BID DOCUMENT FOR: Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries VOLUME I Tender Number: CIL/C2D/SAP/2010-11/ 110 Date of Issue: 2nd November 2010 COAL INDIA LIMITED Coal Bhavan 10, Netaji Subhas Road Kolkata West Bengal – 700 001 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table of Content Invitation to Bid .................................................................................................................. 5 Bid Data Sheet .................................................................................................................... 7 Disclaimer ........................................................................................................................... 8 Glossary .............................................................................................................................. 9 Section1: Project Introduction .......................................................................................... 10 1.1 Coal India Limited – An Overview ........................................................................ 11 1.2 Mission, Vision & Objectives of Coal India Ltd .................................................... 13 1.3 ERP Project at CIL - Overview .............................................................................. 15 1.4 Current IT Scenario at CIL ..................................................................................... 15 Section 2: Summary of Scope of Work ............................................................................ 17 3.1 Cost of Bidding ....................................................................................................... 19 3.2 Qualification to Bid................................................................................................. 19 3.2.1 Mandatory Qualification Criteria ................................................................... 21 3.2.2 Consortium Guidelines .................................................................................... 25 3.3 Structure of the Bid ................................................................................................. 26 3.4 Submission of Bid ................................................................................................... 26 3.4.1 Complete Bid and Bid Submission Format ..................................................... 26 3.4.2 Contents of Part A, B and C ............................................................................ 27 3.4.3 Sealing the Bid .................................................................................... 29 3.4.4 Rejection of Bid ............................................................................................... 29 3.4.4 Bidder Check List ............................................................................................ 29 3.5 Instruction to Bidder ............................................................................................... 29 3.5.1 Bidder to obtain their own Information ........................................................... 29 3.5.2 Addenda / Corrigenda / Amendments issued to this Tender ........................... 30 3.5.3 Extension of Bid Opening Date ....................................................................... 30 3.5.4 Bids Received Late .......................................................................................... 30 3.5.5 Modification and Withdrawal of Bids ............................................................. 30 3.5.6 Deviations ........................................................................................................ 31 3.5.7 Bid Validity Period .......................................................................................... 31 3.5.8 EMD/ Bid Security .......................................................................................... 31 3.5.9 Price Basis, Taxes and Duties .......................................................................... 32 3.5.10 Rates to Be In Figures & Words .................................................................... 32 3.5.11 Abnormal Rates ............................................................................................. 33 3.5.12 Corrections & Erases ..................................................................................... 33 3.5.13 Details & Signature of Bidder........................................................................ 33 3.5.14 False or Misleading Claims ........................................................................... 33 3.5.15 Fraud and Corruption ..................................................................................... 34 3.5.16 Contacting the Owner .................................................................................... 34 3.5.17 Conflict of Interest ......................................................................................... 34 3.5.18 Ownership of Responses ................................................................................ 34 3.5.19 Owner’s Right to Accept Any Bid and to Reject any or all Bids .................. 35 3.5.20 Clarification on Bids ...................................................................................... 35 3.5.21 Language ........................................................................................................ 35 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 2 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.5.22 Page Numbering............................................................................................. 35 3.5.23 Workplace/Facilities to be provided by CIL at site ....................................... 35 3.5.24 Integrity Pact ................................................................................................. 35 Section 4: Evaluation of Bids ........................................................................................... 37 4.1 Opening of Bids ...................................................................................................... 38 4.1.1 Preliminary Examination of Bids..................................................................... 38 4.1.2 Procedure for Evaluation of Bids ..................................................................... 38 4.1.3 Evaluation Tables............................................................................................. 41 4.1.4 Price Justification ............................................................................................. 48 4.1.4 Selected Bidder and Signing of Agreement ..................................................... 48 4.1.5 Failure to Sign Agreement / Commence the Work .......................................... 49 Appendix A: Bidding Reference ....................................................................................... 50 Appendix A1: Present IT Assets in CIL ....................................................................... 51 Appendix A2: Business Processes - Overview ............................................................. 52 1.0 Financial & Management Accounting & Corporate Planning ............ 52 2.0 Materials, Purchase, Tendering, Inventory Management ................... 64 3.0. Sales & Distribution ............................................................................ 70 4.0 Planning & Production........................................................................ 74 5.0 Equipment Maintenance ..................................................................... 81 6.0 Human Resources & Payroll............................................................... 85 7.0 Project Management ........................................................................... 92 8.0 Environment, Health & Safety ............................................................ 94 9.0 MIS & Reporting ................................................................................ 99 Appendix B: Bid Support Documents ............................................................................ 101 Appendix B1: Letter of Undertaking by Bidder ......................................................... 102 Appendix B2: This is left Intentionally Blank ............................................................ 104 Appendix B3: Exclusions / Deviation Statement........................................................ 105 Appendix B4: Proforma for Bank Guarantee for Bid Security (EMD) ...................... 106 Appendix B5: Consortium MOU ................................................................................ 107 Appendix B6: Profile of Bidder .................................................................................. 109 Appendix B7: Profile of Consortium Partner ............................................................. 116 Appendix C: General Conditions of Contract (GCC) ..................................................... 117 1 Definitions & Interpretations ................................................................................... 118 2 Scope of Agreement ................................................................................................. 120 3 Obligation of Vendor ............................................................................................... 120 4 Obligation of Owner ................................................................................................ 124 5 Implementation Plan ................................................................................................ 126 7 Product Updates ....................................................................................................... 128 8 Assignment and Subcontracting .............................................................................. 128 9 Tests ......................................................................................................................... 128 10 Performance Guarantee / Warranty / AMC ........................................................... 132 11 Waiver .................................................................................................................... 134 12 Price and Payment.................................................................................................. 134 13 Liquidated Damages .............................................................................................. 137 14 Insurance ................................................................................................................ 137 15 Indemnity ............................................................................................................... 138 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 3 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 16 Patent Infringement ................................................................................................ 138 17 Settlement of Disputes ........................................................................................... 139 18 Term and Termination ........................................................................................... 139 19 Force Majeure ........................................................................................................ 141 20 Ownership .............................................................................................................. 141 21 Limitation of Liability............................................................................................ 142 22 Time of the Essence ............................................................................................... 142 23 Confidential Information ....................................................................................... 142 24 Miscellaneous ........................................................................................................ 143 Annexure 1: Preliminary Project Implementation Plan .................................................. 145 Annexure 2: Detailed Scope of Work (Refer Volume II & III) ...................................... 