perpetual ambitions
Haji Hassan Group
FIRST EDITION 2015
© COPYRIGHT
Text and Photography copyright
Haji Hassan Group
P.O. Box 530, Tel: +973 17551111, +973 17875287
Fax: +973 17919111, headoffice@hajihassan.com
www.hajihassan.com
ALL RIGHTS RESERVED No part of this publication
may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, electronic,
mechanical, photocopying, recording or otherwise,
without the prior written permission of the copyright
holder.
The bridges we have built forged many links and
spanned great distances, and showcased our pioneering
spirit, expertise and perpetual ascent in the construction
industry. By remaining steadfast, we have achieved our
goals. Through our capabilities and an insatiable drive
to succeed, we have defied obstacles. As “when one
sets aim to an end, one must constantly endeavor and
abandon caution .. and one who detests climbing the
heights, will forever live among the pits”. At Haji Hassan
Group (HHG), we are extremely driven and motivated to
work hard. Our solid resolution and unwavering belief in
ourselves enforced our ambitions and guided our march
in the path drawn by the late Haji Hassan Al A’ali. In his
long journey towards greatness, he transformed every
obstacle in his path into an enduring drive to reach for
the heights.
‫ أظهرت من خاللها الرياد َة في‬،‫أنحاء ش ّتى‬
‫ش َّيدنا جسوراً ربطت بقوتها‬
ً
‫ ارتقينا‬.‫ والقوة في الخبرات والنمو المتواصلين‬،‫صناعة البناء والتشييد‬
‫ فال مستحيل أمام‬،‫بطموحنا الالمتناهي لنصل إلى خارطة الغايات‬
َ ‫ فـ(إ َذا َما‬.‫صعب في تحقيق النجاحات‬
‫ت إ ِلى َغايَ ٍة‬
‫اإلمكانيات وال‬
ُ ‫ط َم ْح‬
َ
ْ ‫ال يَ ِع‬
‫الد ْه ِر‬
ُ ‫س‬
ُ ‫َر ِك ْب‬
ّ ‫ َو َم ْن ال يُ ِح‬،‫الح َذر‬
َ ‫يت‬
ُ ‫ب‬
َّ ‫ش أَبَ َد‬
ِ َ‫ت ا ْل ُم َنى َون‬
ِ ‫الج َب‬
ِ ‫ص ُعو َد‬
.)‫الح َفر‬
ُ ‫بَ ْي َن‬
‫ مجموعة الحاج حسن امتلكنا الحافز فسعينا وعملنا واجتهدنا‬.. ‫نحن‬
‫ إيماننا بذاتنا وقناعتنا بإمكانياتنا عزز طموحنا ورسم لنا درب ًا‬.‫فوصلنا‬
،‫مشيناه؛ وكنا على خطى صاحب اإلرادة القوية الفقيد الحاج حسن العالي‬
‫وهو من استند على الصعاب التي اعترضت طريقه ليصل إلى القمة‬
.‫بطموحه الالمحدود‬
the founder
Haji Hassan Al A’ali
“My loyalty is to my country and its people,
first and foremost. The profit I make is a profit
generated to the country and the people”.
‫“والئي لوطني وشعبه أو ًال‬
‫ربح‬
ٌ ‫ والربح هو‬.ً‫وأخيرا‬
.”‫للوطن وأبنائه‬
“If you have to
flourish, you
have to leave
home and see
the world.”
Haji Hassan Al A’ali - 1952
Founder
1921
2003
“Step by step is my philosophy to achieve
success”
With these words of wisdom by the founder, and
the competence of his successors, Haji Hassan
Group is managed by his descendants, who are
armed with the same sense and commitment,
innovation, community and responsibility as his.
Haji Hassan’s success story began with many struggles and hardships, but he
overcame them all. He succeeded in the construction industry and became the
first to establish a chain of factories. Amidst a competitive commercial market,
Haji Hassan embarked on a challenging journey towards success, from his
humble roots in the village of A’ali to the hub
of business in the Kingdom’s capital, Manama.
The group had been in existence since
the emergence of the construction and
infrastructure industries during the fifties
and sixties. During this period, Haji Hassan
had the vast potential and opportunities;
and so he ventured in the business armed
with his success philosophy and founded the
first Asphalt Factory in Bahrain in the 60s,
which was the starting point for Haji Hassan
who became one of the biggest successful
entrepreneurs in the country. During that
time, he introduced to the country the use
of specialized machineries for reclamation
and excavation. In the 70s, he expanded his
business by founding a large-scale Readymix
and another Precast factories, followed by
the establishment of a block-manufacturing
factory and more.
» ‫« خطوة بخطوة هي فلسفتي نحو تحقيق النجاح‬
‫ وبفضل كفاءة أبنائه ممن تقلدوا‬،‫بهذه الكلمات الحكيمة من قبل المؤسس الراحل‬
،‫إدارة مجموعة الحاج حسن من بعده وتسلحوا باإلرادة والعزيمة وتحمل المسؤولية‬
‫ حيث بدأت‬،‫تفتحت آفاق جديدة في مجال اإلنشاءات والتشييد في مملكة البحرين‬
‫قصة نجاح الحاج حسن بالكثير من الصعوبات والظروف القاسية التي عمل جاهدا ً على‬
‫ وكان أول من أسس‬،‫ فنجح في صناعة قطاع البناء واإلنشاءات‬،‫مواجهتها وتخطيها‬
‫ وانطلق في رحلة مليئة بالتحديات نحو النجاح‬،‫سلسلة من المصانع في البحرين‬
‫ متخذا ً من مسقط رأسه (قرية عالي) مركز انطالقة نحو‬،‫وسط سوق تجاري تنافسي‬
.‫ المنامة‬،‫عاصمة مركز األعمال‬
‫بدأت مجموعة الحاج حسن مع نشوء الحركة‬
‫العمرانية واإلنشائية في المملكة في فترة‬
‫“ إذا أردت‬
‫ فعليك‬،‫النجاح‬
‫مغادرة المنزل‬
”‫ورؤية العالم‬
‫م‬1952 - ‫الحاج حسن العالي‬
Today it is a diversified conglomeration of complementary businesses, which
has been serving the construction and industrial services sector in Bahrain.
It became the foundation of Haji Hassan’s growing empire, which soon
transformed him into an iconic symbol in the industry, as the largest provider of
excellent standard construction services to both the public and private sectors
in the Kingdom. Haji Hassan Al A’ali pursued his goals diligently one at a time,
aided by his methodical, perceptive and insightful qualities. Over a period of
time, he established the Haji Hassan Group and eventually ventured into the
construction and infrastructure industries, commencing in the ‘Noora’ Trade.
،‫الخمسينيات والستينيات من العقد الماضي‬
‫و ذلك ما دفع الحاج حسن نحو تعزيز تجارته‬
‫فتجسدت الخطوة األولى في دخوله ميدان‬
‫اإلعمار وبناء أول مصنع لألسفلت في البحرين‬
‫ فكانت القفزة النوعية التي‬،‫م‬1960 ‫خالل العام‬
‫أهلته لنيل مكانة عالية ضمن كبار المنافسين‬
‫لتصبح المجموعة األولى في البحرين من حيث‬
‫استيراد واستخدام اآلالت والمعدات في عمليات‬
‫ من هنا كانت‬.‫االستصالح والرصف لتلك الحقبة‬
‫ فتوالت بعدها وتيرة األفكار لتأسيس‬،‫االنطالقة‬
‫مصنع للخرسانة الجاهزة وآخر للخرسانة مسبقة‬
‫ ثم تك ّللت الجهود‬،‫الصب خالل السبعينيات‬
.‫بتأسيس مصنع للطابوق‬
‫أضحت مجموعة الحاج حسن اليوم سلسلة‬
‫متنوعة من الشركات التكميلية التي تخدم قطاع البناء والتشييد والخدمات‬
‫ كما جعلت من‬،‫ وأسست إلنشاء امبراطورية تجارية رائدة‬،‫الصناعية في البحرين‬
‫ جعلته في الريادة في السوق المحلي‬،‫الحاج حسن العالي رمزا ً بارزا ً في الوسط التجاري‬
.‫وأسواق الدول المجاورة ممن يقدمون خدمات لمختلف الجهات‬
‫ أو كما كان‬- ‫ خطوة بخطوة‬،‫هكذا بدأ الحاج حسن المراحل األولى من مسيرته‬
‫ نحو تأسيس امبراطورية من الشركات العمالقة والتي يعود‬- "‫يسميها "عتبة عتبة‬
‫الفضل فيها لعقله المدبر وفكره الفذ ورؤيته الواضحة نحو بناء مجموعة شركات‬
‫كبرى تعرف اليوم باسم "مجموعة الحاج حسن" بدءا ً من تجارة "صناعة النورة" من‬
.‫ قرية عالي‬..‫مسقط رأسه‬
‫برز الحاج حسن بفضل عقله الفذ وقدرته على مواكبة‬
‫وتيرة المشهد االقتصادي المتغير والسريع ليرسم‬
‫بذلك خطوات النجاح ويُدخل طفرة ملموسة على‬
‫اقتصاد البحرين كما فعلت قرية عالي التي ينتمي‬
،‫ والتي اشتهرت بصناعة الفخار منذ آالف السنين‬،‫إليها‬
‫فاستمد قوته من تلك الحرفة حيث عمل منذ صغره‬
‫ وهي مادة محلية الصنع تتمثل في‬،"‫في صناعة "النورة‬
‫تحميض الحجر الجيري ومن ثم تبريده بالماء حتى‬
.‫يصبح مسحوق ًا أبيض ًا يستخدم كمادة لدهن الجدران‬
‫وتعتبر صناعة النورة والفخار إحدى بصمات التاريخ التي‬
‫ما زالت ماثلة أمامنا على الرغم مما اعتراها من تغيير‬
‫ والتي تحمل في‬،‫وتطوير منذ نشأتها قبل آالف السنين‬
.‫طياتها هوية حضارية لسكان تلك القرية‬
Haji Hassan was able to rise above his situation
in A’ali village, through his gift of intellect,
drive and the flexibility to keep up with a fast
‫“ارتبطت بصداقة وثيقة مع‬
‫ كان عصامي ًا‬... ‫الحاج حسن‬
‫واستطاع أن يبني نفسه‬
.”‫بنفسه‬
‫الشيخ عبداهلل بن خالد آل خليفة‬
“I had a close friendship
with Haji Hassan...He was
self-made man who built
up himself”.
changing economic landscape. As a young
Sheikh Abdullah bin Khalid Al Khalifa
acquired a reputation for A’ali village, since
man in a village famous for pottery making,
he utilized his special skills and determination
in order to excel and earn a living. Later on, he
was part of venturing the 'Noora' Trade, an
industry that catalyzed the development and
it began in the area a thousand years ago.
‘Noora’ is a substance derived from roasting
limestone, and cooled with water until it
becomes a white powder that serves as an
ingredient in wall paints.
It was a significant phase in the life of Haji
Hassan, the time when he fulfilled his greatest
goal as pioneer and founder of Haji Hassan
Group.
board of directors
‫رؤيتنا‬
The minds behind the success...
‫الحفاظ على ريادتنا اإلقليمية كأول من انخرط في أعمال صناعات البنى‬
‫ وكمصنعين‬،‫التحتية وأيض ًا كشركاء في إنشاء المشاريع العمالقة والمميزة‬
.‫ومزودين رئيسيين لمواد البناء وتوابعها‬
‫مهمتنا‬
‫أن نلتزم بتنمية األعمال الصناعية والبنية التحتية في المنطقة من خالل‬
‫توفير منتجات وخدمات ذات جودة عالية تلبي رضا عمالئنا في كل من‬
‫القطاعين العام والخاص من خالل المسؤولية االجتماعية للشركات عبر‬
،‫ بحيث نلتزم بالمعايير الدولية لجودة المنتجات‬،‫التميز في جميع الجوانب‬
‫ وتحقيق تطلعات العمالء باإلضافة‬،‫والتكنولوجية القائمة على االبتكار‬
.‫للصدق والنزاهة‬
Adel Hassan Al A’ali
Director
Vision
Our vision is to maintain our leadership status in the region and serve
as a premier partner in the infrastructure industry; to be known as the
originator of exceptional developments and as a manufacturer and
provider of building materials and products.
Mission
The Haji Hassan Group is committed to the continuous development
of industrial and infrastructural businesses in the region by providing
products and services of high quality to meet the satisfaction of its
clients from both the public and private sectors. The team will continue
to maintain clients’ satisfaction through social responsibility to their
companies, excellence in all aspects, international standards of product
quality, innovative technology, fulfilment of clients’ expectations,
honesty and integrity.
Ebrahim Ali Al A’ali
‘SUCCESS CONTRIBUTOR TO HHG’
Moh'd Waheed Hassan Al A’ali
Director
Jalal Hassan Al A’ali
Director
Hana Hassan Al A’ali
Director
Hani Hassan Al A’ali
Director
Maitham Ahmed Al A’ali
Director
Ahmed Ali Al A’ali
‘SUCCESS CONTRIBUTOR TO HHG’
ُ ‫رق‬
ٌ ‫ط‬
ُ
‫ وال شك بأن كل هذه‬.‫إنتاج ما يُسهم في اقتصاد البلد‬
‫ هم أولئك الذين سخروا وقتهم وجهدهم من أجل العمل على‬.‫أياد خفيّة‬
ٍ ‫ ساهمت فيها‬،‫شيدت وجسو ٌر ُم ّدت‬
ِ
ً
ً
.‫ فاحتلت الصدارة وكانت دائما في المقدمة لجهودها المثمرة وسواعدها البناءة‬،‫الجهود ساعدت على رفع اسم مجموعة الحاج حسن العالي عاليا‬
1950
1960
1970
1980
1990 -2010
1952
1960
1972
1980
1993
Small manual crushing plant near Burhama Area
Moved all plants to Salmabad site
Moved asphalt plant to Sitra
Opened phase 1 of Jalal Garden housing compound
Established Haji Hassan Crane Division
provided the largest capacity crane in
Bahrain at 400 tons
1975
Opened Delmon Shopping Centre
Opened Faisal Garden housing compound
1981
Established the first polythene tank
factory in the GCC
Established United Precast Concrete
(UPC) in Dubai
Invested in Bahrain Rubber Co.
Acquired Haji Hassan Reinforcement Co.
1996
1954
Purchase of the first manual block
machine producing one block at a time
Upgrade of crushing plant through
purchase of new crushing machineswith a capacity to produce 115 tons/hr
1963
Secured a three-year crusher contract with Bahrain
Petroleum Company (BAPCO)
1964
1976
Upgraded crushing plant producing 150 tons/hr
Implemented all pavement works at Mina Salman
development; including paved area for container
handling facilities
1955
1965
Location moved to Nuaem
Purchased the first asphalt plant on the
Island
Established Bahrain Asphalt as the first
national asphalt contractor in Bahrain
Implemented the first airport runway
1956
First upgrade for the blocks factory
through purchase of the first electric
block machine which produced two
8 inch blocks at a time.
Opened the first group office in Lulu Road
Opened a small manual tile plant for the production of
floor tiles
1957
Block Factory moved to Salhiya Area
Establishment of the construction department
Implemented the 1st reclamation project
in Mina Salman for the Public Works
Department
Constructed a number of projects for the Public Works
Department such as small Health clinic in Tubli, Mariam
Al Omran School in Muharraq and Hospitals in Hidd
1972
1965
Upgraded blocks factory production increased to
12,000 blocks per day with capabilities of producing
kerbs and interlocking paving bricks
1966
First-time upgrade of the asphalt plant production
increased to 115 tons/hr
1969
Second-time upgrade of the asphalt plant
1982
Purchased calcium silicate plant produced the first
lightweight blocks in the Gulf region
Opened Hani Garden housing compound
1977
1983
Major upgrade of the brick and block plant
producing 20,000 high-quality 8 inch blocks per shift
Partnered with Bahrain Bulk Trade
Opened the Al A’ali Shopping Complex
in Seef Area
Opened Bahrain Asphalt Branch in Doha
to do the sub-base and asphalt work
for the Dukhan Highway project, as a
subcontractor
Established Bahrain Pipes Co.
