material, tax, transportation, equipment, and services necessary for the construction and completion of San Joaquin General Hospital Phase 2 Acute Care Patient Wing Expansion Project in accordance with the specifications and working details and other contract documents now on file with the County of San Joaquin Purchasing and Support Services. Page 4 of 23 Location Plan Name Bid Date Gilroy HAMPTON INN (ONLINE) 10/27/16 Bid Time # Of Addenda Plan # 1:00 PM SF30-31 Online 0 Plans Scope of work to include, but not limited to, the following: erosion control, site demo, grading, paving, site utilities, site concrete, concrete pavers, lanscaping/irrigation, metal fencing, CMU, GFRC columns, building concrete, gyp-crete, structural & misc steel, rough carpentry, finish carpentry, casework, insulation, caulking, single ply roof, sheet metal, metal trellis, doors/frames/hardware, windows/storefronts, curtain wall, auto doors, stucco, drywall/metal studs, FRP, tile, paint, flooring, t-bar, restroom partitions / accessories, folding partition, laundry chutes, elevators, plumbing, fire sprinklers, HVAC, electrical, fire alarm.Plans available ONLNIE ONLY Hayward OLYMPIC STATION - 23 SINGLE FAMILY DETACHED HOMES (ONLINE) 10/7/16 5:00 PM 0 Online Ground up construction of 23 single family detached homes. Complete on and off site improvements, underground wet and dry utilities. Estimated start of construction is January 2017. Plans available ONLINE ONLY Hayward PHYSICS LAB RENOVATION - CSU EAST BAY 10/10/16 2:00 PM 0 SF104 Paper & Online Remodeling of the Science Building, including renovation of the Physics Department.Plans and specs also available for review at Santa Clara Builders Exchange Hayward PEDESTRIAN HYBRID BEACON & TRAFFIC SIGNAL IMPROVEMENTS 10/11/16 2:00 PM 0 Paper & Online The work consist of installing a pedestrian hybrid beacon system (HAWK) along with new curb ramps, new crosswalk and median modification at the intersection of Mission Boulevard and Blanche Street. The work also consists of installing a new traffic signal along with a new curb ramp and truncated domes at the intersection of Gading Road and Huntwood Way. A traffic signal system, new curb ramps and crosswalks will be installed including emergency vehicle preemption, video detection, pedestrian push buttons.Contact: Alex Tat 510-583-4769Plans & specs also available at Santa Clara Builder Exchange Hayward CHEMISTRY LAB RENOVATION - CSU EAST BAY 10/24/16 2:00 PM 0 SF164 Paper & Online Provide the complete remodeling of the Science Building, including renovation of the Chemistry Department.Project Contact: Chris-Lam-Vazquez 510-885-7606Email: chris.lamvazquez@csueastbay.eduPlans and specs also available for review at Santa Clara Builders Exchange HERCULES COMMUNITY CENTER POOLS REPLASTERING PROJECT (ONLINE) 10/18/16 2:00 PM 0 SFONLI Online NE The Project is located at the Hercules Community Center at 2001 Refugio Valley Road, and is described as follows: replastering the 30,000 gallon wading pool and 300,000 main lap pool including emptying and refilling the pools, obtaining the necessary permits from the County Health Department and Pinole-Hercules Wastewater Treatment Plant, and all other associated work necessary to complete the project.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Hillsborough TOURNAMENT TANKS RECOATING/RETROFIT 10/19/16 2:00 PM 0 Paper & Online This Project includes the recoating of two 600,000 gallon water tanks in addition to structural repairs and appurtenance upgrades. Work includes the removal and disposal of the existing interior and exterior coatings followed by surface preparation and applying the specified coatings. Exterior and interior surfaces to be coated include the roof support structure, roof plates, roof hatch/openings, domes, shell, floor, columns, flush drains, attachments, accessories and attachments such as shell manholes, ladders, railings, overflows, and all other ferrous and non-ferrous metal surfaces inside and outside the tank. Work also includes the replacement of the existing ladders (both interior and exterior), roof hatches, level indicator assemblies; the installation of new sampling stations, tool pulley systems, roof guardrails; electrical relocation; plating of an existing abandoned 24" manhole, enlargements of 24" manholes to 30"; rafter realignments, rafter repairs and/or replacements, center vent collar replacement, and miscellaneous tank mechanical repairs. Work shall be completed within 130 Working Days from the date when Contract Time commences to run.Plans and specs also available for review at Santa Clara Builders Exchange King City KING CITY DIVE POOL FIBERGLASS RESURFACING AND CRACK REPAIR 10/11/16 1:30 PM 0 Paper & Online Remove existing fiberglass coating, repair cracks and provide all material, labor, equipment & services necessary to furnish and install Advanced-Glass pool interior fiberglassing (or lining), underwater tile as opted, accessories and other related items necessary to complete the work as indicated by the contract documents or otherwise required for a complete installation. PREVAILING WAGE King City RAPPEL TOWER 10/13/16 2:00 PM 0 Paper & Online Procurement of professional services for the design, and construction upgrade of a Rappel Tower. The current facility has reached life cycle end and is in critical need of upgrading to meet current training standards. This project will be a design/build project for modernization of the Rappel Tower located at Fort Hunter Liggett. The Rappel Tower is closed for training due to safety deficiencies therefore leaving a training shortfall. King City FIRST STREET / LONOAK ROAD SHOULDER SAFETY IMPROVEMENT PROJECT 10/11/16 2:00 PM 2 Paper & Online Class A, or C12 & C32. AC grinding, regrading & installation of new road section to allow for shoulder improvements on First Street & Lonoak Rd including necessary improvements to conform to existing grades. PREVAILING WAGE Page 5 of 23 Location Plan Name Bid Date LATHROP CONSOLIDATED TREATMENT FACILITY PHASE II EXPANSION 10/25/16 Bid Time # Of Addenda Plan # 2:00 PM SF171172 1 Plans Mandatory Pre-bid Meeting: A mandatory pre-bid meeting is scheduled for Tuesday, October 4, 2016 at 10AM at City of Lathrop Council Chambers in City Hall. All contractors interested in submitting a sealed bid for this project must attend the mandatory pre-bid meeting.The scope of work to be performed under this contract is generally described as, but not necessarily be limited to: furnishing labor, materials services and equipment required as necessary for Consolidated Treatment Facility Phase II Expansion Project, CIP WW 1414. In accordance with the plans and specifications and other bid documents, the work generally consists of the construction of an expansion to the existing Lathrop Consolidated Treatment Facility and the conversion of the existing plant to an aerobic digester. Livermore DEMOLITION & HAZMAT ABATEMENT AT 636 TERMINAL CIRCLE 10/5/16 2:30 PM 1 SF900 Paper & Online Demolition of the Building at 636 Terminal Circle (old Airport Terminal Building). The work is also comprised of asbestos/lead/PCB hazardous material removal and disposal, and the demolition and disposal of the building, including but not limited to removal and off-site disposal of building and their contents, foundations, utility disconnections and removal of existing piping and backfilling pad to existing grade.Project Contact: Tom Purcell 925-960-4511Email: thpurcell@cityoflivermore.net Plans and specs also available for review at Santa Clara Builders Exchange LOCKEFORD SOUTH SYSTEM PUMP STATION REPLACEMENT 10/11/16 2:00 PM 1 SF114 A MANDATORY PRE-BID MEETING will be held at August 16, 2016 at 10:00 am PST, at the project site located at the termination of Tretheway Road on the south side of the Mokelumne River. The pre-bid meeting will be held only to familiarize Bidders with site conditions and to clarify any questions or concerns posed by Bidders regarding the site or these bid documents. Verbal statements made at the pre-bid meeting, or at any time before the closing bids, will not be binding unless the statements are addressed in these bid documents or in any written addenda to this bid.The work is to provide all labor, materials, coordination and management necessary for demolition of the existing South Pump Station and/or to construct and commission the South System Pump Station Replacement Project detailed in the bid set of plans, specifications, addendums and/or other documents made available during the bidding process.Work may include providing temporary pumping and associated facilities to deliver irrigation water to the District’s distribution system during pump station construction. The work is located in San Joaquin County, CA, approximately 5.5 miles northeast of Lodi, CA, in Section 35, Township 4N, Range 7E, Mount Diablo Base and Meridian. Project is adjacent to the Mokelumne River and is accessed via Highway 99 to Highway 12, then east approximately 4.5 miles to Tretheway Road, then north approximately 1 mile to the access road (a private road) running west to the pump station site. Loma Mar RFP MEMORIAL PARK WASTEWATER TREATMENT & INFRASTRUCTURE REPLACEMENT PROJECT 10/21/16 4:00 PM 0 Paper & Online Seeks a qualified Consultant to design a wastewater treatment and infrastructure replacement for Memorial Park (Project) in the Loma Mar Area. The Consultant will work with the County to replace the aging Wastewater Treatment Plant (WWTP) and wastewater infrastructure.Project Contact: Matthew L. Ruble 650-599-1411Email: mruble@smcgov.orgRFP also available for review at Santa Clara Builders Exchange Los Altos RFP FOR PLANNING CONSULTANT SERVICES FOR DEVELOPMENT OF PUBLIC ARTS MASTER PLAN 10/28/16 4:00 PM 0 Paper & Online Provide professional services for the “Los Altos Public Arts Master Plan” project.Project Contact: Jon Maginot 650-947-2609Email: jmaginot@losaltosca.govRFP also available for review at Santa Clara Builders Exchange Los Altos Hills NEW DISTRICT OFFICES FOOTHILL-DE ANZA COMMUNITY COLLEGE DISTRICT (ONLINE) 10/5/16 2:00 PM 3 SF126127 Online Construction of a new building to house the administrative functions of the Foothill De Anza Community College District, comprised of a two-story office block connected to a singlestory lobby and board room. The 23,700 square foot building consists of a steel framed structure supported by drilled piers and enclosed with light gage metal framing and curtain wall systems. Site improvements include extension of utilities, modifications to the parking lot on the site, and new landscaping.Plans available ONLINE ONLY Los Altos HIlls RFP FOR TREE PRUNING & REMOVAL PROGRAM (AREA 1 & 2) LOS ALTOS HILLS COUNTY FIRE DISTRICT Los Gatos LOS GATOS HIGH SCHOOL LOWER FIELDS RESTROOM PROJECT - LOS GATOSSARATOGA JOINT UNION HS DISTRICT 10/4/16 2:00 PM 1 Paper & Online Removal or pruning of designated medium to large treeswithin District.RFP also available for review at Santa Clara Builders Exchange 10/4/16 1:00 PM 0 Paper & Online Note: Addendum will be issued that includes rest of project manual with bid forms, bonds & division 0 and 1Construction of a restroom building at the Lower Field are at Los Gatos High School.Project Contact: Philip English, Kramer Development 408-628-8736Email: Philip@kramerpdc.comPlans and specs also available for review at Santa Clara Builders Exchange Los Gatos E. MAIN STREET GREEN BIKE LANES PROJECT (COLORED GLASS AGGREGATE) 10/6/16 11:00 PM 0 Paper & Online Installation of new Green Bike Lanes and thermoplastic striping and pavement markings on East Main Street.Project Contact: Mike Vroman Email: mvroman@losgatosca.govPlans and specs also available for review at Santa Clara Builders Exchange Los Gatos VEGETATION MANAGEMENT FOR ACCESS AT BEAR CREEK REDWOODS OSPMIDPENINSULA REGIONAL OPEN SPACE 10/6/16 12:00 PM 0 Paper & Online Mechanical and manual treatment of vegetation for safe access to the following:* Patrol access roads and trails,* ATV access roads and trails,* Hazard Tree Removal.Project Contact: Lupe Hernandez Page 6 of 23 Location Plan Name Bid Date Bid Time # Of Addenda Marina MARINA HEIGHTS 6000 SERIES - VILLOSA 10/10/16 3:00 PM Plan # 0 Plans Paper & Online Wathen Castanos Peterson Homes Inc. is soliciting qualified bids for our newest project in Marina, CA. This new project will be called “Marina Heights 6000 Series” and/or “Villosa” and will be located near Imjin Parkway and Abrams Drive in Marina. This project is the first of two projects we will be doing in the Master Planned development of Sea Haven.The Marina Heights 6000 Series project consists of 105 existing Lots in the Marina Heights Tract 1428 in Marina. This Master Planned Community is called Sea Haven and consists of 1,050 Lots that we intend to build on. There will be 4 plans. They will be the Plan 1, Plan 2, Plan 3, & Plan 4. The first single story, and the last 3 are 2 story. We are projecting models to begin in the middle of July, with production houses beginning in the middle of October. Starting in February the production flow should be 4 to 5 starts per month.Please email your bids to Jeff Cooks no later than the due date of October 10, 2016 at jeffc@wchomes.com and Marta Hamp at martah@wchomes.com.Prevailing Wage Marina SALINAS VALLEY RECLAMATION PROJECT COAG-FLOC TANKS' DRAIN VALVE REPLACEMENT 10/12/16 2:00 PM 1 Paper & Online Replacing three buried gate valves next to the SVRP Coag-Floc Tanks with new gate valves. The work includes, but is not limited to, the following: Excavation, dewatering, shoring, removing and installing new valves, new riser, new valve stem extension, new valve box, backfilling, concrete sidewalk replacement, AC pavement restoration, minor piping work, etc.Project consists of: Site Work; Concrete and Grout; and Mechanical.PREVAILING WAGE Marina MRWPCA SVRP 57-INCH FILTER EFFLUENT PIPE REHABILITATION 10/27/16 2:00 PM 0 Paper & Online Rehabbing the 57-inch Filter Effluent Pipe and includes but not limited to the following: removing the CML down to the steel pipe, surface prepping the steel pipe, and coating it with a corrosion-resistant coating system.PREVAILING WAGE