eDART December 2015 Release Enhancements eDART Users Group Meeting 11/12/2015 www.pjm.com PJM©2015 Release Schedule • Production – Release of December enhancements scheduled for Wednesday, December 9th. • Sandbox – December enhancements will be completely in Sandbox the week of November 23rd. www.pjm.com 2 PJM©2015 Agenda • December 2015 Enhancements: Inclusion of Reactive Devices on Transmission Outage Tickets – Network Model Functionality to Provide Station Longitude/Latitude Information – M10/Capacity Performance Related eDART Changes – Transmission Outage and TERM Tickets Linkage – TERM Coordinated Ties • Other Discussion Topics • Question & Answer Resolution Session www.pjm.com 3 PJM©2015 Background • Static VAR Compensators are Transmission assets but modeled as Gens in the PJM EMS system. • Current process to report SVC outages is to submit Transmission Outage Tickets for the SVC breakers. • New functionality to identify SVCs in PJM’s model and allow TOs to report SVC outages. • PJM’s Operations Planning Department will identify list of SVCs in eDART. www.pjm.com 4 PJM©2015 SVC List • Identified SVCs added to Transmission Equipment list download. – New value for <type> element: GEN www.pjm.com 5 PJM©2015 Creating SVC Outage Ticket • To create outage ticket for SVC select GEN from Type drop down – Enter Min Var and Max Var: • Min Var : minimum output available during outage • Max Var : maximum output available during outage – Business rules: • For ticket with Open (O) or Open Ended (E) equipment status, Min Var & Max Var must be zero. • For ticket with Closed (C) equipment status: – Min Var ≤ Max Var. – Min Var & Max Var cannot be zero. www.pjm.com 6 PJM©2015 Creating SVC Outage Ticket • Tickets created for SVCs cannot include other equipment types. www.pjm.com 7 PJM©2015 Reviewing/Revising SVC Outage Tickets • GEN added to Type drop down on all applicable reports and filters. www.pjm.com 8 PJM©2015 Agenda • December 2015 Enhancements: − Inclusion of Reactive Devices on Transmission Outage Tickets Network Model Functionality to Provide Station Longitude/Latitude Information – M10/Capacity Performance Related eDART Changes – Transmission Outage and TERM Tickets Linkage – TERM Coordinated Ties • Other Discussion Topics • Question & Answer Resolution Session www.pjm.com 9 PJM©2015 GIS Data in eDART • New functionality for TOs to enter station coordinates. • Currently being maintained in spreadsheets by PJM Model Managers. • Lat/Long Update button added to Network Model Main Menu. – Button is red if there are stations missing GIS (Geographic Information System) Data. www.pjm.com 10 PJM©2015 Longitude/Latitude Update Form • By default, stations with missing data are displayed. – Uncheck Missing Lat/Long to display all. • Display limited to 500 rows; user can filter by Station for smaller list. www.pjm.com 11 PJM©2015 History Log • History Log displays Lat/Long changes. – Changes for Last 60 days displayed by default. – Archive date indicates equipment in the station is retired. www.pjm.com 12 PJM©2015 Agenda • December 2015 Enhancements: – Inclusion of Reactive Devices on Transmission Outage Tickets – Network Model Functionality to Provide Station Longitude/Latitude Information M10/Capacity Performance Related eDART Changes – Transmission Outage and TERM Tickets Linkage – TERM Coordinated Ties • Other Discussion Topics • Question & Answer Resolution Session www.pjm.com 13 PJM©2015 Background • Changes to PJM Manual 10 effective 10/01/2015 included: – Section 2.2.2, Planned Outages – Rules & Regulations – Section 2.3.2, Maintenance Outages – Rules & Regulations 14 PJM©2015 New Generator Ticket • New date/time field for Forecasted Planned tickets called Est. Early Return added to New Generator Ticket. – Mandatory field. – Defaulted to Est. End Date. • Will be set to Est. End Date for existing tickets at time of eDART release. – End Date Unknown cannot be selected for Forecasted Planned tickets. www.pjm.com 15 PJM©2015 New Generator Ticket www.pjm.com 16 PJM©2015 Review/Revise Ticket • Est. Early Return can be edited for Forecasted Planned and Planned Outage Types. www.pjm.com 17 PJM©2015 Review/Revise Ticket • New date/time field added for Maintenance tickets called Recall Date. • – Blank except when entered by PJM. If a recalled Maintenance outage is still active after the recall time, it will