SOUTH BEND HERITAGE for HABITAT FOR HUMANITY 803 Lincoln Way West Telephone 574 289-1066 Fax 574 289-4550 Residential remodeling Bid Package for 741 Cottage Grove South Bend, IN 46616 Levels Sq.Ft. Garage 2 none Exterior Color Roof lap Hardi-plank TBD replace Date issued: Revised: 9/17/2014 _________________________ Deadline for bid submittal: by 2:00 PM on 10/03/2014 Instructions for bidders: You are invited to submit a proposal for the Work as described in this Bid Package. IMPORTANT NOTE: This property is owned by Habitat for Humanity of St. Joseph County. SBH will act as their Const. Manager (CM) and facilitate all construction related activities. Contracts for this project will be with Habitat for Humanity and all invoices will go to Habitat for Humanity. 1. This Bid Package includes: a. written specifications b. floor plans c. kitchen cabinetry preliminary layout d. Exhibit B - HUD requirements for CDBG funded projects e. SBH insurance requirements (under 1.00 General Conditions) f. lead inspection report g. addenda if issued The floor plans included with this bid package are intended to supplement the written materials. If there is a contradiction between the drawings and written material, the written material is to take precedence. 2. Carefully review the written specifications and corresponding drawings. Field verify all conditions. Contact Pat Lynch at SBH with any questions concerning specifications. Report any discrepancies or errors you may find immediately. Any changes or clarifications will be addressed with an addendum to these specifications. 3. Keys for the property may be checked out from SBH for brief periods so that you and/or your subcontractors can walk through again. It is advisable to call first to verify key availability. 4. Submitted bids must have at least one line item price for each applicable catagory (i.e. 1.00 General Conditions; 6.00 Siding; 10.00 Walls; etc.) and a separate Interior / Exterior number for 12.00 Painting. If it is helpful to you when figuring your bid, you may enter individual line item prices in the attached written specification sheets. Include any mark-up, overhead & profit, etc., you may have into each line item. There is no line item for overhead and profit on the bid form. 741 Cottage Grove.xls Cover 1 5. Alternates - any substitutions allowed in the Bid Package must be approved by SBH prior to award. 6. If you wish to propose changes or revisions to the Bid Package, you must do so prior to the bid period deadline. At SBH's discretion an addendum describing the change may be issued to all bidders. 7. If all bids received by the above deadline are above the SBH determined maximum price, a verbal or written notice of revision will be issued to all bidding general contractors. SBH will then, at their option, (1) reduce the scope of work, (2) work with the bidders to identify areas within their bids that are excessively out of line with other received bids, (3) ask the bidders to substitute SBHcontracted sub-contractors for theirs, or (4) ask the bidders to consider using a SBH recommended sub-contractor in lieu of the general's sub-contractor or in-house work. 8. This Bid Package (as revised and approved by both the contractor and SBH) will become a referenced part of the final SBH Residential Remodeling Contract. A copy of the SBH Residential Remodeling Contract is available upon request for review. Your draw requests will be based upon the written specification line items, work completed, & SBH inspection/approval. Draw requests must be submitted per the SBH draw schedule for prompt payment. A copy of the draw schedule is available upon request for review. 9. Payments. Due to the nature of our funding sources, SBH cannot pay a retainer or any money down at contract signing. The contractor will submit an AIA G702/703 request for payment to SBH by the 25th of each month or as otherwise agreed. Payment can then be anticipated within 30 days. Payment(s) to the contractor are limited to inspected work-in-place and approved purchased/stored materials. 5% retainage will be held on this contract. SBH will provide blank G702/703 forms for contractor use. The undersigned, after reviewing this Bid Package and becoming thoroughly familiar with 741 Cottage Grove and the local conditions affecting the execution of the Work, proposes to complete the Work for the sum of $________________________ dollars. The undersigned has received and considered the following addenda (if issued by SBH) : _______________ dated: ____________ _______________ dated: ____________ The undersigned can start the Work within ____ days of SBH's notice to proceed and substantially complete the Work within _____ calendar days thereafter. Company: _____________________________________________________ Address: _____________________________________________________ _____________________________________________________ Phone: FAX: _________________ _________________ Employer ID: _________________ Signature: _________________ Mobile: _________________ Date: _________________ This bid is good until this date: 741 Cottage Grove.xls _________________ Cover 2 Minimum acceptable bid numbers for GC: Fill in as applicable per written specifications 741 Cottage Grove 9/16/2014 13:11 INTERIOR PROPOSAL Totals by Trade 1.00 - General Conditions 2.00 - Demolition (Demo) 7.00 - Interior Carpentry / Trim / Doors 8.00 - Insulation (non attic) 9.00 - Exterior Doors & Windows SBH Replacment or Storm package 10.00- Walls & Ceilings 11.00- Floors 12.00- Painting - Interior 13.00- Cabinetry (labor) SBH cabinets and top(s) package allowance 8000.00 14.00- Plumbing 15.00- HVAC 16.00- Electrical Elec. fixture/lamp allowance 1000.00 17.00- Appliances NA NA Total goes to bid form #1 741 Cottage Grove.xls Cover 3 9/16/2014 13:11 741 Cottage Grove EXTERIOR PROPOSAL Totals by Trade 1.00 - General Conditions 3.00 - Landscape & Sitework (LS) 4.00 - Concrete & Masonry (CM) 5.00 - Roof 5.00 - Gutters & Downspouts galv 5.00 - Gutters & Downspouts alum 6.00 - Siding & Exterior Trim / Soffit / Fascia 12.00- Painting - Exterior Total goes to bid form #2 741 Cottage Grove.xls Cover 4 741 Cottage Grove area trade Gen 0 9/16/2014 13:03 no. specification 1.00 PERMITS: The contractor is responsible for applying for, paying for and receiving a building permit prior to starting any work. The contractor shall perform all work in conformance with appicable local codes and requirements. cost GUARANTEE: Contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting there from, which appears within one year from final payment. Further, contractor shall furnish owner with all manufacturers' and suppliers' written warranties covering items furnished under this contract prior to release of the final payment. DRAW PROCEDURE: Monthly or as otherwise agreed in writing between SBH and Contractor. Submit requests for payment to SBH by the 25th of each month on an AIA G702/703 form. 5% retainage will be held on this project. Partial lien waivers are required with each draw request. Gen General Conditions 1.00 INSURANCE REQUIREMENTS: (a) $1,000,000 commerical general liability (b) $500,000 liability for hired or non-owned auto. Use of a personal vehicle requires non-owned/hired auto liability. (c) $100,000/$500,000/$100,000 in workmans comp & Employers Liability (or affidavit of waiver if applicable) (d) $2,000,000 Umbrella Liability - minimum limit (e) SBH and Habitat for Humanity must be listed as add'l insured for Habitat for Humanity owned properties. CHANGE ORDERS: All changes in the work shall be documented by the contractor in writing in the form of a work change order and must be approved in writing by SBH prior to beginning the revised/additional work. The change order will specify the items to be changed and the cost or credit for each item. Add'l time required, if any, beyond the already noted duration of work must be noted. Gen General Conditions 1.00 JOB SITE: The contractor shall keep the job site clean and orderly during the course of work and remove all debris at the completion of the work. Broom clean. The contractor shall adequately protect the work, adjacent property, and the public and shall be responsible for any damage or injury due to his actions. TERMITES: None known to be present. Contact SBH