MARTINEZ HEADWORKS SCREENING UPGRADE 10/13/16 2:00 PM 1 SF194 Paper & Online Div 1-10, 21-23, 26, 28, 31-33, 40-41, 43 & 46. The Work generally consists of improvements to the Headworks facility including mechanical bar screens, screenings handling equipment, a screenings handling building, and other site improvements. Menlo Park MENLO PARK FIRE PROTECTION DISTRICT STATION 6 DEMOLITION AND REBUILD 10/6/16 11:00 AM 0 SF180 Paper & Online Demolition of an (E) fire station, residential home, and other improvements, site preparation, construct a new 2-story fire station & 1-story engine display bldg., site work, relocate carriage house, utility connections, & landscaping.TRADES NEEDED (but not limited to): Trench & Backfill; Demolition; Earthwork; Storm Drainage; Water Systems; Sanitary Sewers; AC Pavement; Unit Pavers; Pavement Markings; Landscape & Irrigation; Fences & Gates; Concrete Formwork; Concrete Reinforcement; CIP Concrete; Concrete Floor Finishing & Polishing; Pre Cast Concrete/Steps/Landings; Brick Veneer Masonry; Structural Steel; Sure-Board Shear Panels; Steel Decking; C.F. Metal Framing; Misc. Metals; Carpentry; Arch. Woodwork; Misc. Insulation; Polystyrene Arch. Trim & Finish Syst.; Concrete Slab Vapor Emissions Treatment; Firestopping; Membrane Roofing; Roof Underlayment High Temp.; Standing Seam SM Roofing; Sheet Metal Work; Fireproofing; Joint Sealers; Misc. Doors, Frames & Hardware; Sectional Glass & Overhead Doors; Entrances & Storefronts; Misc. Alum. Windows; Window Operators; Glass & Glazing; Metal Wall Louvers; Lath & Plaster; Gypsum Drywall & Metal Studs; Tile Work; Acoustical Treatment; ADA Tactile Warning Surfaces; Resilient Base; Interlocking Rubber Flooring; Carpet Tile; FRP Panels; Painting; Misc. Bldg. Specialties; Visual Display Boards; Toilet Accessories & Compartments; Signage; Wire Mesh Lockers; Fire Fighter Slide Pole; Flagpole; Residential Appliances; Window Treatment; Electric Traction Elevators; Fire Protection; Plumbing; HVAC; and Electrical.PREVAILING WAGE Menlo Park SANTA CRUZ AVENUE SIDEWALK PROJECT 10/12/16 2:00 PM 0 Paper & Online Installing new sidewalks on both sides of Santa Cruz Avenue from Johnson Street to Olive Avenue and constructing a storm drainage system along the northwesterly side of Santa Cruz Avenue.Plans and specs also available for review at Santa Clara Builders Exchange Milpitas BAY ROCK STORAGE REBID (ONLINE) 10/13/16 2:00 PM 0 Online CONSTRUCTION OF A 171,924 SQ. FT. OF MINI-STORAGE. PROJECT CONSISTS OF (3) SINGLE STORY BUILDINGS AND (1) THREE STORY BUILDING INCLUDING ASSOCIATED SITE WORK.Plans available ONLINE ONLY Modesto INDUSTRIAL TANK NO. 13 AND PUMP STATION 11/8/16 11:00 AM 0 SF159 A site inspection will be held for potential bidders on Tuesday, October 18, 2016 from 1:30 p.m. to 3:00 p.m., at the job-site, entrance is located on the west side of Codoni Avenue approximately 2,200 feet south of Yosemite Boulevard.This project includes the construction of a 12 million gallon per day (mgd) water booster pumping station, a four (4) million gallon pre-stressed concrete water storage reservoir, a building for the pump station, generator, and controls, a one (1) million gallon retention basin, and all site piping and improvements as shown on the Construction Documents. Monterey RFQS FOR DB SUBS FOR THE MECHICANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SYSTEMS FOR CSUMB 10/4/16 2:00 PM 0 Paper & Online Otto Construction invites your firm to submit a Subcontractor Prequalification Form for the ACADEMIC III project at CALIFORNIA STATE UNIVERSITY, MONTEREY BAY. It is Otto Construction’s intent to select Design Build MECHANICAL, ELECTRICAL, PLUMBING (MEP) subcontractors for this project. Only those who have successfully achieved prequalification status will be invited to respond to a Design/Build RFP.The Academic III is the new home of the College of the Arts, Humanities and Social Sciences. This two story building is approximately 48,000 sf. The first level will contain primarily lecture rooms, rest rooms, lobby and a gallery. The second level will house all of the offices and corresponding rest rooms. This building will also house an amphitheater and exterior service yard. This is a public works project and is therefore subject to prevailing rate wages. Page 7 of 23 Location Plan Name Bid Date Monterey MONTEREY FIRE ENGINE BAY EXHAUST TREATMENT SYSTEM REPLACEMENT PROJECT RE-BID 10/7/16 Bid Time # Of Addenda Plan # Plans 2:00 PM SF226 Paper & Online 1 Class B, C20 or C43. Replacing the fire engine bay exhaust treatment systems at three locations throughout the City of Monterey: Fire Station No. 1 (600 Pacific Street); Fire Station No. 2 (582 Hawthorne Street); and Fire Station No. 3 (401 Dela Vina Avenue), as detailed in these specifications. PREVAILING WAGE Monterey ANNUAL MAINTENANCE - SVRP CHLORINATION SYSTEM 10/11/16 3:00 PM 0 Paper & Online Inspect, disassemble and replace various chlorination parts. Test gauges and emergency cleanup. Provide annual maintenance. PREVAILING WAGE Monterey 10/13/16 PROFESSIONAL ASSESSMENT, ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION SUPPORT SERVICES FOR PROGRAMMATIC REPAIRS TO MUNICIPAL WHARVES 4:00 PM 1 Online The City of Monterey (City) is seeking comprehensive proposals for professional services from qualified firms to perform all necessary assessment, engineering, environmental, and construction support services for the implementation of a municipal wharf rehabilitation program. The scope of work shall include, in general, the range of services required to perform a programmatic assessment of the condition of the City’s two municipal wharf structures (both above and below water line), recommended rehabilitation project, environmental and permitting of the recommended repair project and appropriate construction support. As currently envisioned, the selected team would create a program template that would be used for continued care and maintenance of the wharf structures from the deck to the sea floor. Monterey County PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 1 CLIMBING LANE PROJECT 10/21/16 3:00 PM 1 Paper & Online The County of Monterey is soliciting proposals from qualified firms to provide Construction Management Services for the State Route 1 Climbing Lane project, located in Monterey Co. Morgan Hill LIVE OAK HIGH SCHOOL BUILDING 600 ROOF REPLACEMENT - MHUSD Morgan Hill RFP ELEVATOR EQUIPMENT MAINTENANCE & REPAIR SERVICES 10/4/16 11:00 AM 0 Paper & Online 11:00 AM 1 Paper & Online Removal and replacement of roofing.Plans and specs also available for review at Santa Clara Builders Exchange 10/5/16 Provide elevator equipment maintenance and repair services for the Downtown Parking Garage. Project Contact: Dale Dapp, City Maintenance Manager, (408) 310-4176 RFP also available for review at Santa Clara Builders Exchange Morgan Hill MORGAN HILL FAMILY SCATTERED SITES APARTMENTS (ONLINE) 10/5/16 5:00 PM 2 Online This new family project consists of a 41-unit apartment project on three sites: Site A, Site B, Site C. SITE A - Bella Allori.58 acre site 14 family apartments - two story walk-up style for the three story bldg. One building: 3 story apartment bldg., 1,300 sq. ft. commercial space, with site improvements and some 12 carports. 17,290 sq. ft. building, on a 5" slab with grade beam foundation, stucco exterior, fiberglass composition roof, vinyl windows.SITE B - Belle Noci.3 acre site 8 family apartments - two story walk-up style over a parking garage. One building: one 2 story apartment bldg. and one 1 story community bldg. 7,960 sq. ft. apartments over a 5,479 sq. ft. post tension garage foundation, stucco and hardi siding exteriors, single ply flat roof, vinyl windows, ADA lift.SITE C - Belle Salici1 acre site 19 family apartments - two story walk-up style. Two buildings: one 2 story apartment bldg. with 19 apartments, and one 1 story community bldg., with site improvements, some carports. 20,940 sq. ft. in two buildings, on a 5" slab with grade beam foundation, stucco exterior, fiberglass composition roof, vinyl windows.Federal Davis-Bacon wage rates will apply and weekly certified payroll submissions through the online Elation Systems will be required.Questions: To L&D Construction by email at: mhfamily@landd.comPlans available ONLINE ONLY Morgan Hill CENTENNIAL RECREATION CENTER LOCKER ROOM TILE FLOOR PROJECT 10/13/16 11:00 AM 1 Paper & Online Procure and install approximately 3,014 square feet of new porcelain tile flooring and 860 linear feet of cove tile, right and left open corners and all the grout, mortar, sealer product, and primer product needed for designated areas of the Centennial Recreational Center.Project Contact: Cynthia Iwanaga Email: Cynthia.iwanaga@morganhill.ca.gov Specs also available for review at Santa Clara Builders Exchange Morro Bay 2017 PAVEMENT MANAGEMENT PROJECT 10/11/16 2:00 PM 2 Online The work shall consist of furnishing and supplying labor, materials, tools, equipment, transportation, and services necessary to complete the subject project, which includes, but is not limited to, treatment of existing pavement with rejuvenating agents, restorative, slurry and or scrub sealing, chip /cape sealing, and micro/macro-surfacing at various locations in Morro Bay. Mountain View MOUNTAIN VIEW COMMUNITY CENTER REMODEL - RESPONSIBILITY STATEMENT QUESTIONNAIRE 10/6/16 2:00 PM 0 Paper & Online This Project includes the selective demolition, remodeling, and expansion of an existing community center facility located in a City park. The Community Center will be renovated and expanded to improve the accessibility, sustainability and functionality of the building. Approximately 7,000 sq. ft. will be added to the existing 21,600 sq. ft. building to increase the auditorium seating capacity to 250, add multipurpose rooms, and create a more prominent entrance. Other specific improvements include, but are not limited to, installation of an elevator; all new mechanical, plumbing, and electrical systems; new finishes; site utilities; new parking, landscaping, and irrigation. This Project is designed and will be constructed to achieve Leadership in Energy and Environmental Design (or “LEED”) Silver Certification.Project Contact: David PrintyEmail: david.printy@mountainview.govPlans and specs also available for review at Santa Clara Builders Exchange Page 8 of 23 Location Plan Name Bid Date Mountain View PERMANENTE CREEK FLOOD PROTECTION PROJECT-MCKELVEY PARK DETENTION BASIN - SCVWD (ONLINE) 10/26/16 Bid Time # Of Addenda Plan # Plans 2:00 PM 38-39 Online 3 Installation of temporary pedestrian and vehicular detours; Installation, maintenance and removal of storm water pollution prevention BMPs. Clearing and grubbing of the project limits, including removal of existing trees; Removal and legal disposal of the existing improvements at the project site including underground utilities, buildings and bleachers; Removal and replacement of Park Drive and Miramonte Avenue AC pavement and PCC medians; Removal and replacement of sidewalk, curb and gutter along Mountain View Avenue, Park Drive and Miramonte Avenue; Removal, installation and abandonment of utilities within Park Drive and Miramonte Avenue; Excavation of approximately 110,000 cubic yards of material to construct a dual-use detention basin and ball fields at McKelvey Park; Installation of retaining walls of types including concrete, soldier pile, and sheet pile; Installation of pre-engineered pedestrian bridge; Installation of underground utilities on McKelvey Park site including water, storm drainage and sanitary sewer; Installation of ball fields and\ appurtenant structures including bleachers, concessions and meeting room buildings, scorekeepers booth, storage, restrooms and fencing; Installation of pump station including equipping, mechanical and data communications; Installation of street and ball field lighting; Installation of mini-park; Installation of landscaping and irrigation; Installation of various concrete driveways, walkways, median, valley gutter, and curbs and curb and gutters; Installation of approximately 3,300 linear feet of various types of fencing and access gates.Project Lotina Nishijima 408-630-2795 Email: lnishijima@valleywater.org or atPlans available ONLINE ONLY Nipomo BLACKLAKE WRF HEADWORKS REHABILITATION 10/12/16 2:00 PM 0 Online The work involves concrete repair and re-coating of the headworks as well as electrical conduit replacement and installation of slide gates and safety appurtenances (railings and gates) at the Blacklake Water Reclamation Facility (WRF). The work also involves rehabilitating the influent manhole by re-coating it and replacing its frame and cover.Divisions: Concrete; Painting and Coating; Chemical-Resistant Coatings for Concrete; Fabricated Stainless Steel Slide Gates.PREVAILING WAGE NOVATO REDWOOD & GRANT TRANSIT IMPROVEMENT PROJECT (ONLINE) 10/6/16 2:00 PM 3 SFONLI Online NE The Project involves renovation of the existing bus facilities within the curb-to-curb width of Redwood Boulevard between De Long Avenue/Diablo Avenue and Grant Avenue in the City of Novato, CA. The primary purposes for this project are to enhance pedestrian and bicycle safety and provide operational improvements for buses and vehicles.Under the proposed Project, one center platform area would be provided in the median with common shelters for passengers traveling in both directions. This center median would replace the existing passenger platforms currently in the median as well as the bus pull out areas along adjacent portions of Redwood Boulevard. The Project would include new landscaping in the center median, emphasizing drought tolerant plants and shrubs.Construction of the consolidated facilities would involve removal of existing facilities, minor site preparation activities, construction of the new center platform, paving and finishing the new center bus-only lanes, and installation of new shelter, shelter amenities, crosswalk enhancements, including two new pedestrian traffic signals and signage. Removal of 16 trees is required to accommodate the redesigned alignment of the transit facility. No existing redwood trees are to be removed or disturbed. Construction of all of the proposed improvements is anticipated to take about 6 months. Construction will be staged such that bus operations will not be substantially interrupted during the construction period.Questions: ataylor@marintransit.org, or by calling (415) 226-0870.