148 Annexure 3: SLAs........................................................................................................... 149 Annexure 4: Schedule of Requirement and Price ........................................................... 167 Annexure 5: Payment Schedule ...................................................................................... 197 Annexure 6: Proforma for Performance Bank Guarantee (PBG) ................................... 206 Annexure 7: Bidder Check List ...................................................................................... 208 Annexure 8: Contract Document .................................................................................... 209 Annexure 9: Integrity Pact .............................................................................................. 211 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 4 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Invitation to Bid 1. Bids in two Parts (Techno-Commercial & Price Bid) are invited from financially sound & authorized SAP Implementation Partners having PF Code, IT PAN & VAT/Sales Tax Registration Certificates, Service Tax Registration Certificate, Professional Tax Registration Certificate, on behalf of the Coal India Limited (CIL) for the work of “Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries.” 2. A complete set of Bidding Documents may be purchased by any interested eligible bidder on submission of a written application to CIL providing complete postal address of the bidder and upon payment of a non-refundable fee of 5000/- (Rupees Five Thousand) in cash or in the form of a crossed demand draft drawn in favour of Coal India Ltd payable at par at Kolkata from 08.11.2010 to 27.12.2010 , between 10:00 AM to 3:00 PM on any working day from the CIL offices at Kolkata or New Delhi. Bidders who wish to receive the bidding documents by post should send a non-refundable fee of 5000/-(Rupees Five Thousand) along with an extra amount of 450/-(Rupees Four hundred Fifty) by crossed bank demand draft drawn in favour of Coal India Limited payable at par at Kolkata. CIL shall not be responsible for any misplacements or late receipt of bid documents through the post. In the event of shortfall in the amount being credited in CIL’s account for any reason whatsoever (eg: collection charges levied by any involved bank – such examples being only indicative and not exhaustive) the bid shall be liable to be rejected outright. 3. 4. 5. 6. 7. The Bidding documents can also be downloaded from the CIL website (www.coalindia.in). In case the document is downloaded a non-refundable fee of 5000/- (Rupees five thousand) by bank draft must be enclosed with the bid documents, failing which the bid shall stand summarily rejected. The Bid & Rates shall be in the prescribed form provided in the Bid Document. The Contract Period is for 72 months from the date of Signing of Agreement, the implementation and rollout phase being 36 months followed by 12 months warranty and 24 months of post implementation support / AMC. CIL reserves right to further extend the AMC for a period of two years. Bidders should familiarize themselves with the site conditions before submitting the Bids. A pre-bid meeting will be held at the office of the purchaser(CIL HQ,Kolkata) on 03/12/2010 at 11.30 AM. Bidders are requested to submit their questions in writing to reach the purchaser not later than 7 (seven) days before the date of pre-bid meeting. The bidder’s authorized representative is invited to attend the pre-bid meeting. The purpose of the pre-bid meeting will be to clarify issues and answer questions or any matter that may be raised at this stage. However, No modification to the bid document will be made due to such meetings. Non attendance at the pre-bid meeting will not be a cause of disqualification. Bids will be received up to 13.00 Hrs (IST) of 28.12. 2010 and Techno-Commercial Bid shall be opened at 15.00 Hrs (IST) of 28.12.2010 in presence of the Bidders or their duly authorized representatives. The Bid shall be accompanied by Earnest Money (EMD) of 50,00,000/- (Rupees Fifty Lacs only). The Earnest Money offered shall be in shape of crossed Demand Draft drawn in favour of Coal India Limited and payable at par at Kolkata, India or in the form of irrevocable Bank Guarantee (from Scheduled Bank / Kolkata Branch) with validity of 28 days beyond the validity of the bid in the format given in Appendix B4 Any Bid not accompanied with Earnest Money in accordance with aforesaid provisions shall be rejected by the CIL as non-responsive Bid. In the event of shortfall in the amount being credited in Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 5 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. CIL’s account for any reason whatsoever (eg: collection charges levied by any involved bank – such examples being only indicative and not exhaustive) the bid shall be liable to be rejected outright. No interest will be payable by the Owner on the said amount covered under Earnest Money / other security deposits. The Earnest Money of all unsuccessful Bidders will be returned within thirty (30) days after the award of the contract. 8. The Bid shall be accompanied with letter of undertaking on non- judicial stamp paper of 50 in the prescribed proforma (Appendix-B1) in the Bid document. 9. In consideration of the Owner opening and considering the Bid for purpose of award of Agreement, Bidder shall keep his Bid valid for a period of 180 days (One Hundred Eighty) from the last date for submission of Bids or any extension thereof. During this period the Bidder agrees not to vary, alter or revoke his offer either in whole or in part. If the Bidder however, fails to keep his offer valid for 180 (One Hundred Eighty) days or varies its terms and conditions during the said period then the Owner shall be entitled to forfeit the Earnest Money amount without any notice or proof of damages etc. 10. On finalization of Bid, the successful Bidder will submit a security deposit of 10% of the total contract value in the form of Performance Bank Guarantee (PBG) (Annexure-6), on signing of the Agreement. The EMD of all the Bidders shall be returned on award of the contract. 11. Coal India Limited is not bound to accept the lowest or any Bid or to give any reasons for their decision. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 6 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Bid Data Sheet Tender No: CIL/C2D/SAP/2010-11/ 110 Tender Nomenclature Date: 02.11.2010 Supply, Implementation of SAP ERP and IT Infrastructure along with post implementation support at Coal India Limited and all its subsidiaries. Date of Issue Bid Document Address for Communication 08.11.2010 General Manager (MM) Coal Bhavan 10, Netaji Subhas Road Kolkata West Bengal – 700 001 India Tel: +91 33 2248 8099, 2243 5778 Fax: +91 33 2243 5778 Bid Document Bid Document shall be available on the website http://www.coalindia.in for download from 08.11.2010 Last Date, Time and Place for Date 28.12.2010 submission of Bids Time 13.00 Hrs (IST) Place: Materials Management Division, Coal India Limited, Coal Bhavan Annexe, 4th Floor , 10 Netaji Subhas Road, Kolkata, West Bengal – 700 001, India EMD to be submitted as part of bid Amount: 50,00,000/- (Rupees Fifty Lacs only). Mode: 1) Demand Draft 2) Irrevocable Bank Guarantee Bank: Any nationalized bank recognized by Reserve Bank of India. Period of Bid validity 180 days from the last date of submission of Bids or any extension thereof. Date & Time of Opening of Bids Date: 28.12.2010 Time: 15.00 Hrs (IST) Presentations and Bidder Interactions Exact dates will be communicated to bidders who have qualified in the technical bids. Date and Time of Opening Price bids To be communicated subsequently Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 7 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Disclaimer The purpose of this document is to give the bidders information to help them understand the scope of the IT Solution required for CIL. The information contained in this document is confidential in nature. The bidders shall not share this information with any other party not connected with responding to this Bid document. CIL makes no representation or warranty and shall incur no liability under any law, statute, rules or regulations on any claim, the potential bidder may make in case of failure to understand the requirement and respond to the Bid document. CIL may, in its absolute discretion, but without being under any obligation to do so, update, amend or supplement the information in this Bid Document. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 8 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Glossary Unless the context otherwise requires, the following terms whenever used in this RFP and contract have the following meanings: a. “Applicable Law” means the laws and any other instruments having the force of law in India as they may be issued and in force from time to time. b. “Proposals” means proposal submitted by Prime Bidder/ Consortiums in response to the RFP c. ‘Client/Owner/Purchaser’ means Coal India Limited ( CIL ) d. “Committee” means committee constituted by CIL for evaluation of Technical and Commercial Proposals submitted by the Sole Bidder / Consortium. e. “Contract Price” means the price payable to the Sole Bidder / Consortium under the Contract for the complete and proper performance of its contractual obligations. f. “Bidder” means a. A Sole Bidder or b. A Consortium of firms as described in section 3.2 g. “Contract” means the Contract signed by the parties (CIL and Successful Bidder) along with the entire documentation specified in the RFP. h. “Day” means Calendar day i. “Effective date” means the date on which the contract comes into force and effect. j. “ITB” means Instructions to Bidders k. “Personnel” means professional and support staff provided by the Sole Bidder / Consortium assigned to perform services to execute an assignment and any part thereof. l. “Services” means the work to be performed by the Prime Bidder/ Consortiums pursuant to the contract to be signed by the parties in pursuance of any specific assignment awarded m. “Maintenance” shall mean and include ongoing production support and small software modifications, bug fixing, enhancements, online help, support services and adaptation to changed environments n. “Project” shall mean the Supply, Installation, Services, Technical Requirements Specifications, Functional Requirements Specifications, Testing, Integration and commissioning of the Solution in accordance with the procedures, specifications and timelines set out in the Contract and Tender Document. o. “Project Schedule” shall mean the schedule submitted by the Sole Bidder / Consortium and agreed to by CIL. The project schedule will be included in the final contractual documentation. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 9 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Section1: Project Introduction Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 10 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.1 Coal India Limited – An Overview Coal India Ltd (CIL) is a holding company with eight wholly owned subsidiary companies. Out of these, seven are coal producing companies, while the eighth one is Planning & Design Company having core competence in the whole gamut of activities like identification of coal reserves, detailed exploration followed by design, implementation and optimizing operations for coal extraction. CIL, being the holding company, is accountable to the Government of India for performance of subsidiary companies. It performs the key tasks of deciding the policy matters and remains responsive to the cross-functional issues. CIL is the single largest coal producing company in the world contributing around 84% of coal production in India thereby meeting 46% of nation’s commercial energy needs. With employee strength of over 3.97 Lacs, it is the largest corporate employer in India. Out of these around 15,000 employees are executives. The breakup of these executives subsidiary wise is as follows: x x x x x x x x x x BCCL: 1887 CCL: 2252 CMPDIL: 794 ECL: 2117 MCL: 1203 NCL: 1295 SECL: 2728 WCL: 2178 NEC: 104 CIL: 354 (Including IICM) The vision of CIL is ‘To emerge from the position of domestic leader to leading global player in the energy sector by adopting best practices from mine to market with due care to environmental and societal sustenance.’ To translate the vision into reality, CIL intends to pursue several ambitious goals, some major ones are like: ¾ Ensuring energy supply of around 1 billion tonnes of coal equivalent within next ten years through development of coal mines in India and abroad ¾ Undertake a giant leap in coal production from present level of 400 Million tonnes per annum and increase production by 50% in next five years to reach a level of over 600 Mt. ¾ Acquire 50 Mtpa of coal equities abroad in next 10 years. ¾ Increase in revenue in next 5 years so as to become a US$ 20 billion company. ¾ Foraying into power generation, alternative energy sources or any other related diversification areas. ¾ Implement clean coal technology in coal production. CIL with its Head Office at Kolkata operates on a holding company structure mode, headed by Chairman and having Functional Directors. Each subsidiary coal company under the control of Coal India is headed by a Chairman cum Managing Director and has Functional Directors at company headquarters. The broad functions of CIL include laying down policies, systems and procedures, formulating long-term and short-term plans, assisting the subsidiary companies in achieving their objectives Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 11 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. (production, environmental impact mitigation, cost control, profitability, welfare measures etc) and monitoring the functions of the subsidiaries. Its mining operations are spread over eight states of the country, 81 areas and 473 mines (279 underground mines, 163 opencast mines and 31 mixed mines) and 19 coal washeries. It has 200 other establishments like workshops; hospitals; captive power plants and it employs 3.97 Lac manpower belonging to different regions and communities working in a unified concerted effort to provide the precious energy source to the country. Coal India holds the coveted honor of being one of the five largest companies in India in terms of turnover. In the financial year 2009-10, CIL’s turnover was to the tune of about ` 52,000 Crores. It strives to be the most dominant energy supplier in India, following best practices from Mine to Market. CIL is set to produce 486.50 million tonnes by the end of the XI Five year plan (2011-12) and 642 million tonnes by 2021-22. Coal India’s goal is to produce coal with a firm commitment toward protecting the environment. It is committed to safeguard the natural resources including air, water, land, flora and fauna. To achieve the above aim, CIL has a well laid down Environment policy, with a dedicated group of trained professionals. Coal mining is a labour intensive industry and thus gives great stress on the welfare of its employees. It has a well organized network of hospitals, housing and schools for the welfare of its employees. Coal mines are generally in isolated areas and away from the hustle-bustle of city life. Due to mining activities the local population is greatly affected leading to a change in the socioeconomic profile of that area. In view of this and as a part of its social responsibility, CIL and its subsidiary companies are undertaking different Community development activities. A comprehensive Community Development Policy has been formulated to fulfill the objectives of Community Development. However, care is taken in the process to include the Special Component Plan (SCP) for benefit of the Schedule Castes, Tribal Sub Plan (TSP) for benefit of the tribal groups and Community Development Plan (CDP) for benefit of the Community at large. Coal India has experience of implementation of World Bank aided Environmental & Social Mitigation project in 25 opencast mines. These community development activities are over and above the regular welfare measures provided for the employees of CIL and its subsidiaries. These activities are also in addition to schemes adopted by the subsidiaries for rehabilitation and resettlement of the project affected people in the mining areas being taken up as per the R&R policy of the company. Coal India is the apex body with seven wholly owned coal producing subsidiaries companies and one consultancy company. This encompasses the whole gamut of coal extraction, identification of coal reserves, detailed exploration followed by projection, design and implementation and optimizing operations in its mines. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 12 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. CIL’s coal producing companies are: ¾ ¾ ¾ ¾ ¾ ¾ ¾ ¾ Eastern Coalfields Limited (ECL), Sanctoria, West Bengal; Bharat Coking Coal Limited (BCCL), Dhanbad, Jharkhand; Central Coalfields Limited (CCL), Ranchi, Jharkhand; South Eastern Coalfields Limited (SECL), Bilaspur, Chattisgarh; Western Coalfields Limited (WCL), Nagpur, Maharashtra; Northern Coalfields Limited (NCL), Singrauli, Madhya Pradesh; Mahanadi Coalfields Limtied (MCL), Sambalpur, Orissa; North Eastern Coalfields (NEC), Margretta, Assam. It is directly under the administrative control of CIL; CIL’s planning and R&D wing is: ¾ Central Mine Planning and Design Institute Limited (CMPDIL), Ranchi, Jharkhand. CIL’s Training Institute is: ¾ Indian Institute of Coal Management (IICM), Ranchi, Jharkhand 1.2 Mission, Vision & Objectives of Coal India Ltd Mission The Mission of Coal India is to produce and market the planned quantity of coal and coal products efficiently and economically with due regard to safety, conservation and quality. Vision To emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market. Objectives Major objectives of Coal India Limited are: 1. Ensure energy supply of over 1 billion tonnes of coal within a decade through development of coal mines in India and abroad and foraying into alternative energy sources. 2. Attain “Cost Leadership” through strategic cost reduction in each business process in the coal business value chain. 3. To improve the quality of life of employees and to discharge the corporate obligations to society at large and the community around the coalfields in particular. 4. Undertake continuous efforts to inculcate safe mining practices and promote safety management to reach Zero Accident Potential level in all mines. 5. To lay due emphasis on afforestation, protection of environment and control of pollution. 6. To undertake detailed exploration and plan for new projects to meet the future coal demand. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 13 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 7. Enter into collaborations and partnerships, in India and abroad, to source and implement best technology and management practices across different functional areas. 8. Enter into strategic alliances with organizations par excellence in diverse areas to bring together complimentary skills of the partners to increase CIL’s long-term competitive edge. 9. Improve customer relationship management and strengthen reach to customers through ITenabled system for coal sourcing. 10. Encourage and practice workers’ participation in management in letter and spirit at all levels. 11. Implement Human Capital Development Policy to provide supportive work environment through appropriate training inputs designed to make every employee face the challenges and reap the benefits of opportunities of changing business environment. 12. To develop corporate image and brand equity commensurate to the size and complexity of operations as well as the strategic relevance of the Company. To migrate to a full scale egovernance scenario through creation of a web based backbone to share information with all stakeholders and its integration to the corporate ERP system. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 14 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.3 ERP Project at CIL - Overview After a detailed analysis of Coal India’s current business processes at different locations and analyzing existing pain points, it has been felt that CIL needs to adopt IT solution to increase its process efficiency, reduce its operational costs and increase employee and customer satisfaction. Considering current global environment and India’s increasing demand for quality coal, it is imperative for CIL to streamline its processes, analyze its results and formulate its future strategies based on right information. In order to bring in an IT culture and bring about an end-toend automation of all the business processes, Coal India would like to embark upon an initiative to implement SAP ERP across all its subsidiaries encompassing all areas and mines. Specifically, through a comprehensive information system, Coal India wishes to achieve the following key objectives: A. It should enable Coal India to improve its operational and financial efficiencies. B. Provide on line information and MIS for fast, efficient, transparent decision making at the highest levels. C. Lay down foundation for monitoring all the mining operations. The expected business benefits from this ERP project are ¾ Operational efficiencies in all the subsidiaries and their mines by increasing information availability and adopting process improvements. ¾ Optimize working capital requirement by optimizing the inventory of spares, fuels and other consumables across the plants. ¾ Set in place a system to capture information to build accountability for performance across organizational levels at the corporate office and mines. ¾ Integrated systems to address issues relating to data management to avoid duplication of effort, accuracy, timeliness and comprehensiveness of management information. ¾ Streamline the accounts functionalities for efficient cash flow management & enable profitcentre accounting. ¾ Manage the Customer related processes more efficiently leading to “Customer delight”. ¾ Enabling an efficient HR process to run payroll. Compliance and efficient management of all environment, health and safety issues. ¾ Cost saving and compliance to CVC guidelines for bidding and e-procurement ¾ Informed and intelligent decision making from advanced analytics and management dashboard. ¾ Ensure that the IT systems are ready for the future competitive environment 1.4 Current IT Scenario at CIL IT infrastructure and application backbone at CIL is not mature enough to tackle present and future challenges Coal India is facing. Most of the mines do not have network connectivity which is a huge challenge for automation and communication among different entities of CIL. From application point of view, CIL has mainly 5 components which are: 1. CoalNet: CoalNet is the main ERP application currently running at CIL which have separate modules like material management, finance, human resource etc. But different modules are not well-connected which is not desirable. There are different functionalities which are not supported by CoalNet like two-envelope bidding system, e-auction, quality management etc. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 15 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2. 3. 4. 5. CoalNet is developed longtime back and not updated with industry trends and new requirements from inside and outside of Coal India. Truck Dispatch System: This is a application currently running at CIL which is not integrated with Coal Net. Recently, tender for implementation of GPS based Truck Dispatch System in 11 of its large open cast mines has been awarded by CIL. Washery Automation System: This system is used at mines for washeries. Mining Planning and Operation System: This is used for planning mining operations and tracking the progress. Weighbridge System: Weighbridge is used for weighment of the coal in the truck or wagons at railway siding. The Electronic weighbridges will be integrated with the new SAP ERP system so that information from weighbridge can be captured and processed properly in SAP. Apart from these systems services of ITI, MSTC and Metal Junction are used for e-auction. Details on the current IT Assets of CIL can be found in Section 1.4 of Vol I. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 16 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Section 2: Summary of Scope of Work CIL intends to implement SAP ERP solution at its corporate office, subsidiary head quarters, area/sub-area offices, units/projects/collieries, washeries, workshops, stores, hospitals, weigh bridges, regional sales offices, subsidiary desk offices. Details of SAP implementation and Infrastructure requirements are given in Volume II and Volume III of this RFP. For the purpose, bidder has to submit offer for supply of SAP (Licenses, Engines, Tools, RDBMS etc), supply, installation, commissioning of Computer Hardware, Operating Systems, Infrastructure (WAN/LAN), implementation of SAP modules, training and maintenance, as detailed here under and Annexure-2, on Turn Key basis, 1. Supply of SAP Solutions : x SAP Licenses: Initially 5,500 Users and all other software engines and tools will be required. Subsequently, the users will be increased to 20,000 as per schedule provided in Volume II of this NIT. 2. Implementation of SAP Applications x Project Preparation x Business Blueprint x Realization x Final Preparation x Go Live and Support 3. SAP Services x Risk Mitigation Services x Review Services x Program Management Services x Expert Consulting Services 4. Training & Knowledge Transfer – SAP Applications 5. Supply, Installation & Commissioning of following Infrastructure Components: x Hardware Components - Data Center Equipments, Servers, Storage, Backup Devices, Racks etc. x Network Components x Security Components x Voice Components x Wireless Connectivity Components x Passive Network Components, PC's, Printers and Peripherals x EMS & NMS Software x VSAT Components x Video Conferencing Equipments & Software 6. Design, Installation & commissioning of DC, NR and DR x Hiring of 3000 Sq.Ft. of Data Centre area, Design, Installation & commissioning of Data Center (including Civil Constructions Work if required) x Installation and Commissioning of NR at CIL office at 10, NS Road, Kolkata. x Installation & commissioning of Data Recovery Centre at WCL, Nagpur (including civil construction work, if required). 7. Project Management in different phases, Change Management and Training. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 17 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x The work covering all the above components will be completed by the bidder on a turnkey basis 8. Post Implementation support services for running the SAP Applications and Infrastructure & Facility Management services. x SAP Application Support x Infrastructure Components Maintenance x Infrastructure Facility Management Support 9. Supply of manpower to assist CIL for the following services x Master Data Codification and Porting Note: For detailed scope of work please refer to Volume II and Volume III of this NIT. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 18 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.1 Cost of Bidding The Bidder shall bear all costs associated with understanding the scope of work, bid preparation and bid submission. CIL will in no case be responsible or liable for these costs, regardless of the conduct or outcome of the bidding process. 3.2 Qualification to Bid The bidding process will be open to any Authorized SAP Implementation Partner, who shall be able to supply, design, install and commission all of the components as described in the Broad Scope of work at Section-2 and Detail Scope of Work at Annexure-2 and be able to provide Post implementation support services, either on their own or by forming a consortium bid. Bids may be submitted by either of the following categories of bidders only: x Sole Bidder: o The Sole Bidder must be a Software Implementation and System Integrator company and authorized Implementation Partner of SAP and authorized by SAP to bid against this tender. The Sole Bidder cannot be a part of any consortium for this tender. x Consortium of firms: o Bids can be submitted by a consortium of firms as partners and shall comply with the following requirements: ƒ A properly executed agreement, legally enforceable in India, signed by all partners of the joint venture/consortium. The Agreement shall be signed so as to be legally binding on all partners. ƒ One of the partners of consortium shall be nominated as Partner- inCharge/Prime Bidder, and this authorization shall be evidenced by submitting a power of attorney signed by legally authorized signatories of all the partners. The Prime Bidder and the Consortium partner must be Software Implementation Company, authorized implementation partner of SAP and also authorized by SAP to bid against this tender. ƒ Mandatory Qualification Criteria for the Prime Bidder and the Consortium Partners is mentioned in the Table 3.2.1 below The bidder shall furnish along with their bids, producers authorization certificate, at least for the following categories of the products from the respective manufacturers of (i) SAP Applications (ii) Computer Hardware (iii) System software (iv) Network and Communication equipment. Mandatory Qualification Criteria as mentioned in clause 3.2.1 (Table A) has to be met by the Bidders. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 19 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. This page is intentionally left blank Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 20 of 249 Vol- I Existence 2 The Bidder should be in existence for the last 5 years in the areas of Software Development, Software Implementation, System Integration, Training, Support and other allied services. The Bidder can be a partnership firm or corporation. The bidder may choose a consortium partner. In the event a bidder presupposes the involvement of a consortium partner, proposal must detail clearly the responsibilities of partner involved. However the Prime Bidder will fully responsible for successful completion of the entire project. Minimum Qualifying Requirements Applicable to Prime Bidder of the consortium Applicable to Prime Bidder of the consortium Applicable to Consortium Partner Consortium Partner Consortium Prime Bidder Vol- I Applicable to Sole Bidder Applicable to Sole Bidder Sole Bidder QUALIFICATION CRITERIA Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 General Performance Variable 1 Sl. No Table A 3.2.1 Mandatory Qualification Criteria Certificate of Incorporation Memorandum of Articles & Association and Certificate of Incorporation Documents to be Provided Response (Y/N) SAP Implementation Partner Status SAP Implementation Experience In the Mining and Metals Industry – Globally SAP Implementation Experience - Globally 4 5 6 The bidder should have implemented at least one end-toend SAP implementation of The bidder should have implemented at least one end-toend SAP implementation of 1000 users or more in a Mining /Metal company The Bidder should be an Authorized Implementation Partner of SAP. The Bidder should possess the authorization of SAP to supply customize, implement and support SAP solutions. Minimum Qualifying Requirements The bidder should have a turnover of at least ` 5000 Crore for each of the last three financial years and should also have a positive net worth in each of these 3 years Page 22 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Company Turnover Global Performance Variable 3 Sl. No Vol- I Applicable to Sole Bidder Applicable to Sole Bidder Applicable to Sole Bidder Applicable to Sole Bidder Sole Bidder Applicable to Either Prime Bidder of the consortium or Applicable to Either Prime Bidder of the consortium or Consortium Partner, who will take responsibility of SAP implementation Applicable to Prime Bidder of the consortium and Consortium Partner. The Consortium Partner should have a turnover of atleast `2500 Crore for each of the last three financial years and should also have a positive net worth in each of these 3 years Consortium Applicable to Prime Bidder of the consortium QUALIFICATION CRITERIA Copy of customer order or customer Copy of customer order or customer certificate Partner Status certificate from SAP Documents to be Provided Company balance sheet / Letter from auditor duly certified by Company Secretary and should be notarized. Response (Y/N) Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Page 23 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 The bidder should have at least 5 Mining/Metal domain experts globally on its payrolls for at least the last one year, out of which, at least one should have over 15 years experience in IT in mining/metal industry. 8c The bidder should have its SAP Delivery Center/R&D/ SAP CoE in India with overall employee strength not less than 5000 employees in its payroll as on 31st March 2010 The bidder should have at least 1000 SAP consultants globally on its payroll as on 31st March 2010 Manpower Strength 8 8a Minimum Qualifying Requirements 2000 users or more in any company with multi-location operations. The bidder should have executed at least one turnkey project involving multi-location convergent network with Data Center of value `150 Crore or above in the last 5 years. 8b System Integration for Network & Data Center Capability - Globally Performance Variable 7 Sl. No Vol- I Applicable to Sole Bidder Applicable to Sole Bidder Applicable to Sole Bidder Applicable to Sole Bidder Sole Bidder Consortium Applicable to Either Prime Bidder of the consortium or Consortium Partner who will take responsibility of SAP implementation Applicable to Either Prime Bidder of the consortium or Consortium Partner, who will take responsibility of SAP implementation Applicable to Either Prime Bidder of the consortium or Consortium Partner, who will take responsibility of SAP implementation Applicable to Either Prime Bidder of the consortium or Consortium Partner Consortium Partner, who will take responsibility of SAP implementation QUALIFICATION CRITERIA Self Certification from Authorized Signatory as per latest published annual report. Self Certification from Authorized Signatory Self Certification from Authorized Signatory along with the names of the experts. Copy of customer order or customer certificate Documents to be Provided certificate Response (Y/N) Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Applicable to Sole Bidder Sole Bidder Applicable to Either Prime Bidder of the consortium or Consortium Partner Consortium Documents to be Provided Copy of valid certificate Response (Y/N) Page 24 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Vol- I 1. All financial data should be as per latest financial year unless explicitly mentioned, accompanied by the Balance Sheet duly certified by a Chartered Accountant practicing in India. 2. All figures should be in currency as per the Balance Sheet. CIL shall do the conversion to Indian Rupees. 3. Documentary evidence to be provided to support the claims. 4. SAP “Employee Users” and “ESS Users” will not be counted in arriving at number of named users for responding to SAP credentials 5. End-to-End implementation means implementation of any five of the following modules of SAP, viz, FI, CO, SD, PS, MM, PP, PM, HR, Payroll, QM, BI through the Design, Build, Implementation and Support phases. Instructions for filling up the qualification criteria: Notes: Minimum Qualifying Requirements Should have SEI CMM Level 5 and ISO 27001or its higher version certification. Quality Certification Performance Variable 9 Sl. No QUALIFICATION CRITERIA Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.2.2 Consortium Guidelines In case, the Bidder bids by forming consortium then the following guidelines shall be followed. The consortium will consist of an authorized SAP Implementation Partner and Infrastructure Services Partner. CIL expects certain requirements to be fulfilled by each of the consortium member. These include the following preconditions 1. The SAP Implementation Partner may be either the Prime Bidder or the Consortium Partner. 