if active or past termite damage is found on site. LEAD: All work on this project must comply with HUD regulations on controlling lead based hazards, completed under the supervision of a licensed lead supervisor. Any questions regarding these regulations should be directed to South Bend Heritage Foundation prior to bid submission. Safe Work Practice techniques must be utilized when a lead based paint hazard had been identified. Gen Demolition General 2.00 REMOVAL OF UNUSED AND DEMOLISHED MATERIAL: Remove all materials from property, which will interfere with the construction process. The contractor shall clean debris from the dwelling and site to a dumpster or legal landfill at least once each week, and leave the property in a broom clean condition. In occupied dwellings, debris shall be removed from living quarters daily. Contractor to schedule dumpster and incorporate dumpster & dumping costs in this bid. Gen LS 3.00 Landscape & Sitework General conditions for landscaping: none SBH will directly contract any plantings, landscaping, or lawn work. See section 4.00 Concrete & Masonry for concrete walks. Gen Concrete & Masonry 4.00 Concrete & Masonry general requirements: Per below specifications (if any) 741 Cottage Grove.xls Page 1 of 15 741 Cottage Grove area trade Gen Roof & Gutters 9/16/2014 13:03 no. specification 5.00 Roofing & gutter general notes: If roofwork is called for below in the EXT spec: All roof to siding terminations to be step flashed. Repair existing roof to masonry connections if properly flashed and counterflashed. Otherwise install new aluminum flashing and counterflashing with kerf cut in masonry 6" above roof plane. Frame for proper drainage (i.e. cricket) if required. cost If called out below, new roof to be 30 year dimensional shingle over 30lb building paper. Tear off if two or more layers exist on roof. New overlay sheathing, if required to be 7/16" OSB. Ice and water shield if called out below. If required, patch existing sheating with structural plywood of similar thickness. Gen Int C&T 7.00 Carpentry, Trim & Interior doors general notes: Repair damage caused by installation/repair of mechanical systems. Framing at Bathroom joists: Be aware that revised plumbing may require sistering, decking, or other framing alterations. See plumbing spec. and plan to determine if this issue applies to this project. SBH provided Bathroom accessory package. Contractor to install. (1) wall mounted t.p. dispenser (2) 18" towel bars at full bath and (1) at 1/2 bath (anchored to contractor installed 2x blocking where feasible) Interior Trim : All new interior trim to be wood Select or better. No knots larger than 1/4" diameter. No plastic or imitation wood products allowed unless prior written approval is given by SBH. All joints to be coped or mitered except butt joints at door casing Gen Insulation 8.00 Insulation general notes: All new blown attic insulation and/or crawl space insulation to be by GC. Fiberglass or rigid insulation otherwise specified here (I.e. in wall framing or foundations, etc) by Contractor. Gen Ext Carp +Dr&Win 9.00 Exterior Door & Window general notes when called for in individual specs: 9.00a - Window - for all windows: repair deteriorated sashes. Replace any plexiglass or broken glass w/ SS glass. Replace any missing or loose glazing compound with new. Raise upper sash if dropped and fix in place with small blocks screwed in place. If glazing compound is significantly deteriorated or if glass is broken, remove glazing compound, prime sash with boiled linseed oil and re-glaze with glazing compound and points. Remove obsolete hardware from window & trim. All sash locks to latch securely. Adjust as req'd. Install new brass plated locks & lifts if required. 9.00b - For bedrooms and all second floor rooms: Repair, and adjust lower sash to operate smoothly. Replace sash cords with nylon-reinforced cords if missing or deteriorated. 9.00c - Basement/Attic windows (type 1): repair deteriorating sashes and frames. Replace any plexiglass or broken glass w/ SS glass. Replace any missing or loose glazing compound with new. Clean glass of paint. 9.00d - Basement windows (type 2): remove deteriorating sashes and frames. Install new glass block. Every other basement window to have integral vent, minimum 1 vent per basement. 741 Cottage Grove.xls Page 2 of 15 741 Cottage Grove area trade Gen Wall & Ceiling 9/16/2014 13:03 no. specification cost 10.00 Walls & Ceiling general notes: ASSUME FOR ALL AREAS unless noted otherwise in a specific room's description: 10.00a - All new GWB to be 1/2" unless noted otherwise. Fur out wall patches as necessary to be flush with existing finish surface and adjacent trim. Screw 8" OC. Tape, three-coat finish and sand ready for painting. 1/2" moisture resistant GWB at all bathrooms. All ceilings to be SMOOTH unless noted otherwise. 10.00b - Wallpaper need not be removed if it is securely adhered to wall unless noted otherwise. Scrape loose wallpaper from wall. Cracks in plaster behind the wallpaper that do not break the paper surface may remain. For plaster repair, minor existing imperfections in the wall may remain. Skim coating req'd ONLY in areas w/ obvious imperfections, gouges, holes, or spider cracking. Skim coat existing walls as necessary when adjacent to new const. to blend the transition. Larger exposed cracks must be filled: Cut out cracks 1/4" wide in a vee joint. Apply filler coat of non-shrink "Durock" or equivalent. Use mesh drywall tape and base coat of drywall compound over repaired crack. Finish with drywall compound and sand smooth. Finish patch flush with adjacent wall surfaces. If adjacent surfaces are textured, attempt to match texture. Gen Floor Finish 11.00 Floor Finish general notes: See individual room specification for floor finishes. When specified, Hardwood floor patching and refinishing, if any, by GC. New carpet and pad installation, if any, by GC. New underlayment and vinyl, if any, by GC. Gen Pnt - Int 12.00 Painting general notes: 1.1 LEAD: All work on this project must comply with HUD regulations on controlling lead based hazards, completed under the supervision of a licensed lead supervisor. Any questions regarding these regulations should be directed to South Bend Heritage Foundation prior to bid submission. Safe Work Practice techniques must be utilized when a lead based paint hazard had been identified. 1.2 Painting - Interior Interior color selection as follows: Walls - eggshell - color TBD Ceilings - flat - color TBD Doors & Trim - semigloss - color TBD Stained trim - where indicated, stain and matte poly - color TBD Kitchen and bathroom walls - semigloss - color TBD Gen Pnt - Int 12.00 1.3 EXISTING Interior walls & ceiling: As required, prime all interior walls using stain hiding primer as required. Caulk seams and joints as required. Prep & paint repainted surface - flat: Remove or cover hardware and accessories not to be painted. Scrape loose, peeling, cracked and blistered areas. Clean oil, grease, fungus, dirt and dust from surface. Fill holes and cracks. Prime all new materials and spot prime existing with acrylic latex. Topcoat with premixed acrylic latex. Replace or uncover hardware, fixtures, accessories, and blinds if applicable. 1.4 NEW GWB: prime followed by two coats latex. 1.5 EXISTING PAINTED Interior trim / doors / windows : Remove or cover hardware/surfaces not to be painted. Wet scrape loose, cracked, pealing and blistered paint from all trim including doors and sashes. Clean oil, grease, dirt and dust from trim. Fill holes and caulk cracks. Degloss as required. Prime as req'd and paint. Razor scrape existing or new paint residue from glass. Do not paint windows shut. Any windows that are painted shut will be returned to operable condition by the contractor. 