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY NOVATO RECYCLED WATER CENTRAL SERVICE AREA - NORMAN TANK REHABILITATION 11/15/16 3:00 PM 0 SF232 Paper & Online Div 1-3, 5, 9, 13 & 15-16. In general, the Work consists of, but is not limited to, surface preparation and complete recoating of interior and exterior surfaces and associated rehabilitation work on the District’s 50’ diameter, 35’ tall, 500,000 gallon capacity welded steel recycled water storage tank in Novato, California. Associated rehabilitation work includes, but is not limited to, installation of a spiral stair and stairway security enclosure, inside ladder and platform, shell manway, roof hatch, sample tap, inlet/outlet pipe modifications, screen replacement, cathodic protection system, other project components and appurtenances and tank foundation and rock anchors installation. The project also includes modification of existing yard piping and related appurtenances at a second tank site (Plum Street Tank). Questions: Carmela Chandrasekera at (415) 761-8903, or by email at: cchandra@nmwd.com Oakland BRT CONSTRUCTION MANAGEMENT OFFICE REMODEL Oakland LINEAGE-DREISBACH COOL PORT OF OAKLAND INTERMODAL FACILITY (ONLINE) 10/7/16 10:00 AM 3 Paper & Online Remodel existing District owned office and warehouse spaces,Plans and specs also available for review at Santa Clara Builders Exchange 10/12/16 5:00 PM 3 Online Cool Port Oakland is a 276,369 SF intermodal facility consisting of offices (3 stories), cross docks (90 truck docks & 18 rail docks), & support areas on a 22.36 acre site. The project is prevailing wage and is out for proposals for the following division work scopes: 3, 5, 7, 8-14, 26, 28, 31, 32, & 33. Scope work is on the plans and there are no specifications for the project. Project plans consist of the following drawings to aide bidders: Architectural, Civil, Structural, Refrigeration, Plumbing, HVAC, Electrical, and Pre-engineered Metal Building Plans for Cross Dock. An alternate proposal to change the office cladding from insulated metal panels to stucco is also being requested.Project Contact: Greg JonesEmail: bgi@fishergi.comPlans available ONLINE ONLY Oakland REHABILITATION OF SANITARY SEWERS IN VARIOUS LOCATIONS- C329136 10/13/16 2:00 PM 0 Paper & Online Rehabilitating approximately 3,252 linear feet of existing 6”/8” sewer pipes; rehabilitating sewer structures; reconnecting house connection sewers; rehabilitating house connections sewers.Project Contact: Gunawan Santoso 510-238-7260Plans and specs also available for review at Santa Clara Builders Exchange Oakland ON-CALL SANITARY SEWERS EMERGENCY PROJECTS FY 2016-17 C455640 10/13/16 2:00 PM 0 Paper & Online Rehabilitating sanitary sewers and appurtenant structures in the City streets or backyard/side-yard easements.Project Contact: Gunawan Santoso 510-238-7260Email: gsantoso@oaklandnet.comSpecs also available for review at Santa Clara Builders Exchange Page 9 of 23 Location Plan Name Bid Date Bid Time # Of Addenda Oakland RFQ ON-CALL SEWER MAINTENANCE TECHNICAL TRAINING SERVICES 10/19/16 8:00 PM Plan # 1 Plans Paper & Online Establish multiple on-call contracts to provide professional training services to Oakland sewer field staff.Project Contact: Will Crowder 510-615-5513Email: wcrowder@oaklandnet.comRFQ also available for review at Santa Clara Builders Exchange Oakland ELIHU HARRIS STATE BUILDING-DIR-OAKLAND 9TH FLOOR REASONABLE ACCOMODATION 11/3/16 2:00 PM 0 SF246 Paper & Online Installation of two (2) low-energy door operators on the ninth floor of the Elihu Harris State Building.Project Contact: Pamela Mendoza 916-376-1731Email: Pamela.mendoza@dgs.ca.govPlans and specs also available for review at Santa Clara Builders Exchange OAKLAND 4700 TELEGRAPH AVENUE MIXED-USE BUILDING 10/11/16 5:00 PM 1 SF41-42 Paper & Online 4700 Telegraph Ave. is a 48-unit mixed-use multi-family residential and retail building located in the Temescal District of Oakland, CA. The Project consists of forty-eight (48) CONDO residential dwelling units, a ~ 4,654 SF retail space, landscaped courtyard, elevator, and a subterranean residential parking structure with multi-level car stacking system. The project employs modular construction for the offsite fabrication of the 48 EA residential units and their associated interior components/finishes and roof coverings.Please refer to the specific bid packages for further information regarding the modular construction components of this project. In general, with the exception of off site fabricated modular units, all other components (including site utilities, landscape & irrigation, site concrete, garage, retail TI space, interior corridors, stair towers & stairs, elevator shaft & elevator, trash chute enclosures are traditional site-built construction methods. Questions: Andrew Kent, Nautilus Group, at (510) 343-5593 or by email at: akent@nautilusgrp.comPLEASE NOTE: We are aware that the drawings are missing from the Factory-Built Plans Folder. The Project Manager has been notified. OAKLAND INFLUENT PUMP STATION ODOR CONTROL SYSTEM UPGRADE PHASE 1 AND AERATED GRIT PIPING REPLACEMENT - EBMUD 10/12/16 1:30 PM 2 SF208 Paper & Online Div 1-3, 5-7, 9-10, 22-23, 26, 31-33, 40 & 43-44. Work includes, but is not limited to, installation of a pile supported foundation and duct supports; two (2) biotrickling filters; two (2) carbon adsorber scrubbers; two (2) FRP exhaust fans; two (2) irrigation pumps; associated FRP ducting; dampers; appurtenances; irrigation and feed water piping; demolition of existing carbon scrubber, fans and FRP and SST ducting; excavation for new foundation; relocation of site catch basin and drain line; demolition and replacement of aerated grit piping; paving; and related civil, mechanical, electrical and instrumentation work.Questions, Daniel Eng, District’s Construction Manager, at 510-287-1709. OAKLAND MAIN WASTEWATER TREATMENT PLANT CULVERT STABILIZATION AND UTILITY PIPING - EBMUD 10/19/16 1:30 PM 0 SF255 Paper & Online Div 1-3, 5-6, 22, 31, 33 & 40. Work includes: The stabilization of an approximately 200-foot long, 36-inch diameter corrugated metal pipe culvert that runs between a manhole on the Main Wastewater Treatment Plant (MWWTP) site and an offsite manhole. The culvert passes below Union Pacific Railroad tracks adjacent to the eastern edge of the MWWTP and contains a 6-inch diameter potable water distribution pipe and a broken 6-inch sodium hypochlorite solution feed line for prechlorination. The culvert has deteriorated and will be filled with grout to avoid formation of voids below the railroad tracks and impacts to existing utility piping. Prior to filling the culvert, five (5) new high density polyethylene (HDPE) carrier pipes will be inserted/sliplined into the culvert via an insertion trench on the MWWTP site. Pipe penetrations at the offsite manhole and joints between the culvert and two manholes will be sealed.Questions: Martin Musabyimana, Project Manager, at (510) 287-2099 OAKLAND MAIN WASTEWATER TREATMENT PLANT SECONDARY CLARIFIER MECHANICAL REPAIRS PHASE 1 - EBMUD 10/26/16 1:30 PM 0 SF216 Paper & Online Work includes removal and disposal of existing clarifier sludge collector and structural supports, installation of new clarifier sludge collector and structural supports, surface preparation and recoating of various steel components, concrete resurfacing, miscellaneous metal repairs, electrical and mechanical improvements, testing equipment and elevation surveys.Questions: Mark Chien, Construction Mgr, at (510) 287-1393. OAKLEY CORP YARD PUMP BASE REPAIR PROJECT (ONLINE) 10/18/16 2:00 PM 0 SFONLI Online NE The Corp Yard Pump Base Repair Project, located at 3990 Main Street Oakley, CA, consists of the following: Remove two existing 200 HP Worthington pumps; Service and Repair Pumps; Replace seals; Repair concrete bases, Replace fractured pump castings; Disinfection of clearwells; Install new check valves; Painting; Start-up; testing and balancing of reinstalled pumps.Questions: Mike Yeraka, General Manager at, Diablo Water District, at (925) 625 6159.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY ORINDA MORAGA - ORINDA FIRE DISTRICT FIRE STATION 43 10/4/16 2:00 PM 2 SF24 Paper & Online Div 1-12, 14, 21-23, 26-28 & 31-33. The Work of this Contract consists, in general, of the construction of a new Fire Station Building and related site improvements. The scope of improvements include a two story Fire Station structure including apparatus bay and living quarters, site preparation, grading, paving, irrigation, planting, site lighting and utilities.Technical questions shall be directed in writing by email to Steve Stewart, Construction Manager, Stewart Enterprises II at: stewartent@wwdb.org Palo Alto RFP PUBLIC SAFETY BUILDING (CIP PE-15001) & CALIFORNIA AVENUE PARKING GARAGE (PE-18000) 10/11/16 3:00 PM 1 Paper & Online Request for proposal seeks design professional services, environmental consulting services & integrated delivery and services to construct two separate structures - the Public Safety Building and the Parking Structure.Project Contact: Matt RaschkeEmail: matt.raschke@cityofpaloalto.orgPlans and specs also available for review at Santa Clara Builders Exchange Palo Alto AERATION BASINS SLUICE GATES REPLACEMENT PROJECT 10/11/16 3:00 PM 1 Paper & Online Sluice gates replacement; concrete repairs.Project Contact: Tom KapushinskiEmail: tom.kapushinski@cityofpaloalto.orgPlans and specs also available for review at Santa Clara Builders Exchange Page 10 of 23 Location Plan Name Bid Date Bid Time # Of Addenda Palo Alto MITCHELL PARK TENNIS COURT RENOVATIONS 10/11/16 3:00 PM Plan # 0 Plans Paper & Online Asphalt renovation of (7) seven existing tennis courts.Project Contact: Jeanette SernaEmail: Jeanette.serna@cityofpaloalgo.orgPlans and specs also available for review at Santa Clara Builders Exchange Palo Alto RFQ 2209 OLD PAGE MILL ROAD- 18" BFV INSTALLATION- REBID 10/18/16 3:00 PM 0 Paper & Online BFV installationProject Contact: Carolynn Bissett 650-329-2460Email: carolynn.bissett@cityofpaloalto.orgRFQ also available for review at Santa Clara Builders Exchange Paso Robles CONTRACTOR PRE-QUALIFICATION REQUIREMENTS 12/30/16 5:00 PM 0 Online It is mandatory that all General Contractors, Mechanical/Plumbing Subcontractors, and Electrical Subcontractors (Contractors) for projects estimated at $1,000,000 or over must full complete this Questionnaire, provide all materials requested herein, and be approved by the Paso Robles Joint Unified School District in order to bid. Pismo Beach 2016 QUALIFIED BIDDER LIST 12/30/16 12:00 PM 0 Online The City of Pismo Beach is establishing its 2016 Qualified Bidders List for future public works construction projects. Qualified licensed contractors interested in being placed on the City’s 2016 Qualified Bidders List must submit their company’s information on the attached form indicating the type of work they are interested in and currently licensed to perform. Contractor shall include the class of contractor’s license(s) held and the contractor license number(s). Interested contractors will need to submit the attached form to be placed on the 2016 Qualified Bidders List, even if they have been on the previous year’s list.Annual public works construction projects may include, but are not limited to, earthwork and grading, paving, slurry seal, concrete sidewalks and repairs, sidewalk grinding, steam cleaning, striping, storm drain installation and maintenance, park maintenance, street sweeping, pipelines, electrical, painting, general building including plumbing and mechanical, etc. Pleasanton HOPYARD WELL NO. 6 & STONERIDGE WELL NO. 1 SODIUM HYPOCHLORITE REPLACEMENT 10/4/16 2:00 PM 2 SF103 Paper & Online Building modifications, concrete work and application of a chemically resistant coating, electrical and instrumentation, and other civil and mechanical work. Removal of piping and tanks in direct contact with sodium hypochlorite will be removed by Others prior to start of Work.Project Contact: Athena Watson 925-454-5030Email: awatson@zone7water.comPlans and specs also available for review at Santa Clara Builders Exchange Redwood City LIFE MOVES MAPLE STREET SHELTER RENOVATIONS Redwood City REDWOOD SHORES PORTABLE WATER TRANSMISSION SYSTEM SEISMIC IMPROVEMENT PROJECT - REBID 10/6/16 2:30 PM 6 SF188 Paper & Online Expansion and renovationProject Contact: Johnny Chiem 650-599-1349Email: jchiem@smcgov.orgPlans and specs also available for review at Santa Clara Builders Exchange 10/12/16 3:00 PM 0 Paper & Online • Supply 6 Adapter units to attach 12" anodized aluminum Victaulic style grooved hose couplings to 6n Fire Hydrant Flanges.• Supply 1, 100 ft. of 12" lay flat hose in specified lengths equipped with anodized aluminum Victaulic style grooved ends. Include one trailer and deployment reel to store and deploy the hose. Include 20 anodized aluminum 12" Victaulic style grooved Couplings.