1978
1984
Purchased second asphalt plant which included
a larger storage capacity & automatic batching
producing 120 tons/hr
Opened Maitham Garden housing compound
2000
Established Arabian Parts Company
Establishment of UPC Oman
Moved blocks factory to Abu Zwaid (ALBA Area)
2002
Established the Haji Hassan Readymix
Established Bahrain Precast Concrete
Co. (joint venture)
Upgraded the crushing plant in Hafeera which
became the largest in the Island with one primary
and two secondary crushers producing 300 tons/hr
1979
Established Haji Hassan Mechanical
Engineering Workshop
Opened Haji Hassan Tower building in Sanabis
1985
Established the Arabian Chemical
Industries (ISOLA)
Established UPC Abu Dhabi
Established UPC Qatar
2006
HSBC Partnership through an
Investment in the BPC Group
2007
Major upgrade of Haji Hassan Mechanical
Engineering Workshop
1958
2011
Purchased 2nd crusher resulting in a total capacity of
30 tons/hr
Established KRAH Bahrain (joint venture)
1959
2015
Second upgrade of the blocks factory producing three
8 inch blocks at a time resulting in a capacity of 4,000
blocks per day
Upgraded the Mobile Crane capacity
to 500 ton
TIME
LINE
1952 - present
‫“لقد ضربت بالعمود حجرا ً فانفلقت‪،‬‬
‫فخرجت منها دودة عمياء وفي فمها شيء أخضر تحمله‪،‬‬
‫فقلت في نفسي‪(( :‬ما دام اهلل يرزق الدودة في جوف هذه الصخرة‪،‬‬
‫فإني وثقت باهلل وثوق ًا منقطع النظير))"‪.‬‬
‫‪history the beginning‬‬
‫‪A foundation towards infrastructure‬‬
“Haji Hassan was
one of the greatest
men who had a
major impact in the
renaissance of the
country.”
The marvelous success attained by Haji Hassan Group started in 1952. Today, it
had grown with more than 13 divisions engaged in the manufacture of various
construction materials for the Kingdom’s infrastructure projects. One of the
most important achievements of the Group is founding the Asphalt Factory,
to provide street interlocking paving bricks services in the sixties in partnership
with ‘Barbar Green’ Plant. It was such a huge leap that it immediately propelled
the Group to the pinnacle of the construction industry. After prevailing against
foreign competition, the Asphalt Factory became the first of its kind Bahraini
factory founded using Bahraini capital; as such, it was named Bahrain Asphalt.
‫م ونما جذري ًا‬1952 ‫بدأ نجاح مجموعة الحاج حسن غير المسبوق مع انطالقة العام‬
H.E. Ali Saleh Al Saleh
Minister of Commerce
Alongside an ever-expanding scope of work, the group also entered into joint
ventures with foreign companies such as ‘Wimpy’, in undertaking projects on
the expansion of Bahrain International Airport as well as many other street
interlocking paving bricks projects that became a great part of the architectural
revolution and hastened the growth of the Kingdom.
‫التعاون مع شركات أجنبية مثل (ويمبي) من أجل توسعة مطار البحرين الدولي ورصف‬
The Group eventually established Haji Hassan Readymix and Bahrain Precast
Concrete companies after its eventual success.
These factors heavily contributed to the
projects of the Ministry of Works, among
others. Haji Hassan Group aims to induce a
commercial boom in the Kingdom by building
shopping malls such as Delmon Center and Al
A’ali Shopping Complex.
‫ وكان لمصنع‬.‫للخرسانة مسبقة الصب بعد النجاح الباهر الذي حققه مصنع األسفلت‬
Today, Haji Hassan Group is considered a
pioneer in the Readymix concrete industry in
the Kingdom as well as a leading supplier of
blocks.
‫ شركة يقوم أساس عملها على تصنيع مواد البناء بشتى‬13 ‫ليشمل أكثر من‬
‫ ومن أهم نجاحات المجموعة هو‬.‫ والتي تدخل في مجاالت البنية التحتية‬،‫أنواعها‬
‫ وذلك عن‬،‫تأسيس مصنع لألسفلت لغرض حفر ورصف الشوارع في فترة الستينيات‬
‫ و قد أهلت تلك الشراكة ألن يتبوأ‬.)‫طريق شراكة استراتيجية مع مصنع (باربر غرين‬
‫مصنع األسفلت هذا مرتبة مميزة في مثل هذا القطاع ممكن ًا إياه من التغلب على‬
‫المنافسة األجنبية آنذاك ليصبح أول شركة محلية ذات رأسمال بحريني أطلق عليه‬
‫ بعدها؛ اتسع نطاق العمل فتمكنت المجموعة من‬.)‫اسم (شركة أسفلت البحرين‬
‫أغلب شوارع مناطق البحرين وغيرها من المشاريع التي أحدثت نهضة عمرانية هائلة‬
.‫وساهمت في عمليات التنمية‬
‫بعدها؛ تبلورت فكرة إنشاء مصنع للخرسانة المخلوطة وأيض ًا إنشاء مصنع‬
‫“كان أحد الرجال‬
‫العظام الذين تركوا‬
‫آثاراً كبيرة في مسيرة‬
”.‫النهضة في البالد‬
،‫معالي السيد علي صالح الصالح‬
‫رئيس مجلس الشورى ووزير التجارة السابق‬
‫الخرسانة إسهامات متعددة في مشروعات‬
‫ تال ذلك؛‬.‫وزارة اإلسكان ومشاريع أخرى عدة‬
‫توجه المجموعة إلى إحداث طفرة في السوق‬
‫التجاري من خالل االستثمار في إنشاء المجمعات‬
‫التجارية كمجمع دلمون الواقع في قلب المنامة‬
.‫ومجمع العالي الواقع في ضاحية السيف‬
‫ تعد مجموعة الحاج حسن من الشركات‬،‫اليوم‬
‫الرائدة في إنتاج الخرسانة المخلوطة في مملكة‬
.‫البحرين وأول المزودين للطابوق في المنطقة‬
BAHRAIN
ASPHALT
HAJI HASSAN
CRANES
DIVISION
BAHRAIN
PIPES
BAHRAIN RUBBER
COMPANY
BAHRAIN
PRECAST GROUP
ARABIAN PARTS
COMPANY
GROUP DIVISIONS
KRAH
BAHRAIN
HAJI HASSAN
READYMIX
BAHRAIN
BLOCKS
BAHRAIN
TANKS
HAJI HASSAN
REINFORCEMENT
ARABIAN
CHEMICAL
INDUSTRIES
AL A'ALI
SHOPPING
COMPLEX
HAJI HASSAN
Workshop
BAHRAIN ASPHALT
Founded in
1965
CIVIL ENGINEERING & CONTRACTING
‫م وهي األولى من نوعها في‬1960 ‫تأسست شركة أسفلت البحرين عام‬
‫ وتنفذ مشاريع مرموقة ذات طابع خاص لكال القطاعين‬،‫مملكة البحرين‬
‫ تم‬.‫ وذلك وفق ًا ألعلى المعايير الدولية المعتمدة‬،‫الحكومي والخاص‬
‫م لتفانيها في‬2005 ‫التصديق على الشركة من قبل مكتب "فيريتاس” منذ عام‬
‫ تتميز الشركة‬.‫الحفاظ على أعلى معايير الجودة والسالمة في جميع عملياتها‬
،‫في الريادة في مجاالت البحث والتطوير وإنتاج األسفلت ومشتقاته وتوابعه‬
‫وذلك في مختبرات مجهزة بالكامل ومعدات اختبار حديثة تدار بإشراف فنيين‬
‫ وهي أول شركة تنتج مستحلب البوليمر المعدل‬،‫ومهندسين مؤهلين‬
‫ وقد عملت الشركة على مجموعة من المشاريع الكبرى‬.‫والقار في البحرين‬
‫ بناء المعبر الثالث‬،‫ حلبة البحرين الدولية‬،‫والمميزة مثل مطار البحرين الدولي‬
‫ بناء مدرج جديد للطائرات والمرافق‬،‫في جسر الشيخ خليفة بن سلمان‬
‫المرتبطة بقاعدة الصخير ومشروع جسر شمال المنامة وغيرها من‬
.‫المشاريع‬
Bahrain Asphalt (BA), was established in the 1960s as the first
asphalt contractor in Bahrain. Today, it is considered a leader in the
implementation of prestigious projects in the public and private sectors.
BA operates to the highest international standards and enjoys ratification
by Bureau Veritas since 2005 for its dedication in maintaining quality
and safety in all its operations. The company is a pioneer in the fields
of production, research and development and is fully equipped with
modern laboratories and test equipments under the supervision of
qualified engineers and technicians. It is the first company in Bahrain
to produce Polymer Modified Bitumen (PMB). The company has worked
on a range of major projects like Bahrain International Airport, Bahrain
International Circuit, third crossing of Sheikh Khalifa bin Salman Bridge,
new runway and associated facilities in Sakhir Airbase, North Manama
Causeway, and many more.
bahrainasphalt.com
PRODUCTS
RANGE
VARIOUS ASPHALT MIXES
SUB-BASE PRODUCTS
ROAD-BASE PRODUCTS
LIMESTONE AGGREGATES
EMULSION PRODUCTS
Leading local company
which undertakes
the construction of
roads, airport runways,
taxiways, aircraft
aprons, carparks etc.
MODIFIED BITUMEN
Key Projects
North Manama Causeway,
Bahrain International Airport,
Sakhir Airbase, Sheikh Isa Bin
Salman Causeway, Sheikh Khalifa
Bin Salman Causeway, Bahrain
International Circuit, Dukhan
Highway (Qatar), Sanad Junction,
Salmabad Junction, Diplomatic area
junction, and many more.
Facts you must know
One of the biggest asphalt producers in
Bahrain.
One of the largest producers of
asphalt in Qatar.
4,000 Tonnes daily average asphalt
production in Qatar, with maximum
output of 7,000 tonnes achieved.
Construction of the largest
infrastructure Project issued by the
Ministry of Works, in Joint Venture with
Six Construct.
One of the few local companies given the accreditation to
handle the F1 race track construction.
First company to produce Polymer Modified Bitumen (PMB)
in Bahrain.
Haji Hassan realized his
potentials and foresaw the
overwhelming opportunities to expand
his business and to reflect his philosophy
leading to his success in founding the
first asphalt factory in Bahrain in the 60’s.
BA is one
of the leading
crushing
plant
in Bahrain
STONE CRUSHER
PLANTS
Bahrain Asphalt established their first stone crushing plant
in 1968 in Sanabis area, before relocating to Asker in 1977.
The modern facilities allow Bahrain Asphalt to produce a
wide range of aggregate products which include:
General Type B fill, Type A Road-base, Modified Type A Road-base,
and a full range of single size aggregates for use in drainage
and sewer construction. As well as Limestone dust for tile grout
production.
WET MIX
PLANTS
Bahrain Asphalt's Wet Mix Plants meets the demands of contract specific material
specifications as equipped with a fully automatic control panel, produce homogeneous
blended aggregates with the controlled addition of sand, cement, aggregates and
water to produce a range of specialized aggregates and cement bound sub-base
materials, with an output up to 240 tons per hour per plant.
“Civil and Asphalt
works term contract
within Refinery
borders and Jabal
(Oil Wells Locations)”
(Award for best contractor in
2005 from Bapco)
BAHRAIN PRECAST CONCRETE
Founded in
1978
‫ وهي‬،‫م‬1978 ‫تأسست شركة البحرين للخرسانة مسبقة الصب في العام‬
‫ المصدقة من قبل‬ISO 9001-2008 ‫حاصلة على شهادة نظام إدارة الجودة‬
‫ وتقوم الشركة بتصميم وإنتاج وتركيب المكونات الجاهزة‬.DNV ‫شركة‬
‫الشاملة من األلواح الجوفية وألواح الكسوة ولوائح دمج داخلية وخارجية‬
‫ ويمكن االنتهاء من عنصر الخرسانة‬.‫واألعمدة والجسور واألسوار والساللم‬
‫مسبقة الصب من خالل استخدام خرسانة مصطبغة وحصى ملونة مع‬
.‫الغسل الحامضي أو السفع الرملي‬
Bahrain Precast Concrete (BPC) was founded in 1978. BPC holds a quality
management system Certification ISO 9001-2008 certified by DNV. The
company designs, produces and erects precast components inclusive
of pre-stressed Hollowcore slabs, cladding panels, external/internal
sandwich and solid load bearing panels, shear walls, columns, beams,
boundary walls and staircases. Finishing of the precast element can be
achieved by using pigmented concrete and colorful aggregates with either
sandblasting, retarding and acidwashing.
bpcgroup.biz
Al A’ali
Shopping
Mall colored
façade
panels with
sandblasted/
retarding
finishes,
hollowcore
slabs
and GRC
elements.
THE BIG PROJECTS IN BAHRAIN
Four Seasons Hotel
GOSI Shopping Mall
colored façade elements with acidwashed, light and deep
sandblasted finishes.
colored façade panels with sandblasted finishes and
hollowcore slabs.
Accommodation
Majority of the monuments in the Kingdom.
First ever footbridge (near Marina Club).
Majority of bus stop shelters.
PRODUCTS
RANGE
HOLLOWCORE SLABS
Ritz Carlton Hotel (formerly Le Meridien Hotel)
administration building, mess hall, mosque and boundary
wall for National Guard HQ 2 - full precast building system.
COLUMNS
façade panels in white color with sandblasted finishes
and boundary walls.
13-storey hotel
SHEARWALLS (G/C)
full precast building system.
LOADBEARING
DECORATIVE FAÇADE ELEMENTS (G/C)
BNI HQ
11-storey, 18-storey, 24-storey twin
towers and 35-storey apartment
building
colored façade panels with sandblasted finishes.
structural building system.
Citi Bank HQ
colored façade panels with acidwashed finishes.
BEAMS
BOUNDARY WALLS (G/C)
QUAY WALLS
STAIRCASES
GARDEN / EXTERNAL
DECORATIVE ELEMENTS
DUBAI
ABU DHABI
Established in
2002
OMAN
Established in
2000
United Precast Concrete Dubai L.L.C. (UPC) – an associated
company of Haji Hassan Group - Bahrain, located in Al Quoz
Industrial Area in Dubai which is approximately 20 Kms away
from Dubai City Centre.
UPC Dubai, a Company established in July 1993, is specialized
in design, production and erection of precast concrete elements
for building projects. The company has more than 25 years of
experience from Bahrain.
Our range of products is based on the latest know-how, both as
regards the properties of concrete design as well as product and
production development.
Our product ranges from... Prestressed hollowcore slabs of
150, 200, 265, 320, 400 and 500 mm, Facade elements, Solid
panels (pigmented and grey), Prestressed tt slabs from 400950 mm, Boundary walls, Beams and columns, Standard stair
cases, Building systems.
QATAR
The company has been in Qatar since 2002 and started
production in July 2003 from a brand new factory in the
developing area of Mesaieed Industrial City outside Doha.
United Precast Concrete Abu Dhabi L.L.C. (UPC) – an
associated company of Haji Hassan Group - Bahrain, located in
Mussafah Area in Abu Dhabi which is approximately 30 Kms.
away from Abu Dhabi City. We have the privilege of being
sponsored by Mr. Abdullah Saleem Al Khazma Al Katheeri,
Chairman to Road Department, Abu Dhabi Municipality.
UPC Abu Dhabi, a Company established in July 2002, is
specialized in design, production and erection of precast concrete
elements for building projects. The company has more than 25
years of experience from Bahrain.
Our range of products is based on the latest know-how, both as
agreed the properties of concrete design as well as product and
production development.
United Precast Concrete Oman LLC (UPC) – started business
in Oman around year 2000 under Dubai License and currently
UPC has a representative office in Oman.
Although UPC does not own a production facility in Oman
but widely provides design manufacture, transportation and
assistance with erection, executing the full range of products and
projects in Oman.
Major projects are, Rameez Shopping Mall, Muscat City Centre,
Staff Accommodation in addition to 150 Villas at Duqum.
With the expertise of highly skilled engineers, UPCQ was able to
provide design solutions and precast products offering high value
for money by saving both cost and time for its valued clients.
In order to accommodate the present development in Qatar
with a high rising population and all the related challenges,
UPCQ is among others offering fully precast systems for Labour
Accommodation,Villa Compounds, Sub-stations and other
building systems. These systems have been designed by UPCQ
and have a significantly faster construction time compared to the
traditional systems, ensuring a significantly shorter payback of
the investment.
Our product ranges from... Prestressed hollowcore slabs of
150, 200, 265, 320, 400 and 500 mm, Fully Precast Building
systems, Façade elements, Solid Panels (Pigmented and Grey),
Boundary walls, Beams & Columns, Stair cases.
Our product ranges from... Prestressed hollowcore slabs
of 150, 200 and 265 mm, Facade elements, Solid panels
(pigmented and grey), Prestressed tt slabs from 400 - 950 mm,
Boundary walls, Beams and columns, Standard stair cases,
Building systems.
