Current Projects Data Since it was established in 2006, RAM Electrical & Civil has delivered more than 700 projects throughout the SADC region. Projects between R10 Million - R20 Million Site Code Project Description Project Start Date Project Cost Time Involved Electrical Installations Apr-15 R 19.5 mil 12 months Nebawest 46 PTY Ballenden & Robb Andre Sieberhagen T: 045-838-1815 Robert Skinner Construction Francois Baard 012-8030811 Ariano Consulting Engineers Willie Bouwer T: 083 272 0552 Project Title Client Engineer 2004 M Fletcher New Cluster Offices 0354 LEMO Shopping Mall - Heidedal, Bloemfontein Electrical Installations Sep-14 R 19.5 mil 19 months 0371 Tsitsikamma Windfarm- Civil work and installation of 33kV connector cables Civil works and installation of 33kV and LV cables between wind turbines/substation , LV connector cables between turbines and transformers, road crossings, fibre optic etc. Apr-15 R 17.4 mil 9 months Actom - RAM Subcontracting for CBI-African Cables CBI-African Cables Waldo van Wyk T: 078 459 7560 0000 Kariba Powerstation, Zimbabwe Installation of 400kV Cables Sept-15 R 12 mil 18 months Helcraw Electrical Zimbabwe Gary Laing T: +26 377 215 2440 Projects between R5million - R10million Site Code 0280 Project Title Project Description Project Start Date Project Cost Time Involved Ingula Water Pump Scheme - Hydro Electrical Power Installation of cable brackets and installation of cables from the underground transformers to the 400kV yard. Total installation is 4x circuits, 1500m running length, 400kV XLPE cables Aug-14 R9 mil 12 Months Client Engineer Eskom - RAM subcontracting for CBI African Cables CBI- African Cables Waldo van Wyk T: 078 459 7560 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 www.rame.co.za Current Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Time Involved Client Engineer 2021 Sebenza Project Installation of 132kV cables and cable brackets Nov-15 R 7.8 mil 6 months Eskom RAM subcontracting for CBI - African Cables Piet Marx T: 083 304 5633 2010 Kiepersol Substation construction of 132kV Substation Jun-15 R 7.45 mil 8 months Spring Valley Development Bigen Africa Johan Pieters T: 082 410 9599 0353 Bisho Disaster Management Centre Electrical Installation & Civil Works Sep-14 R 6.1 mil 12 Months Alexander Construction Trust Peter Brooks T: 082 920 4542 2022 Botshabelo Streetlighting Botshabelo Interchange street lighting project Oct-15 R 5.5 mil 5 months SANRAL Triocon Construction Pieter Meyer T: 021 552 4949 0374 Sol Plaatje University Building 2 Electrical Installation Mar-15 R 5.44 mil Trencon Construction Neil van der Westhuizen T: 082 739 2358 2008 NASREC Memorial Park Off grid Solar Installation with water and irrigation systems May-15 R 9.1 mil 11 months Calgro M3 Holding Nicolene Louw T: 011 300 7540 Rudolph Evert T: 082 825 9751 2006 Barky East Stadium Installation of high mast lights at Stadium Senque Municipality N Nkopane T: 051 -603 1300 DFR Consulting Engineers Louw Brand T: 074 889 8308 2024 Moffat Substation, Kuruman Upgrade of existing municipal main intake substation 2009 Kuruman Werkswinkel Installation of 2 x Reclosers Sept-15 2023 Twin City Mall – Heidedal Bloemfontein Supply and Install Electrical Installation Oct-15 Jun-15 Oct-15 R 3.24 mil 5 months 4 months Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 R .68 mil 2 months Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 R2.53 mil 12 months Cupro Consulting Fanie Smit T: 082 923 3072 R 2.6 mil Projects between R1million - R5million Site Code Project Title Project Description Project Start Date Project Cost Time Involved 0374 Sol Plaatjie University Building C002 Project Electrical First Fix Feb-15 R 1.97 mil 2012 Qebe Clinic Construction of a new replacement clinic – Electrical Installation Jul-15 R1.84 mil ‘0274 Xina Xina Solar Field – Solar plant electrical installation Building Electrical Installations, earthing and electrical solar field Oct-15 R 1.5 mil Client Engineer Trencon Construction Neil v.d. Westhuizen T: 082 739 2358 6 months Simunye Developers T: 043 745 1399 Ballenden & Robb Andrè Sieberhagen Consulting Engineers 10 months Teyma South Africa Frederico Zanotta Rizzo T: 021 937 0228 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 2 www.rame.co.za Current Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Time Involved Client Engineer TP Construction 047 532 4427 Mr. Vuyani Skenjana Ballenden & Robb Andrè Sieberhagen Consulting Engineers Ballenden & Robb Andre Sieberhagen T: 071 851 4898 Lawrence&Victor Construction & Civils Leonard Bowles T: 046 622 3205 T: 081 434 4408 6 months MIS Pipelines Guiliano T: 082 334 3738 6 months Chris Hani District Municipality T: 045 808 4600/67 2016 Nkwenkwana Clinic Electrical Installation Jul-15 R1.75 mil 6 months 0343 Ikhala Centre Queenstown Electrical Connection & Building electrical Jul-14 R 1.4 mil 1 year 0324 Komani Hospital Queenstown Eastern Cape Laundry - Electrical Installation Apr-14 R1.3 mil 12 Months ‘0373 Babelegi Reservoir Hammanskraal Supply and install all motor control distribution boards Jun-15 R 1.3 mil 2018 Queenstown WWTW: New Rathwick Bulk Services (Phase 3B) Supply & Installation of standby diesel Generator at Queenstown July-15 R1 mil Projects under R1million Site Code Project Title Project Description Project Start Date Project Cost Time Involved Client Engineer 0342 Tredenham Valley Phase 2 Electrical Connection Jun-14 R 0.4 mil 1 year Aurecon Consulting Engineers Koos Kritzinger T: 082 770 0225 0330 Mdantsane Prison Generator Installation Apr-14 R 0.3 mil 6 months Dept of Public Works G Appels T: 041 - 4082150 0345 Mangaung Small Power Electrical installation at Northern Waste Water Treatment works Jul-14 R 0.27 mil 3 months Stefanutti Stocks 0313 Kimberley Homevale Waste Water Treatment Works Electrical installation Apr-14 R 0.23 mil 3 months 0263 Bloemfontein Race Course Bulk Streetlight 1 month Space Securitisation (PTY) Ltd Aurecon Consulting Engineers Koos Kritzinger T: 082 770 0225 Bulk Streetlight installation Aug-14 R 0.15 mil electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 3 www.rame.co.za Completed Projects Data Projects between R10million - R2million Project Description Project Start Date Project Cost Completion Time Client Engineer Sedibeng Iron Ore Construction of 7.3km 132kV Power Line and 132kV/11kV substation Dec -14 R20.5mil 8 months Sedibeng Iron Ore Eskom 132 kV Cable Installations Jhb = 132kV, 1000MMSQ AL XLPE single core cables Gauteng Trenching and assistance with 132kV cables installations. 