• Retrofit the 24'' segmented steel pipeline on Skyway Road. • Retrofit the 16" segmented concrete cylinder pipeline on Twin Dolphin Drive. • Retrofit the 16" segmented steel pipeline on Marine Parkway.Project Contact: Javier Sierra 650-780-7364Plans and specs also available for review at Santa Clara Builders Exchange RICHMOND PORT OF RICHMOND POTRERO MARINE TERMINAL PAVEMENT REPAIR F.Y. 2016 (ONLINE) 10/6/16 2:00 PM 0 SFONLI Online NE In general, the Work consists of micro-surfacing and restriping a portion of the F section ofthe Point Potrero Marine Terminal along with repairing a sink hole in the D section. Work is to include, but is not limited to, micro-surfacing; cleaning and grouting bollard bolt pockets; replacing dock bumper U-bolts; storm drain pipe repairs at the sink hole location; surface repairs at the sink hole location; and for all other work, items, or details not mentioned above that are required by the Drawings, Standard Specifications, of these Special Provisions.Questions: Robert Stevens (510) 529-0336, or by email at: rstevens@bkf.comPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY RICHMOND 13TH & DUNN CAPACITY IMPROVEMENT PROJECT (ONLINE) 10/20/16 3:00 PM 0 SFONLI Online NE Div 1-3, 5 & 15. The project scope includes, but is not limited to, the following:1. Potholing existing utilities.2. Removal of existing sewer and installation of sanitary sewer mains by open cut construction methods.3. Removal of pavement, excavation, and legal offsite disposal of all removed and excavated materials.4. Abandon existing sanitary sewer main.5. Reconnection of existing service laterals to new sewer main.6. Extending service laterals from abandoned sewer main to new sewer main.7. Reconnection of new sewer mains to existing manholes.8. Removal of existing manholes and installation of new manholes.9. Rehabilitation of existing manholes.10. Replacement of manhole frame and cover.11. Replacement of manhole cone and grade rings.12. Connect and modify existing manhole.13. Abandon existing manhole.14. Dewatering.15. Sheeting, shoring and bracing.16. Pre and Post Construction Sewer Pipeline CCTV.17. Handling and disposal of contaminated material (if direct by Construction Administrator).18. Restoration and repair of existing surface improvements affected by the Work, and incidentals for complete and usable system.19. Replacement of traffic loops.Questions: Michelle McLey, Project Manager, by email at: michelle.mcley@veolia.com, or by phone at (562) 397-5706.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Page 11 of 23 Location Plan Name RICHMOND AND SAN RICHMOND-SAN RAFAEL BRIDGE ACCESS IMPROVEMENT PROJECT (ONLINE) RAFAEL Bid Date 10/25/16 Bid Time # Of Addenda Plan # 2:00 PM SFONLI Online NE 2 Plans The Bay Area Toll Authority (BATA) in cooperation with the California Department of Transportation (Caltrans) is improving the current multimodal access on Interstate 580 (I-580) within Marin and Contra Costa Counties, including the Richmond-San Rafael (RSR) Bridge. Proposed multimodal access improvements will accommodate bicycle and pedestrian access on the upper bridge deck (westbound), and a third lane on the lower deck (eastbound). Bicycle and pedestrian access on the upper deck of the RSR Bridge would be provided by installing a barrier to separate bicyclists and pedestrians from vehicles.Questions: Chris Lillie, Project Manager, at (415) 778-6737, or by email at:clillie@mtc.ca.govPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY RODEO COMPREHENSIVE WASTEWATER MASTER PLAN NEAR TERM IMPROVEMENTS SEWER YEAR 3A IMPROVEMENTS (ONLINE) 11/7/16 2:00 PM 0 SFONLI Online NE Div 1-3, 5 & 15. The Project consists of installation of approximately 4,707 linear feet of new or replacement sewers ranging from 6 inches to 8 inches in diameter. The sewer work will include pipe bursting rehabilitation of approximately 593 linear feet of 6-inch diameter VCP sewer with 8-inch diameter HDPE SDR-17 pipe; open-cut replacement of approximately 4,084 linear feet of 6 and 8-inch VCP or PVC or HDPE sewer with 8-inch diameter PVC SDR-26 or HDPE SDR-17 sewer; open cut installation of approximately 20 linear feet of 8-inch PVC SDR-26 or HDPE SDR-17 sewer; open cut installation of approximately 60 linear feet of new building sewer extensions; replacement of 15 existing manholes with new manholes; installation of 5 new manholes; rechanneling of 1 existing manhole, replacement and or reconnection of approximately 138 building laterals; traffic control, SWPPP requirements, and miscellaneous surface restoration work.Questions regarding the bid package should be directed in writing as soon as possible, but no later than five working days prior to the opening of bids to: Steven S. Beall, PE, District Manager, at: bealls@rodeosan.org.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY RODEO COMPREHENSIVE WASTEWATER MASTER PLAN NEAR TERM IMPROVEMENTS INFLUENT PUMP STATION IMPROVEMENTS 11/7/16 2:00 PM 0 SF93 Paper & Online Div 1-3, 5, 9, 11, 13 & 15-17. The Project work is generally described as: Installation of an interceptor Manhole, removal and installation of sewage pumping equipment, potable water pump, sump pump, inlet gate, diesel storage tank, and minor ancillary systems, complete replacement of the pump station MCC, control equipment, and PLCs, and temporary sewage bypass. Questions: Should be directed in writing as soon as possible, but no later than five (5) working days prior to the opening of bids, to Steven S. Beall, PE, District Manager, at: bealls@rodeosan.org Sacramento SHASTA HOTEL REPAIRS & ALTERATIONS 10/4/16 2:00 PM 11 SF82 Online Modernization of existing passenger elevator, new elevator installation, interior alterations, light fixture installation , window replacement throughout the building, flooring replacement, cabinet, sink and appliance replacement, replacement of existing single-ply roofing, replacement of existing mechanical equipment and associated piping, replacement of existing plumbing equipment and associated piping, fire sprinkler system upgrade, and fire alarm system upgrade.PREVAILING WAGE Sacramento S135 (ATKINS DRIVE) PUMP STATION REPAIR PROJECT - REBID 10/6/16 2:00 PM 0 SF115 Online The Work to be performed under this Contract includes the furnishing of all labor, materials, tools and equipment for the S135 (Atkins Drive) Pump Station Repair Project. The Work generally consists of the following:PUMP STATION REPAIR WORK- Demolition and re-construction of concrete fuel containment area pad, housekeeping pad, odor control pad, and concrete pads surrounding wet wells.- Install temporary bypass pumping including flow isolation of 42” influent sewer and construction of temporary 12” discharge connection for bypass pump discharge.- Removal of 6” ventilation piping, 8” pump discharge piping and associated appurtenances, 4” drain piping and valve vault from Wet Well 1.- Removal of 20” forcemain pipeline.- Removal of 6” ventilation piping from Wet Well 2.- Removal and replacement of three 30” by 36” fabricated slide gates that isolate the Wet Wells 1 and 2.Removal and re-alignment of entrance gate at S135 Pump Station.- Removal and re-installation of potable water piping.- Remove and install four new non-clog submersible lift pumps including new nonsparking guide rails, new VFDs with active harmonic filter and circuit breakers, electrical and signal conduits and cables. Install new pressure and level instrumentation and junction boxes.- Install new 12” and 16” discharge piping from pumps in Wet Well 1 with new valve vault and bypass vault including valves and appurtenances, piping supports, access hatches, drains and ladders.- Install new 8” and 12” discharge piping from Wet Well 2 to Valve Vault 3.- Complete modifications to Valve Vault 3 including connection of 12” and 16” discharge piping, installation of new 16” gate valve, installation of one new CARV, and re-location of one existing CARV.- Site drainage improvements including removal and installation of asphalt paving, excavation and off-site storage of native soil and backfill and re-compaction of native and engineered soils, new trench drain and drain piping and cored drainage holes in existing CMU walls.- Install steel push (pin) piers and/or helical piles on new and existing structures.- Reconstruction and recertification of crane, hoist and trolley including new power connection to the hoist and trolley and new lighting.- Additional electrical and instrumentation work as outlined in drawings and specifications.The successful bidder will achieve substantial completion of the Work on or before 220 working days after the NTP. Sacramento HERON K-8 SCHOOL CLASSROOM ADDITION 10/6/16 2:00 PM 1 SF86 Online The Work consists of the construction of a single story Classroom, Science Classroom, Restroom buildings with covered walkways. Landscape improvemens and related site work as indicated in the Plans and Specifications. Sacramento CALIFORNIA ENERGY COMMISSION ACCESS BARRIER REMOVAL AUTOMATIC DOOR OPENERS & PUSH PLATES 11/10/16 2:00 PM 1 SF240 Install door opener(s) with associated two wire push plates at two restroom doors. License: Contractors’ State License Classification required to bid project: B Page 12 of 23 Online Location Plan Name Bid Date Bid Time # Of Addenda Salinas JOC 2016 - FACILILTIES 10/6/16 2:00 PM Plan # 1 Plans Online Job Order Contract(s) 2016 (JOC) is an indefinite quantity contract(s) pursuant to which Contractor performs a variety of projects, consisting of specific construction tasks. Scope is for general construction, repair, remodel, and other repetitive related work. County has published a Construction Task Catalog® (CTC) containing a series of construction tasks with preset Unit Prices (UP) developed using experienced labor and high quality materials. All UPs are based on local labor/materials/equipment prices, including current prevailing wages. Contractor is to bid Adjustment Factors (AF) to be applied to UPs. Price of an individual project is determined by multiplying preset UPs and appropriate quantities by the appropriate AFs. Term of each JOC is one (1) year.Construction Task Catalog & Technical Specs are available upon request due to file size limits.Questions: Florence KabwasaGreen 831-755-4805 kabwasa-reenfa@co.monterey.ca.us Salinas JOC 2016 - ROADS AND BRIDGES 10/6/16 2:30 PM 1 Online Job Order Contract(s) 2016 (JOC) is an indefinite quantity contract(s) pursuant to which Contractor performs a variety of projects, consisting of specific construction tasks. Scope is for general construction, repair, remodel, and other repetitive related work. County has published a Construction Task Catalog® (CTC) containing a series of construction tasks with preset Unit Prices (UP) developed using experienced labor and high quality materials. All UPs are based on local labor/materials/equipment prices, including current prevailing wages. Contractor is to bid Adjustment Factors (AF) to be applied to UPs. Price of an individual project is determined by multiplying preset UPs and appropriate quantities by the appropriate AFs. Term of each JOC is one (1) year.Construction Task Catalog & Technical Specs are available upon request due to file size limits.Questions: Florence KabwasaGreen 831-755-4805 kabwasa-reenfa@co.monterey.ca.us Salinas GONZALEZ RESIDENCE 10/7/16 5:00 PM 0 Online 3 Bedroom, 2 baths house addition. Need General Contractor (foundation, plumbing, painting, flooring, roofing, ect). Please include all labor and material cost, and include all subcontracted work. If you subcontract any of the work we would like the amount that each subcontractor is charging in the break down of your bid. Call or e-mail Jesus Gonzalez at 831-710-0380 or Nora Cervantes at 831-240-9040. E-mail: jgnv16@gmail.com or nckity77@yahoo.com Salinas LANDSCAPE AND OPEN SPACE MAINTENANCE SERVICES CSA 15 - TORO PARK & SERRA VILLAGE 10/31/16 3:00 PM 0 Paper & Online This Request for Proposal is to solicit written proposals from qualified companies to provide landscape and open space maintenance services for County Service Area No. 15 which encompasses Toro Park Estates, Serra Village, Toro Creek Estates and Toro Sunshine neighborhoods. These proposals will be evaluated to select a CONTRACTOR to negotiate an AGREEMENT with the County. San Carlos RFP FOR PROVISION OF ON-CALL COMMUNICATION & SIGNAL SERVICES- SAMTRANS 10/24/16 2:00 PM 1 Paper & Online Provide on-call communication and signal consultant services primarily consisting of Engineering Services (Services of Professional Services) such as active warning devices, advanced preemption, voice radio, data radio, microwave, station visual messaging systems and public address systems, and rail supervisory control system.Project Contact: Naweed Nezam 650-508-7711Email: NezamN@smatrans.comRFP also available for review at Santa Clara Builders Exchange San Carlos FIRE SAFETY SYSTEMS INSPECTION, CERTIFICATION, MAINTENANCE & MONITORING- 11/1/16 SAMTRANS 2:00 PM 0 Paper & Online Fire alarm control panels, tamper switches, flow switches, various detectors, pull stations, alarm signal devices, fire sprinkler heads, fire sprinkler valves, piping, risers, standpipes, fire hoses/nozzles/cabinets and related communication lines/cables. Project Contact: Robert Isom 650-508-7933Email: isomr@samtrans.comSpecs also available for review at Santa Clara Builders Exchange SAN FRANCISCIO RFQ FOR ARCHITECTURAL & ENGINEERING SERVICES FOR EMERGENCY MEDICAL SERVICES FACILITY (ONLINE) 10/6/16 4:00 PM 1 SFONLI Online NE The City and County of San Francisco (City), San Francisco Public Works (Public Works) announces a Request for Qualifications (RFQ) for an Architectural and Engineering (A/E) Consultant Team led by an Executive Architect with expertise in planning and design of civic buildings to provide design, engineering and related specialty services in assisting the City with the San Francisco Emergency Medical Service (EMS) Facility Project at 2245 Jerrold Street, San Francisco, CA.All requests for clarification of any ambiguities, discrepancies, inconsistencies, or questions concerning this RFQ, whether submitted before or after the pre-proposal conference, must be in writing and directed to Tim Kempf at DPWEMS@sfdpw.org, no later than 4 PM Tuesday, September 20, 2016. Substantive replies, clarifications, interpretations, or changes to this RFQ will be made by written addendum, and shall become part of this RFQ. It is the responsibility of the Respondent to confirm receipt of any and all addenda issued for this RFQ.RFP IS AVAILABLE FOR VIEWING ONLINE ONLY San Francisco MUSEUM VIDEO SCREENING ROOM - SFIA (ONLINE) 10/11/16 10:00 AM 0 SF163 Online Renovate vacant space in the International Terminal Building into a video screening room for San Francisco International Airport Museum. Work includes selective demolition, switchable glass projection wall, furniture, acoustic wall panels, ceiling tiles, flooring, lighting, HVAC, electrical and fire protection.Project Contact: Daniel Ibrahim 650-8215558Email: Daniel.Ibrahim@flysfo.comPlans available ONLINE ONLY San Francisco AIRFIELD SIGNAGE UPGRADE PHASE A - SFIA (ONLINE) 10/21/16 2:00 PM 0 Online Procure a contractor to demolish existing airfield signage system at various locations on the airfield, wind cone and furnish and install new signage and wind cone system at new location(s) that meet the requirements of Federal Aviation Administrator (FAA) Advisory Circular(AC) and addresses Part 139 certification requirements.Project CVontact: Lalesh Sharma 650-621-7754Email: lalesh.sharma@flysfo.comPlans available ONLINE ONLY Page 13 of 23 Location Plan Name Bid Date SAN FRANCISCO RFQ FOR A CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) TO PROVIDE SERVICES FOR THE SAN FRANCISCO ANIMAL CARE AND CONTROL FACILITY AND BURKE WAREHOUSE FACILITY (ONLINE) 10/4/16 Bid Time # Of Addenda Plan # 4:00 PM SFONLI Online NE 1 Plans San Francisco Public Works (“Public Works”) announces a Request for Qualifications (“RFQ”) inviting interested parties to submit their qualifications for evaluation to be pre-qualified and eligible to respond to a forthcoming Request for Proposal (“RFP”) to perform pre-construction and construction services for the San Francisco Animal Care and Control Facility and Burke Warehouse Facility (ACC&BW) Project. Interested parties responding (“Respondents”) to this RFQ are to be Construction Manager/General Contractors (“CM/GC”) capable of performing preconstruction services, as well as facility construction services involving historical preservation and adaptive reuse, small animal hospital and treatment center, seismic retrofitting and renovation, hazardous materials abatement and structural demolition.Written questions regarding the RFQ shall be directed to Tim Kempf at: DPWACCBW@sfdpw.org no later than 4 PM on Friday, Sept 16, 2016.RFQ IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO AS-NEEDED SEWER SEALING PROJECT (ONLINE) 10/6/16 2:00 PM 1 SFONLI Online NE The objective of the Project is to provide as-needed sealing of existing sewer facilities at locations to be determined within the City of San Francisco. The Work is to be performed in San Francisco, California.