741 Cottage Grove.xls Page 3 of 15 741 Cottage Grove area trade Gen Pnt - int 9/16/2014 13:03 no. specification 12.00 1.6 NEW PAINTED Interior trim / doors / windows : Fill holes and caulk cracks. Prime followed by two coats latex. cost 1.7 EXISTING STAINED Interior trim : Remove or cover hardware/surfaces not to be finished. Sand cracked, pealing and blistered finish from all trim including doors and sashes. Clean oil, grease, dirt and dust from trim. Fill holes. Apply a coat of stain, one coat of sanding sealer and two coats of oil based polyurethane varnish. Gen Pnt - ext Gen Cabinetry 12.00 Exterior painting bid is for the entire house. Any additional Exterior painting items listed individually in the following specifications are to be included with the general Exterior painting cost. 13.00 Cabinetry general notes: Pulls: none Cabinet - base: Install base cabinet with doors of solid birch or ash stiles and veneered plywood panels. Frame with solid birch or ash stiles, 1/4" veneered plywood sides and metal or plastic corner bracing. Drawers shall be made of wood or composition material. Cabinet - wall: field measure and screw to studs, level and plumb, kitchen wall cabinets. Doors to have solid wood styles and plywood panels. Frames to have solid wood stiles, 1/4" plywood sides, metal or plastic corners to match base cabinets. 14.00 Plumbing general notes: a. All plumbing to be done per code, PEX, schedule 40 PVC or ABS drain lines b. Cut existing stack at basement floor slab. DWV to be all new above that point. Provide cleanout at furnco connection to CI. c. When applicable (most cases) inspect existing cast iron interior for deterioration. Report condition to SBH. d. Include in base plumbing quote cleaning (1) floor drains and (2) sewer lateral e. As/if called out below, use the following: Shower/tub combo - Delta 1448-712 or SBH approved equal. Kitchen faucet - Delta N400-WF chrome on 8" center. 20GA Kitchen sink per plan - double: 33x22 SS 7" deep with 4 holes. Bathroom Lav faucet - Delta 520 WF or 522 WF. f. Pipe insulation not required u.o.n. Please advise SBH if you feel situation requires pipe insulation. Gen Plumbing Gen HVAC 15.00 HVAC general notes: a. Inspect existing duct layout and determine if it is adequate. Bid to include any required new supply/return lines and/or ductwork repair. b. If missing, returns from individual bedrooms need not be provided. (Existing returns in bedrooms to remain). Provide central return located in the hall outside the bedroom(s) if no return is inside bedroom(s). c. If this spec calls for a new 80% eff. hot water heater AND if this spec calls for the replacement of the existing chimney vented furnace with a high-efficiency model, HVAC contractor is to install appropriate flue liner in the existing chimney for hot water heater. Gen Electrical 16.00 Electrical general notes: a. ASSUME FOR ALL AREAS: REWIRE TO CODE—PER ROOM: Rewire to current National Electric Code including but not limited to: existing fixtures (i.e. contractor to verify existence of j-box); surface mount GFI in bathroom and Kitchen; add a 15 amp grounded receptacle to all usable walls (as code defined); switched lights in all halls, kitchen, baths and furnace areas; counter receptacle; and circuits. Fish all wire and repair all tear outs. New devices and cover plates to be almond u.o.n. (not ivory) b. All new house wiring to be #14 Romex unless code req'd otherwise. c. Remove all surface applied telephone and cable wiring. Exception: Existing telephone / cable that are fully wired within the wall cavity (interior and exterior) may remain. Provide (2) phone jacks: one in living room and the other in main bedroom. Provide (2 or more) cable outlets: one in living room and the others in each bedroom per drawings. See drawings for specific locations. 741 Cottage Grove.xls Page 4 of 15 741 Cottage Grove area trade Gen Electrical 9/16/2014 13:03 no. specification cost 16.00 d. Smoke detectors - install (and replace any existing) smoke detectors w/ hardwired/bat. backup units per code. Combo smoke / CO in basement at bottom of steps. Smoke detector inter-connection is required. e. Door bell if missing - provide low voltage door bell w/ operator at front door. f. SBH will provide light fixture package for all required interior and exterior lights called out in this spec. u.o.n. Contractor to install. g. Stove exhaust hood provided by contractor. See kit. elec. for model. h. Inspect existing panel and meter base. Repair/replace as required. i Install switched exterior light at all ground level exterior doors if missing. j. Replace ALL existing switches, 110, 110GFI, & 220 receps and telephone jacks throughout the house. Install proper replacement receps (grounded or non-grounded) compatable with house wiring. Install new coverplates throughout. Gen Electrical 16.00 k. ALLOWANCE: $1000 light fixture & lamp material allowance to be included in base bid. Allowance is for fixtures/lamps installed after wallboard. Contractor to provide all other specified devices and misc. elements. SBH will select fixtures from US-31 Supply. Contractor to arrange for payment and delivery of fixtures. FY __________ _____ Foyer LR LR __________ _____ Living Room Demo 2.44 Base Shoe removal: Remove existing base shoe (and save for reinstallation if possible) for floor refinishing. 2.60 remove storm door Demo Int C&T 7.44 Base shoe - new: new base shoe at room perimeter after floor is refinished. Ext Carp 9.09 Door - exterior - repair: Remove grilles, obsolete hardware, hasps, etc. from door. +Dr&Win Replace glass as necessary, including replacing any plexiglass panels. Install or repair glazing strips as necessary. LR LR LR LR Ext Carp +Dr&Win LR Ext Carp +Dr&Win LR LR Floor-hw Floor-hw LR Floor-hw LR Pnt - Int LR Pnt - Int LR Pnt - Int LR LR HVAC Elec. LR Elec. LR Elec. LR Elec. LR LR Elec. Elec. see LR 9.16 Knob-set + Deadbolt in existing door: install a Oil-rubbed bronze leverset and a 2-3/4" backset, brass plated, single cylinder dead bolt with minimum 1" throw. Schlage or SBHF approved equal. Provide SBHF with 2 sets of keys - both keyed alike to front door. 9.21 Repair windows: All windows this room adjusted and repaired as necessary per general window specification 9.00a. Special window conditions for this room are: none 11.04 Hardwood - existing to remain: Protect existing hardwood floor during renovation. 11.06 Hardwood - existing - refinish: Repair damaged or missing oak flooring as required. Drum sand and edge floor. Counter sink all nails and fill holes. Vacuum and tack rag room and walls as necessary to remove all dust. Apply stain, sanding sealer and two coats of oil based polyurethane varnish. Matte finish. Vacuum room.. 11.09 Hardwood: Hardwood floors and stairs to second floor this area refinished by GC. Repair oak as required. (Repair of subfloor, if any, and reinstallation of base-shoe to be by Contractor and covered elsewhere in this spec.) 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 12.07 Existing stained trim: Clean existing of nails and misc. hardware. Clean of excessive paint if any. Restain & clear matte poly. Including rebuilt entry door. 12.11 Additional misc. interior painting: clean and repaint existing RA floor grates - matte black 15.06 Ductwork - clean existing with shop-vac. 16.01 All existing elec devices this area Unless Otherwise Noted: inspect, repair, add, or delete all devices this room (1) to code (2) per general spec. 16.00, and (3) as noted below for this area. 16.05 Receptacle-replace: replace receptacles with almond duplex receptacles and almond cover plates. 16.10 Smoke detectors: install UL approved smoke detectors as directed by building code. All smoke detectors to be hardwired to electrical system with battery backup. Detectors to be interconnected. 16.11 Doorbell system: install a doorbell system containing a low voltage transformer, power connection, and buzzer at front door (and side door) Chime to be located in (LR) 16.12 Telephone: telephone jack to be in this room - wall box per plan 16.13 Cable TV: connection to be in this room - wall box per plan 741 Cottage Grove.xls Page 5 of 15 741 Cottage Grove area trade LR Elec. 9/16/2014 13:03 no. specification 16.34 Ceiling fixture - replace surface mount: Install a ceiling mounted, UL approved, 2-bulb light fixture. Verify that existing switch and wiring are in working condition to code. Install/repair/replace if not. One fixture at each existing ceiling j-box. DR DR __________ _____ Dining Room Demo 2.33 Demo - wall: remove wall as shown on plan. Relocate or delete any electrical or mechanical systems located within the removed wall. Prior to demolition confirm load bearing status of wall and provide temporary bracing for existing structure as/if required. DR Demo 2.44 Base Shoe removal: Remove existing base shoe (and save for reinstallation if feasible). DR DR DR Int C&T Int C&T Ext Carp +Dr&Win DR DR Wall & Clg Wall & Clg DR Floor-hw 7.07 beam at removed wall - (3) 2x10 and soffit per plan 7.44 Base shoe - new: new base shoe at room perimeter after floor is refinished. 