1) Croydon substation to Germiston north substation - 7 km (running meters) 2) Croydon substation to Bedfordview substation - 10 km (running meters) 3) Croydon substation to Isando East substation - 5km (running meters) 4) Lombardy substation to Edenvale Industries - 9km (running meters) Nov-09 1) R12.2 mil 2) R7.7 mil 3) R5.5 mil 4) R11 mil Kroonstad Prison Free State Building Electrical Security lighting Generators Substations Intercom systems Biometrical management systems Electrical maintenance 0194 Site Code 0385 0125 Project Title Engineer Somdeb Banerjee T: 011 459 1750 19 Months Eskom Frank van Heerden Eskom Bloemfontein T:051 435 6000 or CBI African Cables Willem v.d Vyver T: 082 770 0225 M and C Consulting Engineers Barry Flood T: 057 357 2763 T: 082 455 9945 CBI - African cables Willem v.d. Vyver T: 083 629 7088 Jan-04 R20.5 mil 36 Months Department of Public Works 44kV Cable JHB 1) Supply and installation of 840m of 500mm2 XLPE cable and accessories from Isando East to Kempton Park Substation. 2)Supply and installation of 800m of 1000mm2 XLPE cable from Horwood Substation to Rietcons Substation. 3)The supply and installation of 2.1km 500mm2 XLPE cable form Friskies to New Rietcons Substation, 140m extension of Croydon fo Friskies cable and 140m cable from Rietcons to Eskom Substation. 4)Supply and installation of 4km of 1000mm2 XLPE cable and accessories from Horwood Substation to Lombardy Substation. 1) R 2.9 mil 2) R 1.7 mil 3) R .4 mil still under installation 4) R 20 mil still under installation 12 Months Eskom - RAM Subcontracting for CBI - African cables 0122 New Intermodal Complex 11kV Reticulation and LV Reticulaton of new taxi rank and shopping complex Mar-09 R16.1 mil 36 Months Kwetse V 3 Kwetse V 3 Coenie van der Merwe T: 082 5600 429 0085 Cecilia Makiwane Hospital East London MV reticulation - install 11kV switchgear, Cables Transformer Standby generators Building electrical Mar-08 R16 mil 24 Months Coega Development Co-operation Rnzuza Engineers Mr. D Flangaan T: 082 771 6901 0008 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description 0269 0270 0271 Free State State Buildings Bloemfontein Kroonstad Bethlehem Free State Electrical repairs to state owned buildings 0197 Sandton 88kV Cable Johannesburg Gauteng 7km 88kv 1000mm2 single core cable installation from Craighall Substation to Benmore Substation Project Start Date Project Cost Completion Time Client Mar-13 R14.6 mil 12 Months Depart. of Public Works 18 Months Eskom - RAM Subcontracting for CBI - African cables CBI - African cables Willem v.d. Vyver T: 083 629 7088 Aurecon Consulting Engineers -B Devenish T: 051408 9610 Dec-11 R14 mil Engineer Department of Public Works Mr Pule Thole T: 051 408 7340 0272 Heuningsvlei Solar Installation Feb-13 R13.6 mil 12 Months Joe Morolong Municipality 0181 UMK Mine Electrical reticulation, lighting and small works Sep-11 R11.60 mil 30 Months UMK Mines Goba Consulting Engineers Mark Louw T: 011 236 3300 0105 New complex for South African Police Services Cradock Eastern Cape Construction of new police station including electrical and mechanical installation and high tension reticulation Dec-08 R12.60 mil 29 Months Department of Public Works Frans van Zyl T:083 680 2456 Carifo Aiden Sweetman T: 041 368 1717 0072 Upgrade for FIFA 2010 World Cup soccer Free State Stadium Bloemfontein Free State Electrical installation and reticulation of low voltage and high voltage installations Upgrading Free State Stadium for 2010 World cup soccer Sep-08 R11.14 mil 12 Months Ruwacon Koos Kritzinger Tell: 051 447 1636 T: 082 770 0225 Client Engineer Projects between R5million – R10million Site Code Project Title Project Description 0297 Kouga Windfarm - Civil work and installation of 33kV connector cables Oysterbay Easter Cape Civil works and installation of 33kV and LV cables between wind turbines/ substation , LV connector cables between turbines and transformers, road crossings, fibre optic etc. 0134 Kimberley GWK Stadium - for FIFA 2010 world cup Kimberley Northern Cape 0232 Postmasburg New Connection Upgrade of the lights to serve as a training facility for a base camp New Mall electrical connection Project Start Date Sep-14 Mar-10 Mar-12 Project Cost R10 mil R9.78 mil R9.1 mil Completion Time 8 Months Actom - RAM CBI- African Cables Willem v.c Vyver T: 083 629 7088 Matshele Monnakgotla T: 082 800 8698 2 Months Depart. of Roads and Public Works Heyns van Rooyen Consulting Engineers Heyns van Rooyen T: 083 259 2271 2 months Purple Fountain Properties Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 5 www.rame.co.za Completed Projects Data (Continued) Project Start Date Site Code Project Title Project Description 0082 Atteridgeville Prison Pretoria Gauteng Repair and maintenance to electrical and mechanical installation and maintenance RAMP Project Mar-08 0180 Solar Geyser installation Port Elizabeth Eastern Cape Solar Geyser installation in RDP houses Installation of 15 000 geysers 0292 Letsatsi PV Farm Solar PV Plant Grootvlei Prison Bloemfontein Free State 11kV cable installation 2 x 1000kVA miniature substations complete installation 11kV protection design, install and commission Low voltage cabling in laundry, kitchen, prison etc. 1.2MVA Genset - install generator, switch over board and commision Building electrical Installation to court Completion Time Client R8.58 mil 36 Months Depart of Public Works Mnjiya Consulting Engineers Raymond T: 011 3182849 Jan-11 R8.5 mil 36 Months Eskom HDC Industries Alkara 79 cc Nico Gouws T: 053 831 1260 Jul-13 R 8.2 mil 8 Months Raubex Raubex Dirk Lourens T: 051 -406 2000 R7.5 mil 8 Months Department of Correctional Services Ingali Engineers Mr. Lotter T: 051 430 5435 T: 082 959 149 Nov-06 Eskom Homestead Refurbishment of all 132kV and 66kV equipment and extension of feeder bay Feb-15 R6.5 mil 8 months Eskom Eskom P Zitha T: 053 830 5415 Jan Pan Theunissen Free State 11kV overhead line feeder strengthening (construction of new and existing O/H lines for Eskom) Mar-13 R6.8mil 12 Months Eskom Paseletso Faba T: 082 812 7378 T: 051 404 6442 0090 Free State Stadium and Athletics for 2010 soccer world cup Bloemfontein Free State Install 246 New Flood lights and control gear install 10 x D/B Boards for lights Install new LV cable network to lights aiming commissioning Free State athletics - Remove old fittings from Free State Stadium and installed at athletics stadium. Refurbished re-lamp, install new control gear Upgraded to 200 Lux and 11kV cables 11kV mini subs New LV cables Erect old masts Jun-08 R6.8 mil 24 Months Mangaung Local Municipality Dihlase Sarel Esterhuizen T: 083 262 1699 0327 Eskom Canal Substation Apr-14 R 6.6 mil 12 Months Eskom Eskom K Zitha T: 053-830 5415 0286 Postmasburg Tsantsabane Community High Mast Lighting Jun-13 R 6.4 mil Eskom Dihlase Consulting Engineers Hendrik Jonck T: 053-342 4648 0231 Chris Hani Gensets Supply and installation of standby generator Mar-12 R6.0 mil Infrastructure Development Gauteng Province Infrastructure