Work Pass Division 18 Havelock Road Singapore 059764 www.mom.gov.sg Application for Man-Year Entitlement Key Information: 1. There are altogether 7 pages in this document. Please complete the pages applicable to the company’s application and submit all 7 pages to the Work Pass Division for our consideration. 2. A main contractor with a valid construction contract can apply for Man-Year Entitlements (MYE) from the Work Pass Division (WPD). 3. A main contractor must have a valid Central Provident Fund (CPF) account for construction Work Permit applications in the name of the company. 4. A main contractor is defined as a company which contracts a project directly from the developer/owner. 5. At the time of the MYE application, the balance period of the project should be at least 1 month and the total remaining project value should be at least $500,000. 6. If you have made an application for MYE for a project, you are not allowed to make any further MYE applications for the same project. However, an appeal for additional MYE allocation may be submitted through a completed ‘Variation Order Form P’ with the supporting documents. 7. A construction sub-contractor who wants to apply for Prior Approval (PA) for Non-Traditional Source (NTS) workers must first get the MYE allocation from the project’s main contractor. 8. The completed MYE application form and the required documents should be sealed in an envelope and mailed to “Construction Permit Section, Work Pass Division, Ministry of Manpower, 18 Havelock Road, S059764”. 9. In addition to the duly completed MYE application form, the main contractor must submit: (a) a photocopy of the contract/letter of award/letter of acceptance dated and signed by the developer/owner, containing the following details: (i) commencement and completion dates of the project (ii) contract value of the project (iii) contract description and location of the construction site (b) the summary of the Bill of Quantities to the project/Form of Tender for the Government projects (c) a photocopy of the BCA/BCU Permit or their equivalent for carrying out building works and the latest notice of approval for the same project (BCA/BCU Permit is optional for a Government or a private project/s without structural works) (d) a photocopy of the firm’s/company’s/partnership’s latest printout (printed within the last 3 months) issued by the Accounting & Corporate Regulatory Authority (ACRA). The construction activities must be reflected as one of the company’s principal activities in the printout. 10. The main contractor for civil engineering project where the scope of work contained building works is required to complete the Classification Form on page 4 (Not applicable to the main contractor for building and upgrading projects). 11. The processing time for the MYE application is 12 working days after we received it with all the documents in order. The outcome of the application will be mailed to the applicant company. 12. Please note that after the submission of the MYE application, the main contractor may be required to produce the original contract/letter of award/other documents at the Work Pass Division for verification. Our officer will contact the main contractor for an appointment if necessary. WPCP 001 1 Work Pass Division 18 Havelock Road Singapore 059764 http://www.mom.gov.sg Application for Man-Year Entitlement This form may take you 30 minutes to fill in. You will need the following information to fill in the form: The CPF Submission No. of main contractor The project / contract details Note: Please refer to the ‘Key Information’ on page 1 before completing Part 1 to 6. This application must be submitted not later than 1 month after the dates on which the signatures and endorsements of the architect, owner/developer, and /or PE are obtained. Part 1 – Main Contractor’s Particulars Main contractor’s CPF Submission No.: Name and address of main contractor: Postal code Telephone number: Fax number: Handphone number: Part 2 – Project Details (a) Location of project: (b) Description of project: (c) Project commencement date (DD/MM/YYYY): (d) Project completion date (DD/MM/YYYY): (e) Original contract value S$ (f) Date of letter of award/contract (DD/MM/YYYY): (g) BCA/BCU approved plan number: (h) Type of project: *upgrading / civil engineering / building - with *piling / sub-structure / super-structure (i) Name and address of developer/owner: Postal code Telephone number: Fax number: (j) Name and address of architect/QP: Postal code Telephone number: Fax number: (k) Name and address of professional engineer/QP: Postal code Telephone number: Fax number: *Delete where inapplicable For Official Use: WPCP 001 2 Application for Man-Year Entitlement Construction Activities and Project Values for the Contract Declared in Part 2 Type of Work Amount S($) 1 General building works - the preparation and laying of the foundation (inclusive of piling works), the construction & demolition of structures, including multi-storey car parks, buildings for parks and playgrounds and other recreation works, industrial plants and gas-holders. The scope of work includes addition, alteration, repair