Established in
1993
Established in
2002
HAJI HASSAN READYMIX
Founded in
1977
‫ حيث‬،‫تعتبر شركة الحاج حسن للخرسانة الجاهزة الرائدة في هذا المجال‬
‫م وهي شركة الخرسانة الوحيدة التي تواصلت‬1977 ‫تأسست في العام‬
‫الموافقة عليها من قبل وزارات مملكة البحرين منذ تطبيق نظام االعتماد‬
‫ و لهذا اكتسبت الشركة سمعة متميزة مرموقة من خالل‬،‫الخاص بهم‬
‫االمتثال للمعايير البريطانية واألوروبية واألمريكية والمتعلقة بشاهدة الجودة‬
.ISO 9000:2008
‫ وقد تتنوع المنتجات سواء كان ذلك في‬،‫الجودة والثقة أمران بالغا األهمية‬
‫اختيار سطح فائق الملمس والتعقيد في حلبة البحرين الدولية أو خرسانة‬
‫ أو في مشروعات ذات طابع‬،‫من الوزن الثقيل ألغراض مباني األشعة الوقائية‬
‫ مشروع مدرجات‬،‫ متر كعب‬145٫000 ‫خاص مثل مشروع جسر شمال المنامة‬
،‫ متر مكعب‬250٫000 ‫ مشروع جسر سترة‬،‫ متر كعب‬500٫000 ‫مطار البحرين الدولي‬
‫ أو مجمع البحرين سيتي سنتر وجسر‬،‫ متر مكعب‬96٫000 ‫فندق فور سيزونس‬
.‫ متر مكعب‬220٫000 ‫الوصول‬
Founded in 1977, Haji Hassan Readymix (HHR) is Bahrain’s pioneer supplier
of factory-produced concrete. It is the only Readymix concrete supplier
in Bahrain to have been continuously approved by the government
authorities since the introduction of their accreditation scheme.
HHR’s quality certification guarantees compliance with ISO 9000:2008,
British, European & American Standards, building a reputation for
quality and service. Wherever quality and reliability are critical, HHR is
the preferred choice. Whether it’s a super-flat surface for the Drag Strip
at Bahrain International Circuit or a heavyweight concrete for X-Ray
shielding, HHR boasts of an unequalled portfolio of projects. Other
recent examples include North Manama Causeway (145,000 m3), Bahrain
International Airport Runways & Aprons (500,000 m3), Sitra Causeway
(250,000 m3), Four Seasons Hotel (96,000 m3) and Bahrain City Centre &
Access Bridge (220,000 m3).
hajihassanreadymix.com
PRODUCTS
RANGE
1. Structural concrete grades from C2 to C80.
2. Specialist designs for
a. Heavyweight Concrete for X-Ray and nuclear shielding
b. Lightweight concrete for insulation and rehabilitation
c. Self Compacting Concrete
d. Pavement Quality concrete for roads, Airports & racing tracks
e. Underwater Concrete
f. High Durability Concrete
g. Dry Lean Mixes for road bases
h. Secant & Segmental Piling and Diaphragm Wall Concrete
i. Slipform Concrete
j. PFA & Silica Fume Concrete
k. Mortars and screeds
l. Gunite & Shotcrete Mixes
3. Precast concrete kerbs & flags
4. High quality Washed Marine Sand
5. Double Screened Aggregates
6. High durability spacers for steel reinforcement (25 mm - 75 mm)
Major Projects
BIC Drag Strip
Specially designed
Pavement Quality
concrete placed
by paving machine
to achieve high
tolerance surface
flatness for drag
racing.
Causeways - North Manama
Causeway, Sheikh Hamad
Causeway, Sheikh Khalif Causeway,
Sitra Causeway
Others -
Flyovers - Zallaq Flyover, Hamad
town flyover, Abraj Al Lulu Flyover,
Seef Flyover, Budaiya Road Flyover
- Sheikh Isa Library
Hotels - Four Seasons Hotel , Ritz
Carlton Hotel, Gulf Hotel, Holiday
Inn
- Riffa International School
Malls - Bahrain City Centre, Seef
Mall Phase I, II and III, Bahrain City
Centre Interchange
- National Assembly Building
- National Theatre
- Grand Mosque
- Villamar
- US Navy Base Development
- Sh. Isa Airbase (Hanga
Defences)
- Bahrain International Airport
(every Runway, all emergency exits
and the remote aprons)
- Bahrain International Circuit
- Durrat Al Bahrain (more than
20,000 m3 of sprayed gunite
concrete just for swimming
pools)
- Bahrain Bay
- Al Dur Integrated Water
Production and Power Plant
- GIIC II Pelletising Plant, sea water
intake and jetty
Fontana Towers
60,000 m3 of up to
C55 concrete placed
at 45 storey heights
for three towers using
hi-power static pumps
and 28 meter radius
placing booms.
BAHRAIN PIPES
Founded in
1996
‫م وحققت نجاحات وسمعة‬1996 ‫تأسست شركة مواسير البحرين في العام‬
‫ وتوسعت منتجاتها تدريجي ًا لتصل الى جميع‬،‫متميزة في السوق المحلية‬
‫دول الخليج وبلدان الشرق األوسط وشمال أفريقيا وتعد من رواد المصنعين‬
‫لمواسير وأنابيب مياه الصرف الصحي ومياه الشرب والري وأنابيب الضغط‬
‫ مستخدمين أحدث اآلالت وباستخدام مجموعة واسعة من‬،‫وتوابعها‬
‫ األوروبي‬،‫ األمريكي‬،‫ البريطاني‬،‫المواد المتوافقة مع اشتراطات السوق األلماني‬
‫ أصبحت الشركة‬،‫ وكخطوة تهدف لمواكبة آخر التطورات التقنية‬.‫واالسترالي‬
.‫عضوا ً فعا ًال في معهد المواسير البالستيكية بالواليات المتحدة األمريكية‬
‫وتعتبر الشركة هي الرائدة في منطقة الشرق األوسط في مجال تصنيع أنابيب‬
‫ ويزيد حجم إنتاجها‬،‫البولي إيثلين ونظام األنابيب للسباكة الساخنة والباردة‬
‫ طن سنوي ًا وبكميات متفاوتة يتم تصديرها بشكل مباشر الى دول‬16٫000 ‫عن‬
.‫الخليج والشرق األوسط وشمال افريقيا‬
Bahrain Pipes (BP), established in 1996, has an outstanding reputation
in the local and region market, produces the highest quality plastic
pipes and fittings using the latest technology machinery and the most
advanced materials. It gradually expanded business throughout the GCC
region, Middle East and East African countries. Bahrain Pipes products
accommodate for a wide range of applications such as drainage,
sewage, drinking water, irrigation, cable ducting…etc. These products
are produced using an extensive range of materials and are produced
in conformance to German, British, American, European and Australian
standards. In order to keep abreast of the latest technology, Bahrain
Pipes is an active member of the Plastics Pipe Institute, USA. Bahrain
Pipes is considered the pioneer in the manufacture of Polybutene-1 hot
and cold plumbing and heating systems in the Middle East. It produces
an approximate output of 16,000 tons per year, with a substantial share
of its production being exported mainly to the GCC, Middle East and
North Africa.
bahrainpipes.com
UPVC DRAIN, WASTE & VENTILATION
PIPES & FITTINGS
UPVC UNDERGROUND SEWERAGE PIPES
& FITTINGS
PRODUCTS
RANGE
UPVC TELEPHONE & ELECTRICAL DUCT
& CONDUITS
UPVC & HDPE PRESSURE PIPES &
FITTINGS FOR POTABLE WATER &
IRRIGATION
LDPE & MDPE PIPES FOR POTABEL
WATER & IRRIGATION
CPVC & PB-1 PIPES & FITTINGS FOR HOT
& COLD WATER APPLICATION
Facts The only manufacturers in Bahrain who has
the certifications of NSF, SKZ Germany, SASO, WRAS.
The only and first manufacturers of PolyButelene-1
pipes in the Middle East.
The One and only factory in Bahrain which has the
most variety of product range.
PROJECTS / AREA
UAE - HDPE Pipes for Potable Water System in Abu
Dhabi’s ‘Yas Marina Circuit- F1’
KSA - HDPE & UPVC Pipes to ‘King Abdulaziz Health
City’ project‘
QATAR - HDPE Cable Duct pipes to ‘Kahrama –
Ministry of Electricity‘
Various Pipes & fittings to ‘Qatar Int’l Airport’
project
Bahrain pipes factory has a
passion for continuous development,
and accurable research as an integral
part of its operation.
BAHRAIN - Bahrain Int’l Airport, Bahrain Int’l Circuit,
Khalifa Port Infrastructure at Hidd, Amwaj Island, Durrat Al
Bahrain, Riffa Views, Reef Island, Bahrain Financial Harbor,
Sheikh Khalifa Bridge, T.S.E Transmission Line & Farm
Connections, Alba Expansion 5, Bahrain Bay, Dilmunia,
Ministry of Housing Projects and many more.
Our Products
Our products reflect the eminence
of life through the standards that
we pursue in being the largest
manufacturer of plastic pipes in the
Middle East. We ensure to deliver
quality, value and durability for
our customers through focused
communication.
BAHRAIN BLOCKS
Founded in
1981
‫م تماشي ًا مع رؤية المؤسس‬1981 ‫تأسست شركة طابوق البحرين في عام‬
ً ‫الراحل الحاج حسن ولتكون مكم‬
‫ال إلحدى اعماله التي امتهنها منذ خمسينيات‬
‫ وكان أول مصنع للطابوق في البحرين يعمل على تصنيع جميع‬،‫القرن الماضي‬
‫منتجات طابوق الكتل الخرسانية المستخدمة في أعمال البناء باإلضافة الى‬
‫ وتنتج‬،‫ ملتزمة بالمعايير الوطنية والدولية‬،‫إنتاج طوب الرصف المتشابك‬
20 ‫الشركة أيض ًا منتوجات مثل طابوق أحادي الخرسانة بجدار أجوف ذا سمك‬
‫ وكتل خرسانية بجدار‬،‫ سم‬19 ‫ و‬20 ‫ وحوائط أحادية صلبة ذات سمك‬،‫ سم‬19 ‫و‬
‫ تمكنت الشركة من‬.‫ ملم‬17 ‫مزدوج عازل للحرارة "بوليسترين مدرج" بسمك‬
‫ قطعة مما دفع للزيادة الهائلة في‬25٫000 ‫تحصيل طاقة إنتاجية يومية قدرها‬
‫الطلب على كتل الطابوق الخرسانية وبالتدريج تحديث معدات وآالت الشركة‬
.‫لغرض التوسعة الدائمة‬
In line with the pioneering vision of its founding father, the late Haji
Hassan Al A’ali, Bahrain Blocks (BB) was founded in 1981 as the first blocks
factory in Bahrain. Haji Hassan started manufacturing the first wave of
concrete blocks in the Kingdom of Bahrain since 1950s. BB manufactures
and supplies all types of masonry concrete blocks and interlocking paving
bricks that adhere to national and international standards, such as the
Hollow Single Wall of 20cm and 19cm concrete block, Solid Single Wall
of 20cm and 19cm concrete block, and the Insulated Thermo Double
Wall block with 17 mm polystyrene inserts. Bahrain Blocks has achieved
a daily production capacity of 25,000, meeting the dramatic increase in
demand for concrete blocks that prompted Bahrain Blocks to purchase
new machineries throughout its lifespan with a major expansion of its
factory in 1985.
bahrainblocks.com
Masonry Hollow Blocks
Insulation Blocks
PRODUCTS
RANGE
Solid Blocks
U Blocks
Rectangular Pavers
Uni lock Pavers
Square Pavers
Certifications Ministry of Works- Insulation Block Certificate,
MCR 1093/2015, Material Engineering Directorate- Ministry of
Housing - Compliance Certificate, Block Fire Rated Certificate from
m/s Al Hoty Analytical Services.
Expansion A New Plant with latest technology having maximum
capacity of about 70,000 concrete blocks and 4,500 m2 of interlocking
paving bricks per day.
THE PRODUCT
MAJOR PROJECTS
To further boost its production capacity and enhance its
quality standards to meet the demands in the Kingdom,
Bahrain Blocks installed a fully automated block and
interlocking paving bricks manufacturing machinery in
1995 with a capacity to produce 45,000 concrete blocks
and 3,500 m2 interlocking paving bricks per day.
- BAHRAIN INTERNATIONAL CIRCUIT
Bahrain Blocks is currently producing all type of
masonry concrete block as well as four colors
(Grey, Red, Charcoal and Yellow) of Interlock
& Unilock paving bricks. It continues to be
devoted in meeting customers’ expectations with
competitive pricing, timely delivery & continual
improvement.
Major Fact
- CITY CENTRE
- CITI BANK BAHRAIN
- AL A’ALI SHOPPING COMPLEX
- DURRAT AL BAHRAIN
- BAHRAIN INTERNATIONAL
AIRPORT
- ZAMIL TOWER
- SEEF MALL
Highlight: “Bahrain City Centre has
consumed 1,181,600 blocks, making it
the second largest single order for the
company. Our blocks have also been
certified by the Ministry of Works for its
quality.“
The first
Hollow Blocks
producer in
Bahrain since
1950
One of the biggest
Hollow Block producers
in Bahrain having
capacity of 45,000
concrete blocks
and 3,500 m2 of
interlocking paving
bricks per day.
HAJI HASSAN REINFORCEMENTS
Founded in
1981
‫م كأكبر مورد‬1981 ‫تأسست شركة الحاج حسن للحديد المسلح في العام‬
‫ وتقوم الشركة باستخدام أحدث‬،‫رئيسي للقطع والثني لحديد التسليح‬
‫التكنولوجيا وأكثر اآلالت تطورا ً من حيث االنحناء التلقائي والمستوردة‬
‫ كما ويمكنها تصنيع خط كامل‬.‫من أمريكا وألمانيا والمملكة المتحدة‬
BS ‫من منتجات حديد التسليح وفق ًا لمعايير هيئة المواصفات البريطانية‬
.ASTM ‫والجمعية األمريكية الختبار المواد‬
‫و لدى الشركة شبكة سلكية ملحومة مجهزة بأحدث التقنيات إلنتاج منتجات‬
ً ‫ فض‬،‫ذات جودة عالية‬
‫ال عن اآلالت الحديثة باستخدام التكنولوجيا المتقدمة‬
‫ وبقدرتها العالية ونتائج التشغيل اآللي في موعد تسليم‬،‫لتقطيع وثني الصلب‬
‫ كما تتميز الشركة بوجود مهندسين مؤهلين‬.‫أقصر ودقة عالية في األبعاد‬
‫ذوي خبرة عالية يجهزون شريط جداول االنحناء والمخططات التنفيذية وفق ًا‬
‫ باستخدام تقنية درع الصفائح المعدنية الواقعية‬BS 4466 ‫ و‬BS 8666 ‫لـ‬
.)ARMOUR SOFTWARE(
Haji Hassan Reinforcements (HHRF), founded in 1981, is the major
supplier of cut and bend reinforcements and welded mesh products in
the Kingdom of Bahrain. The company is equipped with the latest and
the most sophisticated modern technology machineries for automatic
bending, which are all imported from USA, Germany and UK. We are
capable of manufacturing an entire line of reinforcement steel products
according to BS and ASTM standards.
HHRF is equipped with the latest machinery to produce high quality
products as per BS and ASTM specifications. One of the most important
operations in the construction of reinforced concrete products involve
cutting and bending of rebar into the correct shapes and sizes as specified
in structural drawings. New modern machinery of advanced technology
for cutting and bending of steel, high capacity and automation result in
shorter delivery times and higher accuracy in dimensions. Highly qualified
and experienced engineers prepare bar bending schedules and shop
drawings as per BS 8666 and BS 4466 using ARMOUR SOFTWARE.
hhreinforcement.com
PRODUCTS
RANGE
Estimating and detailing of rebar
Cutting and bending of rebar
Steel stock bar trading
Welded wire mesh products
All kinds of rebar fixing and installation at site
Epoxy coated rebar
Supply of
welded
wire mesh
products to
BS4443
Highlights
HHRF
FACTS
Biggest stock of high yield reinforcing
Have been associated with many
bars.
prestigious projects and structures such
as North Manama Causeway, US base
project, Shopping malls, High rise towers
and so on.
Recognized as one of the leading
reinforcement steel cut and bend
producers in the island.
To supply BS4449/ ASTM A615 GR60
steel rebar, sourced from Qatar, UAE,
Turkey, Unirol Bahrain, rebar detailing and
designing services, rebar cut and bend
services supported by professional steel
fixing teams to achieve an average of
2000 tons/month.
Sophisticated and advanced
fabricating facilities, latest software
technology in rebar detailing and
delivery resources to undertake the most
challenging projects.
Holds Ministry of Works and
Ministry of Housing certification.