Development Oliver Chimuru T: 011 355 5000 0033 0393 0276 Project Cost Engineer electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 6 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description 0099 132kVA cable installation Subcontract for CBI-African Cables Bloemfontein Free State Civil works to prepare cable trenches in bottom of storm canal. Assist CBI-African cables with the installation of the cables Restore earthworks to normal concrete and steel works to repair canal floor 0174 Eskom 11kV cable installations Vosloorus Gauteng Civil works: Trenching and installation of 300Sq mm cables - three projects 1) Nguni sub to Womens Hostel Sub 2) Nguni sub toMoagi Sub 3) Nguni Sub to Didetso Sub Project Start Date Sep-08 May-11 Project Cost R6.6 mil R6.5 mil Completion Time Client Engineer 12 Months CBI - African Cables CBI - African Cables Coen Boshoff T: 083 637 9924 or CBI African Cables Willem v.d Vyver T: 082 770 0225 4 Months Eskom - RAM Subcontracting for CBI - African cables CBI - African cables Mr Coen Boshoff T: 082 5600 429 6 Months Eskom - RAM Subcontracting for CBI - African cables Ekurhuleni Metro Municipality or CBI African Cables Willem v.d Vyver T: 082 770 0225 Planet Waves 179 Koos Kritzinger Consulting Engineers Koos Kritzinger T: 082 770 0225 Depart of Public Works Ms Thembisile Madonsela T: 011 713 6155 Nampak 33kV Cable 9.6km 33kV 500mm2 single core cable installation in Wadeville for Nampak Hillside 1,2,3 Bloemfontein Free State 11kV Primary substation, 315kVA and 500 kVA miniature substation installation 11kV cable reticulation Low voltage reticulation to connection boxes Street light installation Test and commission Installation and hand-over to Centlec 0224 SAPS Jhb Generators Supply and installation of emergency generator sets at Langlaagte, Mondeor, Buccleuch, Elsburg, Benoni Radio Tech college & K53 and Daveyton Jan-12 R5.7 mil Department of Public Works 0070 Industrial Park East End Bloemfontein Free State New 11kV and Low voltage design, supply and installation of electrical network as well as ware house electrical installation Aug-07 R5.5 mil 24 Months JM Onderstal Property Developers 0196 0045 Nov-11 Apr-07 R6 mil R5.9 mil 48 Months Mr JM Onderstal T: 082 770 5505 Projects between R1million – R5million Site Code 0119 Project Title Zwelitsha Court Bisho Eastern Cape Project Description Repair and Maintenance of electrical installation Project Start Date Project Cost Completion Time Client Jun-09 R4.9 mil 1 Year Department of Public Works Engineer Mr A Myathaza T: 082 565 0868 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 7 www.rame.co.za Completed Projects Data (Continued) Project Description Project Start Date Project Cost Completion Time Client Engineer May-13 R4.9mil 7 months Eskom Holdings Mr Albertus Teseling T: 051 404 2553 R4.73 mil 36 Months Department of Public Works Element Consulting Engineers Mr. D. Henning T: 043 726 0074 R4.58 mil 36 Months Department of Justice KV3 Engineers Louw Cornelesen T: 083 627 1907 R4.5 mil 4 Months Setsoto Local Municipality Epitome Consulting Engineers Mr Vusi T: 083 5560 676 Apr-06 R4.43 mil 36 Months Department of Public works Ukhukhula Consulting Mr Grobelaar T: 012 644 0291 Mar-13 R4.4 mil 12 Months Eskom Paseletso Faba T: 082 812 7378 T: 051 404 6442 36 Months Department of Public works Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 R4.06 mil 36 Months Department of Public Works Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 R4.01 mil 24 Months Department of Public works BVI Consulting Mr W Bouwer T: 051 447 2137 Site Code Project Title 0285 Beatrix Mine Welkom 132/6.6kV Substation Refurbishment 0050 Bisho Airport East London Eastern Cape 11kV substation maintenance service switchgear, replace battery charger, replace protection relay’s and commission Low voltage cable reticulation replace papi cables Cable Fault location Replace High mast lights and cables Install streetlights Building - New electrical Installations in fire station Living Quarters, Tower, Terminal building etc. Mar-07 0003 Cape Town High Court Cape Building electrical Mechanical installations Electrical maintenance Mechanical maintenance Jan-06 0249 0251 0252 0253 Setsoto Municipality Ficksburg Senekal Marquard Installation of High Mast lights in Setsoto Aug-12 0015 Lesotho / Kwazulu - Natal Borderline basis RAMP Project Kwazulu - Natal Building electrical Security lighting Air conditioning Kitchen Equipment Generators UPS Systems Electrical maintenance 0277 Kgotsong Bothaville Free State 11kV overhead line feeder strengthening (construction of new and existing O/H lines for Eskom) 0010 Rammatlabama Port of entry RAMP Project Mafikeng North - West Province Building electrical Security lighting Air Conditioning Generators UPS Systems Electrical maintenance Civil maintenance 0020 Swaziland / Mpumulanga Borderline basis RAMP Project Mpumulanga Building electrical Security lighting Air Conditioning Kitchen Equipment Generators UPS Systems Electrical maintenance Mar-06 0068 Phillip Sanders Bloemfontein Free State Electrical installations and audio visual Oct-07 Feb-05 R4.17 mil electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 8 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 Engineer 0044 Lebombo -Komatipoort Port of entry Mpumulanga Building electrical Security lighting Air Conditioning Generators UPS Sytems Electrical Maintenance Civil Maintenance Apr-07 R3.9 mil 36 Months Department of Public works 0081 Murray Hill South African Police Services Pretoria Gauteng New Electrical installation of special forces training facility Mar-08 R3.72 mil 14 Months Department of Public works Ruwacon Kobus Markram T: 083 265 2695 0339 Jan Kempdorp & West End Hospital Generator installations Jun-14 R 3.6 mil 6 months Mekan Consulting Engineers S Bakubaku T: 083 208 2649 0265 Vista Park Bloemfontein Free State Construction of Electrical services - Phase 4 Jan-13 R3.5 mil 6 Months Benchmark Development & Construction Aurecon Consulting Engineers 0014 Lesotho / Free State Borderline basis RAMP Project Building electrical Security lighting Air conditioning Kitchen Equipment Generators UPS Systems Electrical maintenance 36 Months Department of Public works Ukhukhula Consulting Mr Grobelaar T: 012 644 0291 0135 UPS Installation on floodlights for Free State Stadium for 2010 World Cup Bloemfontein Free State Installation of 1x 60kVA 1x 100kVA 2x 160kVA 1x 275kVA UPS For back up for floodlights Apr-10 R3.50 mil 1 Month Mangaung Local Municipality Dihlase Coenie Jansen van Rensburg T: 051 447 1636 0096 Parmalat Gabarone Botswana Install 11kV Cable Install 1000 kVA Transformer Install cables to main D/B Do all the reticulation for the whole new factory Jul-08 R3.5 mil 3 Months Parmalat SA Pincor Consulting