Water Tower Place Tenant Criteria Manual Architectural 835 North Michigan Chicago, IL 60611 September 2008 TABLE OF CONTENTS INTRODUCTION ARCHITECTURAL DESIGN CRITERIA Building Description ........................................1 Architectural Drawing Requirements ............13 Tenant Design Criteria Introduction ................2 Landlord Supplied Architectural Items ..........14 Directory..........................................................3 General Design Criteria ................................17 Location Map ..................................................4 Structure........................................................21 PLANS Lighting..........................................................22 Ground & Mezzanine Floor Plans...................5 Storefront Design Criteria .............................24 Second & Third Floor Plans............................6 Display Zone .................................................28 Fourth and Fifth Floor Plans ...........................7 DIAGRAMS Sixth & Seventh Floor Plans ...........................8 Store Design Plan Diagram ..........................30 TENANT SUBMISSIONS & PERMIT REQUIREMENTS Storefront Criteria..........................................31 Design Submissions .......................................9 Building Code Information ............................11 Required Permits & Inspections ...................12 Storefront Section .........................................32 Storefront Section at Well .............................33 Storefront Detail Section ...............................34 Storefront Reflected Ceiling Plan..................35 Typical Neutral Pier Detail ............................36 Neutral Pier Detail at Existing Store .............37 Neutral Pier Detail at a Corner......................38 Neutral Pier Detail at Corridor.......................39 Typical Neutral Pier Elevations.....................40 Typical Neutral Pier Elevations.....................41 Tenant Storefront at Mall Column.................42 Typical Tenant Demising Wall ......................43 Tenant Service Corridor Door .......................44 Construction Barricade .................................45 SIGNAGE DESIGN CRITERIA Signage Submittal Requirements .................46 Tenant Signage.............................................47 Blade Sign Elevation.....................................51 Blade Sign Detail ..........................................52 Water Tower Place i TABLE OF CONTENTS MECHANICAL DESIGN CRITERIA CONSTRUCTION REQUIREMENTS HVAC Drawing Requirements ......................53 Preconstruction Meeting .................................. 90 Tenant Work .................................................54 Site Access ...................................................... 91 Tenant VAV Box Detail .................................57 General Contractor Requirements................... 93 ELECTRICAL DESIGN CRITERIA INSURANCE.................................................... 95 Electrical Drawing Requirements..................58 LANDLORD PUNCH LIST .............................. 96 Electrical Construction Requirements...........59 Electrical Service Diagram............................61 Emergency Lighting Diagram .......................62 PLUMBING DESIGN CRITERIA Plumbing Drawing Requirements .................63 Public and Employee Toilets ........................63 Work by Tenant.............................................64 Floor Penetration Details ..............................67 Plumbing Riser Diagram ...............................68 Water Meter Diagram....................................69 Dishwasher Moisture Eliminator ...................70 FIRE PROTECTION DESIGN CRITERIA Sprinkler System Design Criteria..................71 Sprinkler Drawing Requirements ..................73 Building Fire Riser Diagram..........................76 Equivalent Lengths .......................................77 Tenant Sprinkler Water Supply Data ............80 Tenant Sprinkler Efficiency/ GPM Supply Curve ............................................................83 Tenant Sprinkler Pressure/ GPM Supply Curve ............................................................84 Tenant Sprinkler Riser Diagram 1 ................85 Tenant Sprinkler Riser Diagram 2 ................86 Tenant Sprinkler Riser Diagram 3 ................87 Sprinkler Riser Number for Tenant Spaces..88 FIRE ALARM DESIGN CRITERIA Existing Fire Alarm System...........................89 Emergency Message System .......................89 Future Alarm System ....................................89 Water Tower Place ii INTRODUCTION Building Description Water Tower Place is a mixed-use, cast-in-place concrete mega-structure built in 1975. It combines eight floors of retail shopping, an office floor, the Drury Lane Theatre, The Ritz-Carlton Hotel and some of Chicago’s premier residential condominiums. Located diagonally across Michigan Avenue from Chicago’s Historic Water Tower, Water Tower Place is the best-known shopping destination in the metropolitan area. It is the intent of these criteria to permit a wide range of design opportunities, to encourage excitement in the retail environment and to maintain the high standards of retail design and construction that have been a hallmark of Water Tower Place. The building includes a diverse mix of Tenants that combine an entertainment factor as part of their overall appeal. Minimum restraints are imposed on the Tenant’s creativity and imagination. However, the Landlord reserves the right to reject any Tenant design proposals in part or in whole if it is determined that they would not contribute to the design quality of Water Tower Place Vision of the Design Team Exciting and unique storefronts and merchandising designs create a shopping and entertaining environment that attracts customers and results in increased sales. Tenants are encouraged to create innovative and dramatic storefronts, shop interiors and graphics. Classic interior materials of marble, chrome and brass create an ideal, neutral palate for great store design. Water Tower Place 1 INTRODUCTION Tenant Design Criteria Manual Introduction The requirements of this Manual are referenced and included in Tenant leases, and has been prepared to guide you, as well as your architect, store designer, and contractor in guiding the expediting the design and construction of your lease premises. This information describes the Landlord’s obligations, the Tenant’s design responsibilities, and the Contractor’s requirements. General Design Criteria pertaining to storefront design, materials, colors, signage, interiors and lighting must be addressed by all Tenants. In addition, stores must adhere to specific criteria which are determined by their location and their specific architectural context. In this way, each store will be reviewed on an individual basis in context to ensure diverse and creative design solutions. Through the criteria in this Manual, the Landlord has set certain quality and design standards, which will help the Tenants to create stores that are compatible with the overall design quality of Water Tower Place. The General Growth encourages designs that shall add richness to the built environment. Nationally or regionally recognized merchants may creatively interpret these criteria as it applies to their prototype design. The Tenant Print Package (“Print Package”) consists of: x Tenant Design Criteria Manual x Exhibits A, A-1, B or Lease Outline Drawing (L.O.D.) x Record drawings of the previous Tenant build-out (if available) The lease agreement requires that all Tenant plans be prepared by an architect and engineer(s) licensed by the State of Illinois. Tenants are encouraged to retain an architect familiar with the City of Chicago’s Self Certification Process. Contact the Tenant Coordinator for information for contacts of firms that can offer this service. Note: This Manual is also available on General Growth’s web site at www.ggp.com Water Tower Place 2 INTRODUCTION Directory Water Tower Place 835 North Michigan Avenue Chicago, Illinois 60611-2218 Landlord General Growth Properties, Inc. 110 North Wacker Drive Chicago, IL 60606-1511 (312) 960-5000 www.ggp.com Operations Manager General Growth Properties, Inc. Suite 987W 845 North Michigan Avenue Chicago, IL 60611-2218 (312) 440-3580 (312) 440-1259 Fax www.shopwatertower.com Tenant Coordination General Growth Properties, Inc. 110 North Wacker Drive Chicago, IL 60606-1511 (312) 960-5000 (312) 960-5064 Fax Building Engineer Johnson Controls, Inc. 845 North Michigan Avenue Chicago, IL 60611-2218 (312) 440-3590 (312) 440-1980 Fax Building Security (312) 440-3594 Building Dock Manager (312) 440-3160 Building Permits City of Chicago Department of Buildings 9th Floor 121 North LaSalle Street Chicago, IL 60602 (312) 744-3449 www.cityofchicago.org Health Department City of Chicago Department of Public Health Food Protection Division 2133 West Lexington Chicago, IL 60612 (312) 747-3663 (312) 746-8099 Fax www.cityofchicago.org Construction Inspections City of Chicago Department of Buildings 120 North Racine Chicago, IL 60607 (312) 743-3600 42nd Ward Alderman Brendan Reilly Suite 212 311 West Superior Chicago, IL 60610 (312) 642-4242 www.reillyforchicago.com Electric Utility ComEd Customer Care Center P.O. Box 805379 Chicago, IL 60680-5379 866-639-3532 Gas Utility Peoples Gas 130 East Randolph Drive Chicago, IL 60601 (866) 556 - 6001 Building Telephone Service AT&T 219 South Dearborn Chicago, IL 60604 (312) 786-0794 www.att.com Water Tower Place 3 INTRODUCTION Location Plan Water Tower Place 4 INTRODUCTION Ground Floor & Mezzanine Plans Water Tower Place 5 INTRODUCTION Second and Third Floor Plans Water Tower Place 6 INTRODUCTION Fourth and Fifth Floor Plans Water Tower Place 7 INTRODUCTION Sixth and Seventh Floor Plans Water Tower Place 8 TENANT DESIGN SUBMISSION AND BUILDING PERMIT REQUIREMENTS Design Submissions Prior to starting construction, the Tenant shall prepare and submit a preliminary design package (2 sets) and subsequently a final submission package (3 sets) for review and approval. Submissions are to be made to General Growth Tenant Coordination. Preliminary Design Submission The preliminary design submission should communicate the design intent to the Tenant Coordinator. Drawings submitted shall include a comprehensive floor plan, ceiling plan, storefront elevations, interior elevations and necessary wall sections. Color renderings, representative photos and material sample boards should be prepared. Documents in compliance with the Tenant Design Criteria will have the best opportunity for a prompt review and approval returned to the Tenant. Final Submission The final submission shall consist of complete project construction drawings and specifications. Reference the Architectural and Engineering Design Criteria for drawing requirements. Final Design Approval Landlord, upon final review and approval of the final submission, shall forward to the Tenant (1) one copy of the documents with the Landlord’s comments and conditions of approval in paper or digital format. Tenant’s contractor shall have one (1) Landlord-approved set at the job site at all times and may not commence work until said approved plans are physically within the demised premises. Code Requirements It is the Tenant’s responsibility to ensure compliance with all relevant codes, obtain all approvals, acquire all permits, and pay all fees in connection therewith. Landlord’s review of Tenant submittals does not signify review and/or approval of the submittals for code compliance. It is the Tenant and/or Tenant’s architect who shall be solely responsible for compliance with applicable code requirements. Additional Submittals x Fire Protection Submittals Reference the Fire Protection Design Criteria for sprinkler shop drawing requirements. The sprinkler contractor is required to submit sprinkler shop drawings to the Operations Manager and to the Landlord’s insurance underwriter for review and approval. Drawings and hydraulic calculations must be sealed and signed by a registered fire protection engineer from the State of Illinois. x HVAC Submittals Reference the HVAC Design Criteria for testing & balancing and exhaust submittals. x Signage Submittals Reference the Signage Design Criteria for sign submittals for signage shop drawings and Blade sign artwork. Water Tower Place 9 TENANT DESIGN SUBMISSION AND BUILDING PERMIT REQUIREMENTS Construction barricade graphics must be submitted to the Operations Manager for approval prior to application. All Tenant improvements are subject to the Landlord’s approval and shall conform to all design criteria and lease agreement. No deviation from the approved drawings will be permitted. Any deviation shall be resubmitted for Landlord approval. Tenants should discuss specific thoughts about their design concept and raise any questions about these criteria with the Landlord’s Tenant Coordinator before beginning preliminary design work. Any requested deviations from the Tenant Design Criteria must be approved by the Landlord’s Tenant Coordinator. Each Tenant is required to retain an architect registered in Illinois to prepare design and construction documents. It is imperative that all the requirements outlined above be strictly adhered to by the Tenant and Tenant’s architect. Failure to do so will only result in unnecessary and costly delays in the approval of drawings. Design Submissions are to be sent to: General Growth Properties, Inc. Attn: Water Tower Place Tenant Coordination 110 North Wacker Drive Chicago, IL 60606 Information to be included: Store Name & Space No. Tenant Name and Contact Information (Mailing address, telephone, fax and email) Architect and Contact Information Water Tower Place 10 TENANT DESIGN SUBMISSION AND BUILDING PERMIT REQUIREMENTS Building Code Information It is the sole responsibility of the Tenant’s architect, engineer(s) and general contractor to comply with all applicable federal, state, and local codes and ordinances for their occupancy type. Height - 74 Story Mixed Use • • • • • 8 story Retail with Mezzanine 1 story Office 20 story Hotel 40 story Condominiums 5 story Mechanical Gross Building Area - Retail Ground Floor MezzanineFloor 2Floor 3 Floor 4 Floor 5Floor 6 Floor 7 Floor 8 ` Total Type of Construction • 87,754 square feet 68,994 square feet 110,179 square feet 111,076 square feet 111,238 square feet 110,299 square feet 111,242 square feet 111,105 square feet 113,772 square feet 935,659 square feet Type 1A, Fire Resistive, Fully Sprinklered Primary Occupancy Classification • Mercantile - Group F Required Occupancy Separation / Tenant Separation • Mercantile to Assembly - 2 hour • Tenant to Tenant / Tenant to Corridor - 2 hour Applicable Codes: • Current City of Chicago Building Code (Issued Annually), including Energy Conservation Ordinance • Current Chicago Zoning Ordinance (Issued Annually) • 1997 Illinois Accessibility Code • 2005 Illinois Plumbing Code • Illinois Energy Conservation Code (IBC 2006) • 2000 National Fire Protection Association (NFPA 1) • 2006 Life Safety Code Water Tower Place 11 TENANT DESIGN SUBMISSION AND BUILDING PERMIT REQUIREMENTS Required Permits & Inspections A building permit issued by the City of Chicago must be presented to the Operations Manager prior to work start. It is the responsibility of the Tenant to obtain required approvals from the City of Chicago and to pay for and secure all applicable permits. City website: www.cityofchicago.org. City of Chicago Self Certification Permit Process The City of Chicago Department of Buildings (DOB) has established a program to expedite the permitting process for “Tenant Improvement Projects”. The majority of retailers can benefit from the program. Major features and requirements of the Self Certification Program are: • Project must meet DOB Self Certification eligibility requirements. • Owner/Tenant, design professionals and the general contractor certify that the Project meets applicable codes and so only a cursory review of the documents is performed. • Design professionals must be certified by DOB for the Commercial Self Certification Program. A list of certified architects is available on the City website. • Permit application information must be entered online. • Application information includes the General Contractor and all major sub-contractors; all must be licensed to perform work in the City of Chicago. • The request for a permit Intake Appointment is submitted via fax. The meeting date is usually within two to four weeks after the application is received. • Zoning review and approval is required before the Intake Appointment. • Written aldermanic acknowledgement is required for the issuance of a permit without a mandatory ten business day review period after the Intake Appointment. • Upon submission of the permit application and all required documents, a permit is usually issued within one (1) week. Chicago Energy Conservation Code Compliance with the City of Chicago Energy Conservation Code is mandatory. Plans submitted for permit must include a compliance statement by a City of Chicago Registered Energy Professional. • The Chicago Energy Conservation Code (Chapter 18-13) is published as a part of the twovolume Chicago Building Code. • The code and a list of Registered Energy Professionals are available at the City website at www.cityofchicago.org at the Department of Construction and Permits. Other Permits