9.21 Repair windows: All windows this room adjusted and repaired as necessary per general window specification 9.00a. Special window conditions for this room are: none 10.03 Repair existing plaster walls per Wall & Ceiling spec. 10.00b. 10.11 GWB - new clg: new GWB per Wall & Ceiling spec. 10.00a. New as required and at new soffit 11.06 Hardwood - existing - refinish: Repair damaged or missing oak flooring as required. Drum sand and edge floor. Counter sink all nails and fill holes. Vacuum and tack rag room and walls as necessary to remove all dust. Apply stain, sanding sealer and two coats of oil based polyurethane varnish. Vacuum room.. DR Floor-hw 11.09 Hardwood: Hardwood floors this area refinished by GC. Repair oak as required. (Repair of subfloor, if any, and reinstallation of base-shoe to be by Contractor and covered elsewhere in this spec.) DR DR DR Pnt - Int Pnt - Int Pnt - Int DR DR DR Elec. Elec. Elec. 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 12.02 Prep & paint new GWB interior surface: per general note 12.00.1.4 12.07 Existing stained trim: Clean existing of nails and misc. hardware. Clean of excessive paint if any. Restain & clear matte poly. 16.01 All existing elec devices this area Unless Otherwise Noted: inspect, repair, add, or delete all devices this room (1) (2)room per general spec. 16.13 Cable TV: connection to to becode in this - wall box per 16.00, plan and (3) as noted below for 16.34 Ceiling fixture - replace surface mount: Install a ceiling mounted, UL approved, 2-bulb light fixture. Verify that existing switch and wiring are in working condition to code. Install/repair/replace if not. Kit Kit Kit __________ _____ Kitchen Demo 2.32 Demo - door: remove rear entry door and jamb as shown on plan. Alter RO for new door at new location. Demo 2.35 Demo - clg GWB: Remove ceiling finish and prep for new GWB such that new GWB will lie smooth and flush with existing rafters. Demo 2.36 Demo - wall plaster: Remove/scrape existing wall plaster from lathe. Remove lathe AND plaster from exterior walls. Remove lathe nails and plaster "crumbs" from walls and around remaining trim such that new GWB will lie smooth and in same plane as original plaster. Demo 2.43 Remove vinyl flooring and underlayment. Remove all staples and fasteners from floor down to original subfloor or wood finish floor. Demo 2.45 Remove all cabinets: Remove cabinets this room by withdrawing fasteners to minimize wall damage. If applicable, remove sink, supply, and drain lines as required for new construction. Cap at nearest junction if not to be replaced. Demo 2.54 Chimney removed. Door, frame, and casing to basement stair removed per plan. Kit Kit Demo Int C&T 2.55 Demo - window: remove West window complete as shown on plan. 7.30 General framing: frame for new interior walls per plan. Infill window, opening to BA1 addition, infill opening to bsmt stair per plan. (beam and soffit described under DR) Kit Int C&T 7.42 "Trim package this room: new 1x6 baseboard. 1x4 casing similar to existing in adjacent rooms. Reused trim from demo is acceptable. Kitchen trim to be painted. Kit Kit Int C&T Insul 7.44 Base shoe - new: new base shoe at room perimeter 8.08 Insulation R-13 at exterior walls - provide insulation at exterior walls where plaster and lathe have been removed. Fiberglass with vapor barrier stapled to framing OR cellulose with visqueen vapor barrier. Kit Kit Kit Kit 741 Cottage Grove.xls cost Page 6 of 15 741 Cottage Grove area trade Kit Ext Carp +Dr&Win Kit 9/16/2014 13:03 no. specification 9.21 Repair windows: All windows this room adjusted and repaired as necessary per general window specification 9.00a. Special window conditions for this room are: none 9.26 Refer to EXT for entry door from back yard at new mud rm/BA1 addition. Kit Kit Ext Carp +Dr&Win Wall & Clg Floor-vt Kit Kit Kit Pnt - Int Pnt - Int Pnt - Int Kit Pnt - Int Kit Cabinetry Kit Cabinetry Kit Cab SBHF Kit Kit Kit Kit Cab SBHF Pb Pb HVAC Kit Elec. Kit Elec. Kit Kit Elec. Elec. 16.16 Refrigerator recep 16.18 Vent hood: over range. Provide and install. Verify size w/ cabinetry layout drawing. Unit to be recirculating type with white enameled metal range hood with light, washable grease filter. Unit to be White u.o.n. Mnfr: Broan or approved equal. Kit Elec. Kit Elec. 16.29 Ceiling fixture - recessed can: Install (1) UL approved, 1-bulb recessed light fixture w/ LED lamp, center of sink, J-box and switch. This fixture is not in the light fixture allowance. 16.32 Ceiling fixture - new surface mount: Install a ceiling mounted, UL approved, 3-bulb light fixture. J-box and switch. BA3 __________ _____ BA3 BA1 Bath 1 __________ _____ Bathroom #1 Int C&T 7.08 Cased & trimmed openings at closet and opening btw kit and addition. No doors. Bath 1 Int C&T Bath 1 Int C&T Bath 1 Int C&T Bath 1 Bath 1 Int C&T Int C&T Bath 1 Bath 1 Int C&T Int C&T Bath 1 Int C&T Bath 1 Bath 1 Insul Insul cost 10.11 GWB - new wall/clg: new GWB per Wall & Ceiling spec. 10.00a. 11.11 Vinyl Floor: New underlayment and sheet vinyl floor this area by GC, complete installing including transition strips. Carpentry contractor is responsible for base shoe. Flush with existing DR oak floor. 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 12.02 Prep & paint new GWB interior surface: per general note 12.00.1.4 12.03 Prep & Paint existing interior trim: per general note 12.00.1.5 Existing KIT window painted to match similar to existing stained trim in adj. rooms. 12.05 Prep & Stain new interior trim: per general note 12.00.1.7 13.01 Kitchen cabinets: LABOR ONLY - Install per kitchen layout and Cabinetry general spec. 13.00. 13.02 Countertop - kitchen: LABOR ONLY - Install per kitchen layout plan. Screw to base cabinet a post formed, plastic laminate counter top. Countertop will come with sink cutout. 13.29 Allowance supplied cabinet(s) this area. Refer to cabinetry layout. Allowance in GC contract. 13.30 p-lam top for cabinets this area under material allowance in GC contract 14.06 Kitchen Sink complete - double: Per general plumbing spec. 14.19 Gas shut-off valve: Install bronze, square head, gas cock valve for fixture. 15.55 Coordinate hvac layout with new kitchen cabinetry and wall layout. Heat supply to be relocated as required to toe kick register. 16.08 Receptacles in kitchen - coordinate relocation of existing, installation of new, and GFI where required with new cabinetry layout. 16.15 Garbage disposal - unit to be 1/2 horsepower with stainless steel chamber under sink and connected to waste line. Switch on wall adjacent to sink. Wiring for disposal unit to be on separate 15-amp circuit. Recep under sink in base cabinet. none 1/2 bath 7.30 General framing: frame for new exterior walls, BA1, closet, and shed roof per plan. Flr joists to be 2x10 w/ 3/4" T&G OSB subfloor. 2x6 rafters. 7.33 Interior door-new: Install new 32" x 6-8" prehung wood door at BA1 per plan. Trim door with 1x4. Lockset to be privacy leverset. 7.42 Trim package this room: 1x4 at doors; 1x6 baseboard with eased edge. 7.44 Base shoe - new: new base shoe at room perimeter 7.47 Window trim: new window trim to have 5/4 stool and apron sim to existing int. window trim. 1x4 casing 7.48 Bathroom accessories per general spec 7.00 7.51 Closet rod: install new 1 1/4" wood closet rod. Bracket support at mid point if longer than 40". 7.53 Closet shelf: 1/2" or 3/4" MDO shelf board w/ eased edge, 1/2" white Melamine, or 1x12 board with eased edge on 1x ledger as req'd., or plastic coated wire system. Install metal support bracket as required or if span is greater than 40". 8.05 Attic Insulation: R30 fiberglass batt at addition. 