Ian Pienaar T: 083 09 0391 0103 University of the Free State Bloemfontein Free State Substation Switchgear New substation building Mar-09 R3.4 mil 14 Months University of the Free State CKE Engineers Ben Joubert Tell: 051 444 4728 T: 082 565 0868 0079 Maluti - Border bases RAMP Project Lesotho Kwazulu - Natal Repair, upgrading and maintenance of buildings, civil infrastructure, electrical installations and mechanical equipment for 3 border-line bases Feb-08 R3.41 mil 36 Months Department of Public works Ikhulhula Engineers Mr J Kruger T: 082 335 0535 Mr T De Beer T:079 892 7594 0107 Brandwag Hotel Golden Gate Free State Upgrade of hotel in Highlands National Parks: Electrical installation Jan-09 R3.40 mil 12 Months Sanparks Vela Vke Engineers Jan Voster T: 012 461 3800 Apr-11 R3.5 mil electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 9 www.rame.co.za Completed Projects Data (Continued) Project Description Project Start Date Site Code Project Title 0029 Soweto Magistrates court RAMP Projects Gauteng Electrical installation Air conditioning Fire fighting Nov-06 0171 Lesotho Botshabelo Hospital Design and construct of Botshabelo complex - Lesotho blood transfusion service centre 0175 Brandwag Social Housing Dev. Electrical Connection 0164 Senekal Correctional Services Free State Repair and upgrade of electrical and mechanical installations and maintenance RAMP Projects 0291 Mandela View Phase 2.2 Medium & low voltage Electrical Reticulation Jul-13 0242 ECDC Premiers Office Bisho Upgrade alterations and additions: Electrical installation May-12 0052 Bethlehem Social Developments Free State New Office Block for social development Electrical installations Installation of 11kV mini subs Supply and install standby generators Apr-07 0089 Pinelands SAPS Baracks Cape Town Western Cape Complete Electrical renovations Install new standby generator Apr-08 0188 Ladygrey - Kwezi Naledi High Mast Soccer stadium lighting upgrade 0298 East London Airport Genset Supply and installation of 2x500KVA Generators 0151 Benmore Gardens Shopping Centre CBI Cable Protection Gauteng Relocation of ESKOM cables at shopping centre - 400m trenching, relocating of 44kV cable, a 6,6kV cable and 4 x 11kV cables 0341 Kimberley Talama Square Electrical Connection Completion Time Client R3.3 mil 36 Months Depart of Public Works Kamble Davis Constulting Mr Webster T: 083 378 2907 Apr-11 R3.2 mil 12 Months Sanyati Civil Engineering Construction Trio Con Consulting Johan Grant T: 082 374 5591 Jan-14 R 3.2 mil 3 year 24 Months Department of Public Works Mustapha & Cachalia Barry Flood T: 057 357 2763 R 3.24 mil 3 months Akey Developments Aurecon Consulting Engineers Chris Johnson T: 051-4478911 R3.0 mil 6 months Siya Zama GVK Building & Renovation GVK Colin Bread T: 041 365 1557 R3.0 mil 24 Months Department of Public Works S & W Consulting Mr Wessels T: 058 622 2263 T: 082 446 4116 R3.0 mil 18 Months Depart of Public Works SSI Mr Leon Hans T: 073 345 1695 5 Months Senque Municipality T: 051 6030019 DFR Engineers Louan Schlebusch T: 041 582 1453 3 months CA du Toit Cons Engineers Dawid Bester T: 041 585 7559 3 Months Eskom - RAM subcontracting for CBI African cables CBI African Cables Coen Boshoff T: 016 430 6291 or CBI African Cables Willem v.d Vyver T: 082 770 0225 Sol Plaatje Mun Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 Jan-11 Nov-11 Sep-14 Oct-10 Jun-14 Project Cost R3.2 mil R2.95 mil R 2.93 mil R2.91 mil R 2.89 mil 3 months Engineer Calgro M3 Deon Steyn electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 10 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description 0001 Bisho High Court Bisho Eastern Cape Building electrical Security lighting Air Conditioning Generators Electrical maintenance Civil maintenance 0042 Red Cross Hospital Rondebosch Cape Town Western Cape Replacement of 11kV switchgear and commissioning 11,440kV/400V transformers replace and commissing Replace LV boards complete schedule shutdowns 0004 Cape Town SAPS Garages Maitland Cape Town Western Cape Building electrical Mechanical installations Electrical maintenance Mechanical maintenance Intercom system Electrical fencing 0179 Maria Moroka Nature Reserve Overhead line Project Start Date Project Cost Completion Time Client Apr-05 R2.8 mil 36 Months Department of Justice KV3 Engineers Mr. Viljoen T: 043 721 0055 Feb-07 R2.8 mil 8 Months Department of Public works BFBA Consulting Mr. West T: 021 421 0860 14 Months Department of Public works De Villiers and Moore Mr. Dippenaar T: 021 976 3087 T: 083 375 8992 12 Months Dept. of Public Works and Rural Development Drake and Skull Wyers Ludick T: 082 769 8243 Heyns van Rooyen Consulting Engineers Heyns van Rooyen T: 083 259 2271 De Vos Pecksten Johann De Bruin T: 082 372 2685 Oct-05 Jul-11 R2.7 mil R2.64 mil Engineer 0149 Kathu Sesheng Nothern Cape Electrification of 98 stands in Sesheng Aug-10 R2.63 mil 6 Months Gamagara Local Municipality 0144 Shoprite Ficksburg Free State 11kV Reticulation LV Reticulation Building electrical Jun-10 R2.63 mil 5 Months Water Comfort Wholesale 0286 Harmony North 44/6.6 kV Welkom Free State 44/6.6kV Substation Refurbishment May-13 R2.6 mil 7 months Eskom Holdings 0282 Grasslands Phase 2 Dev. New Development Jun-13 R2.4 mil 12 months Central Development Prop Group FCE Consulting Engineers - Stefan Esterhuysen T: 051 451 2612 0009 Mosselbay Prison Eastern Cape Building electrical Security lighting Airconditioning Generators Hotwater generation Intercom system Kitchen Equipment Electrical maintenance Civil maintenance Jan-05 R2.46 mil 36 Months Department of Public works Naylor, Naylor and van Schalkwyk Mr. Walters T: 083 629 8154 136 Brandfort Tollgate Free State Electrical installation and 200kVA standby generator construction of Toll Plaza R30 Jun-10 R2.3 mil 8 Months South African National Road Agency Aurecon Steve Kruger T: 012 427 2330 Mr Albertus Teseling T: 051 404 2 553 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 11 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Mar-06 R2.39 mil 36 Months Department of Public works Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 Engineer 0017 Leeuwkop Prison RAMP Project Gauteng Building electrical Security lighting Air Conditioning Generators UPS Systems Electrical maintenance 0018 Northern Cape Labour centres and service products Kimberley, Upington, Kuruman Northern Cape Building electrical Security lighting Air Conditioning Electrical maintenance Mechanical installations Spray booths, compressors etc. Mar-06 R2.3 mil 36 Months Department of Labour KV3 Engineers Mr. Hubert T: 053 831 4199 0019 Centlec Electrical connections to 900 stands Bloemfontein Free State Electrical connections to 900 stands High voltage overhead reticulation Transformer installations LV Reticulation