THE BIG PROJECTS
- North Manama Causeway
- US base projects-multi storey buildings
- Alba Pot line expansion 5
- Bahrain International Exhibition Center
- GOSI shopping complex
- Urea project-GPIC
- Hidd Power Station
- Salmaniya Medical Complex
- Ministry of Housing Projects
- National Bank of Bahrain
- Zamil tower
- Sheraton residence
- Shaikh Khalifa Bin Salman Causeway
Supplying high tensile
reinforcement bars of
12 meters long of all
sizes ranging from
8 mm - 40 mm, CARES
approved to the specs.
BS4449/ASTM A615
GR60.
ARABIAN CHEMICAL INDUSTRIES
Founded in
1985
‫ وتوفر‬،‫م‬1985 ‫تأسست الشركة العربية لصناعة الكيماويات في عام‬
‫مجموعة واسعة من المنتجات تحت العالمة التجارية "آيزوال" والتي تعتبر األبرز‬
.‫بين مثيالتها‬
‫الشركة رائدة في مجال صناعة المواد الكيماوية ومواد القطاع الصناعي‬
،‫بدء من المواد المستخدمة في حجر األساس‬
ً ‫ومواد قطاع البناء والتشييد‬
ً
‫ وقد أثبتت العالمة التجارية‬،‫وحتى التشطيبات النهائية وصوال الى الصيانة‬
‫"آيزوال" جودتها وشعبيتها من خالل االستحواذ على الشريحة األكبر من أسواق‬
‫ وذلك بفضل استخدام تقنيات متطورة وحديثة‬،‫البحرين ودول الخليج العربي‬
‫ والتي أثبتت فاعليتها على مدى‬،‫مبتكرة من قبل شركات ألمانية وأمريكية‬
‫الوقت وحققت رضا العمالء آخذين بعين االعتبار المعايير الدولية المتبعة‬
‫ وتتمتع الشركة بوجود طاقم‬.ISO 9001:2008 ‫ و‬ASTM، DIN، BS ‫ألنظمة ال‬
‫ذي خبرة واسعة استطاع على مر الزمن المحافظة على اسم العالمة التجارية‬
.‫"آيزوال" ووضعها في الصدارة‬
Arabian Chemical Industries (ACI), the construction chemical
manufacturing division of Haji Hassan Group was established in 1985
and provides products to the construction industry from groundbreaking
to finishing.
ACI manufactures a broad range of products under the brand name
‘ISOLA’ for well-defined market segments. It has proven to be extremely
popular, and holds major market shares in a large and growing segment
of the construction industry in Bahrain as well as other GCC states. Its
technology was acquired from leading and world renowned German
and American companies. Through the years, it has grown into a solid
and stable company, and has consistently delivered customer satisfaction
in compliance with ASTM, DIN, BS and ISO 9001:2008 standards. A
specialized and experienced staff enables us to keep the ISOLA range
relevant and up-to-date.
arabianchemical.com
CERTIFICATIONS
The Management system of Arabian Chemical
Industries is certified by SGS system as per the
requirements of ISO 9001:2008.
All ISOLA brand products meet the requirements
of international standards such as ASTM, DIN, BS
and ISO 9001:2008.
First
company to
manufacture
construction
chemicals in
Bahrain
Honors & Awards
Major Products
Concrete and Mortar Admixtures Water
reducing, plasticizing retarding admixtures, air
entraining admixtures, plasticizer and workability
enhancer, integral waterproofing liquid
admixtures, foaming agents etc.
Surface Treatments Curing, sealing compound,
concrete surface retarder, synthetic/water based
concrete form release agents, universal mold
oil, penetrating silicone sealer/water repeller,
polyurethane shutter paint, cementitious wall
putty, release agent etc.
Grouts Expansive grout additive, non-shrink, nonmetallic grout, high strength, free flowing grout,
thixotropic anchoring grout, low exotherm epoxy
grout, water cleanable and sanded epoxy tile
grout etc.
Concrete Repair High build patching mortar,
polymer-modified repair mortar, non-shrink micro
concrete, acrylic modified fairing coat mortar, high
build epoxy repair mortar, LV/MV/Gel epoxy system,
Epoxy putty, Epoxy resin crack injection system,
corrosion protection primer, structural micro concrete,
Zinc-rich epoxy primer etc.
Waterproofing/Dampproofing Liquid applied
polyurethane waterproofing, trowel applied
waterproof membrane, flexible cementitious
waterproofing, bituminous protective paint,
waterproofing mastic, fibre-reinforced bituminous
paint, rubberized asphalt emulsion, acrylic based
waterproofing membrane, asphalt primer.
Flooring Emery based concrete floor hardener,
self levelling cementitious compound, heavy duty
epoxy floor topping, heavy duty self levelling epoxy
floor topping, quartz based concrete floor hardener,
polyurethane coating, colored acrylic sealer, chemical
abrasion resistant epoxy coating, moisture-intensitive
epoxy coating, traffic deck coating system, chemical
hardener and dust proofer.
Sealants Polyurethane/ Tar urethane/ Epoxy
urethane joint sealants, Epoxy loop detector and
lighting sealant etc.
Bonding agent/adhesives Acrylic/SBR Bonding
admixtures, Mortar admixture, Epoxy bonding
resin agent, Ceramic/Epoxy/Waterproof/Marble
Tile adhesives and grouts. Wood adhesive, Road
marker adhesive etc.
ACI management won the 1st place
- Gold Medal and Trophy (Men’s
Sprint) of the Second, Third and Fourth
Charity Chariot Chase organized by
Rotary Club of Salmaniya, held at
Awali in 1994, 1995 and 1996.
The Management System of Arabian
Chemical Industries - ISOLA has been
assessed and certified as meeting the
requirements of ISO 9001: 2000 in
December 2003 and ISO 9001:2008
in July, 2010. It was also awarded Best
Division Memento from Haji Hassan
Group, for outstanding performance in
2006.
HAJI HASSAN WORKSHOP
∫(
πx
r2 )
1979
Founded in
Haji
Hassan
Workshop
‫م كشركة تصنيع قادرة‬1979 ‫تأسست ورشة الحاج حسن للهندسة عام‬
‫على إنتاج مجموعة واسعة من المعدات المبنية خصيص ًا ألعمال النفط والغاز‬
‫والمصافي والبتروكيماويات واألسمدة والطاقة والمياه ومحطات التحلية‬
‫ تلتزم الورشة بتوفير مجموعة واسعة من المنتجات عالية الجودة‬.‫وغيرها‬
‫ أوعية ضغط وصهاريج‬،‫ أنابيب مبادالت حرارية‬:‫ مثل‬،‫والخدمات لعمالئها‬
،‫ أجهزة الغسيل‬:‫ معدات عملية مبنية خصيص ًا مثل‬،‫تخزين مختلفة السمك‬
‫ هياكل الصلب الثقيلة وأنظمة تداول‬،‫ عادم المداخن‬،‫ إعصارات‬،‫كواتم الصوت‬
‫ باإلضافة لخدمات تصنيع اآلالت الثقيلة للمعدات الرئيسية للمصانع‬،‫المواد‬
‫مثل المضخات والصمامات وتغطي الورشة أسواق مملكة البحرين ودول‬
.‫مجلس التعاون الخليجي‬
Haji Hassan Workshop (HHW) was established in 1979 as a mechanical
fabrication company capable of manufacturing a wide range of custom
built process equipment required by operations including oil and gas,
refineries, petrochemical, fertilizer, power and water and desalination
plants. HHW is committed to provide a variety of quality products and
services to its customers, shell and tube heat exchangers, pressure vessels
and storage tanks in different metallurgies and shell thicknesses, custombuilt process equipment like scrubbers, silencers, cyclones, exhaust
stacks, heavy steel structures and material handling systems as well as
heavy machining services and major plant equipment such as pumps and
valves, within the Kingdom of Bahrain and in GCC.
hhe.bh
KRAH BAHRAIN
Founded in
2011
‫ وتقوم بإنتاج أنظمة‬.‫م‬2011 ‫) في يونيو‬KRAH( ‫تأسست شركة كراه بحرين‬
‫أنابيب مياه األمطار وشبكات الصرف الصحي متعددة اإليثيلين عالية الكثافة‬
‫ تعمل الشركة على استخدام تقنية خطوط أنابيب‬.‫للجاذبية وأنظمة الضغط‬
‫مرنة بالتعاون مع الشركة األم في ألمانيا وتقوم بتصنيع وتركيب أنابيب‬
‫وفتحات أعلى و أسفل الخزانات األرضية وخطوط المخارج و المداخل بأحجام‬
‫ وعادة‬.‫ ملم بصالبة وضغط متعددين‬4٫000 ‫ ملم وحتى‬300 ‫مختلفة تتراوح من‬
.‫تقوم الجهات الحكومية باستخدام هذا النوع من المنتجات‬
KRAH Bahrain was founded in June 2011, it produces HDPE Storm
Water and Sewerage Systems for both gravity and pressure applications.
The company utilizes “Flexible” pipeline technology from KRAH AG in
Germany and manufactures pipes, fittings, manholes, above/below
ground tanks and outfall/ intake lines in sizes ranging from 300 4,000 mm in multiple stiffness and pressure classes. These products are
commonly used by Government Authorities.
krahbahrain.com
Muharraq Sewer Treatment Plant
“Ocean Outfall line”
Krah Bahrain worked with the Main Contractor on the
Ocean Outfall section of the project. It supplied the pipe
requirements for the outfall line, which consists of 1,500mts
of 1,600 mm ID solid wall HDPE pipe and a “Diffuser” system
designed for the dispersal of the outflow from the Sewer
Treatment Plant.
Four Seasons Hotel
Bahrain Bay
Krah Bahrain supplied the requirements
for the sanitary sewer and drainage
network of the Four Seasons Hotel
located at Bahrain Bay. The project
was originally designed to cater for
reinforced concrete manholes and
chambers. Krah supplied hundreds of
units, in addition to installing the HDPE
system.
BAHRAIN TANKS
Founded in
1993
‫م وتعمل الشركة على‬1993 ‫تأسست شركة خزانات البحرين في عام‬
‫ وذلك‬،‫ لتر‬8٫000 ‫ لتر وحتى‬200 ‫توفير حواجز الطريق وتصنيع خزانات المياه من‬
‫باستخدام أحدث تقنيات القولبة بالحقن والنفخ والذي يعكس التزامها بجودة‬
‫ عالوة على أن جميع منتجاتها معتمدة من قبل وزارة‬،‫معايير شهادة اآليزو‬
.‫اإلسكان لمملكة البحرين‬
Bahrain Tanks (BT) was founded in 1993. The company manufactures,
with high commitment to the ISO 9001 standard, polyethylene water
tanks, floats, buoys and the related accessories as well as products of road
barriers and 200 to 8,000 liter water tanks using the latest technology
in Rotational Molding. The products’ range is certified by the Ministry of
Housing.
Tanks start from 200
liters to
8,000
bahraintanks.com
liters
BAHRAIN RUBBER COMPANY
Engineering Rubbers for the Future ....
1993
Founded in
BAHRAIN RUBBER COMPANY W.L.L.
‫م كأول مصنع للمطاط في‬1993 ‫) عام‬BRC( ‫تأسست شركة البحرين للمطاط‬
‫ وتعد واحدة من أكبر شركات المطاط في دول الخليج التي‬،‫مملكة البحرين‬
‫ تعمل الشركة على صناعة‬.)‫تقوم بتصليب المطاط بالكبريت (عملية الفلكنة‬
‫المطاط الصناعي ومنتجات البولي بوريثين من أجل خدمة قطاعات النفط‬
‫ تلتزم شركة البحرين للمطاط‬.‫والغاز وصناعة البناء الصلب في المنطقة‬
.ISO 9001:2008 ‫ بتوافقها مع شهادة‬ASTM‫ و‬BS ،DIN ‫بالمعايير الدولية‬
،‫ جيبيك‬،‫ ألبا‬،‫ هيئة الماء والكهرباء‬،‫حيث تعتبر موردا ً معتمدا ً لوزارة األشغال‬
‫ باإلضافة إلى شركات النفط الكبرى مثل أرامكو‬.‫جارمكو و شركة الحد للطاقة‬
.‫ وشركة بابكو وشالمبرجر‬،‫ وسابك‬،‫السعودية‬
‫حصلت شركة البحرين للمطاط على جائزة سمو رئيس الوزراء للتميز لعام‬
‫م لخبرتها في مجال توريد منتجات المطاط لمجموعة من الشركات‬1998
.‫ والصناعات التحويلية في جميع أنحاء الشرق األوسط‬،‫الصناعية‬
Bahrain Rubber Company (BRC), established in 1993 with a mission to
serve the regional oil, gas, and steel construction sectors. BRC is the first
rubber factory in the Kingdom that holds one of the leading continuous
Vulcanizing production lines in the GCC region. BRC is engaged in
the manufacture of industrial rubber and polyurethane products. BRC
is an ISO 9001:2008 compliant company adheres to the international
standards; BS, DIN & ASTM. It’s an approved vendor with the Ministry
of Works, Electricity and Water Authority, Alba, GPIC, GIIC GARMCO
& HPC, in addition to major oil companies like Saudi ARAMCO, SABIC,
BAPCO & Shlumberger.
BRC was honored with the prestigious Prime Minister’s Award for
Excellence in 1998, for its specialization in the supply of rubber products
to a host of manufacturing and industrial businesses throughout the
Middle East.
PM Award of Excellence
1998
bahrainrubber.com
ARABIAN PARTS COMPANY
Founded in
1983
‫م وتعتبر من أهم مزودي قطع غيار‬1983 ‫تأسست شركة الغيار العربية عام‬
‫ وتشمل أنشطتها التجارية على‬.‫السيارات وملحقاتها في مملكة البحرين‬
‫استيراد وتوزيع قطع غيار السيارات وملحقاتها من زيوت ومواد التشحيم‬
.‫واألنابيب واإلطارات والبطاريات للسيارات الخفيفة والثقيلة‬
‫تغطي خدمات شركة الغيار العربية مدىً واسع ًا من احتياجات السوق من‬
‫ حيث تستورد الشركة قطع الغيار من بلدان عدة‬،‫المنتجات المعتمدة عالمي ًا‬
‫ وتقدم الشركة‬.‫مثل ألمانيا واليابان وكوريا وإيطاليا والهند وتركيا وشرق آسيا‬
‫ وشركات النقل‬،‫خدماتها لعمالئها أصحاب شركات المقاوالت والمصانع‬
.‫ومحالت قطع الغيار وورش الصيانة وتجار التجزئة وغيرهم‬
Arabian Parts Company (APC) is a leading provider of automotive
products and spare parts in the Kingdom of Bahrain, founded in 1983.
Our business activities include import and distribution of original and
OEM quality automotive spares, oils and lubes, tires and batteries for
both light and heavy vehicles.
APC offers a wide range of internationally recognized brands and
products. Our products come from prominent manufacturers around the
world including Germany, Italy, Japan, Korea, India, Turkey and East Asia.
Our customers include fleet owners, spare part shops, garages, retailers,
and other business entities.
arabianparts.com
HAJI HASSAN CRANES
Founded in
1975
‫م وتقوم الشركة‬1975 ‫تأسست شركة الحاج حسن للرافعات في عام‬
‫ وتواصل استثمارها‬،‫بتوفير خدمات تأجير الرافعات بمختلف أنواعها وأحجامها‬
‫ حيث‬.‫بتقديم رافعات مزودة بأحدث التقنيات لتتوافق وحاجات العمالء‬
‫ طن بشكل‬500 ‫ طن وحتى‬50 ‫تقوم الشركة بتأجير رافعات متنقلة تبدأ من‬
‫ جميع الرافعات مؤمن عليها ومصدقة من قبل‬.‫ أسبوعي وشهري‬،‫يومي‬
‫ وجميع مشغلي الرافعات معتمدين من شركة‬،‫شركة لويدز لضمان الجودة‬
،‫ وتؤجر الشركة رافعات لشركات عدة منها شركات المصافي‬.‫فيريتاس‬
‫ كما أن خدمات تأجير الرافعات‬،‫ إصالح السفن والموانئ‬،‫البتروكيماويات‬
.‫متوزعة في معظم دول مجلس التعاون‬
Haji Hassan Cranes (HHC) was founded in 1975. The company provides
rental services for cranes of all types and sizes. HHC continues to invest
in the provision of cranes equipped with the latest technology to meet
customer needs. It rents out mobile telescopic cranes with capacity
ranging from 30 to 500 tons on daily, weekly and monthly basis. All
cranes are certified by Lloyd’s Register, and all crane operators are
certified by the Traffic Directorate and Bureau Veritas.
The Company caters to projects in construction, refinery, petrochemicals,
ship repair and APM Port throughout the GCC.
Mobile telescopic cranes
30 500
to
hhcranes.com
tons
CORE
SERVICES
Marine
Port
Heavy industry and manufacturing
Daily hire and long term hire
Infrastructural Projects
Rigging & Equipment
We cover Bahrain market as well as Qatar and
Dubai. We rent the latest and most technologically
advanced cranes from Terex and Liebherr.
