SECTION 22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PART 1 - GENERAL 1.1 REQUIREMENTS A. 1.2 RELATED SECTIONS A. B. C. D. 1.3 1.4 Conform with the applicable provisions of the General Conditions, Supplementary Conditions, and General Requirements. Section 21 05 00 Common Works Requirements for Fire Suppression Section 22 05 04 Pipe and Pipe Fittings Section 22 11 00 Facility Water Distribution Section 22 13 00 Facility Sanitary Sewage SCOPE A. It shall be understood that the requirements for seismic restraints are in addition to other requirements as specified elsewhere for the support and attachment of equipment and mechanical services, and for the vibration isolation of same equipment. Nothing on the project drawings or specifications shall be interpreted as justification to waive the requirements for seismic restraint as specified herein, shown on the drawings and required by Code. B. The work under this section shall include furnishing all labor, materials, tools, appliances and equipment, and performing all operations necessary for the complete execution of the installation of seismic snubber restraint assemblies as shown, detailed and/or scheduled on the drawings and/or specified in this section of the specifications. C. The materials and systems specified in this section shall be provided by the Contractor from a single Seismic Snubber Restraint Materials Manufacturer to assure sole source responsibility for the performance of the seismic restraints used. D. The seismic snubber restraint materials manufacturer shall be responsible for detailed design for seismic supports, including calculation for size and attachment, signed and sealed by registered State of Arizona Structural Engineer. SUBMITTALS A. See Section 22 05 00 for general requirements for submittal materials. In addition to the requirements contained in Section 22 05 00, provide submittal information for all products and materials covered under this Section of the Specifications as listed herein. B. Furnish complete catalog data on all vibration isolators and restraints to be utilized for the project in order to establish compliance with the plans and specifications and all code requirements. C. Furnish complete shop drawing information including construction details for all support points and anchor bolt requirements and locations; method of support for piping; method of isolation for piping passing through the building structure; and location and arrangement of seismic restraints. BPCE – 7504.01 ADOA 1400 W. WASHINGTON ST. CHILLER PLANT UPGRADES VIBRATION AND SEISMIC CONTROLS FOR PLUMBING 22 05 48 - 1 1.5 1.6 D. Manufacturers not listed as approved in ‘Part 2 - Products’ of this section must submit for prior approval in accordance with provisions contained in Section 22 05 00. E. Drawings shall be reviewed and certified by a registered Professional Engineer, with a minimum of five (5) years working experience in this field, certifying that the submitted seismic restraint system design and anchorage details complies with all specification requirements and applicable codes. CODE REQUIREMENTS A. Seismic restraints shall be provided for equipment, materials and systems furnished and installed under Division 22 of this Specification in accordance with the requirements of the 2012 International Building Code; as adopted and interpreted by the State of Arizona and the City of Phoenix. B. Performance requirements: 1. Design Spectral Response Acceleration Coefficient SDs = 0.181 and SD1 = 0.091. 2. Mapped Max Considered Earthquake Spectral Response Acceleration Coefficient Ss = 0.170 and S1 = 0.057. 3. Site Class = D. 4. Component Importance Factor = 1.0. SEISMIC RESTRAINT REQUIREMENTS A. The Contractor shall submit calculations prepared by a State of Arizona licensed Structural Engineer to substantiate that all items of plumbing equipment, piping systems are properly supported to resist earthquake forces as required herein. B. All items of plumbing equipment required for life safety shall be provided with seismic restraints securely anchored to the building capable of resisting horizontal forces of 100% of their weight and/or in accordance with IBC Requirements. C. All items of plumbing equipment, except as specified above, and all piping furnished and installed under Division 22 shall be provided with seismic restraints securely anchored to the building capable of resisting horizontal forces of 50% of their weight. D. Seismic restraint/snubber manufacturer shall be responsible for the structural design of attachment hardware as required to attach seismic restraints/snubbers to both the equipment and supporting structure on vibration isolated equipment, or to directly attach equipment to the building structure for non-isolated equipment. E. The Contractor shall furnish a complete set of approved shop drawings of all mechanical and electrical equipment which is to be restrained to the seismic restraint manufacturer, from which the selection and design of seismic restraint devices and/or attachment hardware will be completed. The shop drawings furnished shall include, at a minimum, basic equipment layout, length and width dimensions, installed operating weights of the equipment to be restrained and the distribution of weight at the restraint points. BPCE – 7504.01 ADOA 1400 W. WASHINGTON ST. CHILLER PLANT UPGRADES VIBRATION AND SEISMIC CONTROLS FOR PLUMBING 22 05 48 - 2 PART 2 - PRODUCTS — (See Division 23, Section 23 05 48 for applicable requirements). PART 3 - EXECUTION — (See Division 23, Section 23 05 48 for applicable requirements). END OF SECTION BPCE – 7504.01 ADOA 1400 W. WASHINGTON ST. CHILLER PLANT UPGRADES VIBRATION AND SEISMIC CONTROLS FOR PLUMBING 22 05 48 - 3 BPCE – 7504.01 ADOA 1400 W. WASHINGTON ST. CHILLER PLANT UPGRADES VIBRATION AND SEISMIC CONTROLS FOR PLUMBING 22 05 48 - 4