Locker Installation Instructions

advertisement
LOCKER
INSTALLATION
INSTRUCTIONS
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 1
TABLE OF CONTENTS
Tools Required...........................................................................................................................
Required.....................................................................................................................
3
Fasteners.................................................................................................................
Fasteners...................................................................................................................................
3
Parts........................................................................................................................
Parts...........................................................................................................................................
4
Locker Installation – Standard Procedure ...............................................
.................................................................................
.................................. 5
Finished End Panels .................................................................................................................
........................................................................................................ 6
Metal Base – Standard Procedure..............
Procedure.............................................................................................
......................................... 7
Metal Base – Back-to-Back
Back ....................................................................................................... 8
Fillers.........................................................................
Fillers..........................................................................................................................................
................................................................. 9
Side and Top Trim....................................................................................................................
Trim............................................................................................................
10
Slope Top – Standard Procedure.....................
Procedure.............................................................................................
........................................................................ 11
Slope Top – Inside Corners...................................................................................................... 13
Slope Top – Back-to-Back........................................................................................................
Back........................................................................................................ 14
•
•
•
BEFORE YOU BEGIN
Make sure that you have all the parts as listed on the packing slip.
Verify that all blocking has been installed in th
the
e locations required.
Review the layout drawings and distribute the material.
ORDER OF INSTALLATION
Base – if required.
Lockers.
Fillers – if required.
Side and Top Trim – if required.
Finished End Panels – if required.
Slope Top – if required.
Numbers.
FASTENING
Lockers must be fastened to walls (or to each other, for back-to-back
back installations). Fasten
every second bank of lockers to the wall. Lockers also must be attached to each other – see
page 4 for procedure.
It is not necessary to fasten the lockers to the base.
Due to various types of wall and floor construction, Shanahan’s does not provide fasteners for
attachment of lockers to walls and floors.
•
•
•
•
•
•
•
DISCLAIMER
It is our intention that the information contained in these instructions will help you
yo achieve
successful installation of the lockers and trim. Neither seller nor manufacturer shall be liable
either in part or in contract for any loss or damage (direct, incidental, or consequential) arising
out of the use of or the inability to use the pro
product.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 2
TOOLS REQUIRED
•
•
•
•
•
•
Level
¼” High Speed Drill Bits
Chalkline
Riveter
Tape Measure
Drill
•
•
•
•
•
•
#2 Square Recess Driver Bits
Shears
9/64” High Speed Drill Bits
Centre Punch
13/64” High Speed Drill Bits
Awl
FASTENERS PROVIDED
•
•
•
•
#8 x ¾” Button Head Tek Screw
#10 x 5/8” Button Head SMS Screw
1/8” Rivets
3/16” Rivets
Single Bank
Double Bank
The overall widths of locker banks are 1/8” wider than nominal widths.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 3
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 4
LOCKER INSTALLATION – STANDARD PROCEDURE
1.
2.
3.
4.
Set first bank of lockers in place. Level.
Fasten to wall through the flange of the locker top.
Set next locker bank in place.
Attach locker banks to each other through holes in frame, near top and bottom with
#10 x 5/8” pan head sheet metal screw.
5. Set next locker bank in place, fastening to wall (as in step 2).
6. Repeat steps 4 and 5.
If the wall behind the lockers is a wood or metal
metal-framed
framed wall and does not contain any
blocking, then locate the studs and mark wall. Predrill hole through back flange of locker
top at stud locations and fasten to wall.
Wood strapping is recommended on wall if wall is not plumb or is rough.
If wall is masonry or concrete, then locker can be fastened directly with low velocity
fastening devices.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 5
FINISHED END PANELS
Finished end panels are to be installed before lockers are placed and installed.
1. Place the finished end panel over the side of the locker and transfer hole locations
through the 4 holes in the front edge and two holes in the rear flange.
1. Drill 9/64” dia. holes in locker
ker that were marked.
2. Rivet the finished end panel in place with 1/8” rivets.
3. The locker is now ready to install.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 6
1.
2.
3.
4.
5.
6.
7.
METAL BASE – STANDARD PROCEDURE
Mark the front of base on the floor – locker depth less 1”.
Mark overall length of base (sum of all locker bank widths plus 1/8” per bank). Deduct
½” for locker overhang at end (if bank of lockers is exposed at the end).
Set the required base fronts on the floor (cut if necessary).
Insert a connector (same piece as an intermediate base support) into all base front butt
joints. Pre-drill
drill holes through the top flange of the base front and the connectors and
insert rivet. (13/64” holes and 3/16” rivets to be used for all base to base connections.)
Insert intermediate base supports into the base front (spaced at approximately 3’-0”)
3’
and at the return end at the wall. Pre
Pre-drill
drill and rivet the base front to the intermediate
base supports through the top flange.
Insert the base end into the end of the base front. Once the end is square to the front,
pre-drill and rivet the two pieces together through the top flange. Pre
Pre-drill
drill and rivet the
base end support into the base end (top flange only).
After riveting the base assembly together, slide into place to marks on the floor. Fasten
to floor (one fastener per lilineal
neal foot) with concrete anchors or screws.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 7
METAL BASE – BACK-TO-BACK LOCKERS
1. Mark overall length of base (sum of all locker bank widths plus 1/8” per bank). Deduct
½” for locker overhang at each end (if bank of lockers is exposed at the end).
2. Mark the front of base on the floor – locker depth less 1”.
3. Set the required base fronts on the floor (cut if necessary).
4. Insert a connector (same piece as an intermediate base support) into all base front butt
joints. Pre-drill
drill holes through the top flange of the base front and the connectors and
5. insert rivet. (13/64” holes and 3/16” rivets to be used for all base to base connections.)
6. Insert base ends into the base front at each end and also intermediate base supports
(same as base ends) spaced at approximatel
approximately 3’-0”. Pre-drill
drill and rivet the base front to
the base ends and intermediate base supports through the top flange.
7. Assemble the base back as per steps 3 and 4.
8. Pre-drill
drill and rivet the base back to the base ends and intermediate base supports
through the top flange.
9. After riveting the base assembly together, slide into place to marks on the floor. Fasten
to floor (one fastener per lineal foot) with concrete anchors or screws.
10. Pre-drill
drill and rivet the 8” flat filler to the back of the base back.
11. Assemble the base for the other bank of lockers (back side), following steps 1 to 8.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 8
#8 X ¾”
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 9
1.
2.
3.
4.
5.
6.
SIDE AND TOP TRIM – RECESSED LOCKERS
Place top trim on top of lockers with end against wall.
Starting at the first locker against the wall and holding top trim in position, insert
#8 x ¾” button head Tek screw through locker top, just behind the frame.
Place next trim with 1 ½” to 2” overlapping first trim. Hold trim in position and insert
screw as in step 2.
Repeat step 3 as necessary.
Cut the last piece of top trim to lengt
length and fasten as in step 2.
Insert screws into each locker and top trim as in step 2.
If side trim is required:
1. Place trim beside locker, butting the top end of the trim tight to the underside of the
top trim.
2. Insert #8 x ¾” button head Tek screw through top and bottom hole of locker frame.
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 10
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 11
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 12
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 13
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 14
Installation Instructions Rev3 – Aug 2014
Shanahan's Limited Partnership
www.shanahans.com
Page 15