THE BIG PROJECTS
Durrat Al Bahrain Haji Hassan Cranes Division
participated in lifting life heavy boats and heavy concrete
davits weighing around 120 Tons to 150 Tons, on the
starboard side of Durrat Al Bahrain – Jewel of the Gulf,
one of the biggest projects in Bahrain, comprising of
auspicious villas and commercial complexes on and
around the sea.
Bapco Haji Hassan Cranes Division had been
awarded for the installation and heavy lifting of
many fuel tanks inside BAPCO, the largest fuel
stations in MENA region, by one of the most
powerful cranes in our fleet.
Bahrain bay Haji Hassan Cranes actively took part
in installation of steel at Bahrain Bay, one of the major
projects in the Kingdom of Bahrain, consisting of financial
malls and major investment districts closed to the sea site.
Alba Haji Hassan Cranes Division successfully completed
the heavy lifting works of Pot line 6, for the major
maintenance turnaround of ALBA refinery. Powerful dead
lifter for the largest Aluminum refinery and smelters in
the world (ALBA) producing 890,000 metric tons per
annum.
Batelco Haji Hassan Cranes Division rewarded in
heavy lifting contract for the biggest telecom giant
in Bahrain - BATELCO which is a semi government
owned firm, and the largest in the MENA region.
Gulf Petrochemical Industries
Haji Hassan Cranes Division was the first company which
used fleet of mobile cranes for the heavy lifts of plant
erection and shutdown and site moves for GPI. Gulf
petrochemical industries, a world class petrochemical and
fertilizing company produces million tons each year. This
project marked the excellence of Haji Hassan Cranes Division.
The contractual scope consists of transport and lifting of generators
and chillers. Unloading, transport, lifting and installation of heavy
equipment.
Bahrain International Circuit Haji Hassan Cranes Division
played a vital role in the heavy lifting project of Bahrain International
Circuit, including lifting the heavy stands of 150 Tons and raw materials.
BIC race track is located in Sakhir, Kingdom of Bahrain where the Grand
Prix held over.
Amwaj Island Marking another landmark, Haji Hassan Cranes
Division took contract - lifted heaviest generators and chillers and were
installed on their foundations with our in-house developed system lift
from Group’s toughest cranes. Amwaj Island - a waterside development
squaring 30 million sq./ft. of Kingdom of Bahrain.
Bahrain
Financial Harbor
Haji Hassan Cranes Division has participated
in the erection of the heaviest footbridge
across the link towers. The bridge, with a
weight of over 300 Tons and a length of
around 45 meters was placed and then
moved onto their respective towers. Bahrain
Financial Harbor, a world class financial city,
situated in the heart of Bahrain, Manama,
prime reclaimed waterfront land, hub of all
monetary activities.
AL A'ALI SHOPPING COMPLEX
Founded in
1995
.‫يعد مجمع العالي أحد أهم مراكز التسوق المتميزة في مملكة البحرين‬
،‫م‬1996 ‫م وتم االنتهاء منه في أكتوبر‬1995 ‫بدأ العمل في المجمع في العام‬
‫صممت لتبرز البنية العمرانية‬
ُ ‫حيث تم إنشاؤه كوجهة تسوق راقية‬
‫ تقع وجهة‬.‫العربي األصيل الممزوج بحداثة العصر‬
‫التي نبعت من التراث‬
ّ
‫ طوابق‬3 ‫ ويضم‬،‫ متر مربع‬52٫000 ‫التسوق الراقية هذه على مساحة تقدر بـ‬
‫ باإلضافة إلى تشكيلة واسعة من محالت الموضة‬،‫ مداخل رئيسية‬5 ‫و‬
‫ ومواقف السيارات التي بمقدورها استيعاب‬،‫العالمية والتجارية والمطاعم‬
‫ يجمع هذا المكان الراقي بتصميمه المعماري الفريد بين‬.‫ سيارة‬600 ‫حوالي‬
‫ في حين تعرض التوسعة‬،‫العمارة المعاصرة والعناصر العربية التقليدية‬
‫ وما‬.‫الجديدة للمجمع جانب ًا أكثر معاصرة يجمع بين الحداثة والتقاليد‬
،‫يميز مجمع العالي موقعه وسط المدينة حيث يقع في ضاحية السيف‬
.‫على مقربة من مطار البحرين الدولي وجسر المملكة العربية السعودية‬
As one of the premium shopping centers in the Kingdom of Bahrain,
Al A’ali Shopping Complex, was established as a high-end shopping
destination and was designed to present a modern yet traditional Arabicinfluenced architecture style. Work began in 1995 and was completed
in October 1996 in one of Bahrain’s prime districts, Seef. The Complex is
spread over 52,000 square meters, comprising 3 levels with 5 entrances,
a wide variety of shops and restaurants in addition to parking spaces
for 600 cars. The Complex epitomizes its unique architectural design
gracefully combining contemporary architecture and traditional Arabic
elements and styles while the “new extension” showcases the more
contemporary aspect of the Complex integrating the modern with the
traditional. It’s conveniently located in the center of the city in close
proximity to the airport and the Saudi Causeway.
alaalicomplex.com
CERTIFICATIONS
MECSC - member of the Middle East Council of
Shopping Centers
Operations - British Council of Shopping Centers
most variety of product range
The AAC
has parking
space for
approx. 600
cars
AL A'ALI
COMPLEX
FACTS
The first shopping Mall in the Seef
Area.
The 52,000 square meter complex
took 18 months from start to
opening.
The Complex was inaugurated by
the Prime Minister, H.R.H. Prince
Khalifa bin Salman Al Khalifa.
It’s the first shopping center
in Bahrain comprising entirely of
precast walls.
The first shopping center in
Bahrain using integrated building
management systems.
The first shopping center in
Bahrain utilizing specific electricity
meters for each store.
The first shopping center in
Bahrain to have a restaurant
walkway.
High-end Shopping
destination
Al A'ali Shopping
Complex blazed the
trail for other shopping
malls by being the first
to establish itself in the
Seef District which was
predominantly sea at
the time. It gradually
established itself as
a high-end shopping
destination with a unique
mix of tenants.
HAJI HASSAN PROPERTIES
Founded in
1960
‫ فقد أصبح‬.‫امتالك منزل جميل ومريح هو أكثر من حاجة أساسية اليوم‬
‫ نجد الطلب يتزايد على‬،‫ واليوم‬.‫أساس حياة الشخص ومكانته االجتماعية‬
‫مساحات المعيشة عالية الجودة في البحرين بتطور وتحسن أجنحة االقتصاد‬
‫ قسم ممتلكات الحاج حسن يلتزم بتلبية هذا المطلب مع توفير‬.‫المتنامي‬
.‫مساكن ذات جودة وتميز‬
‫م) مع نمو الطلب على‬1960( ‫أنشئ قسم الممتلكات خالل فترة الستينيات‬
‫ ويلعب القسم دورا ً رئيسي ًا في مجال العقارات إذ شيّد‬،‫المساحات السكنية‬
‫ يعتبر فرع‬.‫مجمعات سكنية وتجارية فاخرة في مختلف أنحاء المملكة‬
‫ممتلكات الحاج حسن واحدا ً من أهم فروع التطوير العقاري في مملكة‬
‫يقدم هذا الفرع مجموعة واسعة‬
ّ .‫البحرين بخبرته التي تزيد على النصف قرن‬
‫ غرف نوم‬5 ‫من الخيارات العقارية المتنوعة بين شقق األستوديو ومنازل ذات‬
.‫فاخرة لترضى مختلف األذواق واالحتياجات‬
‫يمتاز فرع الحاج حسن للممتلكات بالخبرة المهنية إلدارة المشاريع من‬
‫مرحلة اإلنشاءوحتى التشطيب بما في ذلك تعيين المهندسين المعماريين‬
.‫ إضافة إلى القيام بخدمات الصيانة‬،‫ وتنفيذ ومراقبة المشاريع‬،‫والمقاولين‬
A beautiful and comfortable home is more than a basic need. It has
become a statement of one’s lifestyle and social status. Today there is a
great demand for high quality living spaces as Bahrain’s living conditions
improve on the wings of its fast growing economy. Haji Hassan Property
Division (HHP) is committed to meet this demand with unique and quality
homes.
The establishment of the Property Division back in 1960 had shown
how Haji Hassan Group envisaged the current demand in the real estate
sector in Bahrain. With over half-century of experience, HHP, as one of
the prime real estate development companies with hundreds of units
in the Kingdom of Bahrain, offers a wide range of choice from studio
apartments to luxurious 5 bedroom homes to different tastes and needs.
HH Properties has the professional expertise to manage projects from
start to finish including appointment of architects/contractors, project
execution/monitoring and performing maintenance services.
hajihassan.com
VILLAS
list of
property
A’ali
JALAL GARDEN
MAITHAM GARDEN
Jerdab
FAISAL GARDEN
FLATS
West Al-Eker
AL- FATEH
AL-SHABA
AL-QADESIYA
Juffair
JUFFAIR
ABINGDON
CHELTENHAM
Budaiya
HANI GARDEN
Saar
KHALIL GARDEN
Manama
HAJI HASSAN TOWER
Manama
NAIM BUILDING
Facilities
A PRIDE TO SHARE
Our tradition of expert planning and always
putting the consumer first has contributed
a great deal to the success. Having evolved
from its modest beginnings into a diversified
real estate provider in the Kingdom, HH
Properties has gained the confidence of all
its tenants. HHG is very proud to share
the fact that many of the residents have
made HH Properties their home for over
25 years.
Having the privilege of being privately owned
and managed, HH Properties’ professional
team is able to attend to each tenant
personally and adhere to their personal request
immediately.
Swimming pool, Tennis court/
Squash court, Gymnasium,
Children play ground, 24
Hours security service, Car
Park, Barbeque Stations...
Prime real
estate over
300
units
the projects
Reaching beyond the limit
CAUSEWAYS
2.42 km long lanes of
dual carriageway
4.5 km long stretch
120 km bowstring
1.6 km road intersection with
King Faisal Highway
North Manama Causeway
Sitra Causeway
Sheikh Isa bin Salman Causeway
‫ متر مكعب من‬250٫000 ‫ساهمت شركة الحاج حسن للخرسانة الجاهزة بحوالي‬
‫الخرسانة عالية الجودة باستخدام منتجات تجميعية خاصة حيث يعتبر جسر‬
‫سترة أحد أهم المشاريع الحساسة التي تبنتها وزارة األشغال بمملكة البحرين‬
‫باعتباره جزءا ً مهم ًا من البنية التحتية الالزمة لتنمية البالد وتم تصميم هذا‬
.‫ عام‬100 ‫المشروع بهياكل وبنى قوية تدوم حتى‬
‬Archirodon‬ ‫ساهمت شركة أسفلت البحرين بالتعاون ‬مع ‬شركة أركيرودون‬
.‫‬في ‬تنفيذ ‬جسر ‬الشيخ ‬عيسى ‬بن ‬سلمان ‬كمشروع ‬استراتيجي ‬في ‬البحرين‬
‫ ‬متر‬260‬ ‫‬فاستطاع ‬فريق ‬العمل ‬بناء ‬ثالث ‬مسارات ‬بحرية ‬مزدوجة ‬بطول‬
‫‬يربط‬الجسر‬شمال‬جزيرة‬المحرق‬بالمنطقة‬.‫‬كم‬من‬الطريق‬السريع‬11‬‫‬وبناء‬
‫‬تم‬اختيار‬تصميم‬الجسر‬بشكل‬.‫‬الدبلوماسية‬في‬الجزء‬الشمالي‬من‬المنامة‬
‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬ .‫‬ليصورا‬ثقافة‬غوص‬اللؤلؤ‬التقليدية‬في‬البحرين‬
‫‬شراعين‬
ّ
Rizzani De ‬Eccher‬‫ ‬و‬Six ‬construct‬‫نفذت‬مجموعة الحاج‬حسن‬بالتعاون‬مع‬شركة‬
‫‬والذي‬يتضمن‬تطوير‬شارع‬الملك‬فيصل‬وتقاطع‬،‫‬بناء‬مشروع‬جسر‬شمال‬المنامة‬
.‫‬الفاتح‬إلى‬مستويين‬بتقاطع منفصل ببناء جسر‬علوي‬
‫ امتدادات‬8‫ و‬،‫ كم لكل عارض من الجسر‬1٫42 ‫شمل العمل بناء جسر مزدوج بطول‬
‫ كيلومتر من الطريق‬2٫42‫ و‬،‫ متر من الجسر الخرساني المسبق الصب‬237 ‫بطول‬
‫ كيلومتر من الطرق الحالية على‬1٫6 ‫المكون من ثالثة إلى أربعة مسارات وإعادة بناء‬
.‫طول شارع الفاتح والتقاطعات مع شارع الملك فيصل‬
ً ‫ال مباشرا‬
ً ‫ إذ يوفر مدخ‬،‫ويعتبر المشروع أحد أكبر مشاريع البنية التحتية في البحرين‬
.‫لخليج البحرين ومرفأ البحرين المالي‬
HHG worked in joint venture with Six Construct and Rizzani De Eccher on the
construction of North Manama Causeway project, which included the upgrade
of King Faisal Highway / Al Fateh Junction into a 2-level grade separated
junction spanning 1.6 km, and constructed with an elevated flyover.
The work included the construction of a twin glued segmental viaduct,
measuring 1.42km each with single cell box girders, 8 span 237m long prestressed concrete viaduct, 2.42 km three to four lane dual carriageway. It also
included the reconstruction of a 1.6km road along Al Fateh Highway and its
intersections with King Faisal Highway.
Haji Hassan Readymix has supplied over 250,000 m3 of high-grade
concrete using special aggregate products. Sitra Bridge and the new
interchange categorized by the Bahrain Ministry of Works as a critical piece
of infrastructure required for the country’s development, and designed as
a 100-year life-of-structure project.
The Sheikh Isa Bin Salman causeway connects North Muharraq with the
Diplomatic Area in the Northern part of Manama. The design of the bridge
with two sail-like structures was chosen to depict Bahrain’s traditional
pearl diving culture.
In association with Archirodon, who were responsible for the construction
of the 260 meters long cable stay bridge and dredging works, Bahrain
Asphalt constructed the 2.5 km dual three lane highway.
250,000 m3 high grade concrete
supplied for Sitra Causeway
2.5 km causeway stretch
It is the highest valued Ministry of Works funded contracts to date, providing
access to Bahrain Bay and Bahrain Financial Harbor Harbor and link to the
proposed Northern Ring Road.
Divisions
Involved
Haji
Hassan
Workshop
2
∫ (π
xr
)
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
Sheikh Khalifa bin Salman Causeway
‫ بنجاح أعمال‬Six Construct ‫نفذت مجموعة الحاج حسن بالتعاون مع شركة‬
‫ حيث‬.‫مشروع جسر الشيخ خليفة بن سلمان قبل ثالثة أشهر من الموعد المحدد‬
‫ كم والمكون من طريق سريع‬46 ‫عملت المجموعة على تصميم الطريق البالغ‬
‫ مترا ً مسارا ً ثالثي ًا مزدوج ًا‬41 ‫ ويستوعب عرض الجسر البالغ‬.‫مزدوج ثالثي المسارات‬
‫ ويعتبر‬.‫م‬2004 ‫ وقد تم االنتهاء من أعمال الجسر في أواخر العام‬،‫وممرين للخدمة‬
‫جسر الشيخ خليفة بن سلمان أحد الطرق السريعة االستراتيجية في البحرين إذ‬
‫يربط جسر الملك فهد من خالل جسر الشيخ سلمان بن عيسى بالميناء الجديد‬
‫ كما ويساهم الجسر وبشكل كبير في تطوير ونمو‬.‫والمنطقة الصناعية بالحد‬
‫ وتسهيل حركة التجارة الداخلية والخارجية كثالث جسر يربط‬،‫االقتصاد البحريني‬
.‫المنامة مع جزيرة المحرق‬
Haji Hassan Group, in a joint venture with Six Construct, successfully completed
work on the Sheikh Khalifa bin Salman Bridge three months ahead of schedule.
The roadwork element comprises of a 6.4 km dual three-lane highway and
service road. The bridge width was set at 41 meters to accommodate a dual
three-lane carriageway and two service corridors and was completed in late
2004. Sheikh Khalifa bin Salman Bridge is considered one of Bahrain’s strategic
highway links connecting the King Fahad Causeway through Sheikh Isa bin
Salman Highway to the new port and industrial area situated in Hidd. In
addition, it contributes significantly to the development and growth of the
Bahraini economy and facilitates the movement of internal and external trade
as the third bridge linking Manama with Muharraq Island.