The City of Chicago requires sign permits for signs visible to the public. These must be obtained through a City-licensed Sign Contractor. Note that documents for all Tenant store signage must be submitted to the Landlord for review; approval must be issued prior to sign installation. Construction Inspections It is the responsibility of the Tenant’s general contractor to arrange all field inspections required by the City of Chicago Department of Buildings. Final inspections and the issuance of an Occupancy Certificate are required for projects exceeding $400,000 in construction cost. Water Tower Place 12 ARCHITECTURAL DESIGN CRITERIA Architectural Drawing Requirements The following is a list of design information required to expedite plan approval by the Landlord. We urge you to read this Manual in its entirety in order to fully understand the requirements needed to generate an acceptable set of construction documents. Lease Outline Document Landlord will provide Tenant with a Lease Outline Document (LOD) or Lease Exhibits. The Tenant is responsible to field verify the dimensions of the space and other existing conditions prior to starting construction documents. Contact the Operations Manager to gain access to the space. Drawing and Specification Submission Requirements Tenant’s working drawings and specifications shall be prepared in strict compliance with these design criteria. Drawings and specifications shall be submitted to Landlord for approval in the form of three (3) sets of prints and specifications. Working drawings and specifications shall include, but not be limited to the following: Note that scales indicated are minimums. x Key plan showing location of the premises. x Floor plan at 1/8 = 1’-0. x Furnishings, fixtures and equipment plan at 1/8 = 1’-0. x Floor finishes plan at 1/8 = 1’-0. x Reflected ceiling plan at 1/8 = 1’-0. x Overall sections at 1/4 = 1’-0. x Plan, elevations, and section of storefront at 1/4 = 1’-0. x Interior elevations at 1/4 = 1’-0. x Full sections of types of partitions used at 1-1/2 = 1’-0. x Descriptive drawings of store display fixtures. x Details of storefront at 1-1/2 = 1’-0. x Door schedule with jamb details at 1-1/2 = 1’-0. x HVAC, electrical, sprinkler, and plumbing plans at 1/8= 1’-0. x Mechanical details at 1-1/2 = 1’-0. x Lighting plan at 1/8 = 1’-0. x Emergency & exit lighting plan at 1/8 = 1’-0 (required for DCAP permit review). x Electrical details, fixture schedules, and one-line electrical load tabulations. x Structural plans (if required) at 1/8 = 1’-0. x Load tabulations and calculation if structural work is included. x Specifications covering all of Tenant’s work, including, but not limited to, architectural, HVAC, electrical, plumbing, fire protection; and other plans and specifications as may be required by the local fire and building authorities or other governing bodies. Water Tower Place 13 ARCHITECTURAL DESIGN CRITERIA Landlord Required Notes The following notes must appear on the cover sheet of all Tenant final construction documents: • The Tenant’s general contractor must conduct a pre-construction meeting with the General Growth Properties, Inc. Operations Manager prior to work start. • The Tenant’s contractor shall perform first-class workmanship. Acceptance of workmanship is contingent upon Landlord approval. • The Tenant’s contractor will repaint and/or repair Landlord’s property (bulkhead, neutral piers, rear corridor, etc.) damaged during Tenant improvement. • All materials used in the construction of Tenant space must be asbestos free. • Supports for Tenant construction must not be connected to any of the Landlord’s electrical, plumbing, fire protection piping or mechanical equipment. • Any penetration or modifications to structural concrete deck must be coordinated and approved by the General Growth Properties, Inc. Operations Manager prior to performing work. • All slab penetrations must be sleeved, sealed liquid tight and firestopped. • No trenching of structural slabs (i.e. for electrical conduit, etc.) is allowed. • Waterproof membrane water tested to be performed; approval of the test by the Operations Manager or Building Engineer is required. • Tenant storefront must be self-supported. Storefront cannot be suspended from the building structure. • Demising partitions must be of 2-hour fire-rated construction, taped and sealed airtight to deck above. • The ceiling systems are to be constructed using materials with class “A” Fire Rating, but only require fire rating as an assembly in exit corridors and any other locations required by code. • Access panels in ceilings must be located to provide access to Landlord’s mechanical equipment as determined by the Building Engineer. • All reused material and equipment must be refurbished to “like new” condition. • Sign contractor to supply an insurance certificate to the Operations Manager prior to sign installation. • All electrical devices and conduit systems above the finish ceiling are to be Chicago plenum rated. • Only emergency lighting and exit lights are to be connected to the Landlord emergency power system. No battery-powered emergency lighting is allowed. • The Tenant must submit four (4) copies of sprinkler contractor’s shop drawings for approval by Landlord’s risk consultant for approval or Tenant may not be allowed to open. Water Tower Place 14 ARCHITECTURAL DESIGN CRITERIA Landlord Supplied Architectural Items Walls x Demising Walls New partitions dividing the premises from adjacent Tenant spaces may be installed by the Landlord; these will consist of 3-5/8” metal stud framing and shall run from floor to underside of deck above as shown on the Lease Outline Drawing. The wall type, typical spacing and dimensions will be such as to provide adequate fire separations and sound barriers. These walls are not designed to support additional loads. Tenant is required to install in-wall blocking if Tenant wishes to place additional loads on these walls. Drywall and acoustic insulation shall be provided by Tenant. Partitions dividing the premises from service corridors or similar areas may be constructed by Landlord consisting of concrete masonry units or of gypsum board and metal studs. Acoustic insulation and gypsum board at the interior (Tenant) face of the metal studs shall be provided by the Tenant. x Exterior Walls The building is constructed of a reinforced concrete frame with stone façade and concrete or masonry back-up. x Neutral Piers A variety of neutral pier configurations exist in the project. Refer to Architectural Details for general storefront conditions for particular criteria and neutral pier details. Floors x Floor Slab The slab is reinforced, cast-in-place concrete. Construction includes areas of flat-plate construction with drop panels and areas with concrete beams. Care must be taken to avoid damage to existing reinforcing. x Floor Loading Design Floor Live Load: 100 pounds per square foot Design Floor Fill Allowance: 20 pounds per square foot x Floor Depressions Tenant shall fill all floor depressions, if any, in the premises greater than 1/2" with 4000 psi minimum structural lightweight concrete topping on Landlord's structural slab. Where the depression is greater than 1” in depth, the Tenant shall fill floor depressions prior to the performance of any other Tenant's Work. Water Tower Place 15 ARCHITECTURAL DESIGN CRITERIA Acoustic Considerations Landlord construction has been designed to provide general protection to guard against typical sound and vibration transmission between spaces. Tenant is responsible to ensure that sound generated in their premises produce no more sound that transmits through the Landlord’s demising wall and floor structure design. If, in the Landlord’s opinion, additional sound attenuation is needed to sufficiently isolate sound from within the demised premises, Tenant shall design and provide sound attenuation as required. Existing Construction within the Premises All existing conditions shall be verified by the Tenant. Failure to verify the existing conditions shall not relieve Tenant of any expenses or responsibilities resulting from that failure. It is the responsibility of the Tenant to field check all dimensions, utilities, locations and conditions prior to and during construction. Demolition Demolition of existing construction is the responsibility of the Tenant, including flooring and floor topping. Tenant may reuse portions of existing improvements subject to Landlord's prior written approval. Reuse of existing improvements shall be clearly indicated on the Store Layout and Working Drawings. Landlord makes no warranty or representation as to the condition or suitability of existing improvements reused by Tenant. Reference the Construction Requirements section of this document for additional demolition information. Water Tower Place 16 ARCHITECTURAL DESIGN CRITERIA General Design Criteria Overview These criteria are a basic “set of tools” that the Tenant is required to work with and expand upon. Criteria are written to allow freedom of individual expression and to provide a common point of departure for all Tenants. Construction Requirements x Landlord’s building shell is constructed as Type I-A, fire-resistive, fully sprinklered construction. Tenant’s work must conform to this construction type and will use only noncombustible materials within the demised premises except where treated, fire-resistant materials are permitted in accordance with local codes. x Only new, first-class materials, equipment, fixtures (including trade fixtures) and furnishings shall be used in the premises. x All finishes shall have a flame spread rating as required by applicable codes. x Interior wood doors shall be solid-core. Interior hardware shall be of appropriate commercial grade. x All entrances into Tenant premises must remain open and clear of any permanent structural elements. x All Tenant work, with the exception of approved sign installation and approved work performed above and below the space, shall be done from within the demised premises. x Tenant is obligated to verify conditions pertaining to the demised premises from time to time prior to and after the commencement of Tenant’s work. Tenant shall coordinate its work with the Landlord and other Tenants and with existing conditions above and below the demised premises, and shall make changes from time to time as required to accommodate such work or conditions. Any proposed adjustments to the work arising due to field conditions not apparent on drawings, other building documents and previous site surveys shall be submitted to the Operations Manager and receive written approval prior to execution. Architectural/Engineering Fee Architectural or engineering fees incurred by the Landlord as a result of investigating or planning work to be performed on Tenant’s behalf will be paid by the Tenant. Storefronts Tenant’s storefronts are a critical component of Water Tower Place, therefore all storefronts must complement and enhance the ambiance of common retail areas. Storefronts should emphasize a “sense of entry”, and the display of merchandise. National or regional Tenants who have a typical or recognizable storefront design are expected to review this design criterion and adjust their designs accordingly to ensure compatibility and compliance. They will work closely with the Landlord to achieve a high level of quality. Storefront Design Criteria is a separate section within this document. In addition to the storefronts, the area inside within 5’-0 of storefronts have been identified as Tenant Display Zones and special design criteria apply to these areas. Water Tower Place 17 ARCHITECTURAL DESIGN CRITERIA Store Interiors x All storefronts and interior areas of the store which are visible to the public are subject to design approval by the Landlord. x The vibrancy of rich merchandising concepts should not be relegated simply to the storefronts, but as total experiences, where entire stores become showcases of well-crafted merchandise and Tenant identity. x The Store Layout, fixtures etc., must be designed to comply with handicapped accessible requirements as defined by local, state or national codes or laws. x Interior Finishes are to be high quality, long lasting and, durable. All finishes shall comply with building code and the Landlord’s insurance underwriter requirements for appropriate fire resistance and flame spread ratings. All trade fixtures shall be first class new fixtures with durable finishes consistent with the anticipated public exposure. x All Exposed, Finished Wood shall be millwork quality kiln dried wood with a durable protective finish where exposed to public contact. Wood blocking, decking, and framing is permitted below the ceiling line and must be stamped fire retardant. All raised platforms shall be constructed of non-combustible materials. Walls All interior partitions, including column covers, within the demised premises shall be metal stud construction and shall have one layer of gypsum board (5/8” minimum) finish on both sides with taped and sanded joints. x Demising Walls: Shall provide a 2-hour fire rating as required by code and shall comply with one of the following two conditions: In existing spaces which are not reconfigured, demising walls are existing and the Tenant shall be responsible for maintaining and performing any necessary modifications or repairs to maintain the required fire rating. In reconfigured spaces, metal stud framing only shall be provided by the Landlord at all new wall locations. The Tenant shall provide acoustic insulation and two layers of 5/8” fire code gypsum board, taped and sanded and finished on the Tenant side of the metal studs to achieve the code required wall rating. The gypsum board shall extend full height from the floor to the underside of the structural floor above. x Exterior Walls: Where the demised premises include an exterior wall, the Tenant shall provide and install board insulation with an R-19 rating (minimum), an interior vapor barrier up to the structure above. x Interior Walls: All walls visible to the public must be finished in an appropriate manner. If painted, walls must receive two finish coats of paint, minimum. Concrete masonry unit or other masonry construction shall not be permitted within the demised premises without Landlord’s prior written consent. Tenant shall provide fire dampers and stops as required by local codes. All painting, decorating, paneling, wallpapering and all other finishes on walls and columns located in the demised premises shall have a minimum flame spread rating as required by local codes. Penetration of exterior walls will not be permitted without Landlord’s prior written approval. Water Tower Place 18 ARCHITECTURAL DESIGN CRITERIA Tenants with “wet” uses abutting Landlord’s demising partition are required to install adequate moisture protection on walls. Floors Tenants must provide a finished floor within the sales area of the demised premises and areas accessible to the general public. Tenant’s finished floor is to be at the same elevation as adjacent common areas. Tenants shall install a high-quality, highly-durable floor covering in areas accessible to the public which conforms to the following: x Wood flooring installations shall be hard wood with wear-resistant finish. x Ceramic, quarry and stone tiles and exposed colored concrete installations must be commercial grade with nonslip surfaces. x Carpet must be commercial grade and must have proper flame spread ratings to meet local codes. Carpet will not be permitted where color, quality or weave is not suitable for high-traffic areas. x Finished floor elevations at the store entrance must align with the border paver’s elevation at common areas. Vinyl or rubber transitions are not permitted in the sales area; metal, terrazzotype transition strips are required. x All floor surfaces must comply with the requirements of local codes and the ADA. Samples of all flooring materials must be submitted to Landlord for approval. x Floors areas where water is present shall receive a waterproof membrane extending a minimum of 6” up adjoining partitions. The Tenant’s Contractor will be required to provide a flood test of waterproofed areas prior to finishes being applied; the test is to be observed by the Operations Manager. x Floors typically have a 2 ½” dimension from public common area flooring to the structural slab. Ceilings x Ceiling work shall include but not be limited to ceiling treatments, light coves, soffits, suspended ceilings, exposed ceilings, acoustical treatment, ornamental specialties, and other related items. x Interior ceilings shall be of noncombustible construction and shall be plaster; painted gypsum wallboard; metal or cloth baffle system; concealed spline; or lay-in acoustical grid incorporating no greater than a 2’x2’ acoustic tile. Other “lay-in” or exposed-structure ceiling systems may be permitted but require Landlord’s written approval prior to installation. A lay-in ceiling can not be utilized throughout the public store area. Ceiling drops and decorative ceiling treatments are encouraged to break up a lay-in ceiling system. A lay-in ceiling is not allowed in the Display Zone at the storefront. x If acoustical tile systems are used, tile material is strictly allowed on horizontal surfaces only. For transitions to other ceiling heights, Tenant is to use an appropriate hard finish (gypsum board, wood, etc.). x