INTERNATIONAL ELECTROTECHNICAL COMMISSION SCHEME

advertisement
Procedure for Manufacturers to Obtain an IECEx Conformity Mark
License
Application Package
The following items shall be included in the application package to UL:
1. Letter formally requesting IECEx Conformity Mark License
2. Exact details of the nominated products (including valid IECEx Certificate of Conformity
Numbers) to be covered by the License
3. Exact details on how each nominated product is to be marked with the Mark; including
documentation, packaging and promotional material
4. Demonstration that the manufacturer’s quality management system details how they
protect the use of the IECEx Mark, such as:
-A policy that the IECEx Mark shall only be used and associated with the Ex Products
covered by an IECEx Certificate of Conformity, listed on the IECEx Mark License
Schedule and in accordance with IECEx rules and operational documents (IECEx 04,
IECEx 04A, IECEx OD 422 and OD 023)
-Defined procedures for the design and release of promotional material, including
websites to ensure the above policy is maintained and an indication of which position
within the organization that shall have the responsibility and authority
5. The manufacturer shall ensure that all requirements of the IECEx Conformity Mark
Licensing System Rules and Procedures have been met.
Applicable IECEx Documents
IECEx 04
IECEx 04A
IECEx OD 422
OD 023
IEC Scheme for Certification to Standards relating to
Equipment for use in Explosive Atmospheres – IECEx
Conformity Mark Licensing System - Regulations
IEC Scheme for Certification to Standards relating to
Equipment for use in Explosive Atmospheres – Guidance
for making applications for and use of IECEx Conformity
Mark
Rules and Procedures for the granting of Licenses to issue
and use the IECEx Conformity Mark
Terms and Conditions for use of the IECEx Conformity
Mark
Definitions
IECEx Conformity Mark License – Document issued under the IECEx System by an
accredited ExCB under IECEx 04 authorizing a Licensee to use the IECEx Conformity Mark.
IECEx Conformity Mark – Includes the IEC logo and an identification code to indicate the
Licensee and the ExCB that granted the license. Indicates that the Licensee/Holder
demonstrates compliance with the relevant IEC standards without any national differences or
essential differences in requirements, and with other IECEx recognized normative differences.
Licensee/Holder – Applicant, usually a manufacturer, identified on the IECEx Conformity Mark
License. The terms ‘Licensee’ and ‘Holder’ are interchangeable.
00-EX-C0400 - Issue 2.0
Page 1 of 3
UNDERWRITERS LABORATORIES ASSUMES NO RESPONSIBILITY FOR ANY OMISSIONS OR ERRORS OR
INACCURACIES WITH RESPECT TO THIS INFORMATION. UL MAKES NO REPRESENTATION OR WARRANTY
OF ANY KIND WHATSOEVER, WHETHER EXPRESS OR IMPLIED, WITH RESPECT TO THE ACCURACY, CONDITION,
QUALITY, DESCRIPTION, OR SUITABILITY OF THIS INFORMATION, INCLUDING ANY WARRANTY OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE AND EXPRESSLY DISCLAIMS THE SAME.
Copyright 2012 UL LLC. All rights reserved. May not be reproduced without permission. This document is
controlled and has been released electronically. The version on the UL intranet is the up-to-date document. Hard
copies are uncontrolled and may not be up-to-date. Users of hard copies should confirm the revision by comparing it
with the electronically controlled version.
Assessment Location
Please indicate to the UL project planner if you would prefer an on-site assessment of your
facility’s procedures and controlled documents during your QAR surveillance or reassessment
audits or a desktop assessment to be performed at UL.
Assessment Details
Project Plan
You will be notified by a UL project planner to determine the assessment location and
also if any additional documentation is required. You will also be contacted by UL
Customer Service, who will arrange for all necessary applications and financial
aspects to be completed prior to initiation of the investigation.
Contract Review
UL will review your application to ensure that the following items are included:
identification of the Ex products covered by the IECEx CoCs issued by UL, UL’s
nominated application form, copies of the applicant’s internal procedures for use,
display and control of the IECEx Conformity Mark, a controlled document detailing the
design of the IECEx Conformity Mark and the signed License agreement between UL
and Manufacturer which shall include reference to the manufacturer’s agreement
with the Terms and Conditions as detailed in OD 023.
If during the contract review any of the requirements are not met, UL will inform you
and allow you to review the application. If the results of the contract review are not
positive, then we will inform you within 48 hours of arriving at this decision. You may
submit additional information, withdraw their application, or we may terminate the
application where the IECEx requirements are not met.
IECEx CoC Verification
UL will then verify that the nominated IECEx CoCs are current and are only issued by
UL. If there are CoCs issued by other ExCBs, then the manufacturer will need to
request a separate IECEx Conformity Mark License from each ExCB that holds their
CoC.
If during the contract review any of the requirements are not met, UL will inform you
and allow you to review their application. If the results of the contract review are not
positive, then UL will inform you within 48 hours of arriving at this decision.
Assessment and Audit of Procedures
UL will coordinate the review of manufacturer’s procedure documents either at the
manufacturer’s facility during their Quality Assurance Assessment or Surveillance
audits or through a desktop audit. The assessment shall ensure that the IECEx
Conformity Mark is only associated with products covered by the IECEx Certificates
of Conformity listed in the application, shall include a review of the promotional
material where the IECEx Conformity Mark is to be used, shall include identification of
the senior position with the responsibility and authority to control the use of the Mark
within the applicant’s organization and ensure that the requirements of the Terms and
Conditions in OD023 are met.
If the results of the assessment/audit are not positive, UL will inform the manufacturer
within 48 hours of arriving at this decision. The manufacturer may submit additional
or revised procedures or may withdraw their application.
00-EX-C0400 - Issue 2.0
Page 2 of 3
UNDERWRITERS LABORATORIES ASSUMES NO RESPONSIBILITY FOR ANY OMISSIONS OR ERRORS OR
INACCURACIES WITH RESPECT TO THIS INFORMATION. UL MAKES NO REPRESENTATION OR WARRANTY
OF ANY KIND WHATSOEVER, WHETHER EXPRESS OR IMPLIED, WITH RESPECT TO THE ACCURACY, CONDITION,
QUALITY, DESCRIPTION, OR SUITABILITY OF THIS INFORMATION, INCLUDING ANY WARRANTY OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE AND EXPRESSLY DISCLAIMS THE SAME.
Copyright 2012 UL LLC. All rights reserved. May not be reproduced without permission. This document is
controlled and has been released electronically. The version on the UL intranet is the up-to-date document. Hard
copies are uncontrolled and may not be up-to-date. Users of hard copies should confirm the revision by comparing it
with the electronically controlled version.
Review of Proposed Design
UL will review the applicant’s proposed design of the IECEx Conformity Mark and
also check that the design is submitted in the form of a controlled document.
Upon successful completion of the review, UL will indicate the acceptance of the
design to the applicant in an email and create a copy of the controlled document for
our records.
If the results of the review are not positive, then UL will inform you within 48 hours of
arriving at this decision. You may submit a revised document with the modified Mark
for review by the ExCB or may withdraw your application.
IECEx Conformity Mark License Issuance
After successful completion of the above items, the IECEx Conformity Mark License
is issued and the manufacturer is sent a copy of the license via email. The
manufacturer may request to have a hardcopy of the license sent as well.
Surveillance Audit and Reassessment Plan
The Licensee agrees to an extension of its existing on-going surveillance audits, as required
by IECEx 02, to allow UL the opportunity to verify the Licensee’s compliance with the IECEx
Conformity Mark Regulations, Operational Documents, IECEx OD 422 and OD023.
Unit Verification
The assessment of the applicant’s proposed use of the mark is conducted at the
assessment/testing stage of processing the Unit Verification Certificate application. The
Mark may only be used on the product marking covered by the Unit Verification Certificate
and cannot be displayed on promotional material, websites, etc.
Suspension and Withdrawal of IECEx Conformity Mark Licenses
An IECEx Conformity Mark License may be suspended or withdrawn if:

It has been issued in error

The holder requests cancellation

It is used in a misleading way or

It is used by a non-approved third party
Complaints and Appeals
All complaints shall first be brought to the attention of UL. If a complaint cannot be resolved
by UL, the manufacturer may appeal the resolution of a complaint in writing to the ExTL and
the Program Owner. The Program Owner shall respond to the appeal in writing. If the
Program Owner cannot satisfactorily resolve the appeal, the manufacturer may appeal to the
IECEx Management Committee as described in IECEx 01. If an appeal cannot be resolved at
the level of the IECEx Management Committee, an appeal may be lodged with the CAB
whose decision is final. The manufacturer shall cover all costs arising from appeals.
00-EX-C0400 - Issue 2.0
Page 3 of 3
UNDERWRITERS LABORATORIES ASSUMES NO RESPONSIBILITY FOR ANY OMISSIONS OR ERRORS OR
INACCURACIES WITH RESPECT TO THIS INFORMATION. UL MAKES NO REPRESENTATION OR WARRANTY
OF ANY KIND WHATSOEVER, WHETHER EXPRESS OR IMPLIED, WITH RESPECT TO THE ACCURACY, CONDITION,
QUALITY, DESCRIPTION, OR SUITABILITY OF THIS INFORMATION, INCLUDING ANY WARRANTY OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE AND EXPRESSLY DISCLAIMS THE SAME.
Copyright 2012 UL LLC. All rights reserved. May not be reproduced without permission. This document is
controlled and has been released electronically. The version on the UL intranet is the up-to-date document. Hard
copies are uncontrolled and may not be up-to-date. Users of hard copies should confirm the revision by comparing it
with the electronically controlled version.
Download