eDART December 2015 Release Enhancements

advertisement
eDART December 2015 Release Enhancements
eDART Users Group Meeting
11/12/2015
www.pjm.com
PJM©2015
Release Schedule
• Production
– Release of December enhancements scheduled for Wednesday,
December 9th.
• Sandbox
– December enhancements will be completely in Sandbox the week
of November 23rd.
www.pjm.com
2
PJM©2015
Agenda
• December 2015 Enhancements:
 Inclusion of Reactive Devices on Transmission Outage Tickets
– Network Model Functionality to Provide Station Longitude/Latitude
Information
– M10/Capacity Performance Related eDART Changes
– Transmission Outage and TERM Tickets Linkage
– TERM Coordinated Ties
• Other Discussion Topics
• Question & Answer Resolution Session
www.pjm.com
3
PJM©2015
Background
• Static VAR Compensators are Transmission assets but modeled as Gens in
the PJM EMS system.
• Current process to report SVC outages is to submit Transmission Outage
Tickets for the SVC breakers.
• New functionality to identify SVCs in PJM’s model and allow TOs to report SVC
outages.
• PJM’s Operations Planning Department will identify list of SVCs in eDART.
www.pjm.com
4
PJM©2015
SVC List
• Identified SVCs added to Transmission Equipment list download.
– New value for <type> element: GEN
www.pjm.com
5
PJM©2015
Creating SVC Outage Ticket
• To create outage ticket for SVC select GEN from Type drop down
– Enter Min Var and Max Var:
• Min Var : minimum output available during outage
• Max Var : maximum output available during outage
– Business rules:
• For ticket with Open (O) or Open Ended (E) equipment status, Min
Var & Max Var must be zero.
• For ticket with Closed (C) equipment status:
– Min Var ≤ Max Var.
– Min Var & Max Var cannot be zero.
www.pjm.com
6
PJM©2015
Creating SVC Outage Ticket
• Tickets created for SVCs cannot include other equipment types.
www.pjm.com
7
PJM©2015
Reviewing/Revising SVC Outage Tickets
• GEN added to Type drop down on all applicable reports and filters.
www.pjm.com
8
PJM©2015
Agenda
• December 2015 Enhancements:
− Inclusion of Reactive Devices on Transmission Outage Tickets
 Network Model Functionality to Provide Station Longitude/Latitude
Information
– M10/Capacity Performance Related eDART Changes
– Transmission Outage and TERM Tickets Linkage
– TERM Coordinated Ties
• Other Discussion Topics
• Question & Answer Resolution Session
www.pjm.com
9
PJM©2015
GIS Data in eDART
• New functionality for TOs to enter station coordinates.
•
Currently being maintained in spreadsheets by PJM Model Managers.
• Lat/Long Update button added to Network Model Main Menu.
– Button is red if there are stations missing GIS (Geographic
Information System) Data.
www.pjm.com
10
PJM©2015
Longitude/Latitude Update Form
• By default, stations with missing data are displayed.
– Uncheck Missing Lat/Long to display all.
• Display limited to 500 rows; user can filter by Station for smaller list.
www.pjm.com
11
PJM©2015
History Log
• History Log displays Lat/Long changes.
– Changes for Last 60 days displayed by default.
– Archive date indicates equipment in the station is retired.
www.pjm.com
12
PJM©2015
Agenda
• December 2015 Enhancements:
– Inclusion of Reactive Devices on Transmission Outage Tickets
– Network Model Functionality to Provide Station Longitude/Latitude
Information
 M10/Capacity Performance Related eDART Changes
– Transmission Outage and TERM Tickets Linkage
– TERM Coordinated Ties
• Other Discussion Topics
• Question & Answer Resolution Session
www.pjm.com
13
PJM©2015
Background
• Changes to PJM Manual 10 effective 10/01/2015 included:
– Section 2.2.2, Planned Outages – Rules & Regulations
– Section 2.3.2, Maintenance Outages – Rules & Regulations
14
PJM©2015
New Generator Ticket
• New date/time field for Forecasted Planned tickets called Est. Early Return
added to New Generator Ticket.
– Mandatory field.
– Defaulted to Est. End Date.
• Will be set to Est. End Date for existing tickets at time of eDART
release.
– End Date Unknown cannot be selected for Forecasted Planned
tickets.
www.pjm.com
15
PJM©2015
New Generator Ticket
www.pjm.com
16
PJM©2015
Review/Revise Ticket
• Est. Early Return can be edited for Forecasted Planned and Planned Outage
Types.
www.pjm.com
17
PJM©2015
Review/Revise Ticket
• New date/time field added for Maintenance tickets called Recall Date.