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
AIRPORTS
1937 First runway
2002 Runway renovation
Built after the success of Bahrain
Grand Prix for Formula 1
Ever since Bahrain International Airport was established in the Kingdom of Bahrain, Haji
Hassan had always been a partner in its construction and development projects. HH
made a significant contribution in the construction of its first runway in 1937.
2010 Officially opened by HM
King Hamad bin Isa Al Khalifa
Sakhir Airbase (Upgrade of Airstrip)
Bahrain Airshow
‫م عقدا ً لتطوير مهبط الطائرات الحالي‬2006 ‫ُمنحت شركة أسفلت البحرين في‬
،‫بالصخير إلى قاعدة جوية تشغيلية والتي شملت بناء مدارج السالكين‬
،‫ اإلضاءة عالية الصاري‬،‫ إضاءة المطار األرضية‬،‫ نظام الصرف الصحي‬،‫المدرجات‬
‫ وشملت األعمال‬.‫ أنظمة االتصاالت وغيرها‬،‫ محطة الكهرباء‬،‫بناء برج المراقبة‬
‫ متر مربع من مدرجات وممرات من األسفلت‬270٫000‫ متر مكعب و‬500،000 ‫حفر‬
‫وساحات المطار من الخرسانة والتي شيدت باستخدام أحدث التقنيات في هذا‬
‫م وقد أحيلت أعمال شبكة الطرق الكاملة‬2008 ‫ تم االنتهاء منها في‬.‫المجال‬
.‫في قاعدة الصخير الجوية إلى شركة أسفلت البحرين‬
‫تم إسناد جميع أعمال البنية التحتية والطرق في أول قاعدة جوية في البحرين‬
‫ وقد نجحت الشركة في انهاء هذا المشروع‬.‫م‬2010 ‫لشركة أسفلت البحرين في‬
‫ وأعمال‬،‫ وتضمن المشروع أعمال الحفر‬.‫ أشهر باعتباره إنجازا ً يستحق الثناء‬6 ‫خالل‬
‫ وبناء ساحات‬،‫ واإلضاءة‬،‫ األعمال الكهربائية‬،‫ بناء الطرق والمداخل‬،‫الصرف الصحي‬
.‫ إضاءة المطار وغيرها‬،‫ والممرات‬،‫المطار‬
‫م‬2010 ‫ يناير‬23-21 ‫ الذي أُقيم من‬،‫وقد استقطب معرض البحرين الدولي للطيران‬
‫كبرى الشركات العالمية المتخصصة في مجال الطيران العسكري والمدني وخدمات‬
.‫الدعم‬
Bahrain International Airport
Bahrain Asphalt helped build the runway of Bahrain International Airport (BIA)
which was established in 1937 and renovated in 2002. BIA is the first international
airport in the Gulf region and the only major airport in the Kingdom. During the
period 2002-2011, Bahrain Asphalt had completed the following three major
projects at BIA:
1- Reconstruction of parallel taxiway (Aug 2002 – Mar 2004)
2- Resurfacing of live BIA main runway (Apr 2006 – Dec 2007)
3- Construction of 10 new apron stands and new taxiways
(Apr 2008 – Mar 2011)
These projects included the construction of new taxiways, emergency runway,
concrete aprons, drainage system, water supply system, HV & LV system,
electrical substations and upgrading of airfield ground lighting system to CAT II
B requirements as per ICAO.
Divisions
Involved
Haji
Hassan
Workshop
2
∫ (π
xr
)
CIVIL ENGINEERING & CONTRACTING
‫ساهمت شركة أسفلت البحرين في بناء مدرج طائرات مطار البحرين الدولي والذي‬
‫ ويعتبر مطار البحرين الدولي أول مطار‬.‫م‬2002 ‫م وجدد في العام‬1937 ‫أنشأ في العام‬
‫ وخالل الفترة من‬.‫دولي في منطقة الخليج وهو المطار الرئيسي الوحيد في المملكة‬
‫م عملت شركة أسفلت البحرين على تنفيذ ثالثة مشاريع كبرى في مطار‬2012-2011
:‫البحرين الدولي‬
“Bahrain Asphalt (BA) had been awarded a contract in 2006 to upgrade
the existing Airstrip to an operational airbase, which included construction
of runways, taxiways, aprons, drainage system, airfield ground lighting,
high mast lighting, control tower, electrical substation, communication
systems, etc. The work included 500,000 m3 of earth work, 270,000 m2
.)‫م‬2004‫ مارس‬- ‫م‬2002 ‫ إعادة بناء طريق مدرج الطائرات (أغسطس‬.)‫م‬2007 ‫ ديسمبر‬- ‫م‬2006 ‫ إعادة بناء المدرج الرئيسي للمطار(أبريل‬-
of asphalt runways and taxiways as well as concrete aprons which were
carried out using the latest technologies in the field. Upon completion of
the project in 2008, the execution of the complete road network in Sakhir
Airbase was also awarded to BA”.
.)‫م‬2011 ‫مارس‬- ‫م‬2008 ‫ ساحات جديدة للمواقف وممرات جديدة (أبريل‬10 ‫ بناء‬‫ ساحات‬،‫ مدرج لحاالت الطوارئ فقط‬،‫وشملت هذه المشاريع بناء ممرات جديدة‬
HV & ‫ أنظمة‬،‫ نظام إمدادات المياه‬،‫ نظام للصرف الصحي‬،‫ بناء محطات‬،‫إسمنتية‬
‫ وبناء محطات كهربائية فرعية وتطوير نظام اإلضاءة األرضية للمطار لمتطلبات‬LV
.‫ بحسب منظمة الطيران المدني الدولي‬CAT II B
Divisions
Involved
Haji
Hassan
Workshop
2
∫ (π
xr
)
CIVIL ENGINEERING & CONTRACTING
Bahrain Asphalt (BA) had been awarded the infrastructure and pavement
construction works for the First International Airshow held in Bahrain in
2010. BA completed this fast track project in a 6-month period which is a
commendable achievement. The project included earthworks, drainage works,
sewerage works, electrical works and lighting; as well as construction of access
roads, aprons, taxiways, airfield lighting, etc.
The first Bahrain International Airshow, held on January 21-23, 2010, attracted
major international companies specializing in military, civil aviation and support
services.
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
SPECIAL PROJECTS
1,500 m shortcuts
2,500 m test oval and pit lanes
Bapco Projects
6 months Completion of
project ahead of schedule
5,500m stretch of
the race track
Alba Projects
‫ بعقود‬،‫قامت شركة أسفلت البحرين بمختلف مشاريع الطرق اإلسفلتية‬
.‫ومشاريع لصيانة وتوسيع مرافق ألبا والطرق المحيطة بها‬
Bahrain International Circuit
‫عملت شركة أسفلت البحرين على إكمال مدة العقد وعدد من العقود المدنية‬
‫ شمل نطاق األعمال‬."‫الفردية وكذلك عقود األسفلت مع شركة نفط البحرين "بابكو‬
.‫العمل على مواقع آبار النفط والطرق وأعمال إصالح وتوسيع الطرق‬
Bahrain Asphalt (BA) has contributed to Bahrain International Circuit’s development
in the pavement construction of 5,500 meters of Race Track, 1,500 meters of
Service Roads and 2,500 meters of Test Oval and Pit Lanes. In 2004, BA has
also contributed in the “Track Extension Works”. The company was contracted
to design and reconstruct the Drag Race Track in 2010 and was accomplished
as a fast track project in 2 months by continuous interlocking paving bricks using
Concrete Interlocking paving bricks Train.
Bahrain Asphalt completed both term contract and a number of individual
civil and asphalt contracts for Bapco, scope of works included site preparation
works for oil well sites, access roads, repair works and road widening.
Various asphalt road projects undertaken, both term contract and
individual projects for the upkeep and expansion of Alba’s facilities and
surrounding highways.
BA
completed
both term and
individual civil
and asphalt
contract
In addition, Bahrain Precast Concrete has designed, produced, delivered and
erected approximately 12,000 m2 of pigmented wall cladding panels on the team
and pit buildings and 2,100 m2 of grey panels at the multi-purpose building,
around 31,000 m2 of bleachers (on which the spectator’s seating is mounted) at
the grandstand and multipurpose building, 1,150 m2 solid slabs for the VIP tower,
6,490 m2 of colored concrete tiles at the VIP tower and 300 units of barriers.
Rigorous load-testing was conducted to ensure that the bleachers can withstand
the loads that they will be subjected to during the Grand Prix. Another challenge
was the erection of some cladding panels which are inclined at seven degrees to
the vertical facade incorporating window recesses and soffit panels.
Bahrain International Circuit is the race track situated in Sakhir in the Kingdom of
Bahrain, where Bahrain’s international Formula 1 Grand Prix is held.
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
Haji
Hassan
Workshop
2
∫ (π
xr
)
CIVIL ENGINEERING & CONTRACTING
‫ متر من مضمار سباق حلبة البحرين‬5,500 ‫ساهمت شركة أسفلت البحرين في بناء‬
.‫ متر من االختبار البيضاوي وحفرة الممرات‬2.500‫ و‬،‫ متر من طرق الخدمة‬1،500‫الدولية و‬
‫ كما‬،‫ ساهمت أيض ًا الشركة في أعمال توسعة مضمار السباق‬،‫م‬2004 ‫وفي عام‬
،‫م‬2010 ‫) في عام‬Drag Race( ‫تعاقدت الشركة لتصميم وإعادة بناء مضمار السباق‬
‫حيث تم إنجاز المشروع بفترة وجيزة وتم االنتهاء من عمليات البناء والرصف خالل‬
.‫شهرين متواصلين باستخدام تقنيات خاصة‬
‫ قامت شركة البحرين للخرسانة مسبقة الصب بتصميم وإنتاج وتركيب ما‬،‫وأيض ًا‬
‫ متر مربع‬2٫100 ‫ متر مربع من ألواح الكسوة المصطبغة على المباني وحوالي‬12٫000 ‫يقارب‬
‫ متر مربع من‬31٫000 ‫ وحوالي‬،‫من األلواح الرمادية في المبنى المتعدد األغراض للحلبة‬
‫ متر مربع من األلواح‬1٫150 ‫ و‬،‫المدرجات حيث يجلس عشاق هذا النوع من الرياضات‬
300‫ متر مربع من البالط اإلسمنتي الملون لبرج كبار الشخصيات و‬6٫490‫الصلبة و‬
‫ وقد تم عمل فحوصات اختبار دقيقة جدا ً للتأكد من أن المدرجات‬.‫وحدة من الحواجز‬
‫ وتمثل التحدي اآلخر في تركيب بعض‬.‫تستوعب الحمل خالل سباق الجائزة الكبرى‬
‫ألواح الكسوة والتي تميل حوالي سبع درجات إلى الواجهة العمودية مع دمج تجاويف‬
.‫النوافذ واأللواح السفلية‬
‫وتعتبر الحلبة مضمار لسباق سيارات يقع بمنطقة الصخير بمملكة البحرين حيث‬
.1 ‫تقام فيه جائزة البحرين الدولية للفورموال‬
HIGHWAY & ROADS
42 km
of surface roads
930,000
tons of sub-base
1.7 million
tons of asphalt
Major Projects in Bahrain
- Resurfacing of Sh. Isa Bin Salman Highway
- Rehabilitation of Sh. Hamad Avenue & Hamad Town Roads
- Signalized junction upgrade, and reconstruction of Estiqlal Highway
- Resurfacing of Janabiya Highway
- Signalized junction upgrade of Bahrain Gas Junction,
A’Ali junction and Traffic Directorate Junction
- Improvement of Bahrain Gas, A’Ali, Traffic Directorate Junctions
- Construction of Truck Haul Road - Askar
- Asphalt Works for Highway link to Durrat Al Bahrain
- Improvements of Zallaq Highway
Dukhan Highway / Salwa Road - Qatar
- Sanad Junction and associated road improvement
- Rehabilitation of Khalifa Al Kabeer Highway
Bahrain Asphalt (BA) executed the pavement works for The Dukhan Highway
project (west contract) which consisted of approximately 42 km of new highway
from Shahaniya to the Dukhan industrial area. Work included the construction
of a dual four-lane carriageway with grade-separated interchanges, 35 km of
surfaced collector distributor roads and another 32 km of unsurfaced roads.
The work commenced in January 2006 and reached completion in July 2009. BA
laid 1.7 million tons of asphalt and 930,000 tons of sub-base for this project in
accordance to Highway and QNBS specifications. To achieve this above outputs
2nr Asphalt plants having a production capacity of 240 tons/hour, each were
set up with all the necessary ancillaries. Continuous asphalt laying technology
using 6nr Vogele pavers and Hamm PTR and steel drum rollers were utilized and
the average output per day reached up to 4,000 tons to meet project schedule.
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
west( ‫عملت شركة أسفلت البحرين على تنفيذ أعمال الرصف لطريق الدخان السريع‬
‫ كم من الطريق السريع الجديد الذي يبدأ من حوالي كيلومتر‬42 ‫) ويتألف من‬contract
‫ وقد تضمن العمل‬.‫واحد إلى الشرق من بلدة الشحانية وحتى منطقة الدخان الصناعية‬
‫ كم من‬35 ‫ و‬،‫بناء أربع تقاطعات وأربع مسارات مزدوجة مع تقاطعات ذات مستويين‬
‫ وبدأ العمل على مشروع طريق الدخان‬.‫ كم للطرق غير المعبدة‬32 ‫الطرق المعبدة و‬
.‫م‬2009 ‫م وتم االنتهاء منه في يوليو من العام‬2006 ‫السريع في يناير من العام‬
‫ مليون طن وبإرساء القاعدة‬1٫7 ‫نفذت الشركة أعمال اآلسفلت والرصف لما يقارب‬
‫ طن وذلك وفق ًا لمواصفات الطرق‬930٫000 ‫الفرعية لطريق الدخان السريع بما يقارب‬
‫ من قدرة إنتاج أجود أنواع األسفلت بحوالي‬2nr ‫ ولتحقيق مخرجات الـ‬.QNBS‫السريعة والـ‬
‫ وباستخدام‬.‫ طن في الساعة والتي تم إعداد كل واحدة بكافة ملحقاتها الالزمة‬240
‫) واألسطوانات‬Hamm PTR( ‫) و‬6nr Vogele pavers( ‫تقنية رصف األسفلت باستخدام‬
‫ طن لتتناسب‬4٫000 ‫الفوالذية حيث وصلت الطاقة اإلنتاجية القصوى في اليوم الواحد الى‬
.‫والجدول الزمني للمشروع‬
BUILDINGS BAHRAIN
1,792,730 concrete block pieces
51,736 m2 of concrete interlocking
99,000 m2 of Hollowcore slabs
450,000 m2 area for the complex
7,600 m2 cladding panels
Four Seasons Hotel
Bahrain City Center
Sofitel Bahrain
26٫620 ‫قامت شركة الحاج حسن للخرسانة الجاهزة بتصميم و إنتاج و توصيل‬
‫ بما في ذلك‬،‫ مم‬100 x 2٫500 x 1٫000 ‫متر مربع من ألواح التغطية التي يبلغ سمكها‬
‫ متر مربع من‬1٫880 ‫ إضافة إلى‬.‫المتغيرات لموقع بناء فندق الفور سيزونز‬
100 ‫ متر مربع من األلواح المرنة بسمك‬400 ‫ مم و‬100 ‫ألواح تغطية للزوايا بسمك‬
‫ بما في ذلك‬،‫ مم‬100 x 1٫200 x 600 ‫ متر مربع من ألواح تغطية بسمك‬2٫506 ‫مم و‬
.‫المتغيرات من أجل المنصة‬
‫زودت شركة الحاج حسن للخرسانة الجاهزة أكثر من نصف متطلبات الخرسانة‬
‫ عالوة على تصميم وتشييد الجسر العلوي‬،‫لبناء مجمع البحرين سيتي سنتر‬
.‫والذي يصل بين الطريق السريع والطابق الرابع من المجمع‬
paving bricks
Durrat Al Bahrain
‫وقامت شركة البحرين للخرسانة مسبقة الصب بتصميم وإنتاج وتركيب أكثر‬
‫ متر مربع‬77٫000‫ ملم و‬500 ‫ متر مربع من األلواح الجوفية ذات مقاس‬22٫000 ‫من‬
‫ ملم شمل معظمها الجزء الفندقي من‬265 ‫من األلواح الجوفية ذات مقاس‬
.‫المجمع‬
‫وتعتبر شركة طابوق البحرين المزود الوحيد للطابوق لبناء مجمع السيتي‬
‫ من الطابوق مما يجعلها واحدة من أكبر‬1٫181٫600 ‫سنتر مع استهالك ما يزيد عن‬
‫) هو مركز تسوق متعدد‬BCC( ‫ مجمع البحرين ستي سنتر‬.‫طلبيات الشركة‬
.‫م ويقع في ضاحية السيف في مملكة البحرين‬2008 ‫ افتتح في سبتمبر‬،‫الطوابق‬
‫ متر‬450٫000 ‫ من تجار التجزئة ويغطي مساحة‬350 ‫ويضم المركز التجاري أكثر من‬
.‫مربع‬
"Picture Courtesy by Husam Qasem"
،‫تعتبر درة البحرين واحدة من أكبر المشاريع التي نفذتها شركة طابوق البحرين‬
‫ يقع هذا المشروع‬.‫ كتلة خرسانية من أجل الهيكلة‬1٫792٫730‫حيث قامت بتوفير‬
‫ ويربطه بالمنامة طريق سريع جديد مكون من أربع مسارات‬،‫على الساحل الجنوبي‬
‫صممت درة‬
ُ .‫ وطريق مزدوج شيّدته شركة أسفلت البحرين‬،‫ كيلومتر‬25 ‫طوله‬
‫ كيلومتر‬21 ‫البحرين كمشروع سكني وتجاري ومنتجع سياحي فخم وتبلغ مساحته‬
)‫ جزيرة على شكل صفين دائريين مكونين من سبع جزر (مرجان‬13 ‫ ويتألف من‬،‫مربع‬
.‫ فيال سكنية فخمة‬1٫000 ‫ و يضم أكثر من‬،)‫وخمس جزر (فيروز‬
Durrat Al Bahrain is one of the biggest projects of Bahrain Blocks as we have
supplied 1,792,730 concrete block pieces for its structuration. This project is
located on the southern coast, and is linked with Manama by a new 25 km
highway of four lanes; dual carriage way constructed by our division, Bahrain
2
Asphalt. This 21 km master place has been designed as a residential and
commercial project and as a luxurious touristic resort in the Kingdom, offering
over 1,000 beautiful villas and consisting of a cluster of 13 spectacular islands
(seven “Murjan” islands and five “Fairouz” islands).
