Amendment No. 1 to RFP Documents for Procurement of Power from Non-Solar Renewable Energy Power Projects S.N. 1 Doc Clause Type No. / Page No. RFP 1.3.1 (4) / 14 of 90 Existing Provision Revised Provision The Scheduled delivery date for different Contract Modified: Terms is as follows: The Scheduled delivery date for different Contract Contract Contract Contract Terms is as follows: Term A Scheduled Delivery Date th 11 May 2014* Term B Term C 31st March 2015 31 st March 2016 Contract Term A Scheduled Delivery Date * * - 1 year from the PPA signing date Contract Term B Contract Term C 31st March 2015 31 st March 2016 * 1 year from the PPA signing date 2 RFP / 19 of 90 2.1.2.2 (a) Modified: Renewable Energy Projects (A) Wind Energy Annual Mean Wind Power Density (W/m2) Wind zone ‐ 1 (Upto 200) Wind zone ‐ 2 (201 ‐ 250) Wind zone ‐ 3 (251 ‐ 300) Wind zone ‐ 4 (301 ‐ 400) Wind zone ‐ 5 (Above 400) (B) Small Hydro (i) Himachal Pradesh, Uttarakhand and North Eastern States Page 1 of 12 CUF / PLF Renewable Energy Projects (A) Wind Energy 20 % 22 % 25 % 30 % 32 % 45 % 30 % (B) Small Hydro (i) Himachal Pradesh, Uttarakhand and North Eastern States (ii) Other States Biomass Biomass Gasifier Biogas Non Fossil Fuel Based Cogeneration CUF / PLF 22 % 45 % 30 % 80 % 85 % 90 % BSES Rajdhani Power Limited S.N. Doc Type / Page No. Clause No. Existing Provision (ii) Other States Biomass Biomass Gasifier Biogas Non Fosil Fuel Based Cogeneration Project (i) Uttar Pradesh & Andhra Pradesh (ii) Tamil Nadu & Maharashtra (iii) Other states 3 4 5 RFP / 21 of 90 RFP / 33 of 90 RFP / 33 of Page 2 of 12 Revised Provision 2.1.2.2 (e) 2.8.1 2.8.2 Project (i) Uttar Pradesh & Andhra Pradesh (ii) Tamil Nadu & Maharashtra (iii) Other states 80 % 85 % 90 % 45% 60% 53% 45% 60% 53% Modified: Technology Tie-up: Technology Tie-up: The Bidder shall be required to provide technology tie-up. Technology to be used shall be as approved by Appropriate Commission or Government of India appointed body, agency and institutions as the case may be. Modified: 2.8 Due Dates 2.8.1 The Bidders should submit the Bids so as to reach the address specified below by 11:00 AM hrs (IST) on 12th April 2013:………………… 2.8 Due Dates Date of issue of RFP 13th March 2013 2.8.1 The Bidders should submit the Bids so as to reach the address specified below by 03:00 PM hrs (IST) on 29th April 2013:……………. Date of issue of RFP 13th March 2013 BSES Rajdhani Power Limited S.N. 6 Doc Type / Page No. 90 RFP / 41 of 90 Clause No. Existing Provision Submission of written clarification/amendments if any, on the RFP / RFP Documents by the Bidders. Pre-Bid Meeting(s) (if required) Revision of RFP and RFP Documents (if required) and issuance of revised RFP and RFP Documents Bid submission and opening of Non Financial Bid Opening of Financial Bid 20th March 2013 Short listing of Successful Bidder(s) and issue of LOI 22th April 2013 Short listing of Successful Bidder(s) and issue of LOI 10th May 2013 Signing of RFP Documents 12th May 2013 Signing of RFP Documents 30th May 2013 22nd March 2013 12th April 2013 17th April 2013 3.4.4 Sub point 4 Revised Provision Submission of written clarification/amendments if any, on the RFP / RFP Documents by the Bidders. Pre-Bid Meeting(s) (if required) Revision of RFP and RFP Documents (if required) and issuance of revised RFP and RFP Documents Bid submission and opening of Non Financial Bid Opening of Financial Bid 20th March 2013 22nd March 2013 19th April 2013 29th April 2013 06th May 2013 Modified: Head Annual escalation rate applicable to Quoted Escalable Energy Charge Value This shall be the rate notified by CERC applicable on the day which is seven (7) days prior to Bid Deadline Head For Non Biomass Projects: Annual escalation rate applicable to Quoted Escalable Energy Charge Value This shall be the rate notified by CERC applicable on the day which is seven (7) days prior to Bid Deadline Insertion: Page 3 of 12 BSES Rajdhani Power Limited S.N. Doc Type / Page No. Clause No. Existing Provision Revised Provision Head For Biomass Projects: Sub Point 5 Annual escalation rate applicable to Quoted Escalable Energy Charge Value 5% (As per CERC Generic Tariff order for FY 1314 dated 28th February 2013) under Petition No. 243/SM/2012 (SuoMoto)) PS: For payment purposes for Biomass Projects escalation rates as certified / specified by Appropriate Commission for the applicable financial year