and redecoration works on buildings involving structural changes and installation of roofs, as well as interior and exterior renovation works, sanitary and plumbing works and interim upgrading 2 Installation of above ground electrical and communication cable including security systems, central antenna televisions (CATV), street lighting, traffic light systems, and sign posting 3 Civil engineering works - the preparation and laying of foundations (inclusive of piling works), the construction & demolition of sewage treatment plants, bridges, aqueducts, viaducts, elevated highways, flyovers/interchanges, docks, wharves, and jetties 4 The rewiring of electrical installations, the replacement/refurbishing of lifts, escalators, airconditioning plants and ancillary ducting of buildings 5 Building automation including industrial & process control system installation. 6 Installation & commissioning of mechanical plant & machinery systems including power generator & turbine systems 7 The project for construction and maintenance of a process plant ________ % for construction works ________ % for process construction works 8 Fencing and iron works installation 9 Piling, foundation, sub-structure works (partial MYE allocation from the total project) 10 Landscaping works incidental to a building/CE project or stand-alone landscaping works – only hardscape cost is considered 11 Laying of underground electrical and communication cables 12 Civil engineering works for the construction & demolition of culverts, reservoirs, retaining walls, canals, drainage systems, cutting and filling of embankments, river banks, excavation of deep trenches, surface drainage works, tunnels inland navigation, waterworks, flexible pavements, rigid pavements or laterite roads, bus bays, open car parks, roads, and related works such as kerbs and footways 13 Construction of any railway line or siding. 14 Laying of underground main & pipes for the transportation of gas, water & other liquids 15 Reclamation and dredging works 16 Soil stabilization works such as piling/micro piling, sand drain, ground anchoring, grouting etc 17 HDB (MUP) upgrading project 18 Preliminaries and/or provisional sum 19 Overseas material and/or equipment 20 Non-construction works Total contract value WPCP 001 3 Application for Man-Year Entitlement Classification – for Civil Engineering (CE) Project Only Please fill in the amount for related items and indicate “NA” if the items are not applicable. This form is NOT applicable for a project in which the building’s sub-total amount is HIGHER than the CE’s sub-total amount. Item A Description Amount S($) Design or Design-related works Design or design-related works or QP’s & representatives’ supervision (To be filled in for design & build project only) B Structural Works Excavation Piling works/sheet piling Other foundation works Soil stablisation works Retaining walls/diaphragm walls Demolition works Tunnelling works (Link sewers) Tunnel-boring works with TBM including the associated RC works Cutting & filling of embarkment Cut and cover RC works Structural steel works Bridge/viaduct works Other in-situ RC works Precast installation works C Architectural and M&E Works Finishes (includes doors, windows & ironmongery) Fire protection related works M&E works Installation of utilities and underground main & pipes for the transportation of gas, water & other liquids D External Works & Others External works/drainage/landscaping Flexible pavements/rigid pavements/laterite roads Bus bays/open car parks/roads E Preliminaries For other items not given in the above categories, please specify the description and the value of the item clearly. Total Contract Sum WPCP 001 4 Application for Man-Year Entitlement Letter of Consent for Joint Venture (Sample) For a MYE application made by one party of the joint venture, the other party of the joint venture who will not be applying for the MYE for the project must give a letter of consent using its own company’s letterhead. This letter should relinquish their MYE rights to the current MYE application made in respect of the joint venture contract. To: Construction Permit Section Work Pass Division Letter of Consent to Relinquish Rights to Man-Year Entitlements for Joint Venture (Please give a full description of the joint venture project and the contract / BCA Permit no) 1. My company, _________________________________________________ (CPF Submission No.:_________________) is a partner in the joint venture mentioned above (hereafter referred to as joint venture). 2. My company is aware of and supports the Man-Year Entitlement (hereafter referred to as MYE) application submitted by ___________________________________________________________ on behalf of the joint venture. (Name of company applying for MYE for joint venture) 3. My company understands and accepts that only one MYE will be allocated per project, and that with the said MYE application submitted by __________________________________________________________________________, my company (Name of company applying for MYE for joint venture) will not be allowed to apply for any further MYE for this joint venture. My company also understands and accepts that no transfer of MYE will be allowed once it is allocated to the applicant company. 