‫عملت شركة البحرين للخرسانة مسبقة الصب على تصميم وتركيب وإنشاء ما‬
‫ ملم من األلواح الخارجية السميكة بخرسانة من اللون‬230 ‫ متر مربع من‬7٫600 ‫يقارب‬
‫ وقد بدأ العمل به في يناير‬.‫البني الفاتح للغسيل الحمضي للتشطيبات السطحية‬
.‫م‬2010 ‫ وتم االنتهاء منه في أبريل‬،‫م‬2009
‫يعتبر سوفيتيل البحرين منتجع ًا خاص ًا يلبي احتياجات السياح ورجال األعمال وهو‬
‫ وهو يقع بالقرب من حلبة‬،‫األول من نوعه الذي يوفر خدمات عالجية بمياه الخليج‬
.‫البحرين الدولية‬
Haji Hassan Readymix company has designed, produced and delivered
26,620 m2 of 1000 x 2500 x 100 mm thick cladding panels, including
variants, for the Main Four Seasons Hotel area. In addition to 1,880
m2 of corner cladding panels, 100 mm thick, 400 m2 of coping panels,
100 mm thick and 2,506 m2 of 600 x 1200 x 100 mm thick cladding
panels, including variants, for the Podium area.
Haji Hassan Readymix has supplied more than 50% of the concrete for
the structural requirement of Bahrain City Centre (BCC). In addition, HHR
designed, built and structured the access bridge, which is termed as
‘flyover’, from the highway to BCC’s fourth floor.
Bahrain Precast Concrete (BPC) introduced 500 mm of Hollowcore slabs
to cater to the requirements of this shopping cum hotel complex. BPC
designed, produced, delivered and erected approximately 22,000 m2 of
500 mm and 77,000 m2 of 265 mm thick Hollowcore slabs.
26,620 m2 thick cladding panels
1,880 m2 corner cladding panels
Bahrain Precast Concrete (BPC) designed, produced and erected approximately
7,600 m2 of 230 mm thick insulated external cladding panels in beige color
concrete with acid washed surface finishes. Work began in January 2009 and
was completed in April 2010.
Sofitel Bahrain is an exclusive resort which meets the needs of tourists and
businessmen. It is also the first hotel in the Gulf to perform treatment of sea
water.
Bahrain Blocks (BB) has been the sole supplier of blocks in the construction
of BCC with the consumption of 1,181,600 blocks making it one of the
second largest single orders for the company.
Divisions
Involved
Haji
Hassan
Workshop
2
∫ (π
xr
)
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
Divisions
Involved
BUILDINGS BAHRAIN
2,500 m2 total area
Regency Hotel
‫قامت شركة البحرين للخرسانة مسبقة الصب بتصميم وإنتاج وتركيب ألواح‬
.‫مجوفة و ألواح للتغطية لمشروع فندق الريجينسي‬
Breaker Tower
Zamil Tower
‫م انتهت شركة البحرين للخرسانة مسبقة الصب من تركيب آخر‬2014 ‫في مايو‬
‫ متر للمبنى ذو أطول بنية فوقية‬150٫165 ‫لوحة خرسانة مسبق الصب على ارتفاع‬
.‫خرسانية في العالم‬
‫ يجمع بين الطابع التقليدي والطابع العصري‬،‫ طابق ًا‬22 ‫معلم سياحي بارتفاع‬
‫ مم‬200‫ مم و‬150 ‫مكسو بألواح خرسانة بيضاء صلبة معزولة ومصقولة بسمك‬
‫ ويشمل المشروع أيض ًا تزويد‬،‫زودتها شركة البحرين للخرسانة مسبقة الصب‬
.‫ متر مربع‬10٫785 ‫ لمجموع مساحة يصل حتى‬GRC ‫ من الواح التغطية وال‬1٫700
In May 2014, BPC has completed erection of the last precast concrete
panel at 150.165 meters high for the world’s tallest precast concrete
superstructure building.
BPC has designed, produced, delivered and erected Hollowcore slabs and
cladding panels for the construction project of Regency Hotel.
Divisions
Involved
Awali Mosque
،‫قامت شركة البحرين للخرسانة مسبقة الصب بتصميم و إنتاج و تركيب عوارض‬
.‫قباب و ألواح مجوفة لمشروع بناء مسجد عوالي‬
BNH Headquarters
Divisions
Involved
200 ‫عملت شركة البحرين للخرسانة مسبقة الصب على تصميم وتركيب ما يقارب‬
.‫من األلواح الخارجية السميكة لمبنى شركة البحرين الوطنية القابضة‬
22 Story landmark Tower, which incorporates both traditional and modern
features, is cladded with 200 mm and 150 mm thick insulated and solid
white sandblasted panel supplied by BPC. It includes 1,700 cladding
panels and GRC (total area 10,785 m2)
BPC has designed, produced, supplied and erected 200 pieces of insulated and
solid pigmented panels.
10,785 m2 total area
Bahrain Precast Concrete company has designed, produced and erected
beams, Domes and Hollowcore Slabs for Awali Mosque.
Divisions
Involved
Divisions
Involved
Divisions
Involved
BUILDINGS BAHRAIN
12,000 m2 complex precast
insulated cladding panels
CitiBank Tower
The Ritz-Carlton Hotel
GOSI Complex
‫قامت شركة البحرين للخرسانة مسبقة الصب بتصميم و تركيب ألواح‬
‫ متر‬1٫225 ‫ متر مربع و ألواح تغطية معزولة يصل عددها الى‬20٫000 ‫مجوفة تقدر بـ‬
‫ من الفلل الفخمة ألحد أشهر‬22 ‫ لعدد‬GRC ‫ و جدران عالية التحمل بعناصر‬،‫مربع‬
.‫المنتجعات و أكثرها رفاهية في العالم‬
‫قامت شركة البحرين للخرسانة مسبقة الصب بتصميم وتصنيع وتوصيل‬
‫ باإلضافة إلى ألواح اسمنتية بطبقتين‬،‫وتركيب ألواح خرسانة للتغطية الخارجية‬
‫ مصقولة ومطلية باللون البني الفاتح لمشروع مجمع التأمينات‬،‫من التغطية‬
.‫ باإلضافة إلى تصميم وتصنيع وتوصيل وتركيب ألواح خرسانية مجوفة‬،‫التجاري‬
‫يمكن القول بأن مسجد أحمد الفاتح (المعروف باسم المسجد الكبير) هو أضخم‬
،‫ متر مربع‬150٫000 ‫ يغطي المسجد مساحة تبلغ حوالي‬.‫بناء تقليدي مميز في البحرين‬
‫ بدأ تنفيذ‬.ً‫ مترا‬70 ‫ و له منارتين يبلغ طولهما‬،‫ متر‬22 ‫و تتوسطه قبة يبلغ قطرها‬
‫ المعروفة عالمي ًا في ديسمبر‬C.C.I.C ‫مشروع بناء مسجد الفاتح عن طريق شركة‬
‫ و من أجل تشييد هذا البناء الرمزي تم اختيار شركة الحاج حسن للخرسانة‬،‫م‬1983
.‫الجاهزة لتزويد المشروع بالخرسانة‬
‫اشتمل نطاق هذا المشروع على تصميم وتركيب ألواح خرسانة مسبقة الصب‬
‫ مع طلب‬،‫ متر مربع بسبب تفاوت أقطارها‬12٫000 ‫جاهزة و مركبة و معزولة لمساحة‬
.‫ألواح تغطية مصقولة و مصبوغة باللون األصفر‬
‫ قامت شركة البحرين للخرسانة مسبقة الصب بتصميم و تزويد‬،‫باإلضافة إلى ذلك‬
.‫ بالط للرصف و ألواح مجوفة‬،‫ جدران للحدود‬،‫و توصيل عوارض مسبقة الصب‬
The project scope is to design, deliver and erect 12,000 m2 complex precast
insulated cladding panels due to its different radius, with a yellow pigmented
fairfaced finish for the cladding panels.
BPC also designed, supplied, delivered and erected precast beams, boundary
walls, paving tiles and hollowcore slabs.
BPC has designed, produced, delivered and erected approximately
20,000 m2 Hollowcore slabs, 1,225 m2 insulated cladding panels, loadbearing walls and GRC elements for 22 nos. of VIP Villas of one of the
world renowned luxury resorts.
BPC has designed, produced, delivered and erected external cladding
panels with two finishing ie. sandblasted and fairfaced on beige colored
concrete for GOSI Complex, in addition designing, producing, delivering
and erecting Hollowcore slabs.
20,000 m2 hollowcore slabs
1,225 m2 insulated cladding panels
Divisions
Involved
Al Fateh Mosque
Divisions
Involved
Arguably the grandest and most traditionally distinctive building in Bahrain is
the Ahmed Al Fateh Mosque (commonly referred to as the Grand Mosque). It
covers an area of 150,000 m2, it has a 22 meters diameter dome and two 70
meters tall minarets. Constructed by the internationally recognized company
C.C.I.C. which began in December 1983 and for such an important iconic
structure, they chose Haji Hassan Readymix as their supplier.
150,000 m2 total area
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
Divisions
Involved
BUILDINGS BAHRAIN
Bahrain National Assembly Building
Bahrain National Theatre
Construction of Bahrain’s National Assembly Building (BNAB) began with the
formation of the substructure. Ready mixed concrete was required for the
casting of mass blocks to form the sea walls for podium and lagoon promenade.
These blocks were too large to transport on public roads so they were to be
manufactured on site.
‫تم تنفيذ أعمال البنية التحتية لمشروع مبنى الصرح الوطني من قبل شركة الحاج‬
‫حسن للخرسانة الجاهزة من خالل توفير خليط من االسمنت الجاهز لصب حواجز‬
‫ الجدير بالذكر‬،‫مقوسة كبيرة من أجل بناء الحاجز البحري والمنصة والواجهة البحرية‬
‫بأن تلك الحواجز تم صبها في موقع العمل نظرا ً لضخامة حجمها وصعوبة نقلها عن‬
.‫طريق الشوارع الرئيسية‬
Haji Hassan Readymix (HHR) presented an opportunity to demonstrate how
expertise, experience and resources can lead to the rapid establishment and
Ministry approval of a site batch plant. Once the agreement was signed, HHR
poured approved concrete from the erected, commissioned and certified site
batch plant within 8 weeks. The mix design was specially developed to provide a
particularly smooth surface, high durability using Silica Fume and early strength to
allow 24-hour turn-around of moulds.
‫يحمل هذا النوع من المشاريع طابع ًا خاص ًا وأتاح فرصة للشركة لكي تثبت إمكانياتها‬
‫وخبرة كادرها في التعامل مع الجوانب التقنية الدقيقة والمطلوبة لمثل تلك‬
‫ أسابيع تم تركيب المصنع المتنقل في موقع العمل والذي‬8 ‫ في غضون‬.‫المشاريع‬
‫عزز بدوره الحصول على الموافقة الفورية من قبل الوزارة المعنية واإليذان بالبدء في‬
‫ تطلب التصميم اختيار نوعية خرسانة خاصة لتكوين أسطح ملساء‬.‫األعمال التابعة‬
‫ وتقوية مبكرة تسمح بإدارة القوالب‬Silica ‫ذات شكل بارز وقوي مستخدمين مادة ال‬
.‫ ساعة قبل استخدامها‬24 ‫ل‬
The shape of the lagoon was further enhanced by another Haji Hassan Group
Division, Bahrain Precast Company, who supplied red-hued coping blocks for sea
walls to reinforce the patriotic flavor of this iconic project.
‫ وهي شركة‬،‫ تم تطوير شكل الواجهة البحرية من قبل فرع آخر للمجموعة‬،‫أيض ًا‬
‫ والتي زودت المشروع بحواجز كبيرة ذات لون احمر‬،‫البحرين للخرسانة مسبقة الصب‬
.‫وذلك من أجل تعزيز الروح الوطنية لهذا المشروع المميز‬
Divisions
Involved
Haji Hassan Readymix supplied concrete for yet another exceptional building that
adds to Bahrain’s architectural portfolio. The National Theatre has landed the
United States Institute for Theatre Technology’s (USITT) 2015 Architecture Award
for exceptional performance spaces.
‫ساهمت شركة الحاج حسن للخرسانة الجاهزة في بناء معلم استثنائي آخر ينضم إلى‬
‫اإلنجازات الهندسية لمملكة البحرين حيث حاز مسرح البحرين الوطني على الجائزة‬
‫م والمقدمة من قبل المعهد األمريكي لتكنولوجيا المسارح‬2015 ‫المعمارية لعام‬
.‫) وذلك عن مساحات العروض االستثنائية‬USITT(
The theatre was designed by Paris-based Architecture-Studio in collaboration with
Theatre Projects Consultants of London and is one of the largest performance
spaces in the Middle East.
‫ بالتعاون مع‬،‫م المسرح من قبل أستوديو الهندسة المعمارية في باريس‬
َ ‫ص ّم‬
ُ
‫ ويعد أحد أكبر مساحات العروض في الشرق‬،‫مستشاري مشاريع المسارح في لندن‬
.‫األوسط‬
Opened in 2012, the waterfront theatre covers 12,000 square meters and consists
of a 1,001 seat auditorium and a smaller 150 seat flexible studio theatre. The used
concrete mix was standard material, but it was required to form many of the
interesting shapes used in the theatre’s design.
‫م والمطلة على واجهة البحر وتغطي‬2012 ‫تم افتتاح هذه التحفة المعمارية في عام‬
‫ شخص ًا وقاعة أخرى‬1٫001 ‫ متر مربع وتحتوي على قاعة احتفاالت تتسع ل‬12٫000 ‫مساحة‬
.‫ شخص ًا‬150 ‫أصغر تتسع ل‬
Divisions
Involved
BUILDINGS BAHRAIN
Riffa Views International School
Shaikh Isa Library
‫يعتبر مشروع مدرسة الرفاع فيوز الدولية جزء من مشروع تطوير الرفاع فيوز‬
‫ متر مربع والذي يضم حوض سباحة‬70٫000 ‫الحصري والمقام على مساحة تمتد لـ‬
.‫ وأخرى رياضية ومكتبة‬،‫ صاالت عرض‬،‫بمقاييس أولمبية‬
‫إبان فترة النقص الحاد لمواد البناء األولية التي شهدها السوق البحريني خالل‬
‫ نجحت شركة الحاج حسن للخرسانة الجاهزة بتوفير‬،‫فترة تشييد المشروع‬
‫تلك المواد بما يشمل اإلسمنت والرمل والذي بدوره ساعد على المواصلة في‬
.‫ ويعود ذلك لسياسة الشركة الحكيمة المتبعة آنذاك‬،‫أعمال البناء دون توقف‬
‫التحديات التي واجهتها الشركة أثناء العمل أثبتت قدرتنا التنافسية على‬
‫مواجهة المعضالت التقنية بما في ذلك توفير حلول مواد اإلسمنت المضاد‬
‫والمستخدم لبركة السباحة واإلسمنت خفيف الوزن المستخدم للعزل‬
.‫الصوتي و الحراري‬
Riffa Views International School is a part of the exclusive Riffa Views
development of a 70,000 m2 plot including an Olympic sized swimming
pool, Band and Chorus Hall, gymnasium and library.