shall be used. 7 Format 4.7 RFP / 87 of 90 RFP / 88 of 90 RFP / Format 5.7 8 9 10 Replaced: Format A RFP / 71 of 90 Page 4 of 12 Amended Format A enclosed at Annexure 1 Illustration for Bid Evaluation and Computation of Levelized Tariff Insertion: Bid Evaluation Model will be issued separately Format 5.8 Transmission Charges Matrix As per the CERC Notification No. Eco 1/2013-CERC dated April 1, 2013 or any amendment issued 7 days before bid submission date Format 5.9 Transmission Loss Matrix As per the CERC Notification No. Eco 1/2013-CERC dated April 1, 2013 or any amendment issued 7 BSES Rajdhani Power Limited S.N. 11 12 13 Doc Type / Page No. 89 of 90 Clause No. Existing Provision Revised Provision days before bid submission date PPA / 17 3.2.1 b) PPA / 19 3.5.1 PPA / 21 4.4.2 Modified: b) The Procurers shall have obtained the order of b) The Procurers shall have obtained the order of the Appropriate Commission for adoption of tariff (if the Appropriate Commission for approval of PPA. required) under Section 63 of the Electricity Act 2003 and given a copy of the same to the Seller. Modified: The Contract Performance Guarantee as submitted by Seller shall be released by the Procurers within eight (8) Months from the actual Delivery Date of the Project. In the event of delay in achieving Scheduled Delivery Date by the Seller ……………… 4.4.2 Procurers shall at any time during any Contract Year, shall not be obliged to purchase any additional energy from the Seller beyond ……….. MUs [Insert value of energy quoted by the Seller in its bid plus an additional 10% of Contracted Energy]. The Contract Performance Guarantee as submitted by Seller shall be released by the Procurers within three (3) Months from the actual Delivery Date of the Project. In the event of delay in achieving Scheduled Delivery Date by the Seller ……………… 4.4.2 Procurer, at any time during any Contract Year, shall not be obliged to purchase any additional energy from the Seller beyond ……… MUs [Insert value of energy generated corresponding to a CUF/PLF value which is 2% higher than the quoted CUF/PLF) by the Seller at the point of signing the PPA]. If for any Contract Year, it is found that the Seller If for any Contract Year, it is found that the Seller has not been able to supply to the Procurers at has not been able to supply to the Procurers at Page 5 of 12 BSES Rajdhani Power Limited S.N. Doc Type / Page No. Clause No. Existing Provision Revised Provision Interconnection Point, the minimum energy of …… MUs (Insert value of energy generated corresponding to a CUF/PLF value which is 7% lower than the quoted CUF/PLF) by the Seller at the point of signing the PPA], the Seller shall be The penalty shall be equal to the compensation/ liable to pay as penalty for such shortfall in penalty/liquidated damage imposed by the generation as below. Appropriate Commission for non fulfillment of the RPO, on the Procurers for such shortfall in The penalty shall be equal to the compensation/ penalty/liquidated damage imposed by the generation by the Seller. Appropriate Commission for non fulfillment of the RPO, on the Procurers for such shortfall in generation by the Seller. Interconnection Point, the minimum energy of …………… MUs [Insert value of energy quoted by the Seller in its bid], the Seller shall be liable to pay as penalty for such shortfall in generation as below. 14 PPA / 23 4.6.1 If the Seller is not able to commence supply of power to the Procurers by the Scheduled Delivery Date other than for the reasons specified in Article 4.5.1, the Seller shall pay to each Procurer liquidated damages, proportionate to their then existing Allocated Contracted Capacity, for the delay in such commissioning. The sum total of the liquidated damages payable by the Seller to the Procurer for such delay shall be calculated as follows: Modified: If the Seller is not able to commence supply of power to the Procurers by the Scheduled Delivery Date other than for the reasons specified in Article 4.5.1, the Seller shall pay to each Procurer liquidated damages, proportionate to their then existing Allocated Contracted Capacity, for the delay in such un commissioned capacity. The sum total of the liquidated damages payable by a) Delay up to 200 days: 0.5% per day of the total the Seller to the Procurer for such delay shall be Contract Performance Guarantee value. calculated as follows: a) Delay up to 200 