2/25/2015 Georgia Public Notice | Georgia Press Association Notice Publish Date: Wednesday, February 25, 2015 Notice Content gpn05 Legal 16233 SECTION 00 11 13 ADVERTISEMENT FOR BID S Project Name: Westpark ­ Pebblestump Sanitary Sewer Rehabilitation PCWASA #54­2532 Project No.: 1040.1308 Owner Contract No. PCWASA # 54­2532 Date of Issue: February 23, 2015 Bid Date: March 26, 2015 at 2:00 PM Owner Peachtree City Water & Sewerage Authority 1127 Highway 74 South Peachtree City, GA 30269 (phone) 770­487­7993 Contact: Nathan Brooks, contracts@pcwasa.org Engineer Integrated Science & Engineering, Inc. 1039 Sullivan Road, Suite 200 Newnan, GA 30265 Phone 678­552­2106 Contact: Cary Dial, cdial@intse.com The Peachtree City Water & Sewerage Authority will be receiving separate sealed Bid s for all material, labor and equipment for the Westpark ­ Pebblestump Sanitary Sewer Rehabilitation PCWASA #54­2532 project. This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications: New construction of 3 manholes and approximately 600 L.F. 8” DIP gravity sewer pipe via open cut, including connection to existing sewer manhole. Rehabilitation of approximately 12 manholes and 2,630 L.F. of 8” gravity sewer via pipe bursting of various pipe materials. This contract is local funded. Contract Documents may be examined at the following locations: Peachtree City Water & Sewerage Authority, 1127 Highway 74 South, Peachtree City, GA 30269 (www.pcwasa.org) Integrated Science & Engineering, Inc., 1039 Sullivan Road, Suite 200, Newnan, GA 30265 (www.intse.com) Georgia Procurement Registry (http://ssl.doas.state.ga.us/PRSapp/) Reed Construction Data, 30 Technology Parkway South, Suite 100, Norcross, GA 30092 (www.reedpsp.com) iSqFt2, 4485 South Atlanta Road, Smyrna, GA 30080 (www.isqft.com) Data Fax (www.datafax.net) It is mandatory that all prospective bid ders purchase the Project Manual and Construction Drawings from the office of Integrated Science & Engineering, Inc.. A hard copy may be obtained upon non­refundable payment of $50. An electronic copy may be obtained upon non­ refundable payment of $25. Each Bid der must deposit with his bid , security in the amount of 5%, and shall be subject to the conditions provided in Section 00 21 13 “Instruction to Bid ders.” Each Bid der is required to submit a “Construction Contractors Qualification Statement”, “ Bid Security”, “ Bid Form”, Non­Collusion Affidavit”, and “Security and Immigration Compliance Affidavit” as outlined in Section 00 22 13 “Supplementary Instructions to Bid ders.” The Peachtree City Water & Sewerage Authority will receive sealed bid s until March 26, 2015 at 2:00 PM at the John W. Gronner Administration Facility located at 1127 Highway 74 South, Peachtree City, GA 30269. Bid s received after this time will not be accepted. Bid s will be opened and publicly read aloud. The contract will be awarded to the low, responsive, and responsible bid der with the Owners reservation of right to reject all bid s. Bid s may not be withdrawn by Bid ders for 60 days following opening of the bid s. This project requires formal funding appropriation and the owner reserves the right to suspend the bid should there be a delay in that process. The project shall be Substantially Complete within 60 calendar days from the date of Notice to data:text/html;charset=utf­8,%3Ctable%20style%3D%22box­sizing%3A%20inherit%3B%20margin%3A%200px%200px%2015px%3B%20padding%3A%200px… 1/2 Proceed of the contract. Liquidated Damages shall be assessed in the amount of $300 per day 2/25/2015 Georgia Public Notice | Georgia Press Association for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $500 per day for each calendar day required to achieve Final Completion. There will be a required “Pre­ Bid ” meeting on March 5, 2015 at 2:00 PM located at the Peachtree City Water & Sewerage Authority office. All contractors submitting a Bid are required to attend. The Peachtree City Water & Sewerage Authority provides assurances to Bid der that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained by Notice to Proceed date. The Peachtree City Water & Sewerage Authority will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bid s, excluding Saturdays, Sundays, and State of Georgia Legal Holidays. END OF SECTION February 25, 2015 March 4, 2015 data:text/html;charset=utf­8,%3Ctable%20style%3D%22box­sizing%3A%20inherit%3B%20margin%3A%200px%200px%2015px%3B%20padding%3A%200px… 2/2