2. The response to the Bid has to be submitted only by the Prime Bidder for the purpose of this Bid. 3. The response to the Bid must contain a written declaration by the competent authority of all the consortium members that : a. They have collectively agreed to respond to the Bid. b. They have nominated the named entity as the Prime Bidder (as the leader of the consortium) and his nomination shall be evidenced by submitting a letter of authorization signed by legally authorized signatories of all the members of the consortium. c. The consortium also has to declare the SAP implementation partner for the project. The SAP implementation partner has to take care of all SAP product and licenses required by the CIL for the project. d. The Prime Bidder is authorized to receive instruction / communications from CIL, authorized to incur liabilities and shall deliver all the provisions of the contract on behalf of consortium members. e. All members of the Consortium shall be responsible and liable severally for the execution of its respective Scope of Work under Agreement in accordance with the terms and conditions of the Agreement. 4. However, the leader of the Consortium shall be solely responsible for the integration, interface, coordination and completeness of the entire Scope of Work including establishment of Performance Guarantees under the Agreement. A format in which such a declaration should be submitted as given in Appendix-B5: Consortium MOU. 5. The consortium has to be unique, i.e. neither the Prime Bidder nor the Consortium Partner can be part of more than one consortium. 6. It will be Prime Bidder’s responsibility to certify the work completed by the other consortium members. 7. Payments shall only be released to the Prime Bidder against his Invoices as per the Price schedule. 8. The Prime Bidder should provide a declaration from all the consortium members that they have full property right or requisite right to use all intellectual property / tool they propose to supply or use in course of this project. 9. The Prime Bidder must provide in writing the mechanism for decision making and dispute resolution among the Consortium members. 10. The offer shall include all the information required for a Bid as described in Bid Document including the eligibility criteria, for each Consortium partner. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.3 Structure of the Bid The Bid Document is structured into Four Sections, Three Appendices and Nine Annexure. 1. Section-1 to Section-4 describes the Project Introduction, Broad Scope of Work, Bidding Procedure and Evaluation of bids. 2. Appendix-A provides indicative details of the existing IT infrastructure & Facilities in CIL and a brief overview of the business processes. 3. Appendix-B outlines the supporting documents/inputs which are to be submitted as a part of the bid. 4. Appendix-C outlines the Agreement. 5. From Annexure-1 to Annexure-9 are related to Preliminary Implementation Pan, Detailed Scope of Work, SLA’s, Schedule of Requirement and Price, Payment Schedule, PBG, Bidder Check List, Contract Document, Integrity Pact. 3.4 Submission of Bid 3.4.1 Complete Bid and Bid Submission Format The Bidder shall prepare: 1. One original of: a. The Certificate of Acceptance of Important Conditions b. EMD and c. Crossed Demand Draft for Rupees 5000 (Five Thousand) toward cost of bid document if downloaded from CIL website. and clearly mark them as “ORIGINAL - Certificate of Acceptance of Important Conditions, EMD and Draft (If Applicable) ”; 2. One original of the Technical Bid and mark it as “ORIGINAL - TECHNICAL BID” 3. One original of the Price Bid and mark it as “ORIGINAL - PRICE BID” In addition, the Bidder shall submit: 1. TWO copies of the Technical Bid and clearly mark them “COPY NO … - TECHNICAL BID” 2. TWO copies of the Price Bid and clearly mark them “COPY NO…. - PRICE BID”. In the event of any discrepancy between the original and the copies, the original shall prevail. The packet containing “ORIGINAL - Certificate of Acceptance of Important Conditions, EMD and Crossed Demand Draft of `5000/- (If Applicable)” will be put into another envelope and marked as PART A. The packets containing “ORIGINAL - TECHNICAL BID”, “COPY NO 1 TECHNICAL BID” and “COPY NO 2 - TECHNICAL BID” will be put into another envelope and marked as PART B. The packets containing “ORIGINAL - PRICE BID”, “COPY NO 1 PRICE BID” and “COPY NO 2 - PRICE BID” will be put into another envelope and marked as PART C Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 26 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. All these envelopes i.e. PART A, PART B and PART C shall be put in to a fourth envelope and marked as “BID DOCUMENTS”. All the envelopes must be sealed & superscripted with NIT Name and No., and due date of opening. The full name, postal address, telegraphic address and Telex / telephone / fax / E-Mail of the Bidder shall be written on the bottom left corner of the envelope. Completed Bid shall be submitted within due date and during office hours only. The bids can be sent by speed post /registered post or submitted in person so as to reach the accepting authority on or before the date & time fixed for submission of the bid. Bids received by any other mode(s) and after Due Date and Time will be rejected. All pages of the Technical Bid and Price Bid must be signed by the person or persons of the bidder, duly authorized to sign such a Bid. Any changes, erasing, alterations, additions or overwriting made in the Bid will be valid only if the person or persons signing the bid have authenticated the same with their signature. Deviation, if any, from the Bid specifications and other parts of the Bid Document, shall be listed out separately and clearly by the Bidder as per the format of Exclusion /Deviation Statement attached as Appendix-B3. If deviations are not clearly listed as such, they will not be considered by CIL later. However, bidders are advised to note that “Critical Components” as provided in the Table 01 to Table 11 under the heading ‘Technical Compliance Table’ in Section A2.8 Volume III of the RFP contains items where no deviations are permissible. Also, NO deviations will be allowed in the “Functional Specification Compliance Tables” in Section A2.4 of Volume II. Bidders deviating on any of the items listed in the said tables will be liable for rejection. 3.4.2 Contents of Part A, B and C The Bidders are requested to submit the proposals written only in English language. Each proposal shall have three parts containing the following: Part - A: Certificate of Acceptance of Important Conditions and EMD 1. Covering letter signed by an authorized person holding the Power of Attorney. 2. Power of Attorney. 3. Crossed Demand Draft / Irrevocable Bank Guarantee for requisite amount drawn in favor of Coal India Limited, payable at par at Kolkata, India in the manner prescribed in NIT enclosed herewith towards the Earnest Money (Refer: 3.5.8). 4. Crossed Demand Draft for Rupees 5000 (Five Thousand) toward cost of bid document if downloaded from CIL website. 5. A letter from the Sole Bidder / Prime Bidder, that they all agree to the terms and conditions specified here in the RFP/NIT, unconditionally. 6. Letter of undertaking in non-judicial stamp paper of worth ` 50 in the format enclosed at Appendix-B1. 7. Consortium MOU, as per Appendix - B5 (applicable for consortium bidding) 8. Response to the Qualification criteria defined in Section “3.2 Qualification to Bid” with documentary evidence. 9. Submission of Bidder Check List detailed in Section Annexure 7 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 27 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Part - B: Technical Bid 1. Certified copy of valid VAT/Sales Tax Registration Certificate and IT PAN. 2. Certified copy of Provident Fund Registration No. and Service Tax Registration No. of appropriate category issued by competent authority. 3. Certified copy of the Registration of Firm / Company. 4. Present & permanent Address for correspondence along with Telephone No./Fax No./E-mail address etc. 5. Submission of Authenticity Letters from OEM that all active equipments / components are original and not re-furbished and that their support life is minimum 8 (eight) years from the date of supply. 6. Formal proposal as per the broad guidelines mentioned below A. Executive Summary B. Overview of proposed solution C. Proposed applications landscape D. Suggested technical Architecture E. Delivery of Services with Implementation plan F. Data Migration Plan G. System Testing Plan & Strategy H. Description of OEM services, (if any). I. Maintenance and Support Services J. Change Management Plan K. Training Plan L. Disaster Recovery Plan M. Responses to technical and functional specifications & Compliance Statements N. Any other technical information, Bidder wishes to furnish. 7. Conformance to Deliverables and SLA’s mentioned in Annexure 3. 8. Exclusion /Deviation Statement in the proforma at Appendix-B3. 9. Unpriced Schedule of Bill of Quantity, being proposed by Bidder. Technical Proposal shall not contain any price. 10. Bidder Credentials as per Section “4.1.3 Evaluation Tables” along with documentary evidence 11. In case of consortium bidding, bidder needs to additionally submit profile of the Infrastructure Services Partner as per “Appendix B7: Profile of Consortium Partner” with documentary evidence. In case the Infrastructure services partner is the prime bidder, the profile of the SAP implementation services partner profile will need to be submitted as per Appendix B7. 12. Apart from hard copy, a CD / DVD containing soft copy of the above will also have to be submitted (in the original only). The CD / DVD should also contain other technical documents like published data sheets and technical literature relating to the proposed solution components. Bidder should ensure that the Price Bid is NOT submitted as part of the CD/DVD. Part - C: Price Bid Price bid shall include 1. Original price bid / schedule of quantity duly filled in, signed & stamped on each page. The Bidder shall take utmost care in filling the Bid documents corresponding to instruction to Bidder and relevant information elsewhere in Bid document. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 28 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2. Price Bid shall be completed in all respects with all their annexures as specified only. 2.4.3 Sealing the Bid All the envelopes containing the Bid documents must be properly sealed. 3.4.4 Rejection of Bid The Bid Document must be submitted as specifically mentioned in the RFP, failing which the bid is liable to be rejected 3.4.4 Bidder Check List The bidders are required to submit the checklist as detailed in Annexure- 7. This checklist must be submitted in Part A of the Bid Document failing which the bid is liable for rejection (Refer 3.4.2) 3.5 Instruction to Bidder 3.5.1 Bidder to obtain their own Information 1. Bidder shall for all purposes and whatsoever reason may be, deemed to have independently obtained all necessary information for the purpose of preparing his Bid. The correctness of the details given in the Bid Document is for guideline/ information only, to help the Bidder to prepare his Bid. 2. The Bidder shall bear all costs associated with the preparation and submission of its bid, and the Purchaser named in the Bid Data Sheet, hereinafter referred to as “the Purchaser”, will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the bidding process. 3. The Bidder shall submit the Bid Security of 50,00,000/- (Rupees Fifty Lacs Only), in the form of crossed Demand draft drawn in favour of Coal India Ltd Payable at par at Kolkata or in the form of irrevocable Bank Guarantee (from Scheduled Bank / Kolkata Branch )with validity of 28 days beyond the validity of the bid. The Bid submitted without the Bid Security will be summarily rejected. 