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO 100 MCALLISTER TOWER FRONT DOOR AT HASTINGS COLLEGE OF LAW 10/7/16 4:00 PM 0 SF233 Paper & Online Invitation to Bid #67-0163 is to furnish all labor and materials to complete the fabrication and installation of steel doors for the University of California, Hastings College of Law. The 100 McAllister Tower Front Door Project will be performed at one (1) building of Hastings College of Law campus. It is located at 100 McAllister Street, San Francisco, California.Please direct any questions to: purchasing@uchastings.edu SAN FRANCISCO EXPAND CLINICAL OPERATING ROOMS & SURGERY BUILDING 200 10/11/16 1:00 PM 2 SF122 Paper & Online Div 1-3, 5-13, 21-23 & 26-27. The intention of this project will entail the construction of an additional floor that will add 5,800 S.F. that will construct three State-of-the-art operating rooms. Construction will be occurring adjacent to existing Surgery Suite and a restricted access. Contractors will be required to follow the VA’s Infection Control guidelines per the Infection Control Risk Assessment. The scope will include providing all installation and demolition of general construction and including heavy structural, mechanical, electrical, plumbing, med-gas, and design built fire sprinkler and fire alarm system. The Renovation includes expansion of the pre-op waiting area and provisions for equipment storage areas.Questions: Rick Garcia, Estimator, by email at: rick.garcia@hermancg.com, or by phone at (619) 964-9274 PREVAILING WAGE SAN FRANCISCO STREET ENTRY CANOPY, POWELL STREET AND CIVIC CENTER STATIONS - BART 15LK-130 10/11/16 2:00 PM 0 SF215 Online Div 1-11, 20, 22, 26-28 & 31-33. Two new canopies to be provided at Powell Street Station and one new canopy at the Civic Street Station. The new canopies Scope of Work include off-site fabrication and the installation of the following elements complete with connections to the existing and added structural elements: new support system for the canopy with a glass enclosure, new lighting system complete with new light fixtures and the integration of the existing architectural finishes to match the existing interior and sidewalk finishes.Project Contact: Suntusita GunawardenaEmail: SGunawa@bart.gov SAN FRANCISCO 5 FULTON MID-ROUTE MUNI FORWARD PROJECT (ONLINE) 10/11/16 3:00 PM 0 SFONLI Online NE Div 1-3, 5, 9 & 15. Work to be performed under the Project includes, but not limited to, the following:A. Extend the existing sidewalk and construct combined 6-inch wide concrete curb and gutter and curb ramps on the southwest side of McAllister St. at Divisadero St.B. Relocate catch basins and support facilities at various locations.C. Install new traffic signals at various locations/intersections along McAllister St.D. Construct two traffic circles on McAllister St at Steiner St and Broderick St.E. Install new 10” thick bus pad along Southwest McAllister St. at Divisadero St.F. Install new concrete curb ramps with detectable surface tile at various locations.G. Install new miscellaneous overhead system, new traffic signals, and new streetlight installation at various locations.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO URBANO DRIVE PAVEMENT RENOVATION AND SEWER REPLACEMENT (ONLINE) 10/12/16 2:30 PM 1 SFONLI Online NE Div 1-3 & 31-33. The Work is located along various streets that intersect with Urbano Drive in San Francisco, California and consists of pavement renovation, sewer replacement, traffic routing, and all associated work.Questions: Ramon Kong, Project Manager, at (415) 554-8280.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO AS-NEEDED SIDEWALK INSPECTION AND REPAIR PROGRAM (SIRP) NO. 11 (ONLINE) 10/12/16 2:30 PM 0 SFONLI Online NE Div 1-4 & 31-32. The Work is at various locations in San Francisco and includes concrete work for the reconstruction of sidewalks, driveways, curbs and curb ramps; replacement of utility boxes and covers; trimming/pruning of trees and hedges and all appurtenant work in accordance with drawings and specifications. The Work will be given out as work orders packages that include the scope and will specify the time limit for completion.Questions: Michael Lennon, Project Manager, at (415) 554-5797.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO RFQ CM/GC SERVICES FOR PLOT 2 AIRCRAFT PARKING RECONFIGURATION 7 SOUTH 10/14/16 MCDONNELL ROAD REALIGNMENT- SFIA (ONLINE) 2:00 PM 0 SFONLI Online NE Provide Construction Manager/General Contractor (CM/GC) services. The selected CM/GC Contractor will provide the following services: preconstruction services and construction services to relocate utilities; construct interim and permanent roadways; install new AOA aircraft jet blast resistant security fence; and construct new AOA pavement specific to the Federal Aviation Administration's aircraft pavement design and construction standards.Project Contact: Jim Chiu 650-821-7741Plans available ONLINE ONLY Page 14 of 23 Location Plan Name Bid Date SAN FRANCISCO SAN FRANCISCO STREET SMARTS PROJECT - RFP (ONLINE) 10/17/16 Bid Time # Of Addenda Plan # 5:00 PM SFONLI Online NE 1 Plans The SF Street Smarts project is to create a miniature city designed to teach children traffic and street safety. SF Street Smarts will be modeled after a previous installation that was designed and built for the City of Los Angeles called Richie’s Neighborhood. SF Street Smarts will simulate a series of hazards such as crossing the street at an intersection, looking both ways, cars backing out of a driveway and a ball going into the street. The set will be designed to be able to pack up and fit into a truck so that it can be moved around to different sites to set up for children to use.Questions regarding must be submitted no later than October 12, 2016, by email, to the Contract Administration Division at: Tiffany.Tsang@sfdpw.orgRFP IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO CAMPUSWIDE DOOR REPLACEMENT AT SFSU 10/18/16 2:00 PM 0 SF243 Paper & Online Work consists of furnishing all labor and materials, equipment and tools necessary to remove and replace exterior doors in various buildings at San Francisco State University. Work includes, but is not limited to, demolition, modification of storefront systems, new aluminum and hollow metal doors, door hardware, automatic door operators, patching and painting, etc. Bidder must possess a valid Class C-61 License with a D-28 Door Specialty. Questions: Shirley Yuki at (415) 338-7089, or by email at: syuki@sfsu.edu SAN FRANCISCO RADIO STATION TWIN PEAKS TOWER REPLACEMENT - REBID (ONLINE) 10/19/16 2:30 PM 0 SFONLI Online NE Div 1-3, 26-27, 31 & 33. The Work to be done under this Contract includes demolition of existing radio tower, construction of new radio tower, transferring/coordination of 3rd party radio equipment, fencing work, grading, lighting along Christmas Tree Point, San Francisco, California.Questions: May Chan, Project Manager, at (415) 558-4568.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY(Rebid - Previously scheduled bid date was 8/4/16) SAN FRANCISCO BACKUP GENERATOR RETROFIT 2 (ONLINE) 10/19/16 4:00 PM 2 SFONLI Online NE In an effort to reduce diesel particulate matter emissions and greenhouse gases(black carbon) from the backup generator at the Bay Area Regional Agency Headquarters facility, located at the Bay Area Metro Center, 375 Beale Street, San Francisco, California, 94105, BAHA is seeking a consultant to install a retrofit device on the existing backup generator, which is further described in Appendix A, Scope of Work.Questions: Andrew L. Nguyen at: alnguyen@mtc.ca.govRFP IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO SAN FRANCISCO GROUNDWATER SUPPLY PHASE 2 10/20/16 2:00 PM 1 SF211 Paper & Online Div 1-3, 5-11, 22-23, 26, 28, 31-33, 40 & 43. The objective of the Project consists of constructing two new groundwater well stations; clearing, grubbing and grading; demolition; work on existing wells; foundations, piers, shoring and retaining walls; new pumps, motors and related appurtenances; ventilation; trenching and utility and conduits; cathodic protection system; surge tanks and compressed air; electrical distribution; I&C; perimeter security fence and gates; security monitor and control; final grading and drainage; landscape and irrigation systems; furnish and install 3,000 feet of 8-inch and 2,100 feet of 12-inch ductile iron pipe, valves, and appurtenances; sidewalk and roadway work. The Work is to be performed in San Francisco, California. SAN FRANCISCO CROCKER AMAZON/EXCELSIOR/INGLESIDE DISTRICTS SEWER REPLACEMENT AND PAVEMENT RENOVATION (ONLINE) 10/20/16 2:00 PM 0 SFONLI Online NE Div 1-3 & 31-33. The objective of the Project is to replace the existing sewers and street pavement on the subject streets. The Work is to be performed in San Francisco, California.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO JEFFERSON SQUARE PARK HARDSCAPE MAINTENANCE PROJECT (ONLINE) 10/20/16 2:30 PM 0 SFONLI Online NE Demolition of heavily deteriorated pathways and replace with new asphalt pathway along Eddy St., and center of park. Asphalt mill and fill central plaza, and heavily worn pathways. Sealcoat minimally worn pathways. Work shall be conducted at Jefferson Square Park, San Francisco, CA.Questions: Sean McFadden, at (415) 831-2779, or by email at: sean.mcfadden@sfgov.org PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO PALACE OF FINE ARTS / CHRISTOPHER PLAYGROUND HS MAINTENANCE PROJECT (ONLINE) 10/20/16 2:30 PM 0 SFONLI Online NE The Palace of Fine Arts, Lyon St. and Bay St., San Francisco, CA - Sealcoat existing concrete asphalt pathways and make patch repairs. Cow Hollow Playground, 1 Miley St. at Baker St., San Francisco, CA - Evaluate and refurbish wooden trolley. George Christopher Playground, 5212 Diamond Heights Blvd, San Francisco, CA - Rehabilitate concrete asphalt pathways around existing baseball diamond. Questions: Sean McFadden, at (415) 831-2779, or by email at: sean.mcfadden@sfgov.org PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Page 15 of 23 Location Plan Name Bid Date SAN FRANCISCO KIRKLAND, SCOTT AND FLYNN FACILITIES TANK UPGRADE PROJECT 10/20/16 Bid Time # Of Addenda Plan # Plans 3:00 PM SF154 Paper & Online 2 Div 1-3, 5, 7, 9, 11 & 15-16. The Work generally consists of the following, but not limited to:1. Selective demolition and/or removal work for the installation of work to be performed at the three facilities.2. Utility work in private right- of-way including but not limited to storm water, compressed air, electrical work, utility boxes, etc.3. Excavating, handling, transportation, and disposal of site soils, groundwater and storm water controls, environmental mitigation controls, environmental management of excavated materials, and imported backfill.4. Dewatering work, including dewatering of excavations, equipment, foundations, and utility trenches.5. Shoring for excavations and open cuts as required by the governing jurisdiction(s) requirements, governing codes and as determined by the Contractor to perform the work.6. Site work including possible street and sidewalk work.7. Fluid systems including underground and aboveground tanks, piping, dispensing systems, and monitoring systems. The Scope of the fluid system work differs at each facility.8. Replacement of three existing fuel dispensers, and their under dispenser containment sumps and associated piping.9. Provide temporary aboveground fuel storage.10. System integration work which includes integrating various systems including, but not limited to, new tank leak detection system at each facility.11. Sewer work at the Kirkland Facility Yard.12. Testing, Training, and Start-up. A comprehensive program for testing, training, and start-up of systems and components installed in the work of this Contract.13. Providing as-builts and all closeout documentation for each facility. SAN FRANCISCO EL DORADO ELEMENTARY SCHOOL MODERNIZATION 10/25/16 2:00 PM 0 SF177178 Paper & Online Div 1-3, 5-12 & 14-17. The Project is generally described as: General School Modernization and reconstruction including hazardous material/asbestos remediation, new wall framing, new mechanical, electrical and plumbing systems, installation of a new elevator and new wheelchair lift, structural upgrades, new windows, new floor, wall and ceiling finishes and exterior site work including exterior utilities, ramps, handrails and asphalt paving. In addition, this project includes Proposition 39 funded work related to the installation of a condensing boiler system and associated piping, mechanical unit replacements, HVAC controls, lighting upgrades, window replacements and an efficient cooler. SAN FRANCISCO REMOVAL OF EXISTING CHAIN LINK FENCING, TEN (10) SWING GATES, CONCRETE PLANTER, AND BUSHES AND SHRUBS AT DMV (ONLINE) 10/27/16 2:30 PM 0 SFONLI Online NE Removal of existing chain link fencing, ten (10) swing gates, concrete planter, and bushes and shrubs as shown on drawings, and the installation of new 1,350 linear feet long, eightfoot (8') high perimeter ornamental fencing, which includes four (4) motorized rolling gates, one (1) keypad, two (2) pedestrian gates and forty-two (42) bollards at the San Francisco DMV Field Office.Questions: Julie Phang at (916) 651-2556, or by email at: julie.phang@dmv.ca.govPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO POTRERO HILL BLOCK X PROJECT (ONLINE) 11/1/16 2:00 PM 0 SFONLI Online NE PROJECT WILL BE POSTED BY NOON ON MONDAY, OCT 3RD!!!Cahill Contractors is requesting bids for all trades EXCEPT: Demolition, Shoring and Underpinning, Site Clearing, Earthwork, Concrete, Exterior Building Maintenance System, HVAC, Electrical, Plumbing, Fire Sprinkler, Solar Panels, and Site Utilities.The Potrero Hill Block X project is a 72 unit, 110,000 gsf, 100% affordable multifamily housing building located at the Southeast corner of 25th Street and Connecticut Street. The Project consists of 1 lower level concrete podium (Type IA) and 4-5 levels of wood framing (Type IIIA). Block X is the first phase of the Rebuild Potrero Master Plan. This is a Cahill project.