No combustible materials or equipment are allowed above the ceiling (i.e. transformer, water heaters, etc.). All furring, framing and blocking above the ceiling shall be of noncombustible construction that satisfies local code requirements. Construction is to be consistent with return air plenum usage whether the space is used as a plenum or not. x Areas with exposed structure at the ceiling will require extra coordination with mechanical, fire protection, lighting, and structural system requirements in order to provide an acceptable level of appearance. If Tenant elects to utilize the exposed structure, all visible elements must receive a painted finish. Water Tower Place 19 ARCHITECTURAL DESIGN CRITERIA x All ceiling systems must allow for access via removable lay-in panels, tabbed concealed spline panels or access panels of sufficient size to allow adequate access. x Ceiling surfaces within the Display Zone shall be gypsum board, wood, or other type of hard surface material, and must extend a minimum of 10’-0” beyond the point of entry. Acoustical tile will not be allowed in the Display Zone. x Store exit signs should be located so as not be seen from the center’s common area. x Sprinkler heads in hard ceilings must be fully recessed. The cover plates are to be chrome finished or coordinated to match the ceiling color. Stockroom and Exit Access x Tenant shall meet all Building Code requirements for exiting through a stock room. Tenant shall also meet all requirements for general lighting and for emergency lighting requirements for exits through stockrooms. The service door must be recessed so as not to reduce the width of the service corridor when the door is opened. The Tenant must match the service corridor finishes established by Landlord throughout the corridor side of the alcove. x Provide 2” high black lettering at the door indicating the store space number and name. x Stock room walls must be painted. x Stock room floors must have a finished floor material. Exposed concrete flooring is prohibited. x Tenants with direct access to Landlord’s service corridors shall install at least one (1) “B Label”; 18-gauge hinged 3’-6” x 7’-0” x 1 3/4” hollow metal exterior service door and 16-gauge hollow metal, welded door frame, including commercial-grade hardware, consisting of a surfacemounted closer, one and one-half pair of butt hinges, wall or floor stops, 18” high kick plates, and one push-bar type exit device. Toilet Rooms Tenants may be required to provide restrooms in accordance with Landlord requirements and the Chicago Building Code. Reference the Plumbing Criteria section of this Manual for additional requirements. x Ceramic tile or F.R.P. panels are required to be installed on all walls to a minimum height of 72” above finished floor. x A waterproof membrane shall be installed at the floor. x A raised, accessible threshold must be installed at all toilet room doors to retain water spills. x Floor drains are required at all toilet rooms. Water Tower Place 20 ARCHITECTURAL DESIGN CRITERIA Structure Any alterations, additions, reinforcements, or modifications to Landlord’s structure, piping, conduit, or ductwork that are needed to accommodate Tenant’s work and vertical transportation connections shall not be performed without in each instance obtaining Landlord’s prior written approval. Tenant shall leave Landlord’s structure as strong as or stronger than the original design with finishes unimpaired. Landlord may require that approved structural or mechanical/electrical modifications be performed by Landlord’s contractor under contract to Tenant at Tenant’s expense and Landlord will require that engineering analysis, review or design be performed by Landlord’s engineer at Tenant’s expense. x The structural system of the Center has been designed to support a live load of one hundred (100) pounds per square foot excluding required concrete floor topping. This capacity shall not be exceeded by any of Tenant's Work on a temporary or permanent basis without the prior written consent of Landlord in each instance. x A 2-1/2" finish floor depression extending the full width and depth of the store may be unfilled or a lightweight concrete topping may have been installed by a previous Tenant. The total weight of existing and/or additional or replacement concrete fill combined with finish flooring is not-toexceed twenty (20) pounds per square foot. x Supplemental structural support framing shall be installed by the Tenant to adequately support suspended equipment within the premises. Where unusually heavy loads are applied to either the structural floor slab or to the building’s structural deck, specific details must be developed by the Tenant and submitted for Landlord review and approval. All storefront construction shall be floor supported only with an appropriate structural system, with appropriate lateral bracing back to the building structure as required. No vertical load shall be suspended from the Landlord’s storefront bulkhead system. x Mezzanine structures or staircases within any Tenant space shall require review and approval in writing by the Landlord’s structural engineer at the Tenant’s expense. All mezzanines shall be designed to be self-supporting. The area of Tenant mezzanines will be added to the Tenant’s total leasable area. x Channeling of the structural concrete slab on any level shall not be permitted. x Coring may be permitted for installing piping and conduit through the slab, with concrete repairs installed in accordance with building requirements. A drawing submittal must be made to the Operations Manager prior to any slab penetrations being made. Sonar investigations (X-Raying is not allowed) must be performed to locate existing reinforcing and a drawing prepared; then proposed cores must be located within the reinforcing. Drawing is to be dimensioned and to scale. Allow ten business days for the review of the coring submittal. No coring work is to be performed without approval from the Operations Manager. Water Tower Place 21 ARCHITECTURAL DESIGN CRITERIA Lighting Tenants are encouraged to use lighting as an integral part of their storefront and interior store design. In recent years, a wealth of lighting fixtures and techniques has come on the market, and innovative lighting should be explored. Lighting can play an important role in attracting customers and enhancing merchandising strategies. All storefronts and general store lighting must be reviewed and approved by the Landlord, subject to the following basic guidelines: x Tenant is responsible for lighting within the entire demised premises. All lighting must be indicated on Tenant’s design submissions to the Landlord. x Lighting within the Tenant’s premises is to be designed to accentuate the merchandise and product display within the Storefront show windows as well as the general sales area of the store. x The Tenant shall provide a high level and quality of illumination above the Display Zone and entrances. x All signs, logos, and Display Zone lighting at show windows shall be illuminated during Water Tower Place operating hours, the period of which will be determined by the Landlord. These will be controlled by a calendar time clock, with minimum 7-day, 24-hour capability, and connected to the Tenant’s power supply. x All showcase and display cases must be adequately lighted and ventilated. Direct visual exposure of incandescent bulbs and/or fluorescent tubes is prohibited. x A mixture of lighting types is encouraged in the Sales Area. x All light fixtures shall be the glare-free type. Light sources shall not be visible from outside the store. x Troffer-type fluorescent fixtures used in public areas shall be fitted with parabolic diffusers. x Exit signs to be glass, edge-lit type. x Track light type lighting should be unobtrusive. x All lighting is subject to Landlord on-site review and approval. x All lighting is subject to City of Chicago energy conservation requirements. Water Tower Place 22 ARCHITECTURAL DESIGN CRITERIA Display Zone Lighting x Fixtures shall utilize lamps which have appropriate color rendering characteristics. All lamps within the fixtures shall not be directed to shine into or be visible from common areas. x Track lighting must be recessed or else located so as to have minimal exposure to public view. x No lamp shall extend below the ceiling line or below the window head at show windows within the Design Control Area. Light Fixtures Fixtures shall be high quality commercial grade. The fixtures shall be constructed and installed to be glare free and shall comply with all applicable code requirements. Specific fixture requirements are as follows: x Exposed fluorescent tube fixtures are to be used in non-public storage areas only. x Recessed incandescent or fluorescent can type fixtures must have specular or semi-specular Alzak reflectors, coilex baffles, or other glare free shielding devices. x Specific Landlord approval is required for the use of coated metal halide lighting. For consideration, information must be submitted which documents the quality of the light. (Color rendering index rating, etc.) x All ceiling lighting fixtures above the ceiling must be City of Chicago plenum rated. Lighting Not Permitted x Exposed lamps unless in an approved track light fixture. x Colored lamps. x Mercury vapor or high pressure sodium lamps. x Luminous ceiling, chandeliers and glitter strips. x Exposed, unshielded neon tube lighting of any kind. x Strobe, spinner, or chase type lighting. Animated flashing or intermittent lights, black lights. x Battery-powered emergency and exit lighting. x Luminous, internally-illuminated panels at the storefront. x Storefront lighting in the common area ceiling outside the lease line. Exit Signs and Emergency Lights Fixtures shall be installed to serve their intended function, but also be as inconspicuous as possible. The quantity and location of exit signs and emergency lights shall be installed as required by code and the Chicago Fire Department. Only these lights can be connected to the Building emergency power system. Water Tower Place 23 ARCHITECTURAL DESIGN CRITERIA Storefront Design Criteria Overview Water Tower Place is the premier shopping center in the Chicago area. The quality of today’s retail environment demands distinctive and high quality storefronts and presentations to enhance the shopping environment. Storefront Design The unique characteristics and quality Tenant mix of Water Tower Place calls for innovative and modern storefronts. Critical to the design integrity and success of the shopping center’s image are the individual contributions of each Tenant’s store. It is essential that proper attention be paid to proportion, scale, color, and detailing so that the Tenants can both enhance their image and that of Water Tower Place. The Landlord has established general criteria for the storefronts, signage, and interiors intended to give Tenants maximum design flexibility while maintaining a consistent and high quality environment. Storefronts shall be designed, fabricated, and installed by Tenant at Tenant’s sole expense. The design objective is to create a sophisticated, urban landscape that expresses a sense of scale and features transparency, texture, and thoughtful response to Landlord provided architecture. All storefront designs shall be carefully reviewed and approved by the Landlord. x Special lighting effects such as cove lights or up-lights are subject to approval by the Landlord’s representative and will be reviewed on an individual basis. x In some cases, building columns occur along Tenant’s lease line and are exposed to public view. Tenant shall incorporate these columns into their Storefront design. x Finished, ½” x ½” black reglets are to be installed at revels between Tenant storefront construction and building neutral piers and ceilings. Neutral Piers If not already existing, it will be the Tenant’s responsibility to install the neutral pier(s). Front and side panels are available from the Landlord at the Tenant’s expense. The Tenant shall install a 1’-0” deep x 1’-0” wide minimum recess between the neutral pier and the Tenant’s storefront. Field Verification of Existing Conditions Because of varying conditions throughout this center, Tenants and their architects should field verify the existing conditions before drawings are completed. Items to be verified that critically affect the store construction include, but are not limited to, the following: x Storefront opening boundary conditions (heights, width, floor slope conditions). x Conditions of the neutral piers. x Bulkhead construction above the existing storefront. x Exact location of the storefront lease line. Storefront Transparency At the storefront, Tenants shall maximize the use of glass to maintain a show window type concept in the design of the storefront. Storefronts shall be a minimum of 70% transparent. Full height opaque areas on the storefront shall not exceed 12 feet in width. Opaque areas exceeding 8’0 in width must be illuminated; note that Tenant light fixtures may not be located outside the lease line. Water Tower Place 24 ARCHITECTURAL DESIGN CRITERIA Storefront Entry Door Closure Line May be recessed from the lease line to create visual identification at each storefront. Swinging entry doors shall be recessed at least three feet from the lease Line, or as necessary to ensure that when open the doors do not swing beyond the lease line. Storefront Entry Opening Widths x Storefront openings shall be limited to six feet in width for storefronts with 30’ or less of frontage. x Storefront openings (combined frontage) of more than 30’ but less than 60’ shall have one entrance of 10’ maximum width. x For stores with more than one elevation facing public common areas, one entry will be allowed for each distinct storefront elevation which is 20 feet or greater in width. The general opening width restrictions noted above shall apply for each individual elevation. The total combined opening width for all openings shall not exceed 12 feet. Storefront Entry Element x Storefronts should be designed to incorporate an entry feature at the entrance into each leased space. x For the intent of this criteria, the term “entry” shall be described as a grand or imposing entrance and shall encompass the whole architectural composition surrounding and including the doorway. x Recessed storefront entry elements are permitted.. Floor finishes on the outside of any storefront setback are to be finished with the building’s ‘black’ granite border material and terrazzo pavers. Storefront Materials and Colors x Tenants are required to employ high quality, richly finished materials in the construction of storefront to promote high quality. x Metal storefronts shall have factory finished components with baked enamel or anodized finished. x Clear anodized aluminum is the minimum acceptable finish for metal systems. x The return on any projecting architectural element must be finished with storefront material to avoid a thin “stage set” look. x Rich, visually dramatic hardwoods are acceptable. All wood and wood panels must be book or color matched. For Landlord approval, submit an actual sample (9” x 9” minimum) of the intended material and finish for review as part of the required material sample board. x Natural stones that are rich, elegant and/or visually dramatic are preferred. All stone materials (including marbles, granites and tiles) must be color and grain matched. All edge and corners must be mitered; no unfinished corners or edge allowed. Tile may be used as a decorative application. Water Tower Place 25 ARCHITECTURAL DESIGN CRITERIA x The Storefront Base shall be a minimum of six (6”) inches in height. The base must be a highly durable material such as stone, tile, substantial gauge metal with an anodized finish or other material that can withstand contact with cleaning equipment and solutions. Storefronts shall be designed to resist damage at potential impact areas such as outside corners. Storefront Construction All storefronts shall be self-supporting unless otherwise approved by the Landlord. The storefront may be braced to the base building. No gravity loads may be suspended from the Landlord’s structure or light cove bulkhead framing without the written approval of the Landlord’s structural engineer. No attachment will be allowed to the Landlord’s vertical neutral pier. Common Area Flooring Border at Tenant Storefronts The Tenant is to install a decorative black granite border at the storefront. The Tenant shall be required to purchase the stone from the Landlord; contact the Operations Manager for procurement of materials. Prohibited Storefront Materials x Painted drywall. x Vinyl or fabric wall coverings. x Plexiglas type materials. x Stucco or similar finishes. x Slat wall or pegboard. x Plastic laminates. x Mill finished aluminum. x Field painted metal. x Thin gauge metal or metal laminate finishes which will warp. x Artificial ‘faux’ finishes. x Mirror finishes. x Wood veneer except for commercial grade veneer products that are recommended for use in high traffic locations. Solid wood must be used at all corners and edges. Wood must have a durable finish. Excessive graining patterns in any wood will not be allowed. Recessed Storefront Configurations The Tenant shall be allowed to recess the storefront construction behind the lease line. Common area stone flooring shall be installed