8.06 Insulation R-13 at new framing - provide insulation at new framing. Fiberglass with vapor barrier stapled to framing OR cellulose with visqueen vapor barrier OR R-13 unfaced with visqueen vapor barrier. R30 FG at floor joists 741 Cottage Grove.xls Page 7 of 15 741 Cottage Grove area trade Bath 1 Ext Carp +Dr&Win Bath 1 Ext Carp +Dr&Win Bath 1 Wall & Clg Bath 1 Floor-vt 9/16/2014 13:03 no. specification 9.06 Exterior door covered under EXT. cost 9.26 New window at BA1 - nail fin new construction type. Vinyl 24x36. Double hung. Color: white 10.11 GWB - new wall/clg: new GWB per Wall & Ceiling spec. 10.00a. 11.03 Sheet vinyl: Install 1/4" underlayment grade plywood (offset joints 8"-12" min), using 7d ring shank or pneumatically driven staples, 6" on center allowing a 1/4" gap at wall. Any irregularities in the surface such as chipped edges, gaps and gouges must be filled with a joint compound approved by the flooring manufacturer. Install 070" thick backed vinyl sheet goods with minimum seams, per manufacturer's recommendations. Caulk edges of vinyl with clear silicone caulk to form positive seal. Install metal edge strip in openings and shoe molding around perimeter. Bath 1 Bath 1 Bath 1 Pnt - Int Pnt - Int Pb 12.02 Prep & paint new GWB interior surface: per general note 12.00.1.4 12.04 Prep & Paint new interior trim: per general note 12.00.1.6 14.07 Bathroom Sink - faucet: Install a faucet per general spec, drain fittings, and shut off valves. 14.08 Bathroom sink - pedestal: Install new pedestal sink per plan. White vitreous china w/ faucet per plumbing fixture spec.. 14.11 Toilet - new per plan : Install 2 piece white vitreous china, 1.29 GPF water saving toilet made by American Standard or SBHF approved equal. Include plastic or pressed wood seat, plastic water supply line, shut-off valve, flap valve and wax seal. Bath 1 Pb Bath 1 Pb Bath 1 Bath 1 Pb HVAC Bath 1 HVAC Bath 1 Elec. Bath 1 Elec. BA2 Bath 2 __________ _____ Bathroom #2 Demo 2.31 Demo - to stud: Remove all fixtures, trim, and wallboard/plaster to framing. Remove floor finish and underlayment. Demo 2.32 Demo - door: remove door slabs and frames complete. Demo - window: remove window and trim complete as shown on plan. Demo 2.33 Demo - wall: remove wall as shown on plan. Relocate or delete any electrical or mechanical systems located within the removed wall. Prior to demolition confirm load bearing status of wall and provide temporary bracing for existing structure as/if required. 14.20 Do not run supply lines to BA1 through crawl space. 15.06 Ductwork - new supply grille this room - wall mounted - routed from basement through new crawl. 15.09 Ceiling fixture - HVAC contractor to provide and install "combo" light/vent fan: install a combination vent fan/light fixture vented to exterior. Include wall cap. Fan to be 70 cfm minimum. Light and fan to be separately switched at adjacent switches. Center unit in ceiling. 16.09 Receptacle-GFI new: Countertop height. Install a flush mounted, ground fault circuit interrupted, almond, duplex, receptacle and almond cover plate. 16.23 Ceiling fixture - "combo" light/vent fan: Wire and switch for HVAC provided vent fan/light fixture vented to exterior. Light and fan to be separately switched at adjacent switches. Center unit in ceiling. upstairs Bath 2 Bath 2 Bath 2 Demo 2.35 Demo - clg plaster: Remove ceiling plaster and lathe. Remove lathe nails and prep for new GWB such that new GWB will lie smooth and flush with existing rafters. Bath 2 Demo Bath 2 Bath 2 Int C&T Int C&T 2.36 Demo - wall plaster: Remove/scrape existing wall plaster from lathe. Remove lathe AND plaster from exterior walls. Remove lathe nails and plaster "crumbs" from walls and around remaining trim such that new GWB will lie smooth and in same plane as original plaster. 7.30 General framing: frame for new interior walls per plan. 7.35 Interior door-new - 2-8x6-8 two panel interior door panel - prehung. Privacy lockset. Bath 2 Int C&T Bath 2 Int C&T Bath 2 Bath 2 Int C&T Int C&T Bath 2 Bath 2 Int C&T Insul 7.39 Subfloor: Contractor is responsible for proper repair/denailing of subfloor to receive new vinyl floor underlayment or leveling compound. 7.42 Trim package this room: 1x6 baseboard with eased edge. Painted. 7.44 Base shoe - new: new base shoe at room perimeter 7.47 Window and door trim: new window trim at new window - 1x4 casing with 5/4x stool and 1x apron - proportionate to exsiting second floor trim. 7.48 Bathroom accessories per general spec 7.00 8.05 Attic Insulation: R21 fiberglass batt between attic joists. (See ATT for add'l insulation at attic floor) 741 Cottage Grove.xls Page 8 of 15 741 Cottage Grove area trade Bath 2 Insul Bath 2 9/16/2014 13:03 no. specification cost 8.08 Insulation R-13 at existing wall - provide insulation at exterior walls where plaster and lathe have been removed. Fiberglass with vapor barrier stapled to framing OR cellulose with visqueen vapor barrier. 9.17 Window - new: Install per plan - new RO such that BA2 window is same size as existing removed double hung. Vinyl window - white. 10.11 GWB - new wall/clg: new GWB per Wall & Ceiling spec. 10.00a. Moisture resistant. 11.11 Vinyl Floor: New underlayment and vinyl floor this area, complete installing including transition strips. Carpentry contractor is responsible for base shoe. 12.02 Prep & paint new GWB interior surface: per general note 12.00.1.4 12.04 Prep & Paint new interior trim: per general note 12.00.1.6 13.04 Vanity & top- bathroom: LABOR ONLY - Install (30") vanity base and (corner) HPL top with integral backsplash. (separate side splash w/ clear silicone sealant) Scribe to wall as required. Bath 2 Bath 2 Ext Carp +Dr&Win Wall & Clg Floor-vt Bath 2 Bath 2 Bath 2 Pnt - Int Pnt - Int Cabinetry Bath 2 Bath 2 Bath 2 Bath 2 Bath 2 Cab SBHF Cab SBHF Cabinetry Pb Pb Bath 2 Pb Bath 2 Pb Bath 2 Bath 2 HVAC HVAC 15.06 Ductwork….route supply to BA2 to new toe-kick grille in vanity base. 15.09 Ceiling fixture - HVAC contractor to provide and install "combo" light/vent fan: install a combination vent fan/light fixture vented to exterior. Include wall cap. Fan to be 70 cfm minimum. Light and fan to be separately switched at adjacent switches. Center unit in ceiling. Bath 2 Elec. Bath 2 Elec. 16.09 Receptacle-GFI new: Countertop height. Install a flush mounted, ground fault circuit interrupted, almond, duplex, receptacle and almond cover plate. 16.23 Ceiling fixture - wire and switch for HVAC provided "combo" light/vent fan: install a combination vent fan/light fixture vented to exterior. Light and fan to be separately switched at adjacent switches. Center unit in ceiling. Bath 2 Elec. STR 1 Stair 1 __________ _____ Stairway Int C&T 7.42 Existing stair skirt, newel, and adjacent trim to remain. Scrape and prep for refinish as required. 7.56 Handrail: new wood handrail per code, stained w/ poly. Int C&T Ext Carp 9.21 Repair windows: All windows this room adjusted and repaired as necessary per general +Dr&Win window specification 9.00a. Special window conditions for this room are: none Pnt - Int 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 Pnt - Int 12.06 Existing stained trim: Fill/putty holes in trim; wipe new coat of stain over all trim this area. Matt sheen poly. Color by SBH. Elec. 16.34 Ceiling fixture - replace surface mount: Install a ceiling mounted, UL approved, 2-bulb light fixture. Verify that existing switch and wiring are in working condition to code. Install/repair/replace if not. Stair 1 Stair 1 Stair 1 Stair 1 Stair 1 cabinet(s) material cost per allowance p-lam top for cabinets per allowance Additional misc.: surf. mounted med. cab. w/ light in BA2 Bathroom sink - drop in type to hpl top. White. Bathroom Sink - faucet: Install a faucet per general spec, drain fittings, and shut off valves. 14.10 Tub surround: Lasco 2 or 3 piece or SBHF approved equal. Order minimum number of pieces needed to allow installation. 14.11 Toilet - (new per plan): Install 2 piece white vitreous china, 1.5 GPF water saving toilet made by American Standard or SBHF approved equal. Include plastic or pressed wood seat, plastic water supply line, shut-off valve, flap valve and wax seal. 13.29 13.30 13.32 14.03 14.07 16.24 Medicine Cabinet: Provide switch & wire for GC provided medicine cabinet with adjacent light (above). Center over sink none STR 2 __________ _____ Back Stair HL __________ _____ Hall - Lower HU HU HU __________ _____ Hall - Upper Demo 2.32 Demo - door: remove door and jamb as shown on plan. Remove all trim. Demo 2.35 Demo - clg plaster: Remove ceiling plaster and lathe. Remove lathe nails and prep for new GWB Int C&T 7.42 Trim package this room: new baseboard, door casing complete. New 1x6 base, 1x4 door casing Insul 8.05 Attic Insulation: R21 fiberglass batt between attic joists. none HU HU 741 Cottage Grove.xls Page 9 of 15 741 Cottage Grove area trade HU Ext Carp +Dr&Win HU Wall & Clg HU Wall & Clg HU Floor-c HU HU HU HU Pnt - Int Pnt - Int HVAC Elec. HU Elec. HU Elec. 9/16/2014 13:03 no. specification cost 9.28 Replacement Window installation: LABOR ONLY - Install SBHF provided units per plan. Provide incidental materials (stops, caulk, etc.) as required. 