4. With my company’s support of the MYE application submitted by ____________________________________________________ as stated in paragraph 2, my company understands and (Name of company applying for MYE for joint venture) agrees to : (a) relinquish all rights to any MYE under this joint venture (b) allow _________________________________________________________ to have full control over the Man-Year (Name of company applying for MYE for joint venture) allocation for this joint venture (c) accept joint responsibility with the other partners of this joint venture for any foreign workers employed under the MYE. This responsibility involves the accommodation and new job placements if the foreign workers are abandoned by their employer(s) as a result of the employer(s) defaulting on levy payments leading to the cancellation of the workers’ Work Permits. Name of *Director / Partner / Sole Proprietor listed in company’s business profile printout *NRIC/ Passport number of *Director / Partner / Sole Proprietor *Delete where inapplicable. WPCP 001 Signature Date Company’s stamp 5 Application for Man-Year Entitlement Part 3 – Declaration By the Architect / QP I, (Name of architect and architect ID) In my capacity as (Designation in company) of (Name of company) hereby declare, on behalf of the company mentioned above, that I am the architect for the above project and the information given in this application is true and correct. I also understand that should any information or documents submitted for the above application be found to be false or inaccurate, the company and I may be subject to prosecution. I also confirm that the contract value is 1) Original S$ 2) Remaining S$ (Please indicate the remaining contract value even if it is the same as the original contract value) Name and designation of Declarant Signature of Declarant *NRIC / Passport number Company’s stamp Date Part 4 – Declaration By the Professional Engineer / QP I, (Name of professional engineer and PE ID) In my capacity as (Designation in company) of (Name of company) hereby declare, on behalf of the company mentioned above, that I am the professional engineer for the above project and the information given in this application is true and correct. I also understand that should any information or documents submitted for the above application be found to be false or inaccurate, the company and I may be subject to prosecution. I also confirm that the contract value is 1) Original S$ 2) Remaining S$ (Please indicate the remaining contract value even if it is the same as the original contract value) Name and designation of Declarant *NRIC / Passport number Signature of Declarant *Delete where inapplicable Company’s stamp WPCP 001 Date 6 Application for Man-Year Entitlement Part 5 – Declaration By the Developer / Owner I, (Name of person making declaration) In my capacity as (Designation in company) of (Name of company) hereby declare, on behalf of the company mentioned above, that the company is the developer/owner for the above project and the information given in this application is true and correct. This project has never been awarded to any main contractor previously. (If it has previously been awarded, a letter of explanation / documents to substantiate the reason for the change of main contractor must be attached.) I also understand that should any information or documents submitted for the above application be found to be false or inaccurate, the company and I may be subject to prosecution. I also confirm that the contract value is 1) Original S$ 2) Remaining S$ (Please indicate the remaining contract value even if it is the same as the original contract value) Name and designation of Declarant *NRIC / Passport number Signature of Declarant Company’s stamp Date Part 6 – Declaration By the Main Contractor I, (Name of person making declaration) In my capacity as *General Manager / Sole Proprietor / Partner / Director of (Name of company) hereby declare, on behalf of the company mentioned above, that the company is the main contractor for the above project and the information given in this application is true and correct. I also understand that should any information or documents submitted by the company for the above application be found to be false or inaccurate, the company and I may be subject to prosecution. I also understand and accept that the company and I will be barred from future applications for Work Permits. My company is a partnership. I am also signing the above declaration on behalf of another partner (name of partner and *NRIC / Passport no) ____________________________________________________________ in my company. I also confirm that the contract value is 1) Original S$ 2) Remaining S$ (Please indicate the remaining contract value even if it is the same as the original contract value) Name and designation of Declarant Signature of Declarant *Delete where inapplicable WPCP 001 *NRIC / Passport number / FIN Company’s stamp The form is updated on 24 Jul 2014. Date 7