4. The Bidding documents can also be down loaded from Coal India Limited website www.coalindia.in In case, the document is downloaded the non-refundable fee of 5000/(Rupees five thousand) by crossed demand draft must be enclosed with the bid documents, failing which the bid will not be considered. 5. Bidder shall be deemed to have examined the Bid documents and to have obtained his own information in all matters whatsoever that might influence carrying out the implementation of the Project at the scheduled rates and satisfied himself to the sufficiency of his Bid. 6. Bidder shall be deemed to have visited the sites, to have satisfied itself to the nature of all existing Business processes and also as to the nature and the conditions of available facilities and communications and possible interruptions there to the access and egress from site and to have made enquiries, examined satisfied himself of the sites in respect to requirements for Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 29 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. implementing Project and to have made local independent enquiries on all matters affecting the Agreement. He is deemed to have acquainted himself his liability for payment of Government Taxes, Customs and Duties and other charges. 7. Any neglect or failure on part of the Bidder in obtaining necessary and reliable information on issues stated in the above clause or any other matters affecting the Agreement shall not relieve him from any risks or liabilities or the entire responsibility for implementing the SAP Solution at the scheduled rates and time in strict accordance with the contract documents. 8. The oral agreement or inference from conversation with any officer or employee of the Owner before, during or after the execution of the Agreement shall not in any way affect or modify the terms and obligations herein contained. 3.5.2 Addenda / Corrigenda / Amendments issued to this Tender 1. CIL reserves the right to issue any addenda or corrigenda to the Bid document without assigning any reason thereto. In response to such addenda / corrigenda, the Bidders shall submit their Bid in a fresh schedule. However, if the Bidder has already submitted his Bid prior to issue of such addenda / corrigenda, they shall resubmit a fresh offer marked on the envelope as “Amended Offer”. The original offer submitted by such party shall be destroyed in presence of the Bidder on the date of opening. 2. At any time prior to the deadline of submission of Bids, CIL may, for any reason, whether at its own initiatives or in response to a clarification by a prospective bidder, modify the bid document through Amendment(s) 3. The Amendment(s) will be notified to all prospective bidders through the website and such Amendment(s) will be binding on them. 3.5.3 Extension of Bid Opening Date CIL may, at its sole discretion, decide to extend this Bid Opening Date and / or date for submission of Bids. In such a case, all rights and obligations of CIL and that of Bidders previously subject to the Bid Opening Date will thereafter be subject to the new Bid Opening Date. 3.5.4 Bids Received Late Any bid received by CIL after the expiry of the specified date and time for submission of bids will be rejected outright and returned to the Bidder. The Bidders must take all responsibility of submitting the Bids within the prescribed date and time of submission of Bids. CIL will not accept as valid reason or be responsible for any postal delay or non-receipt / non-delivery of the Bids. 3.5.5 Modification and Withdrawal of Bids 3.5.5.1 Modification Request by Bidder The Bidder will not be allowed to modify its Bid after its submission, Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 30 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.5.5.2 Withdrawal of Bid by Bidder No bid shall be withdrawn during the period between the Bid Opening Date and the expiration of the bid validity period as specified in Notice Inviting Tender. Withdrawal of a bid during this interval period may result in the forfeiture of the Bidder’s Bid Security (EMD). 3.5.6 Deviations Deviation, if any, from the Bid specifications and other parts of the Bid Document, shall be listed out separately and clearly by the Bidder as per the format of Exclusion /Deviation Statement attached as Appendix-B3. If deviations are not clearly listed as such, they will not be considered by CIL later. However, bidders to note that items marked as “Critical” in the Table 01 to Table 11 under the heading ‘Technical Compliance table’ ” in Volume III of the RFP. Bidders deviating on any of these items so marked in the said table(s) will be liable for rejection. The bidder may please note that NO deviations will be allowed on any ‘Terms & Conditions” of the RFP. Any deviation(s) in the “Terms & Conditions” shall result in the rejection of the bid. 3.5.7 Bid Validity Period All bids, not rejected for any other reason, will remain valid for a period of 180 (One Hundred Eighty) days from the last date for submission of Bids or any extension thereof. Each Proposal shall indicate that it is a firm and irrevocable offer. Non-adherence to this requirement may form ground for declaring the proposal as non-responsive. In case of the bidder revoking or withdrawing / canceling his Bid, varying any term in regard thereof during the validity period of the Tender without the written consent of CIL, the Bid submitted shall be liable for rejection and will entail forfeiture of the Earnest Money paid along with the Bid. On completion of the validity period 180 (One Hundred Eight) days, unless the bidder withdraws its bid in writing, it will be deemed to be valid until such time that the bidder formally (in writing) withdraws its bid. 3.5.7.1 Extension of Period of Bid Validity In exceptional circumstances, CIL may request all the Bidders consent to an extension of the period of validity of their respective bid. The request and the response thereto will be made in writing. 3.5.8 EMD/ Bid Security The Bidder shall furnish a crossed Demand Draft of 50,00,000/- (Rupees Fifty Lac only) towards Bid security drawn in favor of Coal India Ltd payable at par at Kolkata or in the form of irrevocable Bank Guarantee (from Scheduled Bank / Kolkata Branch )with validity of 28 days beyond the validity of the bid in the format given in Appendix B4. A forwarding letter is to be prepared enclosing the Demand Draft / Bank Guarantee stating - NIT No, Opening Date, Name of the Bank issuing the Demand Draft, Draft Number, Draft Date, Value of Demand Draft and Payable at. The demand draft and the forwarding letter are to be sealed in a separate envelop. The envelop should be marked as “BID SECURITY” and bear the NIT Title and No., and the Bid opening date. (Refer 3.4.2) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 31 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. In case the bid documents are down loaded from Coal India Limited web site, crossed demand draft from any scheduled bank in favor of “Coal India Limited”, payable at Kolkata, towards cost of bid document for ` 5000/-(Rupees Five thousand) must be put in this envelop also. Bids not accompanied by the requisite EMD, or bids accompanied by EMD of inadequate value or without cost of bid document shall not be entertained and in such a case bids shall be returned to the Bidders without being opened. The EMD may be forfeited: 1. If the Bidder withdraws its bid during the period of bid validity. 2. In the case of a successful Bidder, if the Bidder fails within the specified time limit to furnish the acceptance of Letter of Award and / or fails to submit Performance Guarantee of requisite amount. 3. If, during evaluation of bids, CIL ascertains that there is discrepancy in the bid price due to arithmetical error, and on communicating such error to the Bidder, the Bidder does not accept the proposed correction of errors. 3.5.9 Price Basis, Taxes and Duties Complete details of Commercial Bid are to be provided in specified schedules in Annexure-4: Price Schedule. All prices are to exclude central and local taxes and duties which shall be indicated separately. Bidder may refer the Notes in Annexure-4 for quantities and calculation of TCO. All items and services are to be quoted in Indian Rupees. No adjustment of the contract price shall be made on account of variation of costs of labour and materials or any other cost component affecting the total cost in fulfilling the obligations under the Agreement. The prices once offered must remain firm and shall not be subject to escalation due to fluctuation in foreign currency or for any reason; however Taxes, Duties, Levies etc prevailing during the contract period as per payment milestones shall be paid. All the Bidders are requested to familiarize themselves with the laws, rules and regulations prevailing in India and consider the same while developing and submitting their Proposal. The Bidder has to consider all taxes, duties, levies, cess etc., applicable for executing this Contract and accordingly, shall indicate the excise duties, customs duties and all other taxes, levies, cess etc. considered on supplies and services either imported or locally sourced included in the bid. 3.5.10 Rates to Be In Figures & Words The Bidder shall quote both in figures and in words for the rates and amount Bided by him in the Schedule of quantities / Price schedule forming part of the Bid document, in such a way that interpolation is not possible. The amount of each item shall be worked out and entered and requisite total given for all items. The Bided amount for the work shall be entered in the Bid and duly signed by the Bidder. If any ambiguities are observed in the rates & amount given in words & figures the following procedure shall be followed: 1. When there is difference between the rates in figures and words, rate which corresponds to the amount worked out by the Bidder, shall be taken as correct. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 32 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2. When the rate quoted by the Bidder in figures and words tally but the amount is incorrect, the rate quoted by the Bidder shall be taken as correct but not the amount. 3. When it is not possible to ascertain the correct rate by either of above methods, the rate quoted in words shall be taken as correct. 3.5.11 Abnormal Rates The Bidder is expected to quote the rate for each item after careful analysis of cost involved for the satisfactory performance and completion of item work considering all specifications and conditions of Agreement. This will avoid loss of profit or gain in case of curtailment or change in specification for any other item. In case the rates quoted by the Bidder for any item are unusually high or unusually low it will be sufficient cause for the rejection of the Bid unless the Owner is convinced about the reasonableness of the analysis for rate furnished by the Bidder (on demand) after scrutiny. 3.5.12 Corrections & Erases No erases or over writings and corrections are permissible. 3.5.13 Details & Signature of Bidder The Bid shall contain the name, residence and place of business of person or persons making the Bid and shall be signed by the Bidder with his usual signature. Partnership firms shall furnish the full names of the partners in the Bid. It should be signed in the partnerships name by all the partners or by duly authorized representative followed by the name and designation of the person signing. Bid by a Corporation shall be signed by an authorized representative and a power of attorney / authorization on its behalf shall accompany the Bid. A copy of constitution of the firm with names of all partners shall be furnished. In case of cooperative society, the authorized representative of the society will sign the Bid. Similar principle shall be followed in case of any Trust and Hindu Undivided Family business. The signature should be attested, at least by one witness. 