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN FRANCISCO UNDERGROUND STORAGE TANK (UST) AT CPUC BUILDING (ONLINE) 11/3/16 2:00 PM 0 SFONLI Online NE Div 1-2, 5, 22-23, 26 & 31-32. Scope of Work: Major components of Project Work consist of two (2) Phases:PHASE I: Installation of a new, above ground 1,000 gallon, diesel fuel storage tank (AST) and all associated fueling system items, including but not limited to: two fuel pumps (supply and return), all above ground, exterior double-walled piping connecting to a new doublewalled, roof mounted 30 gallon day tank, a fuel management system, reinforced concrete pad, asphalt paving, spill kit, bollards, bollard sleeves, chainlink security cage, and all electrical work required to support fuel dispensing and alarm systems. New fuel dispensing system must be fully operable and have received all appropriate regulatory approvals prior to starting Phase 11.The building back-up generator system shall remain operable throughout the duration of the Project, with the exception of the "cut over" period when the new day tank, and associated piping and electrical are installed. All "cut over'' work will be done on a weekend as directed by the State.PHASE II: Removal of an existing, 4,000 gallon, underground storage tank (UST) and all associated fueling appurtenances, including but not limited to: removal of existing concrete, electrical conduiUwires, sump, all underground/above ground fuel piping, vent, vent pipes, including any testing required by the regulatory agencies, backfill and restoration of surface areas to match existing conditions as well as compliance with the American with Disabilities Act (ADA) where applicable. Work shall also include removal of existing fuel pump and concrete dike around existing pump, roof mounted day tank, piping and electrical from Boiler Room to day tank and generator located on roof.If soil contamination related to the UST is discovered, the project may include removal of up to 50 tons of contaminate soil. If contamination is more extensive, the remediation will be considered a separate action for purposes of CEQA. Any removal action will comply with applicable State and local environmental permitting requirements.Questions: Jim Chambers, Project Director II, at (916) 3761729.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY San Joaquin CUPCCAA FOR SAN JOAQUIN COUNTY 12/31/16 12:00 PM 0 test Online San Joaquin County has adopted the Uniform Public Construction Cost Accounting Act (UPCCAA) and invites all interested licensed contractors to submit their company for inclusion on the County’s Informal Bidding Contractors List for each respective calendar year. San Jose EVERGREEN VALLEY HIGH SCHOOL SCIENCE CR REFURB - ESUHSD 10/5/16 2:00 PM 2 Paper & Online Modernization of twelve (12) science classrooms, including, but not limited to, safety upgrades, new equipment and furniture, and new casework.Plans and specs also available for review at Santa Clara Builders Exchange San Jose INDEPENDENCE HIGH SCHOOL RESTROOM BUILDINGS G, H, K, L - ESUHSD 10/6/16 2:00 PM 0 Paper & Online Associated utilities, A.C. paving and concrete for (2) Portable 12’x40’ restroombuildings.Plans and specs also available for review at Santa Clara Builders Exchange Page 16 of 23 Location Plan Name Bid Date Bid Time # Of Addenda San Jose STEVENS CREEK SUBARU (ONLINE) 10/7/16 4:00 PM Plan # 0 Plans Online The project consists of demolition of the existing building, surface parking/car display, curbs, and gutters totaling approximately +/- 68,456 SF. Construction of a new 2-story auto dealership (45,384 SF) integrated into a 3-story concrete parking structure (101,024 SF) totaling 146,408 SF gross area. Construction of associated site work and off-site work is also included.Plans available ONLINE ONLY San Jose SANTA TERESA HIGH SCHOOL FIELD CONCESSION - ESUHSD 10/11/16 2:00 PM 0 Paper & Online Provide and install complete utilities, underground and above ground, from existing point of connection to new points of connection as indicated in the Contract Documents. Utilities include but are not limited to domestic water, fire water, sewer/waste, storm, high and low voltage electrical, etc. Contractor shall be responsible for excavation, trenching, shoring, backfill and compaction, repairs and/or replacement to existing surfaces, surrounding materials, landscape, etc. damaged or demolished as a result of or in order to complete their Work.Project Contact: Joanna Ma, Gilbane 408-476-6180Email: jma1@gilbaneco.comPlans and specs also available for review at Santa Clara Builders Exchange San Jose RFP JAMES LICK HIGH SCHOOL CR MODERNIZATION NEW TECH MATHEMATICS/PHYSICAL EDUCATIONI CLASSROOM - ESUHSD 10/11/16 2:00 PM 1 Paper & Online Interior modernization to classroom to created new-tech mathematics/physical education classroom. Work includes minor cabinetry demolition & painting.Project Contact: Kwan Choi, GilbaneEmail: kchoi@gilbaneCo.comRFP also available for review at Santa Clara Builders Exchange San Jose YERBA BUENA HIGH SCHOOL NEW STUDENT UNION ALTERATION & ADDITION ESUHSD (ONLINE) 10/12/16 2:00 PM 1 SF87-88 Online The project consists of substantial demolition of existing buildings and modifications and additions to transform the existing buildings into the New Student Union. Approximately 15,000 SF of the existing buildings shall remain and 22,500 SF shall be new construction. Trades include demolition, concrete, steel, rough carpentry, architectural wood casework, insulation, metal panels, single-ply roofing, terra cotta cladding, metal and wood doors, overhead doors, glazing, metal studs and drywall, plaster, interior finishes, specialties, food service equipment, and associated site improvements.Project Contact: Jared WrightEmail: jwright@flintbuilders.comPlans available ONLINE ONLY San Jose BOILER REPLACEMENT & AHU MODIFICATIONS EVERGREEN VALLEY COLLEGE SJECCD 10/12/16 2:00 PM 0 SF228 Paper & Online Replacement of a boiler that serves the domestic hot water loop in the mechanical room of the Evergreen Valley College PE Building and the Installation of new variable frequency drives on two exhaust fans for the two air handler units serving the PE Building and connecting the new boiler and the two new VFDs into the campus building management system.Project Contact: Andrea Mendoza, Project Manager, at (408) 223-6729, or by email at: AMendoza@GilbaneCo.comPlans and specs also available for review at Santa Clara Builders Exchange San Jose RFQ ARCHITECTURAL SERVICES "POOL" - SJECCD 10/12/16 2:00 PM 0 Paper & Online Seeks architectural services for the projects identified in Evergreen Valley College Facilities Master Plan, San Jose City College Master Plan and approved project list for the Measure G-2010 Bond program.RFQ also available for review at Santa Clara Builders Exchange San Jose CHILD DEVELOPMENT CENTER ROOF REPLACEMENT - SJECCD 10/12/16 3:00 PM 0 Paper & Online Removing and replacing existing roofing system, insulation, and flashings.Project Contact: Carlos Marques Email: carlos.marques@sjeccd.eduPlans and specs also available for review at Santa Clara Builders Exchange San Jose DEWITT AVENUE "S-CURVE" ROADWAY REALIGNMENT PROJECT, SPRING ROAD TO ORIGILLIA LANE 10/13/16 2:00 PM 2 SF807 Paper & Online Roadway realignment that will include: clearing & grubbing, roadway excavation & embankment, site grading, erosion control, slope stability, traffic control, new roadway pavement, property driveways, ditches, relocation & replacement of existing facilities, replacement of water main & water facilities, storm drains & sub surface drainage, signing & striping.Project Contact: Bernardine Caceres 408-573-2486Email: Bernardine.caceres@rda.sccgov.orgPlans and specs also available for review at Santa Clara Builders Exchange San Jose 8301-STORY ROAD & REMILLARD COURT STORM SEWER CROSS CONNECT 10/13/16 3:00 PM 0 Paper & Online Installation of storm sewer main to cross connect the existing 30” diameter storm main on the south side of Story Road in front of Happy Hollow Park & Zoo parking lot entrance to the existing 42” diameter storm main on the north side of Story Road at the intersection of Story Road and Remillard Court.Project Contact: Huggen Angeles 408-975-7482Plans and specs also available for review at Santa Clara Builders Exchange San Jose 8043-MUNICIPAL ROSE GARDEN IMPROVEMENTS PROJECT 10/13/16 3:00 PM 1 Paper & Online Demolition, clearing and grubbing, earthwork and grading, irrigation controller upgrade, maintenance area chain link fencing, fountain safety fencing and miscellaneous site amenities.Project Contact: Stacey K. Palomar Plans and specs also available for review at Santa Clara Builders Exchange San Jose 7847-3RD STREET GARAGE NEW LIGHTING EMERGENCY POWER SYSTEM 10/13/16 3:00 PM 1 Paper & Online Design of UPS and new lighting system along with the replacement of the existing UPS system with the new updated system.Project Contact: Raj Verma 408-535-8443Plans and specs also available for review at Santa Clara Builders Exchange Page 17 of 23 Location Plan Name Bid Date San Jose OPEN SPACE AUTHORITY (OSA) HEADQUARTERS TENANT IMPROVEMENT 10/14/16 Bid Time # Of Addenda Plan # Plans 3:00 PM SF80 Paper & Online 1 Tenant improvements to an existing office and warehouse building to house the new headquarters for the Santa Clara Valley Open Space Authority (OSA). The tenant improvements will include:• Minor interior and exterior demolition• Exterior improvements, including accessibility upgrades, paint, fencing and gates.• Interior improvements, including partitions, ceilings, finishes, ducts, diffusers, plumbing upgrades, electrical power and lighting upgrades.• Exterior shade canopies and minor structural improvements associated with installation of canopies.Project Contact: Donna PlunkettEmail:dplunkett@openspaceauthority.orgPlans and specs also available for review at Santa Clara Builders Exchange San Jose OAK GROVE HIGH SCHOOL REPLACEMENT SECURITY FENCING - ESUHSD 10/19/16 2:00 PM 0 Paper & Online Removal of existing fencing and gates, support poles and their foundations; the clearing and grubbing at selected areas; the installation of new decorative fencing, and gates; signage and irrigation relocation work.Project Contact: Michael Carson, Kitchell 408-280-7889Email: macarson@kitchell.comPlans and specs also available for review at Santa Clara Builders Exchange San Jose 7267-BRAMHALL PARK LAWN BOWLING RENOVATION 10/20/16 3:00 PM 0 Paper & Online Demolition, clearing and grubbing, earthwork and grading, synthetic lawn bowling green system from bank-to-bank, including all sub-base, base, and drainage system, rigid and pervious flexible paving, irrigation, landscaping, stone veneer columns, shade umbrellas, steel tubular fencing and gates, pervious pavers, and miscellaneous site amenities.Project Contact: Joe DeVito 408-535-8350Plans and specs also available for review at Santa Clara Builders Exchange San Jose 7673-AGNEWS DEMOLITION PROJECT 10/20/16 3:00 PM 1 Paper & Online Demolition of, including but not iimited to, the buildings shown in the table below, utilities connected to the buildings, trees that will likely be damaged due to the close proximity to building and hazardous materials abatement.Project Contact: Peter Testa 408-535-8435Plans and specs also available for review at Santa Clara Builders Exchange San Jose 8036-DEL MONTE PARK PHASE 2 10/20/16 3:00 PM 0 Paper & Online Demolition, soil remediation, clearing and grubbing, earthwork and grading, storm drainage, rigid and flexible paving, trash enclosure/storage building, irrigation, landscaping, sports field and street lighting, synthetic turf sports field, fencing and gates, netting, traffic signal modifications and miscellaneous site amenities.Project Contact: Mike Pruitt 408-5358439Plans and specs also available for review at Santa Clara Builders Exchange San Jose 8135-31ST & ALUM ROCK PARK 10/20/16 3:00 PM 0 Paper & Online Demolition, clearing and grubbing, earthwork and grading, storm drainage, rigid and flexible paving, decomposed granite paving, irrigation, landscaping, security lighting, shade