at the floor of recesses to continue the pattern and installation quality of the adjacent common area flooring. The 6” wide black border granite and travertine flooring must be purchased from the Landlord; contact the Operations Manager for procurement of materials. Water Tower Place 26 ARCHITECTURAL DESIGN CRITERIA Entries/ Doors x Tenant must recess entry doors such that they do not swing into the common area or beyond lease line. At the entry door recess, Tenant shall install paving, extending from the lease line to the door closure line. Tenant must install the Landlord’s standard granite border and terrazzo pavers; contact the Operations Manager to arrange the purchase of the stone pavers. x Tenant’s doors are encouraged to be substantially glass and must be a minimum of 8’-0” high. x Storefront doors may incorporate decorative features that enhance the overall storefront. Tenant designers should strive to specify doors that become an integral aesthetic feature to the overall storefront design. Door Closure Types Permitted x Swinging doors that project beyond the lease line. x Frameless glass sliding doors. x Sliding glass doors that are concealed from view when the store is open. The sliding doors must be hidden in a storage pocket with a door. The storage pocket must be creatively incorporated into the design of the storefront and storefront display zone to be as inconspicuous as possible. Overhead or side-coiling grilles are NOT allowed in the storefront! Display Windows/ Glazing x Display windows should be unique and individual. Window displays should thus be integrated into the architectural design and character of the entire storefront. A variety of textures in display and window treatment should be explored, as well as innovative lighting and window designs (see Signage Criteria). Display windows shall be transparent and open to the store. No backdrops behind displays will be allowed unless approved by the Landlord. x For greater transparency, a storefront glazing system with a minimum use of mullions or frames is required. x Corner Tenants must install display windows and/or store openings on both elevations. Solid walls will not be permitted along the lease line without approval from the Landlord. x All textured, patterned or obscure glazing must be reviewed and approved by Landlord. Water Tower Place 27 ARCHITECTURAL DESIGN CRITERIA Display Zone The Display Zone for the purposes of these criteria is defined as the area of the store extending from the storefront glass and entry door lines into the store a minimum of 5 feet across the entire width of the store. In this zone, design solutions and materials are expected to be of the highest quality. The Display Zone includes all display windows and retail graphics, display fixtures, signs, materials, finishes, colors, and lighting. x The Landlord will closely review all elements in the Display Zone. x The soffit at the storefront entrances may be finished in the same material as the storefront. The soffit height shall not be greater than the required storefront opening height. Acoustical tile is not an acceptable ceiling for any part of the Design Control Area. x Floor finishes in this zone shall be hard surface, high quality, durable materials such as wood, stone, or ceramic tile shall be provided throughout this zone. Carpeting will not be allowed. x The finished floor elevations at the premises entrance must match exactly the floor elevation of the common area. No tripping hazards such as reducer strips, thresholds or other noticeable transition devices shall be permitted. x All walls within this zone shall be provided with high quality finish materials. Materials such as stone tile, wood panels, high quality wall coverings, and the use of trim and other decorative treatments shall be utilized. Slatwall is not permitted. x Refer to the Lighting Criteria for Display Zone lighting requirements. Water Tower Place 28 ARCHITECTURAL DESIGN CRITERIA High Quality Show Window Displays The Tenant shall utilize distinctive, high quality and appropriate display techniques which best showcase the Tenant’s merchandise, including but not limited to the use of mannequins, platforms, tables, etc. x The sidewalls of the store Display Zone shall be dedicated to storefront display, and the storefront show windows shall not contain “sale” merchandise. x At the storefront entry, display fixtures or merchandise, either temporary or permanent, shall not be placed closer than three feet inside the Tenant’s premises, measured from the point of storefront closure. Video Monitors Monitors installed within the Display Zone or that are visible from common areas require specific approval by the Landlord. Monitors within the Display Zone shall be integrated into the overall show window design. The monitors, if allowed, may not emit any sound that can be heard from outside the store. Sound Systems No sound systems are to be audible in common areas or in adjacent Tenant spaces. Storefront Security Systems Systems must be indicated on the Tenant design submittal drawings and reviewed and approved by the Landlord in shop drawing form prior to installation. Tenants shall not place a security system into operation without first receiving Landlord’s prior written approval as to size, location, design and appearance. All wiring to security systems must be concealed from view. Any security system installed shall be generally compatible with the finishes of the Storefront Display/Entry Zone. Trenching of the topping layer only must be first coordinated and approved by the Operations Manager. Security Systems Permitted: x Concealed systems not visible to the customer (under floor system), within the topping layer only. Power poles or wiring channels exposed to view are not permitted. x Suspended overhead “bar” type systems concealed behind a storefront soffit above the entry. x Small pod type systems on each side of the storefront opening. x Tower tied into the storefront as part of the architecture. Security Systems Not Permitted: x Free standing tower or wall-mounted type exposed security devices. Sprinkler Heads Display Zone heads shall be the fully recessed type with cover plates. A sprinkler water curtain is required by the building-specific agreements with the City of Chicago. Heads must be spaced a minimum of 6’-0” apart and within 4’-0 of the storefront. Sprinklers at that spacing in common areas must not be blocked from the storefront. Water Tower Place 29 ARCHITECTURAL DESIGN CRITERIA Store Design Plan Diagram Water Tower Place 30 ARCHITECTURAL DESIGN CRITERIA Storefront Criteria Water Tower Place 31 ARCHITECTURAL DESIGN CRITERIA Storefront Section Water Tower Place 32 ARCHITECTURAL DESIGN CRITERIA Storefront Section at Well Water Tower Place 33 ARCHITECTURAL DESIGN CRITERIA Storefront Detail Section Water Tower Place 34 ARCHITECTURAL DESIGN CRITERIA Storefront Reflected Ceiling Plan Water Tower Place 35 ARCHITECTURAL DESIGN CRITERIA Typical Neutral Pier Detail Water Tower Place 36 ARCHITECTURAL DESIGN CRITERIA Neutral Pier at Existing Store Water Tower Place 37 ARCHITECTURAL DESIGN CRITERIA Neutral Pier at a Corner Water Tower Place 38 ARCHITECTURAL DESIGN CRITERIA Neutral Pier Detail at Corridor Water Tower Place 39 ARCHITECTURAL DESIGN CRITERIA Typical Neutral Pier Elevations Water Tower Place 40 ARCHITECTURAL DESIGN CRITERIA Typical Neutral Pier Elevations Water Tower Place 41 ARCHITECTURAL DESIGN CRITERIA Tenant Storefront at Mall Column Water Tower Place 42 ARCHITECTURAL DESIGN CRITERIA Typical Tenant Demising Wall UL U411 - 2HR Water Tower Place 43 ARCHITECTURAL DESIGN CRITERIA Typical Service Corridor Door Water Tower Place 44 ARCHITECTURAL DESIGN CRITERIA Construction Barricade Water Tower Place 45 SIGNAGE DESIGN CRITERIA Signage Drawing Requirements Overview The primary purpose of this exhibit is to ensure that project and tenant signage within Water Tower Place enhance the “urban” character of the property, create a lively and provocative atmosphere, establish the identities of Tenants, and provide clear, functional information. The Sign Criteria/Master Sign Plan will ensure that signage used by individual businesses will contribute to the vitality and interest of Water Tower Place. Special considerations were taken to ensure signing becomes an extension of the architecture. The Water Tower Place program will allow for flexibility in size and number of signs. The criteria for tenant signage are divided into sections which align with the scale and variety of leasable zones on the site. The following descriptions outline design goals and functionality for the differing zones within the development. Drawing Submission Requirements • Incorporate signage into storefront elevation. • Indicate letter height. • Provide typical sign section(s). • Indicates methods for wiring and mounting. • Indicate color and materials. • Provide blade sign graphics (if applicable). General Requirements • To verify compliance with the design intent of these criteria and local codes, the Landlord reserves the right to review and approve or disapprove all proposed signs and/or graphic treatment governed by these criteria per the Landlord’s interpretation of these criteria, and to require revisions of any sign design which the owner/Landlord judges to be not in compliance. • Sign fabrication and installation shall comply with any applicable building codes and the National Electrical Code, and all internal and external wiring, lighting, and other electrical devices shall bear the U.L. symbol. It is the Tenant’s responsibility to verify that its sign and installation are in accordance with these requirements and with local signage ordinances. • Tenant is responsible for maintaining its sign in a good state of repair including prompt replacement of burned out lighting or damaged pieces. Tenant has 24 hours to make repairs after being notified by Landlord. Water Tower Place 46 SIGNAGE DESIGN CRITERIA Tenant Signage Signage Design Requirements • The Landlord requires that all signage at this center be of the highest design and material quality in order to maintain an appropriate, upscale atmosphere. The Landlord encourages innovation of design and sophistication of materials (i.e. polished brass, etc.). • All Tenant identity signs shall be illuminated. • A mix of sign styles and materials is encouraged, though all signs remain subject to Landlord’s approval and must comply with applicable, local code requirements. • Tenant’s signage shall be installed on Tenant’s storefront surface and shall be designed as part of the overall storefront design. • Tenant is required to design, fabricate, install and maintain all Tenant signage with the exception of the blade sign (if applicable). • The Tenant’s sign shall be limited to the Tenant’s approved trade name as stated in the lease. The use of a corporate logo or other established corporate insignia shall be permitted only if specifically approved in writing by the Landlord. Taglines or identification of specific products or services are not permitted. • One sign is allowed per storefront elevation. A second sign may be provided at elevations exceeding 90’-0 in length. • The power source for Tenant Display Zone lighting, storefront signs and blade sign must originate in Tenant’s electrical panels and must be regulated by Tenant’s seven-day, twentyfour-hour calendar time clock, set in accordance with the Landlord’s operating hours. Signage Location Criteria Storefront signage shall not be located closer than two feet from the edge of each neutral pier, less than three feet from the floor or project over the lease line. Signage Size Criteria • In all cases, the Tenant’s storefront signage shall be proportional to the scale of the overall storefront design. • Upper case letter size for storefront signs using all upper case letters shall be limited to a maximum height of 14 inches. • Upper case / lower case and script letter sizes shall have a maximum height of 18 inches for ascending or descending letters. Lower case letters without ascending or descending letters shall have a maximum height of 12 inches. • The length of horizontal lettering shall not exceed 50% of the horizontal storefront length. The proportional ratio of the proposed signage length to the overall horizontal storefront length shall be left to the sole discretion of Landlord. Permitted Signage Types • Silhouette (Halo Type) illuminated individual reverse channel letters. • Open faced channel letters with internal tube neon illumination. • Internally illuminated fully recessed cabinet sign with push through letters. • Non-internally illuminated individual letters. Water Tower Place 47 SIGNAGE DESIGN CRITERIA Signage Types Not Permitted • Internally-illuminated sign boxes with translucent faces are not permitted. • Internally illuminated individual letters with translucent faces. • Exposed, surface mounted, box or cabinet type signs. • Cloth, paper, cardboard and other similar stickers or decals on or around the storefront surfaces. • Freestanding, moving, rotating, flashing, noise making or odor producing signs. • LED signs where individual LED ‘dots’ are visible. • Signs which are not professional in appearance. Permitted Sign Type Criteria • • • • Halo Type Illuminated Signs o The background surface for the sign is to be opaque and not reflect the illumination or image of the lamps within the letters. o All lamps must be fully concealed within the letter to not be visible to the public. o The rear face of the letter shall not be more than one inch from the background surface. o Standoff brackets shall be mounted in the least visible location to support the letters. o Visible standoff brackets and fasteners shall be painted to match the background surface. Reverse Channel Letters with Tube Neon Illumination o Sign letters are to be fabricated of metal or aluminum faces, returns and backs. o If trim caps are used they are to match the letter returns. o Fasteners shall be concealed from view and painted to match the surrounding sign letter. o PK Housings shall be used. Internally Illuminated, Fully Recessed, Cabinet Signs o Signs shall be fully recessed into the storefront construction with the face of the cabinet sign flush with the surrounding storefront material. o The size of the sign cabinet and the design of the face materials are to be integrally designed into the appearance of the storefront. o Letters only shall be translucent on the sign face. The background must be opaque. o Signs must be of the highest quality, design and construction. o Seams are not permitted in the face of the sign cabinet. Individual Letter Signs with External Illumination o Included types are: non-dimensional and dimensional letters or graphics applied directly to the face of the storefront area. Techniques include painting, silk-screening, pressure sensitive vinyl, metal appliqué, glass etching or wood, metal and acrylic letters. o Signs shall not be placed on a background material which detracts from the sign’s appearance. o Supplemental lighting inside the lease line is required for signage mounted on opaque surfaces. o Dimensional letter signs applied directly to transparent storefront glass will have matching dimensional letters on each side of the glass to create a finished appearance from both sides of the storefront glazing. Water Tower Place 48 SIGNAGE DESIGN CRITERIA Tenant Blade Signs A single, internally illuminated, fully recessed, cabinet-type blade sign must be installed at Tenant spaces not in or directly adjacent to the center Atrium area; Tenants at the Atrium cannot install blade signs. The sign will be adjacent to the neutral pier closest to the center Atrium. Proposed blade sign graphics are to be included in the Tenant design submittal. • • Graphics Requirements: o Graphics are limited to Tenant trade name and logos; see page 47. o Minimum height of trade name upper case letter is 3”. o Translucent graphics must be within the 9” by 20” illuminated area of the sign body. o Sign graphics may be layered if necessary, but three-dimensional graphics are not allowed. o Translucent graphics are to push-through the face panel between ¼” to ½”. o If the Tenant logo or logotype is too fine for push-through fabrication, the cut-out graphics may be flush with the opaque face panel. Color Requirements: o Colors of translucent graphics and opaque face panels are determined by the Tenant; the Landlord reserves the right to review and approve/ disapprove all proposed sign colors. o The blade sign design concept consists of light-colored, translucent, back-illuminated graphics on a darker, opaque face panel. White or light-colored face panels are not allowed. o Tenants that have corporate colors may use those colors for graphics and face panels, subject to Landlord approval. • Blade signs will be furnished and installed by the Landlord's sign contractor; this excludes power wiring from the sign to the Tenant power panel to be provided by the Tenant. The blade sign is to be switched with the Display Zone. • The cost of sign fabrication and installation is to be paid by the Tenant. Tenant to provide digital artwork in EPS format and Pantone color specifications for fabrication by the Landlord's sign contractor. • The sign contractor will submit a shop drawing to the Tenant for review & approval prior to sign fabrication. Repetitive Safety Symbols Graphics may be applied to the storefront glass for