10.03 Repair existing plaster walls per Wall & Ceiling spec. 10.00b. 10.11 GWB - new clg: new GWB per Wall & Ceiling spec. 10.00a. 11.13 New Carpet & Pad: New carpet and pad this area by SBHF. Complete installation including any transition strips. 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 12.04 Prep & Paint new interior trim: per general note 12.00.1.6 15.06 New central RA. See HVAC general notes. 16.10 Smoke detectors: install UL approved smoke detectors as directed by building code. All smoke detectors to be hardwired to electrical system with battery backup. Detectors to be interconnected. 16.32 Ceiling fixture - new surface mount: Install a ceiling mounted, UL approved, 2-bulb light fixture. J-box and switch. 16.42 3-way switch: ceiling light fixture to be "3 way" with switches located by SBHF. LNDRY __________ _____ Laundry Room LNDRY Demo 2.32 Demo - door: remove door slabs and frames complete. Demo - window: remove window and trim complete as shown on plan. Remove all int. trim. LNDRY Demo 2.35 Demo - clg plaster: Remove ceiling plaster (and lathe if required. Remove lathe nails ) and prep for new GWB such that new GWB will lie smooth LNDRY Int C&T 7.30 General framing: frame for new interior walls per plan. Frame new 2x4 "wet wall" at interior of existing exterior wall. LNDRY Int C&T 7.33 Interior door-new: New door to attic to be insulated fiberglass exterior type with gaskets and threshold. Standard passage leverset. Trim to be 1x4 casing each side. Painted. LNDRY Int C&T 7.42 Trim package this room: new baseboard, window, door casing complete. New 1x6 base, 1x4 door casing, 5/4 stool, 1x apron, 1x4 window casing. LNDRY Int C&T LNDRY Insul LNDRY Insul 7.44 Base shoe - new: new base shoe at room perimeter 8.05 Attic Insulation: R21 fiberglass batt between attic joists. 8.06 Insulation R-13 at new framing - provide insulation at new framing. Fiberglass with vapor barrier stapled to framing OR cellulose with visqueen vapor barrier OR R-13 unfaced with visqueen vapor barrier. 10.03 Repair existing plaster walls (ceiling is new) per Wall & Ceiling spec. 10.00b. 10.11 GWB - new wall/clg: new GWB per Wall & Ceiling spec. 10.00a at new wall framing. LNDRY Wall & Clg LNDRY Wall & Clg LNDRY Floor-vt LNDRY Pnt - Int LNDRY Pnt - Int LNDRY Pb LNDRY Pb LNDRY LNDRY LNDRY LNDRY Pb HVAC HVAC Elec. LNDRY Elec. LNDRY Elec. 2nd lvl 11.11 Vinyl Floor: New underlayment and vinyl floor this area, complete installing including transition strips. Carpentry contractor is responsible for base shoe. (Enter base shoe cost at Carp&Trim line item for this area) 12.02 Prep & paint new GWB interior surface: per general note 12.00.1.4 12.03 Prep & Paint existing interior trim: per general note 12.00.1.5 14.17 Washer/Dryer connection box: Provide hot & cold water supply and shut-offs, drain line, and dryer vent ducted to exterior. 14.18 Washing machine drain pan - at second floor - install a drained washing machine pan. Run 1" drain to basement floor and not to sewer. 14.19 Gas shut-off valve: Install bronze, square head, gas cock valve for fixture. 15.06 vent dryer to exterior wall. Coordinate hood with siding contractor. 15.07 New supply grille to this room - to an interior wall behind door. 16.30 Ceiling fixture - new surface mount: Install (number) ceiling mounted, UL approved, keyless fixture(s). J-box and switch. 16.44 Washer circuit - 20 Amp: install a 110, 20 Amp washer circuit using #12 copper Romex. 16.46 Washer outlet: install duplex outlet for washing machine on a separate 20 Amp circuit using #12 Romex. SW BD1 BD1 BD1 BD1 __________ _____ Bedroom #1 Demo 2.30 Demo - paneling: wall panel removal - remove wall paneling from closet framing. Framing to be reused. Demo 2.32 Demo - door: remove door slabs and frames complete. Demo - window: remove window and trim complete as shown on plan. Remove all int. trim. Demo 2.35 Demo - clg plaster: Remove ceiling plaster and lathe. Remove lathe nails and prep for new GWB such that new GWB will lie smooth and flush with existing rafters. 741 Cottage Grove.xls Page 10 of 15 741 Cottage Grove area trade BD1 Int C&T BD1 Int C&T 9/16/2014 13:03 no. specification 7.30 General framing: frame for new interior walls per plan. 7.34 Closet door - new door panels to match bedroom entry door style. (2) x 24" bi-pass. Recessed pull. All associated bi-pass hardware. Include frame and trim at opening. BD1 Int C&T 7.36 Interior door- new: new 2-panel door slab in new frames. Field verify sizes. New hinges. New lever type lockset. Passage fnx. Color for new hardware to be oil rubbed bronze. Mnfr: Simpson; Lemieux; or approved equal. Door to be undercut to allow return air - coord. with HVAC contrator. BD1 BD1 Int C&T Int C&T BD1 Int C&T BD1 Int C&T BD1 BD1 BD1 BD1 BD1 Insul Ext Carp +Dr&Win Wall & Clg Wall & Clg Floor-c BD1 BD1 BD1 BD1 Pnt - Int Pnt - Int HVAC Elec. BD1 Elec. BD1 BD1 BD1 Elec. Elec. Elec. BD1 Elec. 7.38 Door bumpers/stops: 7.42 Trim package this room: new baseboard, window, door casing complete. New 1x6 base, 1x4 door casing, 5/4 stool, 1x apron, 1x4 window casing. 7.51 Closet rod: install new 1 1/4" wood closet rod. Bracket support at mid point if longer than 40". 7.53 Closet shelf: 1/2" or 3/4" MDO shelf board w/ eased edge, 1/2" white Melamine, or 1x12 board with eased edge on 1x ledger as req'd., or plastic coated wire system. Install metal support bracket as required or if span is greater than 40". 8.05 Attic Insulation: R21 fiberglass batt between attic joists. 9.28 Replacement Window installation: Install vinyl dbl hung units per plan. Provide incidental materials (stops, caulk, etc.) as required. Verify egress compliance. 10.03 Repair existing plaster walls per Wall & Ceiling spec. 10.00b. 10.11 GWB - new clg: new GWB per Wall & Ceiling spec. 10.00a. 11.13 New Carpet & Pad: New carpet and pad this area by SBHF. Complete installation including any transition strips. 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 12.04 Prep & Paint new interior trim: per general note 12.00.1.6 15.07 New supply grille 16.01 All existing elec devices this area Unless Otherwise Noted: inspect, repair, add, or delete all devices this room (1) to code (2) per general spec. 16.00, and (3) as noted below for this area. 16.10 Smoke detectors: install UL approved smoke detectors as directed by building code. All smoke detectors to be hardwired to electrical system with battery backup. Detectors to be interconnected. 16.12 Telephone: telephone jack to be in this room - wall box per plan 16.13 Cable TV: connection to be in this room - wall box per plan 16.32 Ceiling fixture - new surface mount: Install a ceiling mounted, UL approved, 2-bulb light fixture. J-box and switch. 16.36 Closet light & switch: replace existing (wall mount / ceiling) closet light with new SBHF provided globe fixture. (switch / pull chain) BD3 BD3 __________ _____ Bedroom #3 Demo 2.32 Demo - door: remove door slabs and frames complete. Demo - window: remove window and trim complete as shown on plan. Remove all int. trim. Demo 2.35 Demo - clg plaster: Remove ceiling plaster and lathe. Remove lathe nails and prep for new GWB such that new GWB will lie smooth and flush with existing rafters. cost NW BD3 BD3 Int C&T BD3 Int C&T BD3 BD3 Int C&T Int C&T BD3 Int C&T BD3 Int C&T BD3 BD3 Insul Ext Carp +Dr&Win 7.34 Closet door - new 30" pre-hung door panel & frame to match bedroom entry door style. Schlage lever set - passage fnx. Color: ORB. 7.36 Interior new doors: 2 panel door slabs, ptd. New lever locksets and hinges. Passage fnx. Color to be oil rubbed bronze. Mnfr: Simpson; Lemieux; or approved equal. Door to be undercut to allow return air - coord. with HVAC contrator. 