structure, fencing, play equipment and surfacing, and miscellaneous site amenities.Project Contact: Jose Balingit Plans and specs also available for review at Santa Clara Builders Exchange San Jose RFP COMMUNICATIONS SYSTEM DEPLOYMENT & INTEGRATION - SJECCD 10/21/16 2:00 PM 0 Paper & Online Seeks proposals for an expanded telecommunications platform.Project Contact:Priscilla Louangrath, 408-270-6496Email: priscilla.louangrath@sjeccd.eduRFP also available for review at Santa Clara Builders Exchange San Jose RFP TAMIEN STATION TRANSIT ORIENTED DEVELOPMENT - SCVTA (ONLINE) 1/20/17 4:00 PM 0 Online Seeks proposals from qualified respondents to develop VTA’s 6.96 acre property located in the heart of Silicon Valley.Project Contact: Jessie O'Malley Thielen 408-321-5950Email: Jessie.thielen@vta.org San Juan Bautista CUPCCA 12/30/16 5:00 PM 0 Online The Aromas-San Juan Unified School District offers this information to any individual, company, or firm wishing to be added to the District's general construction informal bid list for all trades pursuant to Public Contract Codes 22032 and 22034 - The California Uniform Public Construction Cost Accounting Act (CUPCCA). Interested parties must submit the CUPCCA contractor/vendor application to be included. Application forms are available through the Aromas-San Juan Unified School District Maintenance and Operations Department or can be downloaded by clicking the links below or by contacting Bill Rupert at (831) 623-4776 or brupert@asjusd.k12.ca.us. Forms must be returned via US mail to:Aromas-San Juan Unified School DistrictAttn: Bill Rupert2320 San Juan Highway, San Juan Bautista, CA 95045or by fax to (831) 623-4907 San Luis Obispo THE MONTEREY HOTEL 10/5/16 1:00 PM 1 Online The Monterey Hotel project consists of a new 102 unit hotel located in San Luis Obispo, California. A 131 space post tensioned concrete parking garage makes up the basement level and 1st floor on grade with 3 stories of wood framed construction above. There are miscellaneous structural steel framing members within the building structure as well. Shoring for the basement level has been completed.Questions: Brad Barker (bbarker@bernards.com) (818) 898-1521 San Luis Obispo RFP PHOTOVOLTAIC ENERGY 2016 10/5/16 3:00 PM 5 Online The Trustees of The California State University, through this Request for Proposal (RFP), intend to contract with a solar PV energy service provider utilizing a Solar License and Power Purchase Agreement (SLPPA) model at the California Polytechnic State University, San Luis Obispo (Cal Poly) campus. Qualified solar PV energy service providers shall propose to finance, design, engineer, construct, operate, maintain and own a solar PV system at the Cal Poly campus with the awarded Proposer invited to execute an SLPPA for 20 years with Cal Poly. Each proposer will submit their qualifications and a price proposal which shall include a fixed rate (¢/kWh) as further described in the RFP. A technical review committee shall review the respondents’ Qualifications and, based on the criteria identified in the RFP, the committee shall select no more than five finalists to open the Price proposals.PREVAILING WAGE Page 18 of 23 Location Plan Name San Luis Obispo BUILDING & SAFETY, ENGINEERING DEVELOPMENT REVIEW, AND FIRE PLAN REVIEW 10/6/16 AND INSPECTION SERVICES Bid Date Bid Time # Of Addenda 1:00 PM Plan # 0 Plans Online The City of San Luis Obispo is requesting sealed proposals for plan review and inspection of construction projects necessary to determine compliance with all applicable building, fire and development codes and laws pursuant to Specification No. 91520.Questions: Anne Schneider aschneider@slocity.org 805-781-7572 San Luis Obispo SURVEYING SERVICES FOR THE CHORRO VALLEY TRAIL EASEMENT 10/6/16 3:00 PM 2 Online RESPONSES THROUGH PUBLIC PURCHASE ONLY.COMPLETION OF VENDOR REGISTRATION PROCESS CAN TAKE 24 HOURS.The County of San Luis Obispo (County) is currently soliciting proposals from qualified firms to establish a onetime request for survey services for survey work for an approximately 25-foot-wide by 1.5-mile-long easement for the Chorro Valley Trail, on Camp San Luis Obispo's property. The County of San Luis Obispo has established a 5% Local Vendor Preference. San Luis Obispo COMPLETE JANITORIAL CLEANING SERVICES 10/14/16 3:00 PM 1 Online The purpose of this Request for Proposal is to solicit offers from qualified firms to establish a contract for Complete Janitorial Cleaning Services sufficient to maintain the facility(ies) in County Standard; that is to eliminate all visible dust, dirt, litter, grime, stains, smears, finger marks etc, to the greatest practical degree possible at multiple County Locations. San Luis Obispo HOT WATER UTILIDOR 10/20/16 2:00 PM 0 Online Remove and replace hot water piping and valves throughout Campus. Work will include new welded steel piping, valves, anchors, concrete flatwork, asphalt paving, and minor concrete structures. Work will take place on the California Polytechnic State University campus.PREVAILING WAGE San Luis Obispo RESERVOIR NO 1 ROOF REPLACEMENT PROJECT 11/3/16 2:00 PM 1 Online Class B. Removal of existing roofing, plywood wood sheathing, and existing wood support columns; the installation of new fiberglass reinforced polyester (frp) columns; and the installation of a new plywood deck and single ply membrane roofing system.PREVAILING WAGE San Mateo RFQ PRE-CONSTRUCTION & CONSTRUCTION SERVICES FOR WASTEWATER TREATMENT PLANT (WWTP) HEADWORKS, PRIMARY, SECONDARY TREATMENT (ONLINE) 10/3/16 2:00 PM 4 Paper & Online Provide Pre-Construction and Construction Services (Construction Management at Risk - CMAR) for the construction of the headworks, primary treatment, and secondary treatment facilities at the City’s wastewater treatment plant (WWTP).Project Contact: Ben WrightEmail: ben.wright@ch2m.comRFQ also available for review at Santa Clara Builders Exchange San Mateo 2016 SIDEWALK REPAIR PROJECT 10/14/16 2:00 PM 0 Paper & Online 1 Online Sidewalk repairProject Contact: Jesse Khatkar 650-522-7375Specs also available for review at Santa Clara Builders Exchange San Mateo RFQ CONSULTING SERVICES FOR SANITARY SEWER LIFT STATION REHABILITATION DESIGN SERVICES (ONLINE) 10/17/16 2:00 PM The Scope of Services for this Work covers five individual lift station rehabilitation projects. The City may choose to award work to one, two, or three Consultants based on their needs and the evaluation criteria assessment for each projectRFQ available ONLINE ONLY San Mateo COLLEGE OF SAN MATEO (CSM) TREES - FIRE MITIGATION & SAFETY PHASE III San Mateo RFP ARCHITECTURAL & ENGINEERING PROFESSIONAL SERVICES NEW FIRE STATION #25 10/19/16 2:00 PM 0 Paper & Online Removal of approximately 60 trees.Project Contact: Johnnie Fudge 650-378-7341Email: fudgej@smccd.eduSpecs also available for review at Santa Clara Builders Exchange 10/28/16 2:00 PM 0 Paper & Online 2:00 PM 0 Paper & Online Planning and design of a new Fire Station 25.RFP also available for review at Santa Clara Builders Exchange San Mateo County DISTRICTWIDE ELECTRIC VEHICLE CHARGING STATION EXPANSION - SMCCCD SAN PABLO EL PORTAL WEST RULE 20A UNDERGROUNDING UTILITY DISTRICT PROJECT (ONLINE) 10/20/16 Install new EV Charging Stations on all three SMCCD campuses and the District Office.Plans also available for review at Santa Clara Builders Exchange 10/17/16 2:00 PM 0 SFONLI Online NE The Project is located along El Portal Dr. between Road 20 and Mission Bell Dr. and is described as follows: The utility undergrounding project will consist of removing poles, overhead wires and related aerial electric, cable TV and similar communication facilities and constructing underground utility facilities, consisting of conduits, vaults, splice boxes and conductor wires, including street lighting facilities. The Work will also include installation of fiber optic cables and routing capabilities. To replace the street lights which now are currently supported by timber utility poles, the Project will include erecting steel street light standards/poles, which would be served by underground electric conduits. Where possible, the new street lights would be installed in medians, with dual mast arms.Estimated Cost. The City Engineer has estimated the construction cost at:Bid Form A (Rule 20A Joint Trench): $490,514Bid Form B and Add Alternate (City Improvements): $294,642 Questions: Ronalyn Nonato by email at: RonalynN@sanpabloca.gov at least six City working days prior to the opening of bids.PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Page 19 of 23 Location Plan Name SAN PABLO AND PITTSBURG C-4001 CAMPUS SAFETY CENTER AT CONTRA COSTA COLLEGE AND L-4001 CAMPUS 11/1/16 SAFETY CENTER AT LOS MEDANOS COLLEGE - REBID (ONLINE ONLY) Bid Date Bid Time # Of Addenda Plan # 2:00 PM SFONLI Online NE 3 Plans In general, Work consists of designing, delivering and installing new modular buildings at the Contra Costa College and Los Medanos College campuses to house their respective Campus Safety Centers. It is expected design work will begin September 2016, with submission of construction documents to DSA before November 1, 2016, with site construction beginning on or before May 1, 2017. The modular manufacturer selected to provide Services per this bid proposal will be required to be an integral member of the Project Team to provide a well-integrated and watertight modular building design working in conjunction with LPAS, the AOR, to meet the needs of the DISTRICT within the project program, budget and schedule. A more detailed Scope of Work can be found in Summary of Work, Section 01010, of the Bid Documents.PRE-BID MEETINGS AND JOB WALKS (Mandatory):1) PRE-BID MEETING & JOB WALK #1,Location: Thursday, October 6, 2016, at 11 AMLos Medanos College, 2700 East Leland Dr., Pittsburg, CA 94565Meet in Room PS 20 (see Campus Map - Section 00016 of the Bid Documents)2) PRE-BID MEETING & JOB WALK #2,Location: Thursday, October 6, 2016, at 1:30 PMContra Costa College, 2600 Mission Bell Dr., San Pablo, CA 94806(Meeting Location To Be Announced During Job Walk #1)PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN RAFAEL PREFABRICATED 316 STAINLESS STEEL PRIMARY DIGESTER DOME (ONLINE) 10/7/16 11:00 AM 0 SFONLI Online NE Fabrication of 316SS primary digester dome including field measurement, submittal of shop drawings, and delivery.Questions: Michael P. Cortez PE, District Engineer, at (415) 4721033, ext 18, or by email at: mcortez@lgvsd.orgPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN RAFAEL PRIMARY DIGESTER SANDBLASTING AND PAINTING PROJECT (ONLINE) 10/11/16 11:00 AM 0 SFONLI Online NE The Project work is generally described as:1. Mobilization and demobilization.2. Sandblasting (also called Abrasive Blast Cleaning) the areas to be painted in the interior of the digester cone, digester dome chimney and water launder, roof located inlest box and manhole box, in accordance with the painting or coating manufacturers recommendations and the Society for Protective Coating (SSPC standards, require continuously maintained confined space entry and setting up scaffolding on a tapered floor with up to a 20% slope.3. Application of epoxy filler material in areas determined by the District in accordance with manufacturers recommendations.4. Painting or coating the inside of the digester and all appurtenances including the gas dome, inside of the roof, and five foot 5’ down the inside of the walls, and the inside and outside of digester dome chimney and launder channel and inside and outside of the concrete center support feed column and all attached pipes and penetrations inside the digester, and the pipes crossing the bottom of the digester, and inside the feed and overflow boxes outside of the digester in accordance with manufacturers recommendations.Questions: Michael P. Cortez PE, District Engineer, at (415) 4721033, ext 18, or by email at: mcortez@lgvsd.orgPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY SAN RAFAEL MAINTENANCE FACILITY MODIFICATIONS PROJECT 10/20/16 2:00 PM 0 SF95 Paper & Online This Project includes expansion and remodeling of the Maintenance Building to create an office space, enclosing the open side of the Maintenance Building for storage, and construction of a new storage structure adjacent to the Maintenance Annex.Questions: Brian Thomas, P.E., Engineering Manager, at (415) 459-1455 Ext. 122, or by email at: bthomas@cmsa.us SAN RAMON FARIA PUMPING PLANT & NO. 1 AND NO. 2 RESERVOIRS CONSTRUCTION AND SAN RAMON RESERVOIR REHABILITATION - EBMUD 10/26/16 1:30 PM 0 SF210 Paper & Online Div 1-3, 5-9, 12-13, 22-23, 26-28, 31-33, 40-41 & 43. Work includes three sites in San Ramon.1). AT THE FARIA RESERVOIR SITE: Furnish and install two 0.5-MG welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, flexible expansion joints, valve structures, and appurtenances; furnish and install approximately 180 ft. of 12" ML&PCS pipe, 40 ft. of 8" ML&PCS pipe; furnish and install fencing, radio communication towers; and perform related required work, located as shown on Drawings 2142-Z-000.1, W-10538-1, and W-10538-4 through W-10538-5.2). AT THE FARIA PUMPING PLANT SITE: Furnish and install a 1.5-MGD pumping plant with related piping; furnish and install three 50 HP vertical turbine pumps, motors, bridge crane, motor control equipment and all mechanical and electrical equipment; furnish and install approximately 60 ft. of 24" ML&CS pipe, 30 ft. of 20" ML&CS pipe; 105 ft. of 12" ML&PCS pipe, 40 ft. of 8" ML&PCS pipe, and flexible expansion joints, including all appurtenances and fittings; connect third-party developer (hereinafter defined as "Applicant") installed Inlet/Outlet pipe to existing San Ramon Reservoir Inlet/Outlet line. Provide field testing and startup; approved as-built drawings and operations & maintenance manuals; construct site improvements, and perform related required work, located as shown on Drawing 2141-Z-000.1, W-10538-1 through W-10538-3 and W-10538-4 through W-10538-9.3). AT THE SAN RAMON RESERVOIR SITE: Construct a new access route to the San Ramon Reservoir; remove internal reservoir equipment and sealant; furnish and install new internal