Mar-06 R2.3 mil 4 Months Centlec Centlec Mr. van der Walt T: 051 409 2232 0011 Waterval Prison RAMP Project Kwazulu - Natal Building electrical Security lighting Electrical maintenance Mar-04 R2.2 mil 36 Months Department of Public works KV3 Engineers Mr. Strydom 0088 Ysterplaat Air Force Base Cape Town Western Cape Reticulation Generators Building electrical Apr-08 R2.1 mil 6 Months Department of Public works Tsepa Engineers Mr. Febion T: 079 833 5727 0146 St Rita’s Hospital Limpopo Staff housing and laundry electrical installation and reticulation Jul-10 R1.9 mil 18 Months Department of Public Works KV3 Nico Britz T: 082 450 8917 0028 Sasko Bakery Bloemfontein Free State Design primary substation Design bakery electrical Distribution and boards New office development reticulation 1.8 MVA 11kV/400V transformer installations Air Conditioning Access control Aug-06 R1.9 mil 12 Months Pioneer Foods Civil Engineers Phillip De Waal T: 012 346 2568 0060 LCRC Gauteng Revamp of SAPS Laboratories May-07 R1.8 mil 36 Months Department of Public works Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 0139 Transnet City Deep Gauteng HT and LT Reticulation to new warehouse electrical installation to complete warehouse Jul-10 R1.7 mil 11 Months Ruwacon Kobus Markram T: 083 265 2695 0274 Kaxu Mirror Assembly Pofadder Northern Cape Mar-13 R1.7 mil 12 Months Ruwacon 0234 Ratanang Sport Stadion Improvements including flood light installation Feb-12 R1.7 mil Mofomo Construction cc Raymond Seboko T: 057 355 2306 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 12 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client R 1.63 mil Apr-11 R1.6 mil 6 Months University of the Free State CKE Engineers Ben Joubert T: 082 565 0868 Civil Sense Consulting Johan Hubert T: 082 829 4357 Engineer 0168 Boitumelo Hospital Electrical installation 170 University of the Free State Proefdier Substation Bloemfontein Free State 11kV Internal network upgrade 0173 Kathu SIOC Office Development Northern Cape Office development electrical installation Apr-11 R1.6 mil 16 Months Department of Public Works 0169 Bloemside Kamohelo Primary School Free State Lt Reticulation and building electrical Mar-11 R1.6 mil 15 Months Department of Public Works Nedgroup SA D. Bubb T: 082 824 1288 0159 Kathu CAT Barloworld Norhten Cape LV Reticulation and building electrical Oct-10 R1.6 mil 8 Months Department of Public Works Civil Sense Consulting Johan Hubert T: 082 829 4357 0141 Leandra Tollgate Mpumulanga Electrical installation to new Tollgate buildings Jun-10 R1.5 mil 18 Months Ruwacon Kobus Markram T: 083 265 2695 8 Months SA Police Service Divisional Commissioner Supply Chain Management Snr Supt. P van der Westhuizen T: 012 845 8991 0133 Giyani South African Police Services Limpopo Electrical and air conditioning and generator installation New CSC Block 0059 Saldanha SAPS Cape Town Western Cape Electrical installation of New South African Police Station Jul-07 R1.4 mil 24 Months Department of Public works 0299 Warrenton O/H lights Installation of high mast lights at bridge Jan-14 R 1.13 mil 3 months 0113 Postmasburg Transnet A - Prep Depot Northern Cape Building on new train depot Lighting, D/B, Cabling, Wiring and domesting power 0021 Beaufort - West Prison Northern Cape Building electrical Security lighting Air Conditioning Generators Hot water generation Intercom system Electrical maintenance 0111 Botshabelo stadium lights Free State Upgrade, repair and renovate the flood lights to 750 Lux for the training venue for FIFA 2010 World cup soccer Mar-10 Apr-09 Jul-06 Apr-09 R1.43 mil R1.3 mil R1.3 mil R1.28 mil 4 Months Transnet West Coast Consulstin Mr P Marais T: 022 713 2637 CKE Engineers Ben Joubert Tell: 051 444 4728 T: 082 565 0868 36 Months Depart of Public Works De Villiers and Moore Mr. Dippenaar T: 021 976 3087 T: 083 375 8992 12 Months Mangaung Local Municipality Dihlase Frans Buter T: 051 447 1636 T: 083 279 8200 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 13 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Koos Kritzinger Consulting Engineers Koos Kritzinger T: 082 770 0225 Engineer 0091 Tredenham valley Residential Development Bloemfontein Free State LV reticulation House connection boxes Streetlight installation work Apr-09 R1.22 mil 9 Months Koos Kritzinger Consulting Engineers 0130 N8 Airport inter section bridge Bloemfontein Free State Street light and LV reticulation Jan-10 R1.21mil 5 Months SSI Christoffer Koa T: 051 400 7200 0012 Johannesburg Magistrates court RAMP Project Gauteng Building electrical Security lighting Air Conditioning Generators UPS Systems Electrical maintenance Civil maintenance Feb-06 R1.2 mil 36 Months Department of Public works Manong and ass. Mr. Malamela T: 011 311 2040 0013 Sutherland Magistrates court RAMP Projects Western Cape Building electrical Security lighting Air Conditioning Electrical maintenance Apr-06 R1.2 mil 36 Months Department of Justice Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 0104 Transnet A - Prep Depot New Castle Kwazulu - Natal Building of a new transnet depot Lighting D/B Cabling Wiring and domestic power Nov-09 R1.2 mil 8 Months Transnet Sivest EDM Bruce Garrett T: 084 888 6919 0076 Skilpadshek Port of entry Zeerust North - West Repairs to building electrical and external lighting and generators Nov-07 R1.2 mil 5 Months Department of Public works Virtual Buro Mr. Malan T: 012 452 0450 T: 082 875 5763 0386 3 SAI BN Installation of Temporary Electricity Supply for Temporary Mess Feb-15 R 1.14 mil 14 Days Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 0262 Steynville High Mast Steynville Northern Cape 25 Metre Mid-Hinge High Mast lighting at Mandela Square Steynville Nov-13 R1.1 mil 12 Months Thembelihle Municipality Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 0191 Gariepdam Fish Hatchery A Electrical installation Oct-11 R1.08 mil 2 Months Dikopo Aurecon Brain Devenish Tell: 051 447 8911 0199 Lesotho - Blood Transfusion Lab 5 months Sanyati Engineering Central Sanyati Engineering Central Hendrikjan Mosca T: 051 411 5820 0200 Lesotho - Staff Accommodation 5 months Sanyati Engineering Central Sanyati Engineering Central Hendrikjan Mosca T: 051 411 5820 Electrical installation and Generators Electrical installation and Generators Jan-12 Jan-12 R1.07 mil R1.07 mil electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 14 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Start Date Project Description Project Cost Completion Time Client Engineer 5 months Sanyati Engineering Central Sanyati Engineering Central Hendrikjan Mosca T: 051 411 5820 Sebokwa Engineering Lawrence Bekker T: 012 343 0602 T: 082 653 4299 0201 Lesotho - Student Dormitories Electrical installation and Generators 0041 Oliver Thambo House