7.38 Door bumpers/stops: 7.42 Trim package this room: new baseboard, window, door casing complete. New 1x6 base, 1x4 door casing, 5/4 stool, 1x apron, 1x4 window casing. 7.51 Closet rod: install new 1 1/4" wood closet rod. Bracket support at mid point if longer than 40". 7.53 Closet shelf: 1/2" or 3/4" MDO shelf board w/ eased edge, 1/2" white Melamine, or 1x12 board with eased edge on 1x ledger as req'd., or plastic coated wire system. Install metal support bracket as required or if span is greater than 40". 8.05 Attic Insulation: R21 fiberglass batt between attic joists. 9.28 Replacement Window installation: Install vinyl dbl hung units per plan. Provide incidental materials (stops, caulk, etc.) as required. Verify egress compliance. 741 Cottage Grove.xls Page 11 of 15 9/16/2014 13:03 specification cost Repair existing plaster walls per Wall & Ceiling spec. 10.00b. GWB - overlay: (clg - VERY light texture or smooth finish) New Carpet & Pad: New carpet and pad this area by SBHF. Complete installation including any transition strips. Prep & paint existing/patched interior surface: per general note 12.00.1.3 Prep & Paint new interior trim: per general note 12.00.1.6 All existing elec devices this area Unless Otherwise Noted: inspect, repair, add, or delete all devices this room (1) to code (2) per general spec. 16.00, and (3) as noted below for this area. Smoke detectors: install UL approved smoke detectors as directed by building code. All smoke detectors to be hardwired to electrical system with battery backup. Detectors to be interconnected. Telephone: telephone jack to be in this room - wall box per plan Cable TV: connection to be in this room - wall box per plan Closet light & switch: replace existing (wall mount / ceiling) closet light with new SBHF provided globe fixture. (switch / pull chain) none Bedroom #4 SE Bedroom #2 Demo - door: remove door slabs and frames complete. Demo - window: remove window and trim complete as shown on plan. Remove all int. trim. Demo - clg plaster: Remove ceiling plaster (and lathe if required. Remove lathe nails ) and prep for new GWB such that new GWB will lie smooth and flush with existing rafters. 741 Cottage Grove area trade BD3 Wall & Clg BD3 Wall & Clg BD3 Floor-c no. 10.03 10.13 11.13 BD3 BD3 BD3 Pnt - Int Pnt - Int Elec. 12.01 12.04 16.01 BD3 Elec. 16.10 BD3 BD3 BD3 Elec. Elec. Elec. 16.12 16.13 16.36 BD4 __________ _____ BD2 BD2 __________ _____ Demo 2.32 BD2 Demo 2.35 BD2 Int C&T BD2 Int C&T 7.34 Closet door - new 30" prehung door panel & frame to match bedroom entry door style. Schlage lever set - passage fnx. Color: ORB. 7.36 Interior door: new 2-panel door slab in new frames. Field verify sizes. New hinges. New lever type lockset. Passage fnx. Color for new hardware to be oil rubbed bronze. Mnfr: Simpson; Lemieux; or approved equal. Door to be undercut to allow return air - coord. with HVAC contrator. BD2 BD2 Int C&T Int C&T 7.38 Door bumpers/stops: 7.42 Trim package this room: new baseboard, window, door casing complete. New 1x6 base, 1x4 door casing, 5/4 stool, 1x apron, 1x4 window casing. BD2 Int C&T BD2 Int C&T BD2 BD2 BD2 BD2 BD2 Insul Ext Carp +Dr&Win Wall & Clg Wall & Clg Floor-c BD2 BD2 BD2 Pnt - Int Pnt - Int Elec. BD2 Elec. BD2 BD2 BD2 Elec. Elec. Elec. 7.51 Closet rod: install new 1 1/4" wood closet rod. Bracket support at mid point if longer than 40". 7.53 Closet shelf: 1/2" or 3/4" MDO shelf board w/ eased edge, 1/2" white Melamine, or 1x12 board with eased edge on 1x ledger as req'd., or plastic coated wire system. Install metal support bracket as required or if span is greater than 40". 8.05 Attic Insulation: R21 fiberglass batt between attic joists. 9.28 Replacement Window installation: Install vinyl dbl hung units per plan. Provide incidental materials (stops, caulk, etc.) as required. Verify egress compliance. 10.03 Repair existing plaster walls per Wall & Ceiling spec. 10.00b. 10.11 GWB - new clg: new GWB per Wall & Ceiling spec. 10.00a. 11.13 New Carpet & Pad: New carpet and pad this area by SBHF. Complete installation including any transition strips. 12.01 Prep & paint existing/patched interior surface: per general note 12.00.1.3 12.04 Prep & Paint new interior trim: per general note 12.00.1.6 16.01 All existing elec devices this area Unless Otherwise Noted: inspect, repair, add, or delete all devices this room (1) to code (2) per general spec. 16.00, and (3) as noted below for this area. 16.10 Smoke detectors: install UL approved smoke detectors as directed by building code. All smoke detectors to be hardwired to electrical system with battery backup. Detectors to be interconnected. 16.12 Telephone: telephone jack to be in this room - wall box per plan 16.13 Cable TV: connection to be in this room - wall box per plan 16.36 Closet light & switch: replace existing (wall mount / ceiling) closet light with new SBHF provided globe fixture. (switch / pull chain) ATT ATT __________ _____ Attic & Attic steps 7.05 Window trim - new window: new nail fin vinyl window at two attic gables. Int C&T 741 Cottage Grove.xls Page 12 of 15 741 Cottage Grove area trade ATT Insul 9/16/2014 13:03 no. specification 8.05 Attic Insulation: new R21 fg batt insul. at ceiling joist cavities from below. Install 2" of closed cell rigid foam over entire attic floor. Cover with 7/16" OSB decking with 3" screws to existing attic floor boards. Carefully notch foam at perimeter rafters. ATT 9.28 Replacement Window installation: Install vinyl attic window units sim to existing original design. Provide incidental materials (stops, caulk, etc.) as required. Verify egress 12.03 Prep & Paint existing interior trim: per general note 12.00.1.5 Paint steps and trim and all previously painted stair parts/rails. 16.34 Ceiling fixture - replace surface mount: Install a ceiling mounted, UL approved, keyless base. Verify that existing switch and wiring are in working condition to code. Install/repair/replace if not. ATT Ext Carp +Dr&Win Pnt - Int ATT Elec. BSMT BSMT BSMT __________ _____ Basement & Basement stairs Demo 2.32 Demo - door: remove exterior door and jamb as shown on plan. Prep for new fiberglass door. Demo 2.50 Remove contents: Remove household contents from this area to dumpster or appropriate hazardous waste facility. Ext Carp 9.34 Basement windows: per Spec. 9.00c - Install (2) intergrated glass block w/ vent, into +Dr&Win existing openings. Repair/ replace any framing, sill, or stops as needed. Ext Carp 9.36 removable plywood panel for crawl access opening. +Dr&Win Floor-p 11.16 Paint steps: paint basement steps and landing from first floor down to basement level. BSMT BSMT Floor-p Pnt - Int BSMT Pb BSMT Pb BSMT Pb BSMT Pb BSMT Pb BSMT HVAC BSMT HVAC BSMT Elec. BSMT Elec. BSMT Elec. BSMT Elec. GAR __________ _____ Garage Ext Ext __________ _____ Exterior Demo 2.03 Chimney: remove chimney cap, masonry, and flue liner complete to basement floor level. Ext Demo Ext Demo Ext Demo BSMT BSMT BSMT cost 11.18 Pressure wash basement floor - prep for paint. 12.09 Paint basement floor: After pressure washing, paint basement concrete floor with oil based floor/deck paint. 14.01 Demo - hot water heater: remove hot water heater. Prep for replacement heater as necessary. 14.02 Demo - laundry: remove utility lines, vent lines, & waste lines to nearest junction. Remove associated hardware (interior & exterior) if necessary. 14.12 Hot water heater - new: 40 gallon - hi-eff pwr vent gas to sidewall. Per general plumbing spec. 14.19 Gas lines: Install gas pipe & bronze, square head, gas cock valve for the following fixtures; furnace, water-heater, dryer, stove. 14.21 Sill cocks - exterior: Replace existing or install new as required - (2) new frost-free sill cocks, (1) each at front and rear of house. 15.03 Furnace - new: Remove existing furnace and Install new gas hi-eff furnace. PVC vent. Size to be determined by HVAC contractor. 15.04 Air conditioning - new: Install a central A/C system with minimum SEER of 13.0 including condensing unit, 'A' type coil, control & power wiring, insulated refrigerant lines, exterior pad and connections. Tons to be determined by Contractor. Set unit on new rear porch roof. Lineset to be run interior. Size system to be capable of 68F (at ground floor) interior temperature when exterior is 100F. 16.02 Demo - panel: remove existing electrical breaker panel box and or subpanels as required. 