identifying transparent storefront surfaces for customer safety purposes. This lettering shall not be more than three inches in height and shall be centered at 3’-6 above the floor. Signage Construction Requirements • Shop fabrication and painting is required. • All signs shall be mounted according to Landlord approved drawings. All fasteners shall be of non-corrosive material and concealed. • Sign company names or stamps shall be concealed if permitted by code. All attachments, labels, fasteners, mounting brackets, wiring, clips, transformers, disconnects, lamps (except exposed neon tubes) and other mechanisms required for all signage will be concealed from public view. • Light leaks visible to the public, including drain holes, are not permitted. • Sintra will not be permitted for Tenant storefront signage. Water Tower Place 49 SIGNAGE DESIGN CRITERIA Submittals & Approvals It is the Tenant’s responsibility to obtain approval by the local government agencies. Approval of the Tenant’s design or working drawings by the Landlord shall not constitute review and approval of the Tenant’s signage. Tenant shall submit one set of sign shop drawings for review and approval by Landlord. Fabrication or installation of the Tenant’s signage shall not commence before the Landlord’s approval of the sign shop drawings. Note that only written approvals from the Landlord are valid. Each Tenant submittal shall include the following: • Scaled elevations (minimum 1/8” = 1’-0) with sign materials noted and graphics superimposed on storefront construction. • Color and material board. • Shop Drawings of signs, which must include a cross-section showing methods of installation. • Photographs of similar signs should be submitted wherever possible. City Sign Permit The Tenant is responsible to obtain City of Chicago sign permits. Note that only licensed sign contractors can apply for the permit. The permit process has been known to take up to six months. Water Tower Place 50 HVAC DESIGN CRITERIA The following is a list of minimum design information required to expedite plan approval by Landlord. It is not intended to be a complete listing of all requirements, but should serve as a minimum checklist to be used by Tenant’s design consultants to complete the construction documents. All mechanical designs must conform to City of Chicago Building Code groups 13 Energy Conservation and 28 Mechanical Systems. The code is issued annually. We urge designers to read this manual in its entirety in order to fully understand the requirements needed to generate an approvable set of construction documents. HVAC Submittal Requirements • Heating and cooling design calculations are required for City permit and for Landlord approval. Submit permit-required heating and cooling load calculations. • At spaces with exterior heat loss, also provide a Non-Operating Hours Heating Calculation with the following conditions: Building air system non-operational, space unoccupied and lighting off. A Tenant heating system independent of the building fan system may be required. • Plenum return air system indicated. • Mechanical symbol list and equipment schedules. Include VAV control sequence numbers. • Location of HVAC equipment, including air terminals, heating devices, ductwork, thermostats, control wiring and other equipment intended for installation. • Duct sizes and heights above finished floor, including existing building ductwork and connections to same. Include required damper locations with required fire ratings. • Diffuser and grille schedule. • Insulation specification. • Typical hanger detail from concrete slab. • Control wiring diagram. • Toilet exhaust detail (if required). • Condensate collection with P-trap (if required). • Exhaust fans and related ductwork (if required). Additional Drawing Requirements for Food Related Tenants • Exhaust airflow analysis of Tenant kitchen exhaust system and its effect on Landlord risers. Obtain existing conditions (duct sizes and fan airflow) from the Building Engineer. • Specifications of exhaust equipment. • Equipment locations and structural support details. • Cooking hood details and equipment. Exhaust fans and hoods must have an approved “grease guard” filter system. • Automatic fire extinguishing equipment. • Control/fire alarm wiring interface diagram. • Details of grease exhaust ducts including method of construction, access and connection to existing building exhaust riser. • Make-up air unit details and specifications (if required). • Note that direct-fired make up air units and evaporative pans at refrigeration equipment are not permitted. Water Tower Place 53 HVAC DESIGN CRITERIA Design Parameters • Outdoor Temperature 94.2 FDB/76.5 FWB Summer (ASHRAE 1%) (-10) FDB Winter (ASHRAE 99.6%) • Indoor Temperature 76 FDB Summer/ 50% RH 70 FDB Winter 50 FDB Winter during non-operating hours • Outside Air Minimum Code Requirement provided by Landlord. • “U” Factors Exterior Wall 0.1 Glass 0.70 SHGC 0.50 • Supply Air: Maximum of 1.25 CFM/SF. Winter: Minimum 50°F Summer: Maximum 55°F • Static Pressure: Maximum 4.0 WC” and Minimum 0.75 WC”. • Hours of supply air system operation: Coincides with Mall operating hours. • Lighting and People Load: Per Tenant design and City of Chicago Energy Code. • Equipment Load: Per Tenant design and industry standards. • Water Tower Place is a high-rise building; roof and exterior wall access are extremely restricted. Work by Landlord • The Landlord provides the following in or near the Tenant’s Leased Premises: supply air main duct (tap by Tenant if not existing); return air main duct (tap and volume damper by Tenant if not existing); toilet exhaust main duct (tap and volume damper by Tenant if not existing). Point-ofconnection to Landlord main ducts shall be as specified by the Landlord. Connections shall be by a Landlord approved contractor. • The Landlord provides a building smoke evacuation system. Smoke detectors at return air ducts and sprinkler flow alarms send the fan system to 100% exhaust. Alterations to and interface with Landlord’s life safety/smoke exhaust system, if required, shall be by Landlord’s contractor at Tenant’s sole expense. • 2.0 Watts per square foot is available for electrical heating. Work by Tenant: • The Tenant shall provide VAV boxes, thermostats and controllers conforming to Building specifications. Reference the Tenant VAV Box Detail, page 57. • The Tenant shall provide all ductwork, grilles, volume control devices, fire dampers, etc. within the Tenant’s Leased Premises in accordance with Landlord’s criteria stated herein, Code requirements and good engineering practices. Water Tower Place 54 HVAC DESIGN CRITERIA • Tenants at spaces with exterior exposure must provide HVAC systems that maintain minimum temperature during non-operating hours. • Tenant energy usage will be based on total supply air CFM provided by Building Systems. BTU meters will be required at Tenants utilizing Building conditioned water for heating and/or cooling. • Ductwork shall be galvanized sheet metal designed, fabricated and installed in accordance with the Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) design practices and standards for low pressure, low velocity ductwork. Maximum flexible duct length allowed: 5 feet fully extended. All ductwork from the Landlord’s supply air main to the Tenant’s VAV box shall be pressure class: 4.0 inch / seal class A (flexible duct is not allowed). Balancing devices shall be installed in accordance with Associated Air Balance Council standards and Landlord requirements. • Ductwork Insulation: The minimum installed R-value shall be 3.6, or greater where required by Code. Duct wrap shall have a FRK foil vapor barrier. For exposed supply air ductwork, minimum installed R-value shall be 2.0 so as to prevent condensation. • Fire dampers shall be provided where required by code, but shall not interfere with the Building smoke evacuation system. Provisions shall be made for sufficient access to each fire damper. All fire dampers must carry evidence of UL approval and appropriate fire ratings. • Air distribution devices shall be ceiling or side-wall mounted registers or diffusers installed as required to achieve draft-free air distribution in accordance with good engineering practices. A manual volume damper shall be installed upstream (minimum 3 feet) of registers or diffusers in all sales areas. Residential grade devices are not acceptable. • In areas with an inaccessible ceiling, provide access panels for adjusting volume dampers and air terminal devices. • Air balancing shall be by an independent Landlord approved NEBB or AABC certified balancing contractor. The report shall include VAV box airflow sensor differential pressure reading at maximum and minimum cooling, return air at tap to main and at toilet exhaust (if applicable). If additional types of exhaust systems have been installed, these must be included. • Contractor shall provide the Operations Manager with a copy of a certified HVAC Air Balance Report prior to close out of construction. • The building has been designed for Tenants to use the area above the ceiling as a return air plenum. No ducted returns are allowed. All work above ceiling must meet and comply with City of Chicago plenum requirements. • All demising wall penetrations must be reviewed and approved by the Landlord. • All proposed pipe penetrations through concrete slabs must be documented and submitted on a dimensioned drawing submitted to the Operations Manager for review and approval. • Flexible duct is allowed downstream of VAV boxes only and cannot exceed 5’-0 in length. • The building is transitioning from a pneumatic temperature control system to electrical controls. Selective demolition of pneumatic piping must maintain the integrity of the existing system. Tenant HVAC equipment cannot be connected to the pneumatic system. • The Tenant shall provide a conduit system connecting thermostats and VAV box controllers to support a future, central Energy Management System. Terminate the Tenant conduit at a location within the nearest Building Service Corridor. • Coordinate the possible salvage of existing VAV boxes and accessories with the Building Engineer prior to their demolition. Water Tower Place 55 HVAC DESIGN CRITERIA • No insulation may be installed on top of suspended ceilings. • Thermostat set points are to be programmed by the Tenant in accordance with Building Design Parameters. Evidence of conformance is to be provided to the Building Engineer prior to the occupancy of any Tenant space. Exhaust Requirements • Exhaust systems are required for any Tenant occupancy that may produce odors, such as nail salons, beauty shops, photo processing stores, or stores with demonstration cooking facilities or food preparation and cooking areas. The required exhaust system shall be designed in conjunction with the HVAC system to provide and maintain a negative airflow relative to the mall and adjacent Tenant spaces to prevent the migration of odors and other contaminates out into the mall and adjacent Tenant spaces. The Landlord shall determine the required negative airflow. • Tenants may exhaust to the outside a maximum of 10% of the total Building supply air provided to the space. Additional make-up air shall be provided by the Tenant. • At kitchen exhaust systems, Tenant shall maintain required exhaust airflow and air velocity in the Building exhaust risers in accordance with applicable codes, including NFPA 96. Tenant fire detection system must be connected with Building alarm system for automatic fan shutdown in case of fire. VAV Box Requirements • VAV boxes, thermostats and controllers to be as specified on the Tenant VAV Box Detail. Water Tower Place 56 HVAC DESIGN CRITERIA Tenant VAV Box Detail Water Tower Place 57 ELECTRICAL DESIGN CRITERIA Electrical Drawing Requirements The following is a list of minimum design information required to expedite plan approval by Landlord. It is not intended to be a complete listing of all requirements, but should serve as a minimum checklist to be used by Tenant’s design consultants to complete the construction documents. Tenant’s electrical service has provisions for monitoring electrical usage. We urge you to read this manual in its entirety in order to fully understand the requirements needed to generate an approvable set of construction documents. • Floor and wall receptacles, location and type. • Fans, motors and all electrical equipment, location and type. • Floor and wall voice/data outlets, location and type. • POS outlets (voice/data outlets and isolated ground receptacles), location and type. • Lighting fixture layout (including lamp type and voltage). • Lighting fixture schedule (with make and model numbers). • Emergency exit and emergency lighting fixture layout. • Branch circuit, wire size and layout. • One-line diagram, including conduit and wire sizing. • Conduit and wire as required for extension of the building emergency messaging system. • Building Fire Detection/Emergency Voice Communication appliances and wiring. • Electrical service layout (i.e. panel(s), transformer, time clock, etc.); plan must be 1/2” =1’0”. • Conduit and wire sizing for HVAC equipment and panel; indicate over current protective device type disconnect type and size for equipment and panel. • Complete electrical panel schedule(s) and MEP tabulation sheet. • Transformer size, type and location if needed for retail build-out. • Specifications. Landlord Supplied Electrical and Voice/Data Services The Landlord has designed and installed an electrical distribution system originating from the electrical service rooms located throughout the premises. A main breaker for Tenant use is located in Landlord’s distribution panel. Design Parameters • Electrical Service: 208Y/120V-3Ph, 4W, 60Hz • Retail Tenant: 13.5 watts/square foot. • Free standing kiosk or micro salon shall be furnished with (2) - 20 Amps circuits. • Restaurant Tenant: 40 watts/square foot. Water Tower Place 58 ELECTRICAL DESIGN CRITERIA x Telephone/Communication Service: The Tenant shall install telephone service wiring as required by the phone company. The Tenant shall be required to coordinate the connection at the base building backboard with the phone company directly. x All conduits shall be concealed where possible. Exposed conduits shall be in straight lines parallel with or at right angles to column lines or beams and separated at least twelve (12”) inches from water lines wherever they run alongside or cross such lines. x Emergency lighting shall be based upon 0.1 watts per square foot. x Tenant Heating: 2.0 watts per square foot. x Tenant electrical service requirements which exceed these criteria will require written permission from the Landlord. If modifications to the Landlord’s distribution system are required to accommodate Tenant’s service requirements in excess of the capacities indicated above, such modifications will be at Tenant expense. Work by Tenant The Tenant shall provide a complete electrical system originating from Landlord’s main distribution switchgear. Extension from the stub-in conduit to its final desired location and all wire from Landlord’s main switchgear to within the leased premises including, but not limited to all necessary labor, Tenant panel main and branch circuit breaker panels, conduit, wire, etc., necessary for the satisfactory operation of the electrical system, is furnished and installed by Tenant. Water Tower Place 59 ELECTRICAL DESIGN CRITERIA Electrical Construction Requirements • All Tenants must comply with IECC, 2003 Edition. • All Tenants shall comply with City of Chicago and State of Illinois energy conservation code requirements. • Electrical equipment and material shall be new, in accordance with the Chicago Electrical Code and National Electrical Code (NEC) whichever is more stringent and shall bear the Underwriter’s Laboratory label. • Final connection of Tenant’s conductors at Landlord’s main switchgear shall be performed by the Landlord’s electrical contractor at Tenant’s expense. • Electric meters may be located at existing sockets at Landlord switchgear or may be required to be located within Tenant premises; the Tenant is to confirm the meter location available for their space. • Electrical panel(s) to be provided with bolt-on breakers and copper bus bars (10,000 AIC minimum rating), and Tenant’s engineer to verify that AIC is adequate for available fault current at 120/208V. • Provide single disconnecting means in Tenant space. • Provide 7-day time clock to control the storefront entry, signage and Display Zone lighting during required hours designated by the Landlord. The time clock shall be the calendar type. • Lighting circuit breakers shall be rated for switching duty. • All slab penetrations shall be presented on a dimensioned drawing submitted to the Landlord for review and approved by the Landlord’s structural engineer. • All electrical equipment shall be labeled. Provide permanent mounted panel numbers and schedules. “Dymo” tape type identification is not permitted. • All electrical equipment light fixtures, conduit J-boxes and wiring above ceiling shall meet Chicago Plenum Code requirements. • Conduit connections are to be compression type fittings. • Conductors shall be continuous with no splices between the switchgear in the distribution room and panels within the Leased Premises. • All pre-existing, unused electrical equipment and conduit are to be