stainless steel reservoir equipment and interior sealant; demolish entire perimeter fence, water quality cabinet, and Remote Terminal Unit; demolish existing reservoir man-ways and existing on-site stairs; furnish and install new man-ways, water quality cabinet, Remote Terminal Unit, vents, fall protection, and steel stairs to roof of reservoir; demolish and remove mechanical piping within the valve pit; furnish and install new pipes, associated valves and fittings, lighting, and instrumentation; construct trench dam outside of the valve pit; and perform related required work at the existing San Ramon Reservoir facility as shown on the drawings 1736-Z002.1 and specified herein. Santa Cruz EARTH AND MARINE SCIENCES BUILDING - C580 CONVERSION TO METAL FREE LAB 10/5/16 11:00 AM 6 SF27 Paper & Online Class B. Alterations to Rooms C580 and C584 in the Earth and Marine Sciences Building (approximately 580 s.f.) to accommodate research lab needs for the Principal Investigator and faculty member in charge of this lab. The laboratory conversion work work is described in the Drawings and Specifications entitled Lab Alterations Project, Earth & Marine Sciences Building, Rooms C580 & C584, UCSC. Selective demo, metal fabrication, architectural casework, firestopping, joint sealers, openings, finishes,signage, fume hoods, laminar flow hoods, fire protection system, plumbing, HVAC, electrical, communications, and fire alarm system.PREVAILING WAGE Santa Cruz FALL 2016 SURFACE SEAL 10/6/16 2:00 PM 0 Paper & Online The work to be done consists in general of resurfacing with a double SAMI-R seal and Microsurfacing.PREVAILING WAGEProject Contact: Ricardo Valdes 831-420-5198 rvaldes@cityofsantacruz.com Page 20 of 23 Location Plan Name Bid Date Bid Time # Of Addenda Santa Cruz IMPROVEMENTS ON SOQUEL DRIVE 10/13/16 2:00 PM 0 Plan # Plans Paper & Online Class A. This project involves the construction of of a curb, gutter, sidewalk, retaining wall, and bus turnout are proposed on Soquel Drive, just east of 41st Avenue and green bike lanes are proposed on Soquel Drive at the Highway 1 Interchange. PREVAILING WAGE Santa Cruz FRONT STREET/PACIFIC AVENUE HISTORIC WALL PRESERVATION 10/18/16 2:00 PM 0 Paper & Online Class A or C-8. Capping existing Historic Wall with mortar, removing existing rail and piers, constructing new guard-pedestrian rail per Caltrans Standards, rehabilitation of the face of the wall, replacing sidewalk as needed. PREVAILING WAGE Santa Cruz CURTIS STREET STORM DRAIN - PHASE I 10/18/16 2:00 PM 0 Paper & Online The work to be done consists in general of installing storm drain pipelines and sanitary sewer pipelines, installing manholes and catch basins and replacing sewer laterals. Santa Cruz EASTSIDE ALLEY SEWER PROJECT 10/27/16 2:00 PM 0 Paper & Online Class A. Removing and replacing 7560 lineal feet of existing clay sanitary sewer pipe with new PVC sanitary sewer pipe, replacing existing brick manholes with new concrete manholes, installing terminal cleanouts, sewer lateral replacement and re-connection. PREVAILING WAGE Santa Cruz BROMMER PARK SPORTS COURT RESURFACING AND SPORTS EQUIPMENT INSTALLATION PROJECT 10/28/16 2:30 PM 0 Paper & Online Class C12. Remove and install new sports equipment and resurface and stripe athletic courts at Brommer Park in Santa Cruz.PREVAILING WAGE Santa Cruz SHADE CANOPIES AT DELAVEAGA ELEMENTARY SCHOOL 10/4/16 2:00 PM 2 Paper & Online Class B or C13. Addition of a pre-manufactured Shade Canopy, associated exterior sitework and concrete paving. PREVAILING WAGE Santa Cruz County NOTICE TO INTERESTED GENERAL AND SPECIALTY CONTRACTORS 12/30/16 5:00 PM 0 Online The Housing Authority of the County of Santa Cruz requests responses from qualified General Contractors and Specialty Contractors, including but not limited to: Concrete, Electrical, Painting, Plumbing, Roofing and similar specialty classifications. The Housing Authority is developing a list of pre-qualified contractors to provide construction services for a variety of on-going facility maintenance and modification projects – including vacant unit turnovers, service work and similar. Contractors will be evaluated based on the nature of services required and the qualifications of the Contractor. Depending on nature and location of work, select prevailing wage rates will apply to jobs.Interested Contractors must complete a “Contractor Information” form. Contractors must submit completed forms to the Housing Authority office located at:Housing Authority of the County of Santa Cruz2931 Mission St.ATT: Peter RogersSanta Cruz, CA 95062This Notice will remain open - there is no deadline for submitting a written “Contractor Information” forms.Please contact Peter Rogers at 831-454-5928 with questions. SANTA ROSA RFP FOR PROGRAM/CONSTRUCTION MANAGEMENT (ONLINE) 10/14/16 2:00 PM 0 SFONLI Online NE SRCS intends to select one or more firms that best meet SRCS’s needs to perform the planning, program management, and project/construction management services as described in this RFQ/P. SRCS may assign all or parts of the work described below to one or more of the successful firm(s). The criteria on which SRCS makes its determination will not be limited to the amount of proposed fees, but will also be based on ability and experience as described herein. The successful firms must have the demonstrated ability to complete the requirements of the RFQ/P within an agreed upon timeline and at a competitive agreed upon fee.Questions: Mr. Steven J. Eichman, Assistant Superintendent Business Services at (707) 528-5381, or by email at: seichman@srcs.k12.ca.usRFP IS AVAILABLE FOR VIEWING ONLINE ONLY SANTA ROSA RFP FOR ARCHITECTURAL SERVICES (ONLINE) 10/14/16 2:00 PM 0 SFONLI Online NE It is the intent of the administration to recommend to the Governing Board a pool of architectural firms from which SRCS will make specific project appointments for additions to existing schools, and renovation and modernization projects as identified in SRCS’s Facility Master Plan (FMP) approved by the Board of Trustees on April 27, 2016 with funding for said projects derived primarily from $229 million bond measures approved by the citizens of SRCS in November 2016.Questions: Mr. Steven J. Eichman, Assistant Superintendent Business Services at (707) 528-5381, or by email at: seichman@srcs.k12.ca.usRFP IS AVAILABLE FOR VIEWING ONLINE ONLY Saratoga NEW TRACK AT MCAULIFFE ELEMENTARY SCHOOL - CUPERTINO UNIFIED SCHOOL DISTRICT (CUSD) 10/4/16 11:00 AM 1 Paper & Online New 6-foot wide x 1,198-linear foot running track per plans and specifications, and includes all grading, installation of redwood header boards, installation of 6 inches of base rock and paving with 3 inches of hot asphalt.Plans and specs also available for review at Santa Clara Builders Exchange Saratoga STUDENT SERVICES DEMOLITION WEST VALLEY COLLEGE - WVC 10/14/16 2:00 PM 0 Paper & Online Demolition of Buildings 600 & 700?Project Contact: Michael Sandlin, Gilbane 408-863-2034Email: msandlin@gilbaneco.comPlans and specs also available for review at Santa Clara Builders Exchange Page 21 of 23 Location Plan Name Bid Date Saratoga WEST VALLEY COLLEGE SCHOOL OF PROFESSIONAL STUDIES - WVC (ONLINE) 10/20/16 Bid Time # Of Addenda Plan # 1:30 PM SF18-19 Online 1 Plans Renovating approximately 19,400 square feet of an existing single story "Business" (Building B) building which includes classrooms, computer labs, and office spaces with exterior circulation; and 3,500 SF of existing single story "Administration of Justice building" (Building A) which includes clasrooms and a crime investigations education laboratory.Project Contact: Contact: Elizabeth WittEmail: ewitt@gilbaneco.comPlans available ONLINE ONLYProject Contact: Saratoga KVAMME PLANETARIUIM ADDITION WEST VALLEY COLLEGE (WVC) (ONLINE) 10/20/16 2:55 PM 1 Online Kvamme Planetarium Addition. Specific Work Scope:a. Selective Demolitionb. Rough GradingProject Contact: Deedee Flauding, Gilbane Building CompanyEmail: dflauding@gilbaneco.comPlans available ONLINE ONLY Soledad SOLEDAD USD CUPCCAA - NOTICE TO CONTRACTORS TO BE INCLUDED ON LIST 10/7/16 5:00 PM 0 Online Notice is hereby given that the Soledad Unified School District has elected to participate in the California Uniform Public Construction Cost Accounting Act Public projects, as defined by this Act and in accordance with the limits listed in Section 22032 of the Public Contract Code, will be let to contract by informal procedures as set forth in Section 2203222045 of the Public Contract Code. All licensed contractors are invited to submit the name of their firm to the District for inclusion in the District’s list of qualified bidders for 2016 and Calendar Year 2017 (January 1 through December 31, 2017).All contractors are to be in full compliance with the current Department of Industrial Relations requirements found in Labor Code Section 1725.5 and 1773.3. All contractors and subcontractor who bid or work on public works projects must register with the DIR. Sunnyvale REPAIR OF AIR FLOTATION TANKS NO. 2 & 3 Sunnyvale PARKS BUILDINGS MODERNIZATIONS PROJECT - REBID 10/5/16 3:00 PM 2 Paper & Online Repairs of AFT No. 2 and 3.Project Contact: Lisa Vo 408-730-7608Email: Lvo@sunnyvale.ca.govSpecs also available for review at Santa Clara Builders Exchange 10/12/16 3:00 PM 2 SF4 Paper & Online Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as "Parks Buildings Modernization Project Rebid, Project No. PR-14/08-15" consisting of renovation the existing recreation buildings at Washington, Raynor, De Anza, Ponderosa Parks and the auxiliary restroom at De Anza Park. The additive alternate work will include the work at the auxiliary restroom at Washington Park’s Jelcick Field. The design shall address renovations to the existing electrical, telecommunications, fire, and security systems; remodeling of facility interior elements (flooring, windows, doors, walls, lighting, restrooms, and kitchen/kitchenettes); inspections of and renovations to the plumbing, roofing, and aesthetics of the facilities; other work as necessary for a complete, operational project, according to Plans and Specifications prepared by the City of Sunnyvale and according to the Contract DocumentsProject Contact: Pete Gonda 408-730-7418Email: pgonda@sunnyvale.ca.govPlans and specs also available for review at Santa Clara Builders Exchange WALNUT OLD NAVY BROADWAY PLAZA STORE #4063 (ONLINE) 10/5/16 5:00 PM 0 SFONLI Online NE Please submit bids for the following trades: Final cleaning, demo, building concrete, light weight concrete, masonry, rough carpentry, millwork/finish carpentry, damp proofing & waterproofing, insulation, roofing, doors/frames & hardware, entrances and storefront, glass/glazing, drywall/metal studs, tile flooring, acoustical ceilings, resilient flooring & carpet, painting & wall covering, toilet, bath & laundry accessories, detection & alarm, fire sprinklers, plumbing, HVAC & electrical. Please submit your bids to Irene Enriquez at: ienriquez@gray.com by Wednesday,Oct 5th, 2016 at 5 PM. PROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY WALNUT CREEK LESHER CENTER FOR THE ARTS FIRE ALARM REPLACEMENT (ONLINE) 10/5/16 3:30 PM 1 SFONLI Online NE The Project includes, but is not limited to, performing the following Work:1. Provide complete design drawings and specifications for a new addressable voice evacuation fire alarm system to meet current codes. All existing devices and cabling on site shall be replaced with new.2. All initiation devices and connections to auxiliary equipment such as fans, HVAC units and door release shall be reconnected to the new system.3. The two sets of doors with local hold open shall remain as is.4. Audible and visual coverage shall be installed to meet current code requirements. Existing device locations for speakers and strobes appear to be located so that new devices may be installed at existing locations without the need to add any surface mount devices.5. The contractor shall provide complete design drawings with conduit and cable routing on the Plans. This will require investigation of the existing system in order to determine the existing pathways.6. The City does not wish to have additional surface conduits installed in the building. If during the investigation of the existing systems it is found that additional device locations may be required additional pathways will be coordinated with the City. Removal of all existing equipment will require patching and painting of existing surfaces.7. As the theater cannot have downtime, so both systems will need to be simultaneously operational. The existing system will need to be removed in total or in phases and the new system installed in those areas until the entire building has been changed over. All phasing shall be closely coordinated with the City.8. The contractor shall coordinate location of the Fire Alarm Panel and associated equipment with the City, prior to start of construction and installation.9. Contractor shall coordinate with the City for all submittals to the local fire Marshal for review and approval.Questions: Carolyne Challice at (925) 943-5899 x2203 or by email at: challice@walnut-creek.orgPROJECT IS AVAILABLE FOR VIEWING ONLINE ONLY Watsonville WATSONVILLE CHILD CARE CENTER 10/11/16 2:00 PM Installation of American Modular Systems Classroom, 1440 sq. ft., and related site improvements.PREVAILING WAGE Page 22 of 23 1 Paper & Online Location Plan Name Bid Date Yountville CENTRAL POWER PLANT RENOVATION 11/2/16 Bid Time # Of Addenda Plan # Plans 2:00 PM SF35 Online 0 Project comprises labor, material and services necessary for: Renovation of the existing Central Power Plant. Including the replacement of two 600 HP boilers with three 500 HP boilers; the replacement of pumps, water softener, condensate tank, de aerator tank, and related valves and piping; replacement of cooling towers and associated valves and piping, installation of 2 emergency generators (including fuel tank and transfer switch) and a new 460-volt electrical panel. Demolition work will include removal of concrete, hazardous materials, old equipment, and miscellaneous valves and piping. Page 23 of 23