16.04 Panel - new: install new 200A panel AT west side of bsmt as close as possible to elec. meter. 16.10 Smoke detectors: install UL approved smoke detectors as directed by building code. All smoke detectors to be hardwired to electrical system with battery backup. Detectors to be interconnected. 16.11 Doorbell system: install a doorbell system containing a low voltage transformer, power connection, and buzzer at front door and rear door. Chime to be located in LR none 2.04 Demolish for new kitchen door opening in exterior wall as indicated on plan. Remove west kitchen window. 2.05 Remove all vinyl siding, alum soffit, fascia, and any original trim back to original sheathing. Remove metal columns and balustrade from front porch. 2.09 Remove existing siding complete. Remove all trim; bed mold, freeze, corners, doors & windows complete. 741 Cottage Grove.xls Page 13 of 15 741 Cottage Grove area trade Ext Demo 9/16/2014 13:03 no. specification cost 2.10 Rear Porch: remove roof, walls, and foundation complete. Remove concrete flatwork and steps from around rear porch. 2.14 Demo roof to decking. 4.06 Stoops & sidewalks: form, pour & install new front walk, front & rear steps w/ stoop. Pour new 4" walkways including city sidewalk and 30" wide walkway at curb. Two steps down at grade change at city sidewalk. 4.08 Foundation: Excavate crawl space & footing per plan for new BA1 & mud room. Pour 8x16 footing, build split-face block foundation, install 2" rigid insulation interior of crawl. Backfill to grade. Cut existing fndn to allow crawl access. 4.09 Steel handrail at new rear stoop. SBH recommends John Martin at john@swweldingllc.com. John Martin the Owner of Southwest Welding, Machine Shop in 25389 State Road 119, Goshen, Indiana 46526. 574-862-4453. 4.12 Repair deteriorated brick at house foundation. Parge entire foundation and new east addition with tinted cementitious coating. Dark grey. DO NOT parge front porch piers!! Excavate min. 4" below finish grade and parge to below finish grade. Ext Ext Demo Concrete & Masonry Ext Concrete & Masonry Ext Concrete & Masonry Ext Concrete & Masonry Ext Roof 5.04 Roof - tear off at main and front porch down to original skip sheathing or plywood - repair decking as required. New OSB sheating complete if base is skip sheathing. New shingles to be 30 year architectural over 30 lb felt paper. Ice & water shield at valleys & roof eaves. Roofing contractor to use tarps during tear-off to facilitate complete debris removal from yard. Ext Siding Ext Siding 6.02 Soffit - alum : new alum. soffit and fascia. New front porch ceiling to be beaded plywood - stained 6.05 All existing lap siding to be removed to original sheathing. Check with SBH if any original trim looks salvagable, otherwise remove all. New Tyvek Housewrap (no other is acceptable) on exterior sheathing. Lap to shed water. Secure with Nail-cap fasteners. All Tyvek joints to be taped with Tyvek seam tape. All second floor windows are new nail fin type. Original first floor windows are to remain u.o.n. New windows at second floor per plan. Ext Ext Int C&T Ext Carp +Dr&Win Ext Ext Carp +Dr&Win New siding to be smooth Hardi-plank siding with 4” reveal. Prefinished with SBH custom color. New corner trim to be 5/4 x 5” exposed. 5/4 Corner trim to be smooth Smartside Trim or SBH approved equal. 5/4x6 frieze board below soffit. plywd soffit; Fascia may be aluminum. New window and exterior door casing to be 5/4 smooth Smartside Trim or SBH approved equal. Door and window sides to be 5/4 x 4. Window and door head trim to be 5/4x6. Window head trim to receive Fypon AZM-80 4.25” cove molding with mitered returns and tapered drip cap over. Flash over top of drip cap with alum break metal. Window sills to be Azek cellular PVC historical sill AZM6930. This may be a long lead time item. Porch posts, pilasters, and newels to be cellular PVC. Painted to match house trim. 7.10 Mailbox - install (1) new metal USPS approved mailbox(es) - at main entry door 9.06 Rear door : Prehung door: Install a rear prehung 1/2 lite fiberglass entrance door and jamb including 1x4 interior and 5/4x4 exterior casing, and one keyed leverset and one mortised single cylinder deadbolt keyed alike. See painting spec. for finish. Side door: Custom sized (height) Prehung door: Install a prehung flush-panel fiberglass entrance door and jamb including 1x4 interior and 5/4x4 exterior casing, and one keyed leverset and one mortised single cylinder deadbolt keyed alike. See painting spec. for finish. Front entry door: rebuild and repair original door as required. New lockset provided by contractor. Lockset to be Schlage "Addison" style one side keyed handleset with flair lever #F60 ADD 716 FLA 9.08 Porch balustrade - remove existing front porch balustrade and stair rail. New balustrade rails between brick piers and 2x2 @ 5” OC pine balusters. Top of balustrade is cedar 2x4 screwed to 2x3. Chamfer top of the 2x4. Route channel on bottom side of 2x3 to receive balusters. Invert this assembly for use as bottom rail and omit routed channel. Overall balustrade height to be 30” from deck elevation except as required to meet code at stairs. Coordinate all exterior trim, HVAC wall caps, electrical fixtures, etc. as required. 741 Cottage Grove.xls Page 14 of 15 741 Cottage Grove area trade Ext Ext Carp +Dr&Win 9/16/2014 13:03 no. specification cost 9.25 Window - vinyl replacement at second floor and attic: Remove existing second floor windows and replace with vinyl replacement windows per below schedule. Glass to be thermal pane. Refer to plan for three windows added to floor plan that that may have existing (covered over) ROs. Vinyl window color to be white. At first floor rebuild existing windows. Oval window at stair landing to be rebuilt. New glazing compound, ropes, and hardware as required. First floor windows to be refinished with stain and matte poly. Ext 9.27 Provide and install (3) new 6" diameter tapered fiberglass porch columns with cap and base. Set below original porch beam. Secure to existing construction. 9.32 Storm window: provide and install dbl track alum storm windows to first floor and stair landing window. Color to be white. 9.34 Basement windows: Replace existing basement windows with glass block. Ext Ext Ext Carp +Dr&Win D&W SBHF Ext Ext Carp +Dr&Win Ext Carp +Dr&Win Pnt - Ext Ext Ext Ext Ext Ext Elec. Elec. Elec. Elec. Elec. Site Site Site __________ _____ Sitework (non landscaping) LS 3.03 Remove all overgrown scrub trees and trim original shrubs back to 3' height. LS 3.05 Provide 4" drain leader at each downspout. Each to be min. 4' long and attached to downspout. LS 3.06 Provide concrete flatwork as shown on plan.- new front walk and step down to city sidewalk; new rear stoop and steps; new city sidewalk full width of property. Existing front steps and walkway around north side of property may remain. Ext Site Site LS Site LS Site LS 9.36 Replace entire front porch deck with new t&g 1x4 AZEK "Porch" deck boards. Color to be "Morado". Install with screws. Product is $3.50/lf at K-Wood Products. 12.50 Exterior painting (with replacement windows) : per general painting spec 12.00-3. This line item to include siding / trim / columns / balustrade(s) / Paint sill and trim around replacement windows. Do not paint new windows. 16.63 16.64 16.65 16.66 16.66 Porch light - frpnt - ceiling - install at porch ceiling centered on front stair. Porch light - rear carriage Flood light mounted on building - rear elevation at upper soffit Exterior recep in weatherproof box per code - front and rear porches (1) DoorBell at front door - low voltage chime in LR 3.07 Additional misc.: remove existing garage and concrete foundation complete. Remove any accessory concrete walks and driveways to the structure. 3.08 Additional misc.: remove cistern lid and ring to 12 below grade. Infill with sand. Topsoil and seed. 3.09 Remove all concrete flatwork from site except for walkways shown to remain on plan. Remove flatwork from rear yard near alley. none KitPorch__________ _____ Kit Porch _______ __________ _____ Total_______________________________________________________________ Total 20.00 Total 21.00 Total this unit: (provide separate INTERIOR & EXTERIOR proposals on bid forms) 21.00 22.00 23.00 741 Cottage Grove.xls $_______ Page 15 of 15