days: 0.5% per day of the total Contract Performance Guarantee value proportionate to un commissioned capacity. Page 6 of 12 BSES Rajdhani Power Limited S.N. Doc Type / Page No. 15 PPA / 41 9.5.1 16 PPA / 42 10.1.2 Clause No. Existing Provision Revised Provision If the Force Majeure Event or its effects continue to be present beyond a period of twelve (12) months, either Party shall have the right to cause termination of the Agreement. In such an event this Agreement shall terminate on the date of such Termination Notice without any further liability to either Party from the date of such termination. If the Force Majeure Event or its effects continue to be present beyond a period of three (3) months, either Party shall have the right to cause termination of the Agreement. In such an event this Agreement shall terminate on the date of such Termination Notice without any further liability to either Party from the date of such termination. Insertion 10.1.2 The Seller shall indemnify, defend and hold the Procurer harmless against: a) any and all third party claims against the Procurer for any loss of or damage to property of such third party, or death or injury to such third party, arising out of a breach by the Seller of any of its obligations under this Agreement, except to the extent that any such claim has arisen due to a negligent act or omission, breach of this Agreement or breach of statutory duty on the part of the Procurer, its contractors, servants or agents; and b) any and all losses, damages, costs and expenses including legal costs, fines, penalties and interest actually suffered or incurred by the Procurer from third party claims arising by reason of: (i) breach by the Seller of any of its obligations under this Agreement, (provided that this Article 10 shall not apply to such breaches by the Seller, for which specific remedies have been provided for Page 7 of 12 BSES Rajdhani Power Limited S.N. Doc Type / Page No. Clause No. Existing Provision Revised Provision under this Agreement) except to the extent that any such losses, damages, costs and expenses including legal costs, fines, penalties and interest (together to constitute “Indemnifiable Losses”) has arisen due to a negligent act or omission, breach of this Agreement or breach of statutory duty on the part of The Procurer, its contractors, servants or agents, or 17 PPA / 42 10.2.1 (ii) any of the representations or warranties of the Seller, if any made under this Agreement, being found to be inaccurate or untrue. Modified: Third party claims a. Where the Indemnified Party is entitled to indemnification from the Indemnifying Party pursuant to Article 10.1.1(a), the Indemnified Party shall promptly notify the Indemnifying Party of such claim referred to in Article 10.1.1(a) in respect of which it is entitled to be indemnified. Such notice shall be given as soon as reasonably practicable after the Indemnified Party becomes aware of such claim. The Indemnifying Party shall be liable to settle the indemnification claim within thirty (30) days of receipt of the above notice. Provided however that, if: Third party claims a. Where the Indemnified Party is entitled to indemnification from the Indemnifying Party pursuant to Article 10.1.1(a) or Article 10.1.2 (a), the Indemnified Party shall promptly notify the Indemnifying Party of such claim referred to in Article 10.1.1(a) or Article 10.1.2 (a) in respect of which it is entitled to be indemnified. Such notice shall be given as soon as reasonably practicable after the Indemnified Party becomes aware of such claim. The Indemnifying Party shall be liable to settle the indemnification claim within thirty (30) i) the Parties choose to refer the dispute before the days of receipt of the above notice. Provided Arbitrator in accordance with Article 12.3.2; and however that, if: ii) the claim amount is not required to be paid/ i) the Parties choose to refer the dispute before the Page 8 of 12 BSES Rajdhani Power Limited S.N. 18 Doc Type / Page No. PPA / 43 Page 9 of 12 Clause No. 10.3.1 Existing Provision Revised Provision deposited to such third party pending the resolution Arbitrator in accordance with Article 12.3.2; and of the Dispute, ii) the claim amount is not required to be paid/ the Indemnifying Party shall become liable to pay deposited to such third party pending the resolution the claim amount to the Indemnified Party or to the