Pretoria Gauteng HT Reticulation LV Cabling Upgrade of DB Boards Air Conditioning Feb-07 R1.06 mil 24 Months Department of Public works 0084 Atlantis South African Police Services Western Cape Renovation and rewiring of SAPS station Building Electrical Mar-08 R1.02mil 14 Months Department of Public Works 4EM Fatiegh Soeker T: 082 821 3563 0230 University of Fort Hare Servicing of Medium Voltage switchgear and replacement of some low voltage distribution boards Feb-12 R1.0 mil University of Fort Hare Richard Nzuza & Associates Richard Nzuza T: 043 742 0041 0087 Riebeeck Wes South African Police Services Western Cape Renovation and rewiring of SAPS station Building electrical Apr-08 R1.0 mil 14 Months Depart of Public Works BFBA Consultants Mr I Alloe T: 083 442 7371 Completion Time Client Engineer Worley Parsons Resources & Energy Peet van den Heever T: 053 831 4199 T: 082 925 0442 Jan-12 R1.07 mil Projects under R1million Site Code Project Title Project Description Project Start Date Project Cost 0182 Petrusville Sport Complex Upgrading of Sports complex Aug-11 R0.99 mil 5 Months Renosterberg Municipality T:053 663 0041 0112 Middelburg Military Base Gauteng Electrical upgrade Apr-09 R0.96 mil 12 Months Ruwacon Kobus Markram T: 083 265 2695 0074 Mananga building houses Nelspruit Mpumulanga Repairs Building electrical and external lighting Aircon installation and generators Nov-07 R0.9 mil 5 Months Department of Public Works Virtual Buro Mr Malan T: 012 452 0450 T: 082 875 5763 0066 Jackson House Bloemfontein Free State Electrical installation of residential house Jul-07 R0.9 mil 24 Months Groenewaldt & Preller Argitekte De Villiers & Moore Mr J Dippenaar T: 021 976 3087 0152 Babelegi Water works Limpopo Installation of a new motor starter panel for pump station Oct-10 R0.9 mil 14 Months Ruwacon Kobus Markram T: 083 265 2695 0142 MTN Bloemfontein (HVRC) Free State Electrical installation 1x 165kVA UPS Installation May-10 R0.8 mil 3 Months MTN Bloemfontein Phakamile Engineering Jama Dlamini T: 011 726 1647 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 15 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Engineer Heyns van Rooyen Consulting Engineers Heyns van Rooyen T: 053 8311609 0237 Kathu erf 4106 Electrical supply to erf 4106 Mar-12 R0.8 mil SOIC Community 0382 Harvard Southdrift T-off Installation of 2 x 132kV in-line Isolator Jun-15 R0.75 3 months Eskom 8 Months Department of Transport and Public Department of Transport and Public F Wuim T: 021 483 5867 Dihlase Frans Buter T: 051 447 1636 T: 083 265 2695 Eskom J. Litlhakanyane 0163 Red Cross Hospital Rondebosch Cape Town Western Cape Service and replacement of HT switchgear 0109 Siesa Ramabudo Stadium Bloemfontein Free State Upgrading of the existing 500kVA supply to 1000kVA Aug-09 R0.7 mil 3 Months Mangaung Local Municipality 0165 Ficksburg Clicks Free State 11kV reticulation LV reticulation Building electrical Jan-11 R0.7 mil 2 Months Water Comfort Wholesale De Vos Pecksten Johann De Bruin T: 082 372 2685 0153 University of the Free State New Miniature substation Bloemfontein Free State Installation of a new miniature substation for UFS swimming pool Sep-10 R0.7 mil 10 Weeks University of the Free State KV3 Engineers FCE van der Merwe T: 051 410 8700 0098 Health Treasure East London Eastern Cape Installation of additional plug points Sep-08 R0.7 mil 2 Months Dimension Data Mr Willem Botha 0061 Graaf Reinette South African Police Services College Eastern Cape Electrical Renovations Jul-07 R0.7 mil 8 Months Department of Public works RNA Engineers Steve Lavis T: 082 905 2010 0048 Ruwacon Service Products Bloemfontein Free State Upgrade of electrical installations May-07 R0.7 mil 24 Months Department of Public Works Dirk van Heerden Engineers Dirk van Heerden T: 051 448 0185 T: 082 446 2981 0035 Parys Street Lights Free State Installation of street lights Feb-07 R0.7 mil 2 Weeks Meyker Construction 0040 Admiralty house Simonstown Western Cape Building electrical Air Conditioning Maintenance Feb-07 R0.6 mil 36 Months Department of Public Works BVI Engineers Mr Reighert T: 021 567 7000 0046 Kwaggafontein Industrial Park Bloemfontein Free State Design of 11kV and low voltage reticulation of industrial erven May-07 R0.6 mil 24 Months Qwaha Trust Piet Beukes T: 082 881 2911 0063 Grahamstown Old School Eastern Cape Electrical and mechanical upgrading of historic building Jul-07 R0.6 mil 24 Months Department of Public Works RJ Waters & Ass. Mr RJ Waters T: 041 463 1694 Jan-11 R0.8 mil Meyker Construction Mr De Bruin T: 083 262 1230 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 16 www.rame.co.za Completed Projects Data Site Code (Continued) Project Description Project Start Date Project Cost Completion Time Client Temporary electrical connection for TMFS 2x Temporary connections for LOC Standby during FIFA 2010 World Cup soccer Installation of 4x Mini subs and HV reticulation May-10 R0.6 mil 2 Months LOC Dihlase Koos Kritzinger T: 082 7700 225 Project Title Engineer 0137 Free State Stadium Overlay for FIFA World Cup 2010 Bloemfontein Free State 0128 Ruwacon Student House Bloemfontein Free State Electrical installation Oct-09 R0.5 mil 1 Month Ruwacon Ruwacon Peter Ruthven T: 051 403 0400 T: 082 205 5843 0047 Melanie Street 12 Pentagon Park Bloemfontein Free State Electrical installation - Duet house Jun-07 R0.5 mil 4 Months Piet Beukes Piet Beukes T: 082 881 2911 0071 Burgersdorp Hospital Eastern Cape Electrical installation in guard house Sep-07 R0.5 mil 3 Months Department of Public Works Allan Dale and Rob Mr J van der Merwe 0077 Robben Island Sebokwe House Cape Town Western Cape Electrical repairs and renovations Oct-07 R0.45 mil 24 Months Meirelles Lawson Burger Argitekte De Villiers & Moore Mr J Dippenaar T: 021 976 3087 0093 Settlers Hospital Graaff Reinette Eastern Cape Supply and install 11kV SF6 type circuit breakers Terminate 11kV cables Aug-08 R0.42 mil 1 Month SSI Consutling Engineers SSI Consulting Engineers MR Otto Moffat T: 051 400 7200 0143 UFS Soccer Reticulation Free State Installation of cable and kiosk Lighting protection Jul-10 R0.4 mil 3 Months University of the Free State CKE Engineers Ben Joubert T: 082 565 0868 0138 Branding material for FIFA World Cup Bloemfontein Free State Removal, storage and re-installation of existing branding at FIFA designated venues in the Mangaung Host City for the 2010 FIFA World Cup Apr-10 R0.4 mil 3 Months Mangaung Local Municipality Mangaung Local Municipality George Mohlakoane T: 051 405 8675 1 week Gamagara Development Forum NJ Multi Spillage Control and Contractors CC NJ Mathe T: 076 777 0604 Heyns van Rooyen Consulting Engineers Heyns van Rooyen T: 053 8311609 0190 Deben Bakery Electrical installation Oct-11 R0.4 mil 0244 Kathu erf 5906 Electrical supply