•
– Blank except when entered by PJM.
If a recalled Maintenance outage is still active after the recall time, it
will be considered a forced outage and a Forced Date will be added to
the ticket.
•
Only displayed when Forced Date is entered.
• New field added for all ticket types called Related Ticket.
– Entered by PJM to link related outage tickets.
– Only displayed when ticket ID is entered.
www.pjm.com
18
PJM©2015
Review/Revise Ticket
www.pjm.com
19
PJM©2015
Recalled & Forced Tickets Reports
• Recalled Tickets report displays
current Maintenance outage tickets
being recalled by PJM.
– Red if there are recalled tickets.
– Recall Date/Time in red
indicates mismatch with the Est.
End Date.
• Forced Tickets report displays
outage tickets that have a Forced
Date.
– By default, Active tickets for the
last 40 days are displayed.
www.pjm.com
20
PJM©2015
Recalled & Forced Tickets Reports
www.pjm.com
21
PJM©2015
Agenda
• December 2015 Enhancements:
– Inclusion of Reactive Devices on Transmission Outage Tickets
– Network Model Functionality to Provide Station Longitude/Latitude
Information
– M10/Capacity Performance related eDART Changes
 Transmission Outage and TERM Tickets Linkage
– TERM Coordinated Ties
• Other Discussion Topics
• Question & Answer Resolution Session
www.pjm.com
22
PJM©2015
Transmission Outage and TERM Tickets Linkage
• Certain transmission outages should be accompanied by ratings change on the
equipment.
• New functionality for TOs to link TERM Tickets to Transmission Outage
Tickets.
– Multiple TERM tickets can be linked to one Transmission ticket.
• New Field on TERM Ticket Revision to add Transmission ticket ID.
www.pjm.com
23
PJM©2015
Transmission Outage and TERM Tickets Linkage
• New button added to Review/Revise Transmission Ticket called Show All
TERM to display linked TERM tickets.
www.pjm.com
24
PJM©2015
Agenda
• December 2015 Enhancements:
– Inclusion of Reactive Devices on Transmission Outage Tickets
– Network Model Functionality to Provide Station Longitude/Latitude
Information
– M10/Capacity Performance related eDART Changes
– Transmission Outage and TERM Tickets Linkage
 TERM Coordinated Ties
• Other Discussion Topics
• Question & Answer Resolution Session
www.pjm.com
25
PJM©2015
TERM Coordinated Ties
• There are situations where multiple TOs are involved in the ratings calculation
for a facility. While one TO is responsible for providing the ratings information,
other TOs would need to be aware of the ratings and related changes.
• New functionality for PJM to flag equipment that require coordination and
identify involved parties.
– ‘Coordinated Tie’ displayed on TERM tickets for identified
equipment.
– List of Coordinating TOs displayed on ticket.
www.pjm.com
26
PJM©2015
TERM Coordinated Ties
www.pjm.com
27
PJM©2015
Agenda
• December 2015 Enhancements:
– Inclusion of Reactive Devices on Transmission Outage Tickets
– Network Model Functionality to Provide Station Longitude/Latitude
Information
– M10/Capacity Performance related eDART Changes
– Transmission Outage and TERM Tickets Linkage
– TERM Coordinated Ties
 Other Discussion Topics
• Question & Answer Resolution Session
www.pjm.com
28
PJM©2015
Addition of New Fields on Outage Reports
• During the September release, new fields were added to the Transmission
Facilities Outages List (linesout.txt).
• Per member request, new fields added to eDART Current & Future and
Historical outage reports:
– Availability: in hours or Duration
– Approval Risk: Yes (outage is At Risk or has active conflicts) or
blank
– RTEP Queue #
– Previous Ticket Status: blank if current status = first status
www.pjm.com
29
PJM©2015
Addition of New Fields on Outage Reports
www.pjm.com
30
PJM©2015
Model NDA Acceptance Grace Period
• Users who did not accept the NDA prior to 10/16 now see NDA
acceptance page on initial login and must accept NDA to
proceed.
31
PJM©2015
PJM Announcement
• PJM would like to communicate the new cutover date and time for the
Enhanced Security Update to PJM tools (previously 11/02/2015):
Application
Emergency Procedures
ExSchedule
InSchedules
PowerMeter
Date
11/17/2015
11/17/2015
11/19/2015
11/19/2015
Time
• Mandatory actions prior to 01/31/2016
10AM
1PM
8AM
10AM
– Designate existing accounts as system IDs if they are used for
browserless interaction.
– Create separate accounts if an account is shared between browserless
and browser based tools.
• Contact tools-security@pjm.com with questions.
32
PJM©2015
Contact
www.pjm.com
33
PJM©2015