removed. • Building Fire Detection/Emergency Voice Communication conduit and junction box covers to be pre-finished with red color; box covers to have ‘FA’ alarm designation. Water Tower Place 60 ELECTRICAL DESIGN CRITERIA Electrical Service Diagram Water Tower Place 61 ELECTRICAL DESIGN CRITERIA Emergency Lighting Schematic . Water Tower Place 62 PLUMBING DESIGN CRITERIA Plumbing Drawing Requirements The following is a list of minimum design information required to expedite plan approval by the Landlord. It is not intended to be a complete listing of all requirements, but should serve as a minimum checklist to be used by Tenant’s design consultants to complete the construction documents. All plumbing drawings must be prepared and sealed by State of Illinois licensed engineer and must clearly show: x The location of all fixtures including water heater x Clean-out and floor drain locations x Domestic water distribution x Water heater detail with relief valve and piping to floor drain x Location of sanitary and vent connection x Location of existing drains as applicable x All connections to Landlord’s mains x Water meter location x Water, waste and vent riser diagrams x Line sizes x Control valve locations x Grease line connection x Gas meter locations x Complete gas piping layout as required for cooking equipment Public and Employee Toilets x All Tenant spaces exceeding 900SF in area must provide employee toilets. Tenant spaces less than 900 SF are not required to provide employee toilets if they are within 200 ft and one floor above or below public facilities. x All retail Tenant spaces greater than 7,500 SF must provide toilets for both employees and customers. x All food service Tenant spaces greater than 3,000 SF must provide toilets for both employees and customers. x Provide accessible toilet facilities in accordance with Title III of the Americans with Disabilities Act (ADA) and local codes. Water Tower Place 63 PLUMBING DESIGN CRITERIA Work by Tenant Tenant shall provide a complete plumbing system from Landlord’s distribution point (supply stub-outs), including but not limited to, all necessary labor, connections to supply stubs, piping, clean-outs, fixtures, etc. necessary for the satisfactory operation of a plumbing system. x Connection to Landlord’s point of service and extend service according to Tenant’s requirements and all applicable local codes. x Large water consumers such as food preparation establishments, barber shops, beauty salons, etc. shall furnish and install a water meter conforming to American Water Works Association specifications for domestic service. If a meter is required, it shall be installed within the premises in an area easily accessible by Landlord’s personnel. The Landlord shall determine when a meter is required. x All toilets must be flush tank operated, except restaurants and theaters. x Provide a minimum of one (1) 3” minimum floor drain in each toilet room, kitchen and/or wet area. Provide drains with collars to accept waterproof protective membrane throughout all areas where water is present. x All floor drains, floor sinks and cleanouts shall be compatible with the water proofing system and membrane. All penetrations shall be sleeved, firestopped and sealed in accordance with the Landlord’s standard project details. Tenants must perform flood test as required by Landlord. x Dimensioned drawing for all pipe penetrations through concrete slabs must be prepared and submitted to the Operations Manager for review and approval. Structural reinforcing is to be located by sonar or other approved means and is to be included on the plan x Hot water heaters to be electric type. Provide a code-required expansion tank. Water heaters shall have a maximum 12-gallon tank unless required for Tenant’s operation. Provide relief valve line from water heater to drain pan which routed to floor drain. Water heaters cannot be located in plenum ceilings x Sediment and hair interceptors must be provided as required by Landlord at all sinks, drains, and specialty sanitary units. x Tenants shall not introduce chemicals into the sanitary waste lines; if required, a Landlordapproved chemical dilution system shall be installed. x Dielectric isolation is required at all dissimilar piping connections and supports. x Insulation shall be provided at all domestic water piping. The horizontal runouts in the piping chases need not be insulated, except where fixtures are located adjacent to exterior walls. x Any piping outside Tenant’s premises shall be installed as close to the underside of the slab as possible. x Provide drain down pipe for fire protection system from fire protection cap to nearest floor drain. x Pipe Materials: Sanitary, Vent, Kitchen Waste: 3” and Larger: Service weight, hub & spigot cast iron pipe. 2/12” and Smaller: Type M copper and copper drainage fittings. x Work and materials above finish ceilings must conform to Chicago return air plenum requirements. Water Tower Place 64 PLUMBING DESIGN CRITERIA Plumbing Venting x Tenant must connect to Landlord’s vent system. Additional Food Related Tenant Requirements x The Tenant must comply with the requirements of the Chicago Health Department, including providing hand sinks, three compartment sinks and mop sinks. x Individual grease traps are required for all food usage and grease generating Tenants. Grease traps must be located within the respective Tenant space and sized in accordance with the usage; provide calculations on final plumbing plans. x All restaurants must have water meters. Retail food service tenants may be required to provide water meters if required by the Landlord. x Restaurants with high-volume dishwashing facilities may be required to provide a moisture removal system if required by the Landlord. Natural Gas Service x Natural gas is available from the local utility company at designated locations and may be used for cooking purposes. Tenant shall arrange to obtain service from local utility company. Piping, meter and all associated work for extension of service to the leased premises shall be provided by Tenant, at Tenant’s expense and shall be subject to Landlord’s approval and code requirements. x Each Tenant with natural gas service will supply solenoid valves in the gas supply line that will be interconnected to the Landlord’s fire alarm system and Tenant’s kitchen exhaust hood suppression equipment to ensure the emergency shut down of gas fired equipment. Interconnect any pull stations with Landlord’s fire alarm system, where applicable. x All natural gas distribution systems shall conform to proper engineering practices and the requirements of local governing authorities, the local gas company, Landlord and its insurance underwriter. x Concealed gas piping is not permitted. All gas piping in Tenant spaces must be exposed. Gas piping to be welded construction except connections to equipment. x Gas piping down into space for Food Tenants is to be run through plenum in a sleeve with the sleeve vented to outside air. x Gas casing shall be scheduled 40, black steel, welded with welded fittings and meet requirements of ASTM A53. Casing shall be one pipe size larger than O.D. of gas piping passing through it. x Exposed gas line to be painted. x If gas service is required for restaurant Tenant, Tenant shall contact Landlord’s Tenant Coordinator to review service connection location and pipe routing requirements. Domestic Water x Landlord shall provide a 3/4” domestic water line available for connection by the Tenant. x Hot and cold domestic water piping shall be type L copper with soldered fittings using 95/5 tin antimony solder. Provide dielectric fittings for connections between dissimilar piping. x Hot and cold domestic water piping shall be insulated. Water Tower Place 65 PLUMBING DESIGN CRITERIA Sanitary Sewer x Plumbing risers and/or stub-ins are existing within or near the leased premises. Tenant will be responsible for, extending the line as required by their layout. x All sanitary plumbing must be piped to the nearest vertical riser; generally, connections cannot be made to existing horizontal lines connected to other Tenants. Existing conditions are to be reviewed by the Building Engineer. x Tenant shall install accessible cleanouts, as required by applicable code and Landlord’s requirements and they shall terminate flush with the finished floor. x The waste and vent connection when made to a building waste or vent line outside of the Tenant’s premises shall include a full size plugged “wye” installed at the connection to serve future connections. x Unused, below-floor sanitary piping under the Tenant space is to be removed by the Tenant to the vertical riser. Water Tower Place 66 PLUMBING DESIGN CRITERIA Floor Penetration Details Water Tower Place 67 PLUMBING DESIGN CRITERIA Plumbing Riser Diagram Water Tower Place 68 PLUMBING DESIGN CRITERIA Dishwasher Moisture Eliminator Water Tower Place 70 FIRE PROTECTION DESIGN CRITERIA Tenant’s Sprinkler System The following section includes minimum design information required to expedite plan approval by Landlord. It is not intended to be a complete listing of all requirements, but should serve as a minimum checklist to be used by Tenant’s design consultants to complete the construction documents. We urge you to read this manual in its entirety in order to fully understand the requirements needed to generate an approvable set of construction documents. Sprinkler System Design Criteria • Codes and governing authorities require fire sprinkler protection for the premises. The entire mall is protected by a code approved sprinkler system. Tenant shall, at Tenant’s expense, contract with a licensed and bonded sprinkler contractor with minimum 5 years experience to modify the existing sprinkler system as necessary to accommodate Tenant’s space and any adjacent areas affected by Tenant’s modifications to Tenant’s space. Required changes may include, but not be limited to cross mains, branch lines, control valves, arm-overs, drops, water flow indicators, drains, test valves, sprinklers, drain piping, or other fire protection equipment (e.g., fire alarm system components, fire extinguisher, hose cabinets, etc.) as may be required for the premises, all of which shall comply with the requirements of Landlord’s fire casualty insurer, all applicable codes, standards and ordinances, all referenced National Fire Protection Association standards (e.g., NFPA 13), The Chicago Building Code, the Owner’s risk consultant, and Landlord’s Design Criteria, whichever is more stringent. • Tenant’s system shall be hydrostatically tested in accordance with NFPA 13 in the presence of the Building Engineer, Operations Manager and required local jurisdictional authorities. • Landlord’s fire risk consultant shall from time to time during the term of the lease have the right to inspect the fire protection systems. Said system shall at all times comply with the requirements of said underwriter and shall meet the conditions of its approval. Any alterations, improvements, repairs, or maintenance required by such consultant shall be Tenant’s sole responsibility and shall be performed promptly at Tenant’s expense upon notice of such conditions. • Before any construction begins, temporary fire extinguishers shall be provided and installed in type, number, and locations as required by authorities having jurisdiction. • Tenant shall be responsible for supervision and integration of any new sprinkler devices such as water flow switches, tamper switches, etc. with base building fire alarm system and building automation system for supervision, notification and fan shut down. • If Tenant’s occupancy is to be such as to require upgrades to the existing automatic sprinkler system, sprinkler main or other component, Tenant shall be responsible for all costs of providing the upgrading of the system to meet local code & insurance requirements. • Any damage to the Landlord’s sprinkler system caused by Tenant’s work will be repaired by Landlord at Tenant’s expense. • The sprinkler supply piping for Tenant sprinkler system must be isolated from supplies for other tenants and Landlord areas. The Tenant system will be inoperative during construction and must not affect surrounding active systems. • Tenant shall provide a sprinkler water curtain parallel to the storefront with heads spaced at 6’-0” at the Tenant side of the storefront(s). Provide additional sprinklers outside the storefront if the existing, common area water curtain heads are more than 6’-0 from the Tenant storefront. Water Tower Place 71 FIRE PROTECTION DESIGN CRITERIA • Tenant shall provide a sprinkler water curtain at all vertical openings such as atria, open stairways, etc. regardless of the opening size or dimensions. • All ceilings having suspended elements, floating ceiling, ceiling openings, etc. shall have sprinklers installed both at the finished ceiling and above the finished ceiling. Sprinklers shall be installed in all display windows and accessible concealed spaces. • Sprinklers shall be omitted from all ComEd electric vaults, electrical switchgear rooms, emergency generator rooms and electrical rooms containing equipment 600 volts or higher. • Tenant’s sprinkler system design shall be based on the City of Chicago Building Code. Class F mercantile units, sprinklers shall provide a minimum of .20 GPM over the most remote 2,000 sq. ft. Storage areas with ceiling heights greater than 14 feet shall provide .25 gpm over the most remote 2,500 sq. ft. The maximum sprinkler spacing shall not exceed 130 sq. ft. per sprinkler. Tenant’s sprinkler system shall be hydraulically calculated with flow pressure requirements shown at Landlord’s connection point (see supplemental fire protection information). • The sprinkler hydraulic calculations shall include half the building standpipe demand. The total standpipe and sprinkler demand does not need to exceed 1500 gpm. • Each Tenant’s Fire Protection Contractor shall size the sprinkler piping and then carry the friction loss back down to the pump room and show the match between system demand and available water supply at the pump room based on the pump curve plus 13 psi city suction. Allow 2 psi for friction loss in the loop at 1000 gpm. • The Contractor is cautioned to adjust losses to actual take-off points on each floor, especially where take-offs occur before offsets. The latter are counted in riser elbow for the floor on which they occur. • The following Design Criteria Sheets indicate calculations, supply curves, riser locations and profiles, etc. Consult the space layout drawings as issued for riser number to which the Contractor is to connect as well as location of other piping take-offs between the Tenant’s cap and the riser lateral at that floor. Sprinkler Head Requirements • All sprinkler heads in public areas shall be concealed, standard coverage, standard response type. • Sprinkler Identification Numbers (SIN) should be provided for the type(s) of sprinklers to be used in the installation. Material Requirements • All materials and equipment used shall be UL listed. • Piping: Black Steel, Schedule 40 on piping 2” and smaller. Schedule 10 pipe is permitted on piping 2 ½” and larger and may only be joined with roll grooved fittings. • Fittings: steel screwed, or grooved, rated for system pressure. • All pipe, fittings and hangers shall be galvanized where moisture and corrosive conditions exist and on preaction and dry sprinkler systems. • Installation: The complete installation is to be in strict accordance with Landlord’s design manual requirements. Water Tower Place 72 FIRE PROTECTION DESIGN CRITERIA Drains and Valves • All inspector test drains must be piped to an open site drain. No inspector test drains will be allowed to empty to slop sinks or mop receptors. • Auxiliary drain valves shall be provided at all low points in sprinkler piping. Identify low point with a ceiling marker and provide access to all valve drains. Special Fire Protection Systems • Cooking Hood Exhaust Fire Suppression: Fire protection above cooking equipment shall consist of an automatic fire extinguishing system in accordance with NFPA and Chicago Building Code requirements. Hood suppression system trouble and alarm points shall be tied to the Building Fire Alarm System for supervision. Special Storage Conditions • Tenant’s storage conditions may affect the design and installation of Tenant’s sprinkler system. For areas where height of storage exceeds 12 feet, hydraulically calculated sprinklers shall be provided in accordance with Chicago Building Code and Factory Mutual requirements. Details for storage arrangements, types of racks, aisle widths, etc. shall be submitted to Landlord, Chicago Fire Prevention Bureau and The Landlord’s risk consultant for review. • For double-decked storage areas (whether solid, slatted or open grated), automatic sprinklers shall be provided for each level. Fire protection above rolling shelving units must also be provided in accordance with all applicable requirements. Dry Sprinkler Systems Dry sprinkler systems shall be installed in areas subject to temperatures lower than 50° F. Fire Protection Drawing Requirements Tenant submittal drawings shall include complete plans, calculations and specifications for all sprinkler work which shall consist of, but not be limited to the following: • General notes included on Tenant’s working drawings and information on the specifications which define