of the Dispute, third party, as the case may be, promptly following the resolution of the Dispute, if such Dispute is not the Indemnifying Party shall become liable to pay the claim amount to the Indemnified Party or to the settled in favour of the Indemnified Party. third party, as the case may be, promptly following b. The Indemnified Party may contest the claim by the resolution of the Dispute, if such Dispute is not referring to the Arbitrator for which it is entitled to be settled in favour of the Indemnified Party. Indemnified under Article 10.1.1(a) and the Indemnifying Party shall reimburse to the b. The Indemnified Party may contest the claim by Indemnified Party all reasonable costs and referring to the Arbitrator for which it is entitled to be expenses incurred by the Indemnified party. Indemnified under Article 10.1.1(a) or Article 10.1.2 However, such Indemnified Party shall not settle or (a) and the Indemnifying Party shall reimburse to the compromise such claim without first getting the Indemnified Party all reasonable costs and consent of the Indemnifying Party, which consent expenses incurred by the Indemnified party. shall not be unreasonably withheld or delayed. However, such Indemnified Party shall not settle or compromise such claim without first getting the consent of the Indemnifying Party, which consent shall not be unreasonably withheld or delayed. Modified 10.3 Indemnifiable Losses Where an Indemnified Party is entitled to Indemnifiable Losses from the Indemnifying Party pursuant to Article 10.1.1(b), the Indemnified Party shall promptly notify the Indemnifying Party of the Indemnifiable Losses actually incurred by the Indemnified Party. The Indemnifiable Losses shall be reimbursed by the Indemnifying Party within thirty 10.3 Indemnifiable Losses Where an Indemnified Party is entitled to Indemnifiable Losses from the Indemnifying Party pursuant to Article 10.1.1(b) or Article 10.1.2(b), the Indemnified Party shall promptly notify the Indemnifying Party of the Indemnifiable Losses BSES Rajdhani Power Limited S.N. Doc Type / Page No. Page 10 of 12 Clause No. Existing Provision Revised Provision (30) days of receipt of the notice seeking Indemnifiable Losses by the Indemnified Party. In case of non payment of such losses after a valid notice under this Article 10.3, such event shall constitute a payment default under Article 9. actually incurred by the Indemnified Party. The Indemnifiable Losses shall be reimbursed by the Indemnifying Party within thirty (30) days of receipt of the notice seeking Indemnifiable Losses by the Indemnified Party. In case of non payment of such losses after a valid notice under this Article 10.3, such event shall constitute a payment default under Article 9. BSES Rajdhani Power Limited Annexure 1 (Format (A & B) below applicable in case Fuel is required for the Project such as Bio-mass, bio fuel cogeneration, urban or municipal waste etc.) Quoted Tariff Sub: Bid dated ----- for supply of –MW long from –[insert name of the Renewable Source] for the Contract Term ---[insert A / B / C, as the case may be] to Procurer(s) Format A: Description Contract Term ---- [insert A / B / C, as the case may be] Energy offered (MUs) in figures Energy offered (MUs) in words Total Capacity offered* (MW) in figures Total Capacity offered (MW) in words CUF/PLF COD Date** Name of the Interconnection Point Name of the Injection Point Whether the STU system be used to transmit power between the Interconnection Point and the Injection Point?: (Insert “Yes” or “No” % Transmission loss in STU system*** …………… (To be inserted by the Bidder only if STU system is involved at Bidder’s end) Page 11 of 12 BSES Rajdhani Power Limited * The Procurer(s) can contract the total capacity of power offered by the Bidder or any combination of the fractions of the offered total capacity. Bidders may quote for higher Requisitioned Capacity subject to meeting the Scheduled Delivery Date. Procurers may procure more than the Requisitioned Capacity with approval from the Appropriate Commission ** Not later than Scheduled Delivery Date *** Losses to be considered as mentioned in the relevant tariff orders of the Appropriate Commission as on seven (7) days prior to Bid Deadline. Bidders to provide a reference to the Appropriate Commission Order (Commission name, Order / Case No., Order / Case Date) Page 12 of 12 BSES Rajdhani Power Limited