Riffa Views Royal Golf and Country Club
Completed in 2009, Riffa Views Country and Golf Club was constructed as part
of the exclusive Riffa Views development which uses the Royal Golf Course as a
focal point. Although there were generally routine technical challenges, such as
waterproof concrete for the pool, a particular requirement for white concrete
with an exposed aggregate surface finish allowed Haji Hassan Readymix to flex
their specialist muscles. Additional silos for stocking white cement, sourcing and
quarantine of selected white aggregate, plus special plant operations to prevent
concrete mix contamination were employed.
‫ رغم التحديات‬.‫م‬2009 ‫تم االنتهاء من تنفيذ مشروعي الرفاع فيوز ونادي الغولف في‬
‫التقنية التي واجهت شركة الحاج حسن للخرسانة الجاهزة مثل صب العازل اإلسمنتي‬
‫ إال أنها أثبتت قدرتها وجدارتها في توفير الحل األمثل لمثل تلك‬،‫لبرك السباحة‬
.‫ باإلضافة الى توفير صوامع إضافية لتخزين اإلسمنت األبيض ومنع تلوثه‬،‫المعوقات‬
During a period where Bahrain was experiencing shortages of sand
and cement, Haji Hassan Readymix’s procurement and stocking policies
ensured continuous supplies to the project.
The usual technical challenges that such a project throws up served as a
showcase for Haji Hassan Readymix’s capacity for, amongst other facets,
pool’s waterproof concrete and lightweight concrete for acoustic and
thermal insulation.
‫ وتم االنتهاء‬،‫ مليون دينار بحريني‬12 ‫بلغت تكلفة هذا المشروع اإلجمالية أكثر من‬
‫ و يتميز هذا المشروع بموقعه المميّز و يمثل وجهة سياحية و‬،‫م‬2006 ‫منه في‬
‫ وتم إيعاز تزويد الخرسانة لشركة الحاج حسن للخرسانة‬.‫معلم ًا بارزا في البالد‬
.‫الجاهزة‬
،‫ المبنى األول يتألف من المكتبة الرئيسية‬:‫تم تقسيم مشروع المكتبة إلى قسمين‬
‫ عنوان و‬250٫000 ‫ تشتمل المكتبة على‬.‫و المبنى الثاني يحتوى على مركز المؤتمرات‬
.‫مصادر صوتية و بصرية متنوعة‬
Completed in 2006, Shaikh Isa Library occupies a prime location and serves as
a landmark for Bahrain, it was entrusted to Haji Hassan Readymix for concrete
supplies.
The library project was divided into two parts. Building A comprised of the
library, while Building B accommodates the main conference center. The library
houses over 250,000 titles and audio visual items.
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
CIVIL ENGINEERING & CONTRACTING
Divisions
Involved
BUILDINGS DUBAI
Burj Al Arab
Dubai Marina
Meydan Height Villas
‫ فرع دبي بتصميم‬BPC ‫عملت الشركة المتحدة للخرسانة مسبقة الصب‬
‫ وباقي‬،‫ مم من األلواح العازلة السميكة مع اإلسمنت األبيض‬220 ‫وإنتاج وتركيب‬
‫ والمواد المصقولة المطلية‬،‫التلميع قطع للمبنى الخارجي واإلسمنت الرمادي‬
.‫للمباني الداخلية‬
‫ فرع دبي بتزويد وتركيب‬BPC ‫قامت الشركة المتحدة للخرسانة مسبقة الصب‬
،)‫ والحواجز (إلى جانب األلواح الخارجية‬،‫ألواح الخرسانة مسبقة الصب العازلة‬
‫ والساللم واأللواح‬،‫ األحزام واأللواح الصلبة‬،‫واأللواح الحاملة وغير الحاملة‬
.‫الجوفية بما في ذلك معدات الرف الثقيلة‬
Burj Development Tower
‫ فرع دبي بتزويد وتركيب‬BPC ‫قامت الشركة المتحدة للخرسانة مسبقة الصب‬
‫ وقد تم تزويد عناصر الخرسانة باإلسمنت‬.‫ألواح الخرسانة مسبقة الصب للمشروع‬
.‫ لون صباغة كحد أقصى) باستخدام الركام األبيض‬%1٫5( ‫ وركام مواد الصقل‬،‫األبيض‬
UPC Dubai supplied, delivered and erected (excluding cranage) of precast
concrete cladding panels. The precast elements are supplied with fully white
cement, exposed aggregate finish (with max. 1.5% color pigment) using white
aggregate.
HCS ‫ فرع دبي بتزويد وتركيب‬BPC ‫قامت الشركة المتحدة للخرسانة مسبقة الصب‬
.‫ باإلضافة إلى تركيب درج حلزوني‬.‫لمشروع برج العرب‬
UPC Dubai has supplied, delivered and erected the HCS for Burj Al Arab, as
well as supplying spiral staircase.
UPC Dubai has designed, produced, supplied, delivered and erected
220 mm thick insulated cladding panels with white concrete, exposed
aggregate finish for the external side and grey cement and the trowelled
smooth finish for the internal side.
UPC Dubai has supplied, delivered and erected the precast concrete
insulated panels, parapet (along with the external panels), load bearing
panels, non-load bearing panels, beams, solid slabs, staircase and hollow
core slab including Tower Crane.
Ritaj Residence Complex
Index Building Project
‫ فرع دبي بتزويد وتركيب ألواح‬BPC ‫قامت الشركة المتحدة للخرسانة مسبقة الصب‬
،)‫ مم‬100 ‫ واأللواح الحاملة وغير الحاملة (بسمك‬،‫الخرسانة مسبقة الصب العازلة‬
.‫ بما في ذلك تأجير رافعات البناء‬،‫والساللم واأللواح الجوفية والحواجز‬
‫ فرع دبي بتوفير تصميم‬BPC ‫قامت الشركة المتحدة للخرسانة مسبقة الصب‬
‫ باإلضافة إلى إنتاج وتركيب وحدات تغطية خارجية من الخرسانة‬،‫البرج و التعديالت‬
‫ وعوارض‬،‫ إضافة إلى قيامها بتصميم وتزويد وتركيب ألواح مجوفة‬.‫مسبقة الصب‬
.‫مسبقة الصب‬
UPC Dubai has supplied, delivered and erected (including cranage) precast
concrete insulated panels, load bearing panels, non load bearing panels
(100 mm thick), staircase, hollowcore slabs and parapets.
Some of the major projects done in Dubai - Millennium Estate Villas, Ritaj-Blk, Labour city, Meydan Height Villas, Mirdif City Cent-C/Park, Police & Army
Acco, Central Fish Market at Abudhabi, Dubai Marina - Dist 7, Gems Lincoln Academy, New German International School Dubai, Cambridge International
School, Dubai, Index tower...
BPC has provided tower design and fabrication in addition to supplying,
delivering, off-loading and erecting external precast concrete cladding units. It
has also provided podium design, fabrication, supply, delivery, off-loading and
erection of hollowcore slabs, precast band beams and wheel stopper.
BUILDINGS ABU DHABI
BUILDINGS OMAN
11,229 m3 Tilt
23,392 m2 HCS
2,358 m3 Tilt
26,113 m2 HCS
Links Investments
GEMS American Academy
Muscat City Center
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتزويد و تركيب دعائم‬
GEMS ‫مستطيلة و أخرى مسبقة الشد و دعائم للمدرجات لمشروع أكاديمية‬
‫ بما يشمل تزويد ألواح إسمنتية ملساء مغطاة‬،‫األمريكية في إمارة أبو ظبي‬
.‫بطبقة رمادية و بقوالب فوالذية‬
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتصميم وتزويد وتركيب‬
‫ مم لموقف سيارات‬400 ‫ مم وألواح جوفية بسمك‬150 ‫لوحات خرسانة بسمك‬
.‫مجمع مسقط سيتي سنتر‬
(Car Park Extension)
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتزويد وتركيب عناصر خرسانة‬
،‫ الساللم‬،‫ باإلضافة إلى ألواح للتغطية الخارجية‬.‫ مم لألعمدة و العوارض‬120 ‫بسمك‬
‫ تم‬.Links Investments ‫ مبنى تابع لشركة‬22 ‫وألواح مجوفة لمشروع يتألف من‬
.‫تنفيذ المشروع من قبل مقاوالت علي و أبناءه‬
UPC Abu Dhabi has supplied, delivered and erected 120 mm thick precast
concrete elements for columns and beams, in addition to 100 mm thick external
cladding panels and internal load bearing walls including stair core and lift core
walls and non load bearing walls, staircases, parapets and hollow core slab for
the 22 Buildings project for Links investments. The project contractor is Ali and
Sons Contracting.
ADNOC Underground Carpark
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتزويد و تركيب عناصر من‬
،‫الخرسانة مسبقة الصب لمشروع مواقف سيارات شركة أدونك في إمارة أبو ظبي‬
.‫باإلضافة إلى توفير األعمدة و مجموعة دعائم و ألواح صلبة و ساللم‬
UPC Abu Dhabi has supplied delivered and erected precast concrete elements
for ADNOC Underground Car park at AUH. In addition to columns, band
beams, I-beams Solid slab, Stair & HCS. The project contractor is Arabtec.
Port City Development LLC (Block ‘A’ & ‘C’)
‫ بكمية‬Port City ‫زودت الشركة المتحدة للخرسانة مسبقة الصب مشروع‬
HCS ‫ متر مربع من الـ‬2٫000 ‫) وكمية‬A( ‫ متر مربع من ألواح خرسانة للمبنى الرئيسي‬508
.)C( ‫لمبنى‬
UPC Abu Dhabi has supplied delivered and erected precast Rectangular
beams, Prestressed band beams, Prestressed I-beams, Staircases, Bleachers
& Bleacher beams for Premier Schools International for the GEMS
American Academy project in Abu Dhabi, using Tower crane provided by
Main Contractor (Chicago Maintenance & Construction Co). All precast
concrete elements are supplied with fully grey cement fair faced finish
against steel mold.
UPC Oman has supplied Port City project with 508 m² thick of hollow core
slabs for Block ‘A’ and 2,000 m² of thick HCS for Block ‘C’.
UPC Oman has designed, supplied, delivered and erected 150 mm thick
precast concrete panels and 400 mm thick Hollow Core Slabs for Muscat
City Center Car Park Extension.
150 mm thick
precast concrete
panels and
400 mm thick
Hollow Core
Slabs
BUILDINGS QATAR
Qatar Foundation Headquarters
PC Elements Heritage Park (Cooling Tower)
MOI office at Wadi Al-Sail
‫قامت شركة البحرين للخرسانة مسبقة الصب بدولة قطر بتصميم وتزويد‬
.Heritage Park ‫وتسليم وتركيب عناصر من الخرسانة لمشروع برج التبريد بالـ‬
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتزويد وتسليم عناصر من‬
‫ واأللواح العازلة للمبنى الرئيسي‬HCS ‫الخرسانة ولوحات األسطح والحزم والـ‬
.‫لوزارة الداخلية القطرية بوادي السيل‬
Lusail Sub Stations
‫ باإلضافة إلى‬.‫ وساللم‬،PC ‫وفرت الشركة المتحدة للخرسانة مسبقة الصب عوازل‬
.Strategic Studio Center ‫ لكل من المبنى الرئيسي وكذلك مبنى‬HCS ‫تزويد‬
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتصميم وتزويد وتسليم‬
.‫وتركيب األلواح العازلة من الخرسانة الجاهزة في مشروع لؤلؤة قطر‬
UPC Qatar has provided for Qatar Foundation Headquarters PC Cladding and
Stair Flights. Moreover, BPC offered HCS for QF Headquarters Bldg. and the
Strategic Studio Center Bldg.
UPC Qatar designed, produced, delivered and erected Precast Concrete
200 mm thick solid cladding panels for substations.
UPC Qatar designed ,supplied, delivered and erected Precast Elements.
BPC Qatar supplied and delivered Precast Concrete Elements, Roof Panel,
Beams, HCS and Precast Cladding for the Main Bldg.
Barwa City
Qatar Foundation Central Library Building
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتصميم وتزويد وتركيب عناصر‬
.‫ شقة تقريب ًا‬3٫000 ‫ مبنى يتألفون من‬48 ‫من الخرسانة مسبقة الصب لعدد‬
‫قامت الشركة المتحدة للخرسانة مسبقة الصب بتزويد و توصيل عناصر من‬
‫ باإلضافة إلى‬،‫الخرسانة مسبقة الصب لبناء أساس مشروع مكتبة قطر المركزية‬
.HCS ‫توفير لوحات للسقف و عوارض و‬
UPC Qatar designed, supplied, delivered and erected precast concrete elements
for 48 buildings approximately 3,000 flats.
BPC has supplied and delivered precast concrete elements to Qatar Foundation
Central Library, in addition to roof panels, beams and HCS.
Haji Hassan Group BSC (c)
P.O. Box 530
Tel: +973 17551111 / 17875287
Fax: +973 17919111
headoffice@hajihassan.com
www.hajihassan.com
Arabian Chemical Industries
P.O. Box 530
Tel: +973 17784777
Fax: +973 17911422
isolaaci@hajihassan.com
www.arabianchemical.com
Bahrain Pipes
P.O. Box 530
Tel: +973 17786607
Fax: +973 17786616
info@bahrainpipes.com
www.bahrainpipes.com
Haji Hassan Readymix
P.O. Box 5822
Tel: +973 17785353
Fax: +973 17785025
Email: readymix@hajihassan.com
www.hajihassanreadymix.com
Haji Hassan Cranes
P.O. Box 530
Tel: +973 17875299
Fax: +973 17911147
cranes@hajihassan.com
www.hhcranes.com
United Precast Concrete Qatar L.L.C.
P.O. Box 22995, Doha, Qatar
Tel: +974 44770167
Fax: +974 44770157
upc@upcqatar.com
www.bpcgroup.biz
Arabian Parts Co.
P.O. Box 530
Tel: +973 17785666
Fax: +973 17911455
apc@hajihassan.com
www.arabianparts.com
Bahrain Precast Concrete Co. W.L.L.
P.O. Box 20095
Tel: +973 17875600
Fax: +973 17785036
bpc@bpc.bh
www.bpcgroup.biz
Haji Hassan Reinforcements
P.O. Box 32133
Tel: +973 17786008
Fax: +973 17786133
hhrein@hajihassan.com
www.hhreinforcement.com
KRAH Bahrain
P.O. Box 32671
Tel: +973 17879400
Fax: +973 17917779
info@krahbahrain.net
www.krahbahrain.com
United Precast Concrete Abu Dhabi L.L.C.
P.O Box 43774, Abu Dhabi, UAE
Tel: +971 2 5515404
Fax: +971 2 5515405
upcauh@emirates.net.ae
www.bpcgroup.biz
Bahrain Asphalt Establishment
P.O. Box 530
Tel: +973 17556556
Fax: +973 17556084
inquiry.bae@hajihassan.com
www.bahrainasphalt.com
Bahrain Rubber Co.
P.O. Box 10150
Tel: +973 17830188
Fax: +973 17830166
rubber@hajihassan.com
www.bahrainrubber.com
Haji Hassan Workshop
P.O. Box 530
Tel: +973 17783052
Fax: +973 17783491
adminhhe@hajihassan.com
www.hhews.com
Haji Hassan Properties
P.O. Box 530
Tel: +973 17784989
Fax: +973 17786825
prm@hajihassan.com
United Precast Concrete (Oman)
P.O Box 2150, Ruwi, Sultanate of Oman
Tel: +968 603811
fax: +968 603811
upcoman@omantel.net.om
www.bpcgroup.biz
Bahrain Blocks
P.O. Box 530
Tel: +973 17830044
Fax: +973 17830503
bahblocks@hajihassan.com
www.bahrainblocks.com
Bahrain Tanks
P.O. Box 530
Tel: +97317783533
Fax: +973 17911080
bahraintank@hajihassan.com
www.bahraintanks.com
Al A’ali Complex
P.O. Box 530
Tel: +973 17581000
Fax: +973 17581581
info@hajihassan.com
www.alaalicomplex.com
United Precast Concrete Dubai L.L.C.
P.O. Box 52900, Dubai, UAE
Tel: +971 4 3474440
Fax: +971 4 3474746
upchcs@emirates.net.ae
www.bpcgroup.biz
© copyright Haji Hassan Group