the sprinkler system design, material and installation requirements for Tenant’s space. • Detailed information and drawings as required for special conditions including in-rack sprinkler coverage if required. • Drawings shall include a sprinkler summary indicating material specifications, sprinkler type(s), pressure and temperature ratings, and hydraulic calculations. • Welded, fabricated fittings used for joining sprinkler piping should be FM approved. • Should tenant configurations result in areas which cannot be reached by 30 feet of hose stream being projected from a 75-foot long hose from existing Landlord fire hose connections, the Tenant will be required to provide additional hose connections to meet local code requirements at Tenant cost. Note that the Water Tower Place Fire Protection Program includes 1 1/2” fire hose connections. Water Tower Place 73 FIRE PROTECTION DESIGN CRITERIA Sprinkler Shop Drawing Submittal Requirements All Tenants shall have received approval of the Tenant sprinkler shop drawings and hydraulic calculations from the Landlord’s risk consultant prior to the installation of the Tenant’s sprinkler system. Listed below is a list of general submittal requirements. This list is not intended to be a complete listing; it is the Tenant’s responsibility to contact the Landlord’s risk consultant with questions and concerns relating to their plan review. • Submit three (3) sets of sprinkler protection plans and supporting hydro-calculations. • Shop drawing floor plans shall be drawn at 1/4”=1”-0” scale or larger, and shall indicate: All new connections; locations of sprinklers, inspectors test valve, flushing drains, fire extinguisher locations and fire hose valve locations. Schedule and key of all sprinkler heads; sprinkler summary indicating material specifications, pressure and temperature ratings. Type and size of all piping and fittings, hanger locations and details, proper hydraulic nodes and remote area outlined. Locations of any structural components, mechanical equipment, service lines or fixtures that may shield water spray. • Include reference drawings of adjacent systems or risers feeding the system being submitted. • Hydraulic calculations using equivalent lengths for fittings and approved K factors for sprinklers and including any balancing of the overhead for rack systems. • Specifications/Cut sheets for materials being used such as sprinkler heads, sprinkler pipe, valves and fittings and peripheral equipment (including tamper alarms, waterflow alarms, etc.). • Occupancy details – in order to review submitted plans to ensure adequate protection, accurate occupancy details must be provided. These include, but are not limited to: materials being stored, storage height, storage arrangement, processes present, etc. • For dry systems the valve house heating arrangements, piping slope and air supply details should be included. • The Contractor’s Materials and Test Certificate Form No. 85 should be completed by the installing contractor for all instructions and submitted to Global Risk Consultants for review and record. Sprinkler Installation Requirements • The sprinkler system is to be de-activated during demolition and construction. The Contractor is to schedule the installation of a blind flange to isolate the sprinkler system of the area under construction. The Contractor is to ensure that only the Tenant area under construction has a decommissioned sprinkler system. The Contractor is responsible to perform any sprinkler modification work to achieve this requirement. Draining and capping of the sprinkler system is to be arranged with and performed by the Building Engineer. Contractor shall give a minimum of forty eight hours notice and receive prior approval from Johnson Controls prior to shutting off any sprinkler piping. The cost of this work shall be charged to the Tenant’s Contractor. Water Tower Place 74 FIRE PROTECTION DESIGN CRITERIA • All sprinkler heads are to be protected during construction. Protective caps & covers are to be maintained on all sprinklers during the duration of the Tenant construction. Protective caps and covers are only to be removed after all construction has been completed. Provide temporary plugs and caps on all piping/fittings to keep out construction debris. • Automatic sprinklers must be handled and installed in accordance with the manufacturer’s instructions to ensure reliable operation and to prevent premature operation. This typically includes use of a designated sprinkler wrench specified for installation of the specific automatic sprinkler, proper torquing or seating of the sprinkler into the fitting and inspection of the actuating mechanism. Automatic sprinklers that are damaged or have their fusible element assembly modified due to rough handling should be replaced with new, undamaged sprinklers of the same type/design/temperature rating. Field adjustments of damaged sprinkler heads are not acceptable. • The premises are to be kept free of combustible materials. Trash generated by construction activity must be removed from the premises daily. Combustible enclosures for contractor’s tools and storage are not permitted. • All fire protection materials installed shall be thoroughly clean upon completion of installation. Heads, pipes, valves and fittings shall be completely clean of grease, metal cuttings and dirt, etc. • If any cutting or welding is to be done on any of the sprinkler piping in the field, all cut coupons from modified pipes should be retained for examination by the Landlord’s risk consultant. Fire Protection System Acceptance • Tenant sprinkler system shall not be put in service until the entire system within the demised premises is pressure tested by a designated fire sprinkler contractor, witnessed by the Landlord’s designated on-site representative and accepted by both the Landlord and an officer of the Chicago Fire Department. • The Tenant shall not be allowed to bring any stock, furniture, fixtures, equipment, or other combustible material to the premises until the entire sprinkler system and fire alarm system has been approved and put into operation. • Upon completion of the work, signed copies of the appropriate contractor’s material and test certificates found in NFPA 13, contractor’s “as-built” shop drawings and installation warranty, shall be submitted to the Landlord for review and approval prior to occupancy of the premises. Fire Extinguishers • Fire extinguisher for hand use shall be provided, located and installed by Tenant in accordance with the NFPA-10 and Chicago Building Code Requirements. • Fire extinguishers located in finished areas shall be installed in recessed metal cabinets with solid metal doors. • All fire extinguishers shall have signage visible from at least 50 feet away. Water Tower Place 75 SPRINKLER DESIGN CRITERIA DETAILS CALCULATIONS Building Fire Riser Diagram Water Tower Place 76 SPRINKLER DESIGN CRITERIA DETAILS CALCULATIONS Equivalent Lengths Pump Room @ F-1 to Loop (8”) 30’ + G.V. (4) + ST (35) + L (18) = 87 Pump Room @ G-18 to Loop (8”) 17’ + G.V. (4) + ST (35) + L (18) = 74 Loop Sections F-1 Pump to Riser 11 7-0’ + G.V. (4) + ST (35) = 46 Riser 11 to Riser 7 40 + 46 + 2T (0) = 86 Riser 7 to Riser 4 & 6 48 + 8 + 23 + 28 + 29 + 41 + G.V. (4) + 5T (0) + 2-45L(18) = 199 Riser 4 & 6 to Riser 3 23 + 62 + 8 + 28 + G.V. (4) + 4T (0) = 125 Riser 3 to G-18 Pump 26 + 36 + 1 + 4 + G.V. (4) + 2T (0) + L (18) + ST (35) = 124 G-18 Pump to Riser 2 27 + 87 + 33 + 1 + 36 + 30 + G.V. (4) + L (18) + 5T (0) = 236 Riser 2 to Riser 5 16 + 7 + 62 + 24 + G.V. (4) + 4T (0) = 113 Riser 5 to Riser 8 & 9 63 + 35 + 20 + 4 + 35 + 22 + 86 + 47 (0) + G.V. (4) + 2-45L (18) + + 2L (36) = 323 Riser 8 & 9 to Riser 10 8 + 31 + 15 + 3T (0) = 54 Riser 10 to F-1 Pump 1 + 81 + T (0) + L (18) + G.V. (4) = 104 Loop Friction Loss Calculations Riser 1 F-1 Least Supply L1 = 580 L2 = 830 Q @ Qt = 1000 Q1 = 548 Q2 = 1 + § L2 · + .54 Q2 = 452 ¨ ¸ © L1 ¹ Pf = 1.7 psi Riser 2 L1 = 816 Q1 = 457 F-1 Least Supply L2 = 594 Q2 = 543 Riser 3 L1 = 456 Q1 = 598 F-1 Least Supply L2 = 954 Q2 = 402 Pf = 1.6 psi Riser 4/6 L1 = 331 Q1 = 654 F-1 Least Supply L2 = 1079 Q2 = 346 Pf = 1.3 psi Pf = 1.7 psi F-1 Least Supply Riser 11 L2 = 876 L1 = 534 Pf = 1.7 psi Q1 = 566 Q2 = 434 Clearly a loop loss of 2 psi @ 1000 gpm to any riser from any single pump is acceptable. Water Tower Place 77 SPRINKLER DESIGN CRITERIA DETAILS Riser 1 -3 G.V + L 6 G – 2-90L CALCULATIONS Straight 6” EQ. Length Values 45-7 90L – 14 T – 20 G.V. – 3 All risers are 6” Riser 2 -3 G.V. = 22’ + L = 39 -2 17’ + 3(L) -1 42’ + 4(L) G (2L) M 50 + 3L = ST 2 (2L) 8 (2L) Riser 3 -3 23 + G.V. + L -2 M 29 + 3L + ST Riser 4 Riser 4B -3 2 + L = 19 -1 M 20 = 3L 2 4 5 6 7 3 + 3L 8 6 + 2L + t 32 + T + 2L = 90 26 + 3L 7 + 2L 6 + 2L 6 + 2L 5 + 2L Riser 5A Riser 5B -3 2’ + G.V. + L = 2T = (79) -1 60’ + 4L G 40 + 4L + ST 2 10 + 2L + ST 7 15 + 3L 8 80 + 4L 22 + 2L + T Water Tower Place 78 SPRINKLER DESIGN CRITERIA DETAILS CALCULATIONS Riser 6 -3 81 + G.V. + L G 28 + 2L 2 15 + 2L 3 19 + 31 Riser 7 Riser 7A -3 22 + G.V. + L DL 10 + 2L G 2L 2 22 + 3L 95 + 4L + T Riser 8 -3 4’ + G.V. + 2L G 2’ + 2L M 2“ = 2L 2 115 + 3L + ST Riser 8A 50’ + 2L + ST Riser 9 50’ + 2L + G.V. BR 11 + 3L 2 117 + 3L + ST 7 3’ + 3L Riser 10 -3 60 + 2L + G.V. M 12 + 3L Riser 11 -3 36 + 4L + G.V. Water Tower Place 79 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA Tenant Sprinkler Water Supply Data Pump Room Floor: Elev. (31’2”) Allow 2 psi Loop Loss @ 100% gpm Add 20 psi for City Suction (F1) 13 psi (FPB) Floor 1W Ceiling Elev. 9’6” 17.6 psi 1E 9’6” 17.6 psi M-W 23’6” 23.6 psi M-E 23’6” 23.6 psi 2W 40’ 30.8 psi 2E 40’ 30.8 psi 3W 57’ 51.5 psi 3E 57’ 51.5 psi 4W 74’ 45.4 psi Number 5 4A 4B 7 10 8 5 4A 4B 7 11 10 8 3 4A 4B 5A 5B 6 7 11 8 8A 9/10 3 4A 4B 5A 5B 6 7 7A 8 8A 9 3 4a 4b 5a 5b 6 Riser Location C-10/B-10 G-11 G-10 E-5 C-2 C-4 B-10 G-11 G-10 E-5 E-1 C-2 D-4 E-15 E-11 G-10 B-10 A-11 D-12 E-5 E-1 E-4 C-5 A-7/C-2 E-15 E-11 G-10 B-10 A-11 D-12 E-6 F-4 E-7 C-5 A-7 e-15 e-11 g-10 b-10 a-11 e-12 Water Tower Place Riser Eq. Length 235 59 149 117 131 75 345 121 231 145 149 145 119 212 138 283 400 481 225 162 166 166 244 219/216 229 155 300 417 498 285 243 343 370 261 425 246 172 351 434 515 363 Friction Loss At 1000 gpm 8.2 2.1 5.2 4.1 4.6 2.6 12.1 4.2 8.1 5.1 5.2 5.1 4.2 7.4 4.8 9.9 14.0 16.9 7.9 5.7 5.8 5.8 8.3 7.7/7.6 8.0 5.4 10.5 14.6 17.5 10.0 8.5 12.0 13.0 9.2 14.9 8.6 6.0 12.3 15.2 18.1 12.7 80 SPRINKLER DESIGN CRITERIA DETAILS Floor 4E Ceiling Elev. 74’ 45.4 psi 5W 91’ 52.9 psi 5E 91’ 52.9 psi 6W 108’ 60.2 psi 6E 106’ 60.2 psi 7W 125’ 67.6 psi 7E 125’ 67.6 psi 8W 139’ 73.7 psi 8E 139’ 73.7 psi Number 7 7A 8 8A 9 3 4A 4B 5A 5B 6 7 7A 8 8A 9 3 4A 4B 5A 5B 6 7 7A 8 8A 9 3 4A 4B 5A 5B 6 7 7A 8 8A 9 3 4A 5A 5B 6 1 2 7 7A 8 Riser Location E-6 F-4 E-7 C-5 A-7 H-15 H-11 G-10 B-10 A-11 E-12 H-6 P-4 E-7 C-5 A-7 H-15 H-11 G-10 B-10 A-11 E-12 H-6 P-4 E-7 C-5 A-7 H-15 H-11 G-10 B-10 A-11 E-12 H-6 P-4 E-7 C-5 A-7 E-15 E-11 B-9 A-11 E-12 F-16 A-15 H-6 F-4 E-7 Water Tower Place TENANT SPRINKLER WATER SUPPLY DATA Riser Eq. Length 260 360 387 278 442 263 189 402 451 532 380 277 377 404 295 459 280 206 452 468 549 397 294 394 421 312 476 297 268 469 542 566 414 311 41 438 329 493 311 346 556 660 428 201 401-170-572 325 425 452 Friction Loss At 1000 gpm 9.1 12.6 13.6 9.8 15.5 9.2 6.6 14.1 15.8 18.7 13.3 9.7 13.2 14.2 10.4 16.1 9.8 7.2 15.7 16.4 19.3 13.9 10.3 13.8 14.8 1.0 16.7 10.4 9.5 16.5 19.0 19.9 14.5 10.9 14.4 1`5.4 11.5 17.3 10.9 12.1 19.5 23.2 15.0 7.1 20.0 11.4 14.9 15.9 81 SPRINKLER DESIGN CRITERIA DETAILS Floor 9W Ceiling Elev. 152’ 79.3 psi 152’ 9E Number 8A 9 10 3 4A 5A 5B 6 1 2 7 7A 8 8A 9 10 Riser Location C-5 A-7 C-2 E-15 E-11 B-9 A-11 E-12 F-16 A-15 H-6 F-4 E-7 C-5 A-7 C-2 Water Tower Place TENANT SPRINKLER WATER SUPPLY DATA Riser Eq. Length 343 507 315 324 359 569 673 441 214 585 338 428 455 356 520 328 Friction Loss At 1000 gpm 12.0 17.8 11.1 11.4 12.6 20.0 23.6 15.5 7.5 20.5 11.9 15.4 16.3 12.5 18.3 11.5 82 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA Efficiency/GPM Supply Curve Water Tower Place 83 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA Pressure/GPM Supply Curve Water Tower Place 84 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA Tenant Sprinkler Riser Diagram 1 Water Tower Place 85 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA Tenant Sprinkler Riser Diagram 2 Water Tower Place 86 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA Tenant Sprinkler Riser Diagram 3 Water Tower Place 87 SPRINKLER DESIGN CRITERIA DETAILS TENANT SPRINKLER WATER SUPPLY DATA SPRINKLER RISER NUMBER FOR TENANT SPACES This list indicates to what sprinkler riser the Tenant sprinkler connection is to be made. This information is necessary for the submission of the hydraulic sprinkler calculations and shop drawings required of each Tenant as set forth in the Exhibit B of the lease. See the Design Criteria K thru X for the necessary sprinkler information as well as the space layout drawings which will indicate the cap size and location, take-offs and pipe sizes between the Tenant’s cap and the riser, as well as the distance from the cap to the riser. Please note however that the riser number (if any) indicated on the space layout drawing is to be used if different from that given in this listing. Tenant Space Number/Riser Number: Ground Floor: Third Floor: G1/4B 3-1/3 G2/4B 3-2/3 G3/5A 3-3/7 G4/4B 3-4/7 G5/7 3-5/7 G6/10 3-6/7 Mezzanine Floor: 3-7/8A M1/8 3-8/8A M2/5A 3-9/9 M3/5A 3-10/7 M4/5A 3-11/5B M5/10 3-12/5B M6/7 3-13/5B M7/5A M8/5A 3-14/3 Second Floor: 3-15/9 3-16/5B 2-2/3 3-17/3 2-4/3 3-18/3 2-5/3 3-19/5B 2-6/8A & 10 3-20/7 2-7/9 Fourth Floor: 2-8/9 4-1/4A 2-9/9 4-2/4A 2-10/3 4-4/4A 2-11/9 4-5/7 2-12/9 4-6/7 Water Tower Place 4-7/7 4-8/8 4-9/8A 4-10/8A 4-11/9 4-12/9 4-13/9 4-15/9 4-16/5B 4-17/5B 4-18/5B 4-20/5B 4-21/5B 4-22/9 Fifth Floor: 5-1/4A 5-2/4A 5-3/4A 5-4/4A 5-5/7 5-6/7 5-8/7 5-9/7 5-10/8A 5-11/9 5-12/9 5-13/9 5-14/9 5-15/9 5-16/5B 5-17/5B 5-18/5B 5-19/5B 5-20/5B 5-22/5B 5-23/9 5-24/4 Sixth Floor: 6-1/4A 6-2/4A 6-3/4A 6-4/7 6-5/7 6-6/7 6-7/7 6-8/8A 6-11/9 6-13/9 6-14/5B 88 FIRE ALARM SYSTEMS CRITERIA Building Fire Alarm System • The Building alarm system consists of smoke detectors in building ductwork, flow alarms, tamper switches and an emergency voice communication system. Fire Alarm System • Tenants are required to provide system appliances within their premises and connect them to the Building Fire Detection/Emergency Voice Communication System within their premises at Tenant expense. • Required Tenant Fire Detection/Emergency Voice Communication System design must comply with: NFPA 72 and Life Safety Code 101; Americans with Disabilities Act; the Chicago Building Code section 9 (15-16); and the Chicago Electrical Code. • The Landlord shall provide a junction box with internally mounted terminal strips outside the Tenant’s premises for connection to the Building Fire Detection/Emergency Voice Communication System. These will generally be in service corridors near the Tenant premises. • The final connection of Tenant appliance wiring to the Building Fire Detection/Emergency Voice Communication System, including programming and testing, will be performed by the Building Alarm System Contractor at Tenant expense. • All Tenant sound systems must be interlocked with the Building Emergency Voice Communication System so that the emergency system can override the Tenant system. Fire Alarm Specifications Tenant installation, appliances and wiring must match Building Alarm System specifications. Contact Mark Eggerding of Johnson Controls at (708) 236-9701, to purchase devices and to request Building alarm connection. • Device Manufacturer: GE Security/ EST. • Ceiling speaker/ strobes: GCFR-S7VM. • Wall mount speaker/ strobes: G4RF-S7VM. • Ceiling mount strobes: GCFR-VM. • Wall mount strobes: G4RF-VM. • Remote strobe power supplies: BPS6A; isolator modules will be part SIGA-IM. • Signaling line circuit wiring: 16 AWG Twisted pair cable FPLR Page Wire and Cable number 4731A or equivalent. • Speaker circuit: 16 AWG Twisted pair cable FPLR Page Wire and Cable number 4731A or equivalent. • Strobe circuit: 12 AWG Twisted pair cable FPLR Page Wire and Cable number 4720A or equivalent. • Provide 2 cables for Speaker circuit, 1 out to Tenant speakers and one return to Landlord terminal box. • Conduit and junction boxes: Both to be red and boxes stenciled ‘FA’. Water Tower Place 89 CONSTRUCTION REQUIREMENTS Contractors Guidelines The following is a brief description of required items/procedures for Tenant construction. Pre-Construction Meeting Tenant and Tenant’s contractor shall not commence any work or deliver any materials to the building or site without conducting a pre-construction meeting with the Landlord Operations Manager and supplying all required pre-construction documents. Contact the Operations Manager to schedule the meeting. Documents to be submitted at the meeting shall include but not be limited to: x Copy of the City Building Permit. x Certificate of Insurance. x Copy of Contractor’s City of Chicago Business License. x Tenant Contractor information form. x Contact list, including all subcontractors and a list of 24 hour emergency telephone numbers. x Construction schedule. x Contractor authorization for access form. x Proposed barricade plan & proposed barricade graphics. x Certified check for construction fee and deposit. Documents to be brought to the meeting for review and