be considered a forced outage and a Forced Date will be added to the ticket. • Only displayed when Forced Date is entered. • New field added for all ticket types called Related Ticket. – Entered by PJM to link related outage tickets. – Only displayed when ticket ID is entered. www.pjm.com 18 PJM©2015 Review/Revise Ticket www.pjm.com 19 PJM©2015 Recalled & Forced Tickets Reports • Recalled Tickets report displays current Maintenance outage tickets being recalled by PJM. – Red if there are recalled tickets. – Recall Date/Time in red indicates mismatch with the Est. End Date. • Forced Tickets report displays outage tickets that have a Forced Date. – By default, Active tickets for the last 40 days are displayed. www.pjm.com 20 PJM©2015 Recalled & Forced Tickets Reports www.pjm.com 21 PJM©2015 Agenda • December 2015 Enhancements: – Inclusion of Reactive Devices on Transmission Outage Tickets – Network Model Functionality to Provide Station Longitude/Latitude Information – M10/Capacity Performance related eDART Changes Transmission Outage and TERM Tickets Linkage – TERM Coordinated Ties • Other Discussion Topics • Question & Answer Resolution Session www.pjm.com 22 PJM©2015 Transmission Outage and TERM Tickets Linkage • Certain transmission outages should be accompanied by ratings change on the equipment. • New functionality for TOs to link TERM Tickets to Transmission Outage Tickets. – Multiple TERM tickets can be linked to one Transmission ticket. • New Field on TERM Ticket Revision to add Transmission ticket ID. www.pjm.com 23 PJM©2015 Transmission Outage and TERM Tickets Linkage • New button added to Review/Revise Transmission Ticket called Show All TERM to display linked TERM tickets. www.pjm.com 24 PJM©2015 Agenda • December 2015 Enhancements: – Inclusion of Reactive Devices on Transmission Outage Tickets – Network Model Functionality to Provide Station Longitude/Latitude Information – M10/Capacity Performance related eDART Changes – Transmission Outage and TERM Tickets Linkage TERM Coordinated Ties • Other Discussion Topics • Question & Answer Resolution Session www.pjm.com 25 PJM©2015 TERM Coordinated Ties • There are situations where multiple TOs are involved in the ratings calculation for a facility. While one TO is responsible for providing the ratings information, other TOs would need to be aware of the ratings and related changes. • New functionality for PJM to flag equipment that require coordination and identify involved parties. – ‘Coordinated Tie’ displayed on TERM tickets for identified equipment. – List of Coordinating TOs displayed on ticket. www.pjm.com 26 PJM©2015 TERM Coordinated Ties www.pjm.com 27 PJM©2015 Agenda • December 2015 Enhancements: – Inclusion of Reactive Devices on Transmission Outage Tickets – Network Model Functionality to Provide Station Longitude/Latitude Information – M10/Capacity Performance related eDART Changes – Transmission Outage and TERM Tickets Linkage – TERM Coordinated Ties Other Discussion Topics • Question & Answer Resolution Session www.pjm.com 28 PJM©2015 Addition of New Fields on Outage Reports • During the September release, new fields were added to the Transmission Facilities Outages List (linesout.txt). • Per member request, new fields added to eDART Current & Future and Historical outage reports: – Availability: in hours or Duration – Approval Risk: Yes (outage is At Risk or has active conflicts) or blank – RTEP Queue # – Previous Ticket Status: blank if current status = first status www.pjm.com 29 PJM©2015 Addition of New Fields on Outage Reports www.pjm.com 30 PJM©2015 Model NDA Acceptance Grace Period • Users who did not accept the NDA prior to 10/16 now see NDA acceptance page on initial login and must accept NDA to proceed. 31 PJM©2015 PJM Announcement • PJM would like to communicate the new cutover date and time for the Enhanced Security Update to PJM tools (previously 11/02/2015): Application Emergency Procedures ExSchedule InSchedules PowerMeter Date 11/17/2015 11/17/2015 11/19/2015 11/19/2015 Time • Mandatory actions prior to 01/31/2016 10AM 1PM 8AM 10AM – Designate existing accounts as system IDs if they are used for browserless interaction. – Create separate accounts if an account is shared between browserless and browser based tools. • Contact tools-security@pjm.com with questions. 32 PJM©2015 Contact www.pjm.com 33 PJM©2015