to erf 5906 May-12 R0.4 mil 6 months Khumani Housing Development 0117 St Patricks Hospital Bizana Kwazulu - Natal Electrical installation May-09 R0.36 mil 4 Months Ruwacon Ruwacon Daniel Plekker T: 082 902 0979 0094 Estoire mini sub Bloemfontein Free State Installation on new minisubs Jan-09 R0.35 mil 2 Months Sanyati Sanyati Louw De Bruin T: 083 262 1230 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 17 www.rame.co.za Completed Projects Data (Continued) Project Description Project Start Date Project Cost Completion Time Client Installation of traffic lights Oct-12 R0.3 mil 2 Months Stefcor Construction cc Stefan Kruger T: 083 457 6749 R0.3 mil 4 months Department of Public Works Richard Nzuza & Associates Andisiwe Mngcandubana T: 043 7420041 Apr-11 R0.3 mil 8 Months University of the Free State CKE Engineers Ben Joubert T: 082 565 0868 Replacement of Medical B 1600 kVA transformer from South block substation Feb-12 R0.3 mil University of the Free State CKE Engineers Ben Joubert T:051 444 4728 0078 Robben Island Admin Block Cape Town Western Cape Electrical repairs and renovations Oct-07 R0.3 mil 24 Months Meirelles Lawson Burger Argitekte De Villiers & Moore Mr J Dippenaar T: 021 976 3087 0097 Huis Gavin Davids Bloemfontein Free State New Residential Sep-08 R0.29 mil 8 Months Gavin Davids Gavin Davids T: 051 403 0400 T: 082 885 3987 0092 Ruthven Huis Bloemfontein Free State New Residential Aug-08 R0.27 mil 6 Months Ruwacon Ruwacon Peter Ruthven T: 051 403 0400 T: 082 205 5843 0095 ANC Woman’s League Bloemfontein Free State Install temporary power for ANC conference Jun-08 R0.25 mil 3 Days N/A 0205 Breda School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Brayn Devenish T: 051 447 8911 0025 OFS Fire Office complex Bloemfontein Free State New office building Oct-07 R0.2 mil 3 Months Centa OFS Fire Dirk van Heerden Engineers Dirk van Heerden T: 051 448 0185 T: 082 446 2981 0206 Friesland School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0209 Huntersvlei School Electrical Installation Dec-12 R0.2 mil 6 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0212 Lincoinshire School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 Site Code Project Title 0259 Verkeerslig Checkers Hyper Bloemfontein Free State 0240 Zwelitsha Document Centre Electrical Installation Apr-12 0172 Sport Fields Lighting Phase 2 - Rugby reticulation Free State Supply and install LV cable reticulation 0226 UFS Transformer Replacement Engineer N/A electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 18 www.rame.co.za Completed Projects Data (Continued) Project Start Date Project Cost Completion Time Client Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 Metsi - A - Hare School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0216 Motheu School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0217 Niekerskuil School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0219 Saaiplaas School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0221 Seka School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0222 Sommerso School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0223 Witkoppies School Electrical Installation Dec-12 R0.2 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0027 House Ruthven Bloemfontein Free State New house Sep-07 R0.2 mil 8 Months Mimos 6 Trust Ruwacon Peter Ruthven T: 051 403 0400 T: 082 205 5843 0121 Robben Island Single Quarter Cape Upgrade, repair and renovate of all electrical equipment Domestic and industrial Nov-09 R0.2 mil 2 Months Department of Public Works Ned Group Danie Fourie T: 021 913 1813 0065 Idutywa Magistrate Court Eastern Cape Electrical and mechanical renovations Jul-07 R0.2 mil 24 Months Department of Public Works KV3 Mr W Snyman T: 042 721 0055 0145 CNS Call Centre Bloemfontein Free State Installation of 171 dedicated plug points Jun-10 R0.2 mil 2 Weeks CNS Call Centre IJW Matthys T: 083 633 8196 0140 Country Bird Power Factor Correction Bloemfontein Free State Installation of 4x power factor correction units, design, supply, installation and commissioning May-10 R0.1 mil 1 Month Supreme Poultry Lucas Gerber T: 051 448 6803 0073 Leon Botha Bloemfontein Free State Electrical installation of warehouse Sep-07 R0.1 mil 3 Months Leon Botha 0069 Huis Fichardt Bloemfontein Free State Electrical installation of residential house Aug-07 R0.1 mil 6 Months C Mac Construction Site Code Project Title 0214 McGrarthspark School 0215 Project Description Engineer Mr C van Heerden T: 083 400 0378 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 19 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Engineer 0204 Banklaagte School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0207 Hamsverwacht School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0210 Kgostsofalo School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0211 Lebonong School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0213 Makawansbank School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0218 Nokanapedi School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0062 Cambridge Police Station Eastern Cape Electrical upgrading of offices and prison cells Jul-07 R0.1 mil 24 Months Department of Public Works Mr FJ van Zyl T: 041 408 2041 0064 Grahams Town South African Police Services Leicester street Eastern Cape Electrical upgrading of fourteen flats Jul-07 R0.1 mil 5 Months Department of Public Works Mr Kobus Nel T: 041 408 2123 0220 Sardinia School Electrical Installation Dec-12 R0.1 mil 3 months Department of Education Aurecon Bryan Devenish T: 051 447 8911 0243 132kV Interconnector Croydon and cable 88kV consol glass installation 1) Installation of 132kV, 1800mm sq AL, 270m,cable connection between 132kV busbars and GIS 2) Installation of 132kV, 1000mm sq AL, 600m to Concol Glass, Olifantsfontein May-12 R0.2 mil R.54 mil CBI- African Cables Willem v.d Vyver T: 083 629 7088 Frank van Heerden Eskom Bfn T:051 435 6000 or CBI African Cables Willem v.d Vyver T: 082 770 0225 0225 UFS 11kV Maintenance Plan Maintenance of 11kV substations Feb-12 R0.1 mil University of the Free State CKE Engineers Ben Joubert T: 051 444 4728 0198 Eskom Maintenance MV/LV Maintenance for Eskom’s north West Region - Cable maintenance, substation maintenance, etc. Nov-11 Various amounts 36 Months Eskom - RAM Subcontracting for CBI - African cables CBI - African cables Willem v.d. Vyver T: 083 629 7088 0178 Barkley East Eastern Cape Repair 40m floodlight Jun-11 R0.1 mil 1 Month Senqu Municipality T: 051 603 0019 Senqu Municipality Rean van Heerden T: 082 789 0775 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 20 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Engineer 0051 HDL - Dan Pienaar Drive 7 Bloemfontein Free State Electrical installation - standby generator and standby power May-07 R0.1 mil 2 Weeks HDL Jewellers Harry Loubscher T: 082 774 4985 0039 Library Mansions Bloemfontein Free State Refurbishment of block of flats Feb-07 R0.1 mil 4 Months Bower and Kemp Investments Mr Kemp T: 082 561 7982 0049 Jan Kempdorp development Free State Network Design Low voltage reticulation Certificate of compliance test Jan-07 R0.1 mil 1 Week Definite Pitch Developers Piet Beukes T: 082 881 2911 0038 Leshoto PF Maseru Lesotho Power correction factor installation Connect to electrical system and commission Jan-07 R0.1 mil 5 Months Lesotho Elec. Corporation Electrica assembles Mr Arnold T: 083 658 2981 0032 Maseru Port of Entry Lesotho Emergency repair work Dec-06 R0.3 mil 4 Days Ruwacon Ruwacon Peter Ruthven T: 051 403 0400 T: 082 205 5843 0036 House West Bloemfontein Free State New home for Dr West Building electrical Nov-06 R0.4 mil 4 Months Dr West Dr West T: 051 444 5820 0024 Parys Reticulation Free State Electrical distribution on street lighting Traffic signal lighting Nov-06 R0.1 mil 2 Months Meyker Construction 0034 Bloemfontein Student house Free State Rewire of student accommodation Nov-06 R0.1 mil 3 Days Mr Human Mr Human T: 082 922 4838 0026 Fynbos town house Swellendam Western Cape Reticulation High and Low Voltage Electrical metering Mini Subs Electrical installation - town houses Oct-06 R0.7 mil 6 Months Ruwacon Johan Bester Engineers Johan Bester Cel: 082 414 1867 0031 Henk Jacobs Bloemfontein Free State New Electrical installation Oct-06 R0.5 mil N/A Mr Jacobs N/A 0037 Ruwacon Offices Bloemfontein Free State New offices Building electrical Air Conditioning Sep-06 R0.4 mil 24 Months Ruwacon Ruwacon Peter Ruthven T: 051 403 0400 T: 082 205 5843 0030 Mcome Prison Mpumulanga Earthing of roof structures Sep-06 R0.1 mil N/A DCS 0020 George Labour Offices Eastern Cape Building electrical Security lighting Air Conditioning Electrical maintenance Jun-06 R0.5 mil 36 Months Department of Labour KV3 Engineers 0016 Noupoort Magistrates court Northern Cape Building electrical Security lighting Air Conditioning Electrical maintenance 36 Months Department of Justice Virtual Buro Mr Malan T: 012 452 0450 T: 082 875 5763 Mar-06 R0.6 mil Meyker Construction Mr De Bruin T: 083 262 1230 Kwezi V3 Engineers Mr F Strydom electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 21 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Virtual Buro Mr Malan T: 012 452 0450 T: 082 875 5763 Engineer Diepkloof Prison RAMP Project Gauteng Security lighting 11kV substation (transformer and switchgear) Maintenance transformer oil testing and purification of oil test protection at 11kV supply point. 11kV cable fault location Repair and pressure teste Sep-05 R0.8 mil 36 Months Department of Public Works 0007 Ficksburg Port of Entry Free State Building Electrical Security lighting Air Conditioning Generators Electrical maintenance Civil maintenance Jun-05 R0.3 mil 12 Months Department of Public Works Bigen Africa Mr. Nel T: 082 449 8287 0006 Elliot Magistrates Court Eastern Cape Building Electrical Security lighting Air Conditioning Electrical maintenance Civil maintenance Mar-05 R0.5 mil 36 Months Department of Justice KV3 Engineers Mr. Viljoen T: 043 721 0055 0118 Free State Stadium Overlay for FIFA 2010 World cup soccer Bloemfontein Free State Install 11kV cable network for LOC 2010-03-26 Install different LV cable and points for LOC 2010 R0.8 mil 1 Month Mangaung Local Municipality Dihlase Sarel Esterhuizen T: 051 447 1636 T: 083 262 1699 Parmalat SA Craig Sanders T: 083 386 6072 Nico Jackson T: 083 400 3679 0005 1 & 2) Parmalat Transformer 0248 3) Parmalat Maputo Maputo Mosambique 1) Transformer Maintenance Parmalat Midrand 2) Transformer 630kVA replacement in Maputo Mozambique 3) MV LV Upgrade 1&2) Sept 2012 3) April 2013 1&2) R0.2 mil 3) R2.6 mil 4 Months 0263 Raceway Park Development Bloemfontein Free State Construction of electrical services for development ext 227 Mar-13 R6.3 mil 5 Months 0364 Raceway Park Ext 226 : Phase 2 Construction of the Electrical Services Jan-15 R 6.1 mil 12 Weeks Space Securitisation Aurecon Consulting Engineers Koos Kritzinger 2004 Port Elizabeth international Airport Replace and upgrade of low voltage panels in Main Substation and Terminal Building substation Apr-15 R 5.89 mil 7 months ACSA Port Elizabeth Karina Stroebel T: 041-5077348 0365 King Shaka Airport Generators: Standby Oct ‘15 R5.58 mil 5 Months ACSA 0340 Tuscan Place Townhouse Bloemfontein Installation of Time of use Meters Jun-14 R 0.04 mil 2 days K Dolphin 0281 Bethulie Waste Water Treatment Works Electrical installations R .8 mil RWC Aurecon Constulting Engineers Koos Kritzinger ACSA V Moodley T: 032 436 6000 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 22 www.rame.co.za Completed Projects Data Site Code Project Title (Continued) Project Description Project Start Date Project Cost Completion Time Client Engineer Engineer Senque Mun SKC Engineers Maletswai Peter Brooks T: 051 634 1847 0344 Sterkspruit Sport Stadion Installation of highmast lights at Sportfield Jul-14 R 2.5 mil 4 Months 0363 Volvo New Workshop Bloemfontein Supply and Install Electrical Installation Sep-14 R 2.49 mil 6 months Boys & Willie Otto Construction cc T: 051 433 2949 0328 Fort Glamorgan Prison Generator installations Apr-14 R 1.62 mil 6 months Dept of Public Works G Appels T: 041 4082150 0380 Acacia Park : Kimberley Complete Construction of Electrical Services for Phase 1 : 5 Residential Erven for Trans 50 Group : Acacia Park 0342 Tredenham Valley Phase 2 Electrical Connection Jun-14 R 0.4 mil 1 year 0330 Mdantsane Prison Generator Installation Apr-14 R .3 mil 6 months Dept of Public Works G Appels T: 041 4082150 0345 Mangaung Small Power Electrical installation at Northern Waste Water Treatment works Jul-14 R 0.27 mil 3 months Stefanutti Stocks 0313 Kimberley Homevale Waste Water Treatment Works Electrical installation Apr-14 R .23 mil 3 months 0263 Bloemfontein Race Course Bulk Streetlight Bulk Streetlight installation Aug-14 R 0.15 mil 1 month Space Securitisation (PTY) Ltd Aurecon Consulting Engineers Koos Kritzinger T: 082 770 0225 0370 Tokkie Park: CUT Upgrading of the Existing Sport Field Lighting Installation Nov-14 R 5.2 mil 5 Months Central University of FS Central University of FS Mr. W. Britz T: 051 507 3664 Jan-15 R1.06 mil 6 months Acacia Park Retirement Village Dihlase Consulting Engineers Hendrik Jonck T: 053 861 3722 Aurecon Consulting Engineers Koos Kritzinger T: 082 770 0225 electrical@rame.co.za 1 Rissie Street | Quaggafontein | Bloemfontein PO Box 29741 | Danhof 9310 Bloemfontein: [ T ] +27 (0) 51 523 3720 [ F ] +27 (0) 51 523 3804 Johannesburg: [ T ] +27 (0) 10 003 0341 Port Elizabeth: [ T ] +27 (0) 41 384 3704 Page 23 www.rame.co.za