discussion shall include the following: x Record permit drawing originals. x Landlord-approved design drawings. Construction Fee and Deposit The Tenant shall cause its General Contractor to deposit with the Operations Manager without liability for interest, the sum of $5,000. Note that $2,500 will be applied to the fee for Landlord construction administration. A $2,500 refundable deposit shall be applied to any costs incurred by General Growth in fulfilling Tenant Contractor responsibilities which the Contractor fails to complete. This sum shall be applied toward any costs incurred by Landlord or Landlord’s contractor to complete any part of Tenants’ work including but not limited to punch list items and damage caused to any portion of the mall which Tenant or Tenant’s contractor fails to complete within the time period required by the lease. A certified check made payable to Water Tower LLC; check must be submitted to the Operations Manager prior to work start. All remaining funds will be fully refundable. Quality Standards All work by Tenant’s contractor, including repair work, shall be performed in a first-class, workmanlike manner and shall be in good usable condition at completion. The Tenant shall require any person performing work to guarantee that the work is free from any and all defects in workmanship and materials for one year from the date of completion. The Tenant shall also require any such person to be responsible for the replacement or repair, without additional charge, of work done or furnished by or through such person, which shall become defective within one year after substantial completion of work. Water Tower Place 90 CONSTRUCTION REQUIREMENTS The correction of work shall include, without any additional charge, all expenses and damages in connection with the removal, replacement, or repair of any part of work which may be damaged or disturbed. All warranties or guarantees for material or workmanship on or regarding Tenant’s work shall be contained in the contract or subcontract. The contract shall be written so that all warranties and guarantees shall insure to the benefit of both Landlord and Tenant, as their respective interests appear, and so that the correction can be directly enforced by either party. Coordination The Tenant’s work shall be coordinated with the Landlord and with other Tenants so that the Tenant’s work will not interfere with the operation of the building. Provide not less than 96 hours' notice to the Operations Manager for activities that will/may affect Landlord or Building Tenant’s operations. Construction Barricade The Tenant’s contractor shall erect a construction barricade to serve Tenant’s area. x The configuration shall be at the direction of the Operations Manager. x The barricade must cover the entire storefront width. x Barricade graphics are required; designs must be submitted to the Operations Manager for review and approval prior to the erection of the barricade. x The barricade shall not be removed without Landlord approval. Site Access The Operations Manager will designate approved personnel entry point(s), loading docks and service corridors, acceptable delivery/usage times, dumpster access, etc. x All construction access is through building service corridors if available. All materials and workman access must be delivered to and brought into the building through designated loading dock(s) and service corridors. x No materials, assemblies, deliveries or workman access is permitted through Tenant’s storefront or in the common areas during mall operating hours. x Construction personnel must check-in at the building security office on Mies van der Rohe Way and receive an adhesive, daily building pass. The pass must be worn throughout the work day. Loading Dock Deliveries are to be scheduled with the Building Dock Manager, (312) 440-3160. 45’-0 is the maximum length vehicle that can be accommodated. Freight Elevators Freight elevators are available for use by the Contractor. x Elevators are to be kept free of trash, debris etc. at all times. x Contractors are to load and unload elevators in the most expedient way possible to minimize the duration of use. x The Landlord may elect to provide an elevator operator at Tenant expense if the Contractor utilizes the common freight elevator at the northeast corner of the building during construction. Water Tower Place 91 CONSTRUCTION REQUIREMENTS Construction Trash Removal x The Tenant and Tenant’s contractor(s) are responsible for all trash removal during construction, fixturing and stocking. All trash removal shall be performed during the days and time designated by the Landlord so as not to interfere with the operation of building tenants. x Trash hauling from the building loading dock shall be provided by the Landlord at the expense of the Tenant. Contact the Dock Manager to order waste dumpsters. x Trash accumulation shall not be permitted overnight in the leased premises common areas or service corridors. Common Area Cleaning and Protection x Common areas are to be kept clean at all times, especially at public areas. Cleaning at public areas is to be performed by a cleaning contractor. Daily cleaning work at public areas is to be completed by 8:00 AM. x If Landlord removes Tenant's or Tenant's contractor's trash, the charge to the Tenant will be three (3) times the Landlord's cost. Any material, whether trash or otherwise, placed outside of the leased premises for more than 24 hours shall be subject to removal and disposal without notice. x The Landlord may require that temporary floor protection be provided for delivery and trash removal using wheeled equipment. This is required at all carpeted areas. Demolition The Contractor shall remove all uncovered, unused utilities and equipment, including but limited to the following: ductwork, VAV boxes and grilles; electrical conduit, wiring and light fixtures; plumbing fixtures, domestic water piping, vent piping and waste piping. This includes electrical and plumbing utilities in the space below the Tenant floor level. Existing Utility Interruptions Do not interrupt utilities serving occupied areas unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: x Contractor shall be responsible to verify location of existing utilities, including utilities that pass through the space serving other areas. Any effects of existing utilities on proposed construction will be coordinated by the Contractor at no additional expense to the Landlord. x Notify the Operations Manager not less than seven days in advance of proposed utility interruptions. x Do not proceed with utility interruptions without the Operations Manager’s written permission. Structure Structural modifications and coring through floor slabs require an engineering analysis and design. The Tenant shall perform analyses and submit them for review by the Landlord’s structural engineer; review shall be performed at the Tenant’s expense. x Supplemental structural support framing shall be installed by the Tenant to adequately support suspended equipment within the premises. Where unusually heavy loads are applied to either the Water Tower Place 92 CONSTRUCTION REQUIREMENTS structural floor slab or to the building’s structural deck, specific details must be developed by the Tenant and submitted for Landlord review and approval. • All storefront construction shall be floor supported only with an appropriate structural system, with appropriate lateral bracing back to the building structure as required. No vertical load shall be suspended from the Landlord’s storefront bulkhead system. • Coring may be permitted for installing piping and conduit through the slab, with concrete repairs installed in accordance with building requirements. A drawing submittal must be made to the Operations Manager prior to any slab penetrations being made. Non-Destructive Testing is to be performed to locate existing reinforcing; results are to be shown on the submittal. Proposed cores must be located within existing reinforcing. Drawing is to be dimensioned and to scale. Note that X-Raying is not permitted. Allow ten business days for the review of the coring submittal. No coring work is to be performed without approval from the Operations Manager. General Contractor Requirements • Tenant shall ensure that all Tenant contractors are bondable and licensed in the State of Illinois and City of Chicago. Landlord shall have the right to approve Tenant’s contractors and subcontractors; however, such approval shall not constitute the assumption of any responsibility or liability by Landlord for the actions of Tenant’s contractors or subcontractors or the quality or sufficiency of Tenant’s work. • The Contractor shall comply with all rules and regulations of the Federal and State Governments and Chicago Health Department. • All work performed by Tenant’s contractor shall be performed in strict accordance with the final plans approved by the Landlord. • Tenant’s contractor(s) may perform “noisy” construction, such as jack-hammering, saw cutting, core drilling etc., only during hours designated by the Operations Manager. This is generally from 9:00 PM and 9:00 AM. • Work in public common areas visible to the public (such as barricade assembly & finishing) will take place between 9:00 PM and 9:00 AM. • Tools, supplies, materials, store fixtures, etc. must be confined to the Tenant space. Nothing may be left in common areas from 9:00 AM and 9:00 PM. • Tenant’s contractor shall obtain Landlord’s prior written approval for all drilling, welding, or other attachment to Landlord’s structural system. • Tenant’s contractor’s work shall be subject to inspection by Landlord during the course of construction for the purpose of determining the quality of workmanship and adherence to Landlord requirements. Tenant’s contractor(s) is required to cooperate with the Operations Manager and correct any deficiencies noted within (10) days. • The Contractor is responsible for vehicular parking for all employees and subcontractor employees. No discount is available for utilizing the building parking garage; note that headroom there is at 6’-4. No parking is available in the building loading dock. • No gasoline, flammable oils, or other highly combustible materials are to be stored at the site. • Provide separate, rodent-proof containers for food waste. No food waste is to be deposited in construction waste containers prior to the immediate removal of the containers from the site. Water Tower Place 93 CONSTRUCTION REQUIREMENTS x The Contractor shall notify the Operations Manager or Building Security within 24 hours of receipt, of any complaints, fines, citations, violations or issues, by any governmental body or regulatory agency against the Contractor relating to the Project. The Contractor will subsequently provide evidence to the Landlord that these issues have been satisfactorily addressed and resolved. x Floors areas where water is present shall receive a waterproof membrane extending a minimum of 6” up adjoining partitions. The Tenant’s Contractor will be required to provide a flood test of waterproofed areas prior to finishes being applied; the test is to be observed by the Operations Manager. HVAC Requirements x Contractor is to provide a filter at air returns for the duration of demolition and construction. x All work involving medium-pressure ductwork must be done between 12:00 AM and 8:30 AM. x Air balance reports are to be submitted prior to the store opening. Temporary Power Requirements x The Tenant shall provide its own temporary lighting and power distribution. x In the event Landlord provides temporary electrical utility service, Tenant shall pay Landlord a single charge equal to the greater of $750.00 or $0.75 per square foot of the leased premises. Plumbing Requirements x A drawing submittal must be made to the Operations Manager prior to any horizontal slab penetrations being made. Sonar investigations (X-Raying is not allowed) must be performed to locate existing reinforcing and a drawing prepared; then proposed cores must be located within the reinforcing. Drawing is to be dimensioned and to scale. x Allow ten business days for the review of the coring submittal. No coring work is to be performed without approval from the Operations Manager. x Tenant’s contractor(s) may perform core drilling from 12:00 AM and 8:30 AM. Fire Protection Requirements During Construction x The Tenant sprinkler is to remain inoperative during demolition and construction. x The initial drain down of the system will be performed at Landlord expense. Subsequent drain downs will be at Contractor cost. x The valve test drain shall be piped to an open site drain. x The sprinkler system shall be pressure tested at 200 PSI for two hours and must be witnessed by the Building Engineer. x Provide at least one Class ABC, 10 pound dry chemical fire extinguisher per 3,000 SF of area under construction. Maximum separation between extinguishers is 75’-0. Water Tower Place 94 INSURANCE Insurance The Tenant’s Contractor(s) must fulfill the following insurance requirements and shall maintain at no expense to the Landlord. x An insurance certificate shall be submitted to the Operations Manager prior to the start of construction. Please reference the Store/Brand Name and Store Number for identification purposes. Memorandums of Insurance and certificates sent via fax will not be accepted. x Insurance carriers shall have an AM Best's rating of A-VII or better, and shall be registered or authorized to do business in the state in which the Shopping Center is located. Certificate Holder Water Tower LLC Suite 987W, 845 N Michigan Ave Chicago, IL 60611 Additional Insureds/ Loss Payee Water Tower LLC, Rouse Property Management, Inc. and its direct and indirect parents and subsidiaries, any of their affiliated entities, successors and assigns and any current of future director, officer employee, partner, member or agent of any of them. Required Coverage’s General Liability $1,000,000 Occurrence/ $3,000,000 Aggregate $3,000,000 Products Comp/Op Aggregate $1,000,000 Personal & Advertising Injury $50,000 Fire Legal Liability Include Waiver of Subrogation Automobile Liability $1,000,000 Combined Single Limit Worker’s Compensation Statutory Employer’s Liability $1,000,000 Each Accident $1,000,000 Disease, Policy Limit $1,000,000 Disease, Each Employee Property Special From Perils (“All Risk”) Improvements & Betterments Business Income Replacement Cost Include Waiver of Subrogation Certification Clause 30 Days Notice The following must be stricken from the cancellation wording: “Endeavor to...but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents, or representatives.” OR If this is not possible, an Additional Insured Endorsement specifically naming the above entities and additional language must be provided. Water Tower Place 95 LANDLORD PUNCH LIST General Growth Johnson Controls A. City Certificate of Occupancy has been issued (if required). 1. HVAC Air Balance report received. B. Payment for Landlord work and materials has been received. C. Construction documents. conforms to approved 2. Abandoned utilities have been removed from the space, including below the structural slab. 3. VAV Boxes, controllers and thermostats conform to Building specified models. 4. Conduit for the future Building Management System is installed. D. Common areas are clean. E. Flooring is completed outside the Tenant Storefront and is flush with the public area floor. F. No storefront elements or signage cross the lease line. Energy 5. Thermostat set points conform to Building requirements. 6. Nighttime heating is installed (at spaces with exterior exposure). H. Service corridor penetrations are firestopped. 7. Fire protection material and test certificates, “as-built” shop drawings and installation warranty received. I. Service door graphics have been installed. 8. Sprinkler drain line is hard-piped to a drain. J. Display Zone lighting types and installation are acceptable. 9. Sprinkler heads at 6’-0 spacing at storefronts. G. Service corridor finishes are completed. K. Blade sign is installed (if applicable). L. No light fixtures are aimed into common areas. M. Tenant sound system is not audible outside the space (if applicable). N. Tenant security system requirements (if applicable). conforms to O. Approval of the fire protection system has been issued by the Landlord’s risk consultant. 10. Sprinkler heads at 6’-0 spacing around floor openings. 11. Drain pan installed under water heater and piped to open site drain (if heater required). 12. Water meter installed (if required). 13. 4-inch clean-outs accessible from the Tenant space installed (if applicable). 14. Wet area waterproofing tested (if applicable). 15. BTU meter is installed (if required). 16. Signs and Display Zone lighting are connected to timer; timer is set to correct time periods. 17. Electrical load phases balanced within 7%. 18. Electrical disconnect installed in space. 19. Electric meter reads entire electrical load. 20. Electrical system is fused properly. 21. Emergency and exit lighting fused properly. 22. Circuit breaker panel labeled properly. 23. Conduit connections are compression type. 24. Alarm conduit and junction box covers are red. 25. Tenant Fire Detection/ Emergency Voice Communication system has been tested. 26. Override of Tenant sound system by the Building Emergency Voice Communication is operational (if applicable). Water Tower Place 96