3.5.14 False or Misleading Claims Bidders are expected to submit the response to the bid and required information with supporting documents truly, honestly, and without distortion in any manner whatsoever. In the event it transpires that the Bid Document or supporting documents are untrue, dishonest or distorted, CIL shall have summary right to reject the bid in its absolute discretion without assigning any reason and debar the bidder from participating in any tender of CIL and its subsidiaries for a period of three years. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 33 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.5.15 Fraud and Corruption Bidders are expected to observe the highest standard of ethics during the procurement stage and execution of this Agreement. In pursuit of this policy, CIL defines, for the purposes of this provision, the terms set forth below as follows: “Corrupt practice” means the offering, giving, receiving, or soliciting of anything of value to influence the action in the procurement process or in Contract execution. 3.5.16 Contacting the Owner From the time of bid opening to the time of Contract award, if any Bidder wishes to contact the Owner on any matter related to the bid, he shall do so in e-mail. All queries, if any, shall be referred to the General Manager (MM), by the Bidder. The details for correspondence are as follows: General Manager (MM), 10 NS Road, Coal India Limited, Kolkata – 700001 Email: gmmm@coalindia.in Tel: +91 33 2248 8099, 2243 5778 Fax: +91 33 2243 5778 3.5.17 Conflict of Interest Prime Bidders/Consortium must state in their submission any circumstances, arrangements, understandings or relationships that constitute, or may reasonably be considered to constitute, an actual or potential conflict of interest with the Bidders (or their consortium partners) obligations under this RFP (including but not limited to these conditions of proposal) or under any contract which may be negotiated or executed between the Bidder and CIL. Bidders and their employees, agents, advisers and any other person associated with the Bidder must not place themselves in a position which may, or does, give rise to a conflict of interest (or a potential conflict of interest) between the interests of CIL or any other interests during the bidding process. Participation by Bidder(s) with a conflict of interest situation will result in the disqualification of all Bids in which it is involved. 3.5.18 Ownership of Responses Without affecting any intellectual property rights, which may exist in a response to this RFP document, all responses submitted will become the property of CIL. Without limiting this section, CIL reserves the right to copy and reproduce responses for the purposes of evaluation, clarification, negotiation and/or contract execution and anything else related to these purposes. In addition, CIL will retain (soft and hard) copies of all responses, evaluation, negotiation or such other materials as are required for the discharge of its legal obligations and in order to efficiently and effectively manage any contract entered into with a Bidder. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 34 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.5.19 Owner’s Right to Accept Any Bid and to Reject any or all Bids CIL reserves the right to accept or reject any bid or to annul the bidding process and reject all bids at any time prior to Contract award, without assigning any reasons thereof and CIL shall not entertain any claim whatsoever on this account. 3.5.20 Clarification on Bids During the bid evaluation, CIL may, at its discretion, ask the Bidder for clarifications on its Proposal. 3.5.21 Language English shall be the binding and controlling language for all matters relating to the meaning or interpretation of this Contract. 3.5.22 Page Numbering Each document (Part A, Part B, Part C) submitted by bidder is to be numbered as n/N where “n” is the sequence page number “N” is the total pages in the document. In Technical specification section (Volume III), the bidder should refer this page number wherever cross referencing has been done. 3.5.23 Workplace/Facilities to be provided by CIL at site x Owner shall provide the office space and other essential work facilities within its premises for the Vendor’s team x Suitable workspace in the respective sites/offices may be provided to the Vendor subject to the availability, free of charge. However, providing such space and store is for the smooth execution of Agreement and non provision of such space does not bind Owner and make Owner liable to the Vendor in any manner except as specifically provided in the Agreement terms. Owner is not liable for any loss or damage to the Vendor’s equipment/material as a result of variation in voltage or frequency or interruption in power supply or other loss to the Vendor arising there from. x Residential accommodation will be provided by Owner if available to the staff of Vendor at site on CIL approved rates 3.5.24 Integrity Pact The Bidders will have to submit on plain paper the dully filled-in, signed and stamped (on each page) Integrity Pact enclosed as Annexure – 9 along with their technocommercial bid (Part-B) of their offer, failing which their offer will not be considered any further. Names of the four Independent External Monitors (IEMs) for this tender are as follows:- Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 35 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1. Sri C S Samal, IAS ( Retd.) CA-193, Sec-I, Bidhan Nagar, Kolkata- 700 064 Ph .23212297 /2321 3385 9831894764 2. Sri S M Murshed, IAS ( Retd.) 1 A, Rainey Park, Kolkata- 700 019 murshed11@gmail.com 24865219 / 9831251361 3. Sri Sujit Sankar Chattopadhyay, IAS (Retd.) CK- 205, Salt Lake City, Kolkata- 700 091 033- 23216602 Fax- 22301250 9836105640 4. Sri Nishi Kant Sinha, IAS (Retd.) C-2, / 2468, Vasant Kunj, New Delhi- 110 070 09810508989 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 36 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Section 4: Evaluation of Bids Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 37 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4.1 Opening of Bids The Technical Bid shall be opened at a predetermined time, venue & date in presence of the Bidder(s) or their authorized representative(s) who may like to be present. Partner, Director or permanent employee of the firm duly authorized, only, will be permitted to attend the bid opening meeting. Price bid shall be opened at a future date under intimation to all technically qualified Bidders and in presence of them or their authorized representatives who shall participate. 4.1.1 Preliminary Examination of Bids CIL will examine the Proposals to determine whether they are complete, whether required EMD have been furnished, whether the documents have been properly signed, and whether the Proposals are generally in order. If a Proposal is not substantially responsive, it shall be liable for rejection by CIL. CIL’s determination of Proposal’s responsiveness will be based on the contents of the Proposal itself and any written clarifications, if sought for by CIL and submitted by the Bidder. Bids submitted by the bidders who did not purchase bid document, submitted without the Bid Security and/or the cost of Bid Document of ` 5000/-(Rupees five thousand), in case the bid document is downloaded from CIL’s Website, as specified at clause 3.5.1 (4) above shall be summarily rejected and the Technical Bid for such cases shall not be opened. 4.1.2 Procedure for Evaluation of Bids All responsive bids shall be subjected to a three stage detailed technical scrutiny by CIL with inter-stage eliminations as described below. Bidders whose offers are eliminated during the process of evaluation shall not be informed. CIL will inform only the short-listed bidders as considered necessary. The decision of CIL shall be final in this respect. The bidding evaluation will be based on Quality-Cost Based Selection Criteria (QCBS) 4.1.2.1 Stage 1: Prequalification/Eligibility stage: All bids found responsive as per bid submission format shall be subjected to detailed scrutiny in respect of conformance to pre-qualification/eligibility criteria laid down in the Tender Document. Documents furnished in the offer will form the sole basis of this evaluation. The bidders shall be solely responsible for any errors of commission or omission which may result in their disqualification. Any bid which fails to meet the pre-qualification/ eligibility criteria (Section 3.2 Qualification to Bid) will be summarily rejected and not considered for further scrutiny. The decision of CIL shall be final in this respect. 4.1.2.2 Stage 2: Technical Examination Credentials of all such Bidders who were found eligible in stage 1 shall be evaluated as per evaluation criteria provided in Table 01 and Table 02 - Bidder Credentials (4.1.3) below. Detailed Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 38 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. technical examination of bids short-listed from Stage (1) will be undertaken to establish conformance to technical specifications and other terms & conditions in respect of scope of the project. Technical clarifications, if considered necessary, may be asked from the respective bidders at this stage. Bids which are not considered to be in conformance to technical specifications and terms & conditions of the Tender will be rejected at this stage and shall not be invited for the next stage. 4.1.2.3 Stage 3: Technical Presentation A notice of one week will be given to the bidders whose bids are found in conformance to Technical specifications and Terms & Conditions of the tender to make a technical presentation to CIL. Evaluation of the presentation will be done as per Table 03 Bidder Credentials (4.1.3) below. The duration of the presentation will be around 2 Hours. Evaluation of the Stage 2 & Stage 3 shall be based on the following parameters and associated weightage as follows: Basis of evaluation (Evaluation Matrix) Score For Details Refer Bidder Credentials Table 01 50 Table 01 in this section Technical Response Table 02 34 Table 02 in this section Technical Presentation Table 03 16 Table 03 in this section Criteria 100 Total Minimum 75 Marks are required for the bidder to qualify to Stage 4 – Price Bid 4.1.2.4 Stage 4: Price Bid Evaluation a) Bidders clearing the Stage 1, 2 & 3 of evaluation will have their Price Bids opened. b) Total price will be calculated for the project as below: Total Price = a) Prices for items 1,2,3,4,5,6 of Table O of ‘Annexure 4’ + b) Present Value of items 7, 8, 9, 10, 11, 12, 13a, 13b, 14a, 14b as per Table O, Annexure 4 Present value of (b) will be taken for two years with an indicative annual discount rate of 11.75%. The formula for arriving at the PV will be: Where : A: Quarterly fee quoted for the services k = (11.75/4)% Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 39 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. n = Number of quarters for which the payment has to be made. c) d) e) f) The discounting rates for 24 quarters are given below. For PV calculations the base year would be taken as 2010 The Bid having the Lowest “Total Price” shall be termed as the Lowest Evaluated Bid and will be awarded 100 marks. Financial score of other bidders will be calculated on the basis of the following formula: o Financial score of bidder = “Total Price” of lowest bidder x 100 / “Total Price” of the bidder o Total Score of the bidding party will be determined based on the following formula: o Total Score = 0.70 * Technical score + 0.30 * Financial score Technical score means score of Bidder credentials + score of Technical score + score of Technical presentation, as indicated in page 39 & 41 (4.1.3) of RFP. Ranking & Award Criteria – Ranking of the bidders will be done based upon total score (ie; 0.70 * Technical score + 0.30 * Financial score). The bidder attaining highest total score shall only be considered for award of contract. Present Value (PV) of Quarterly Charges for various heads is as given below: Total Present Value (PV) of charges per quarter for items 7,8,9,10, 11, 12, 13a, 13b, 14a, 14b as per Table O, Annexure 4 shall be arrived at, based on the formula given in 4.1.2.4 (b) given above, by multiplying by the discounting rates given below in the following manner: Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Quarter Total charges per quarter for items 7, 8, 9, 10, 11, 12, 13a, 13b, 14a, 14b as per Table O, Annexure 4 Discounting Rate for each quarter A 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th B C 0.97146 0.94374 0.91681 0.89065 0.86523 0.84054 0.81655 0.79325 0.77061 0.74862 0.72726 0.70651 0.68635 0.66676 0.64773 0.62925 0.61129 0.59385 0.57690 0.56044 0.54444 0.52890 0.51381 0.49915 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 40 of 249 PV of charges per quarter for items 7, 8, 9, 10, 11, 12, 13a, 13b, 14a, 14b as per Table O, Annexure 4 D = B*C Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4.1.3 Evaluation Tables Table 01: Bidder Credentials Note: 1. Please note that in case of consortium, for each of the following criteria, the credentials of either Prime 2. Bidder of the consortium or Consortium Partner will be considered. i.e. clubbing of experience/credential will not be considered. With regards to the bidders international customers ONLY, if the bidder is under obligation by virtue of an agreement of confidentiality not to disclose the relevant information or relevant supporting documents, bidder may submit an undertaking stating the details of their experience for their international customers on a Stamp Paper with company seal as per the following guidelines: a) In case of Multinational companies, the undertaking should be signed by CEO/MD of Sole Bidder or Prime Bidder / Consortium Partner as may be applicable. b) For Indian Companies, the undertaking should be signed by CEO/MD of Sole Bidder or Prime Bidder / Consortium Partner as may be applicable. c) For both a & b above, the undertaking shall be registered or notarized so as to be legally enforceable. d) The undertaking should also clearly state that the said undertaking is being submitted as the bidder is under a non-disclosure obligation with the customer(s) whose experience is being stated. Note: Bidders may note this undertaking will NOT be accepted for their Indian customers / experience. They will need submit the documents (customer letters/contract/acceptance certificate) as mentioned in the table below. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 41 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. TABLE 1 : BIDDER CREDENTIALS S.No 1. 1.1 2. Parameter Criteria Response Supporting Documents Required Max Score Scoring Logic As per Appendix B6: Profile of Bidder (B6.A Organizational Details) > Audited Balance Sheet for the last 3 years 5 Percentile Basis ( average of the 3 years, as asked) As per Appendix B6: Profile of Bidder (B6. B Global SAP Delivery Experience) Customer letters/Contract/Acceptance Certificate 6 Percentile Basis As per Appendix B6: Profile of Bidder (B6. C India SAP Delivery Experience) Customer letters/Contract/Acceptance Certificate 4 Percentile Basis As per Appendix B6: Profile of Bidder (B6. D SAP Delivery Experience, Functional) Customer letters/Contract/Acceptance Certificate 5 Percentile Basis Financial Strength and Stability Global Turnover and profitability of the bidder Turnover for the last three years of the Sole bidder or prime bidder of the consortium. Group turnover will not be considered SAP Implementation Experience 2.1 No. of organizations where bidder has done end-to-end SAP implementation globally with 2000 users or more 2.2 No. of organizations where bidder has done end-to-end SAP implementation in India with 1000 users or more 2.3 No. of Organizations where at least 5 of the following modules have been implemented in India: x FICO x HCM x MM x PP x PM x QM x SD x PS x Payroll - Applicable to sole Bidder or Consortium member, who will implement SAP in CIL - Applicable to sole Bidder or Consortium member, who will implement SAP in CIL - Applicable to sole Bidder or Consortium member, who will implement SAP in CIL (2.5: Turnover: 2.5 2.5: PAT Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 42 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. TABLE 1 : BIDDER CREDENTIALS S.No Parameter 3. x E-Tendering x BI x IS – Mining SAP Implementation Experience In the Mining and Metals Industry 3.1 3.2 4. 4.1 5. 5.1 Criteria Response Supporting Documents Required Max Score Scoring Logic Customer As per Appendix B6: letters/Contract/Acceptance Certificate Profile of Bidder (B6. E Global SAP Delivery Experience in Mining & Metals Industry) Customer No. of organizations - Applicable As per where bidder has done to sole Bidder Appendix B6: letters/Contract/Acceptance Certificate end to end SAP or Profile of implementation with Consortium Bidder (B6. F 500 users or more in the member, who Indian SAP mining and metals will Delivery implement industry in India Experience in SAP in CIL Mining & Metals Industry) SAP Implementation Experience in the Government Sector/PSUs 6 Percentile Basis 2 Percentile Basis Customer letters/Contract/Acceptance Certificate 3 Percentile Basis No. of organizations where bidder has done end-to-end SAP implementation with 1000 users or more globally in the mining and metals industry - Applicable to sole Bidder or Consortium member, who will implement SAP in CIL - Applicable to sole Bidder or Consortium member, who will implement SAP package in CIL Infrastructure Services Experience No. of organizations where bidder has done end-to-end SAP implementation in Government/PSU/Quasi – Govt organizations with 500 users or more in India Experience in executing turnkey project involving multi-location convergent network with Data Center of value `150 Crore or above in the last 5 years Globally - Applicable to sole Bidder or Consortium member, who will implement Data Center and / or N/w As per Appendix B6: Profile of Bidder (B6. G SAP Delivery Experience in Government / PSU in India) As per Appendix B6: Profile of Bidder (B6. H Infrastructure Services Experience in Data Center) Customer letters/Contract/Acceptance Certificate Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 43 of 249 5 Percentile Basis Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. TABLE 1 : BIDDER CREDENTIALS S.No Parameter Criteria Response Supporting Documents Required Max Score Scoring Logic Infrastructure. 5.2 6. Experience in executing - Applicable turnkey networking to sole Bidder projects wherein critical or Consortium enterprise applications member, who are run on a country will wide scale in Indian implement Govt/PSU/Quasi Govt. N/w Enterprise, with more infrastructure than 250 Locations. People & Quality Related As per Appendix B6: Profile of Bidder (B6. I Infrastructure Service experience in WAN Customer letters/Contract/Acceptance Certificate 5 Percentile Basis 6.1 No. of Certified SAP professionals employed in organization’s payroll in India The experience should be that of Sole bidder or member of the consortium , who will implement SAP in CIL As per Appendix B6: Profile of Bidder (B6.A Organizational Details) List of Certified Consultants to be provided. CIL to be given right to verify certificates on a random basis. 3 Percentile Basis 6.2 No. of technically qualified professionals in networking, systems integration, and prior experience in providing the Data Center Infrastructure maintenance services - Applicable to sole Bidder or Consortium member, who will implement N/w in CIL As per Appendix B6: Profile of Bidder (B6.A Organizational Details) List of professionals to be provided. CIL to be given right to verify, on a random basis. 2 Percentile Basis 6.3 SEI CMM Level 5 Certification - Applicable to Prime Bidder or Consortium member Certification Copy 1 Yes: 1 No: 0 6.4 Information Security Management System Standard BS 7799 Or ISO 27001 - Applicable to sole Bidder or Consortium member As per Appendix B6: Profile of Bidder (B6.A Organizational Details) As per Appendix B6: Profile of Bidder (B6.A Organizational Details) Certification Copy 2 Yes: 2 No: 0 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 44 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. TABLE 1 : BIDDER CREDENTIALS S.No Parameter Criteria Response 6.5 ISO 9001:2000 standard/certified process framework - Applicable to sole Bidder or Consortium member As per Appendix B6: Profile of Bidder (B6.A Organizational Details) Supporting Documents Required Max Score Scoring Logic 1 Yes: 1 No: 0 Certification Copy TOTAL 50 Table 02: Technical Response TABLE 2 : TECHNICAL RESPONSE Sl. No 1. Parameter 1.1 Project Team who will be working on this assignment should have the following minimum experience: a) Project Manager i. 3 SAP implementation cycles experience with at least one implementation experience as a project manager in mining/metals organization. ii. Implementation experience in an mining/metals/integrated steel plant environment b) Change Management Lead i. 3 projects experience in Change Management ii. 1 project experience in Change Management in an SAP Implementation context c) Functional Integration Lead i. 3 SAP implementation cycles experience on different modules of SAP ii. Exposure to mining/ metals industry Criteria Response Supporting Documents Score Project deployment to be shown as per Appendix B6: Profile of Bidder (B6.J Team Composition) 5 Scoring Logic Proposed Team Experience of bidder personnel who will be executing this assignment Resumes to be as per Appendix B6: Profile of Bidder (B6.K CV Format) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 45 of 249 Vol- I For each section 1 for Yes, 0 for No ** NOTE ** People once deputed for the Project/ assignment can only be replaced, if required, with equal or better experienced person. Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. TABLE 2 : TECHNICAL RESPONSE Sl. No Parameter Criteria Response Supporting Documents Score Scoring Logic d) Functional Leads i. 2 SAP implémentation cycles expérience. ii. Exposure to mining/metals industry iii. India localisation experience in the relevant modules iv. Functional consultant with at-least one IS-Mines implementation experience (for Commodity Management / F&A Pricing Component) e) Infrastructure Management Leads i. 2 DR/DC commissioning experience ii. ITIL/ISO 20000 Certification 2. Project Timelines & SLAs 2.1 Adherence to Project timelines as described in the RFP for both SAP application and infrastructure solution Timeline proposed by the bidder Bid Response 2 x Meeting RFP requirement s-2 x Any deviation 0 2.2 Adherence to SLAs and uptime requirements as per the RFP SLAs and Timelines and Business Continuity Plan as responded by the Bidder Bid Response detailing the SLAs, uptime and Business Continuity 2 x Meeting RFP requirement s-2 x Any deviation 0 3. Proposed Infrastructure Solution 3.1 Proposed design and architecture of the applications and network infrastructure along with design and sizing considerations including but not limited to scalability, security and redundancy offered in the proposed hardware and network solution proposed by bidder. Proposal Documentation. Proposed application and network deployment documents along with the supporting documentations from OEM. 10 Documentation :5 Proposal Articulation, SAP& other software landscape details with Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 46 of 249 Vol- I Articulation: 5 Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. TABLE 2 : TECHNICAL RESPONSE Sl. No 3.2 Parameter DC and DR design. Criteria Response DC/DR design best practices and power consumption of proposed equipments as per Tier -3 datacenter specification Supporting Documents one to one mapping of SAP applications in proposed servers DC/DR design document Equipment wise peak power consumption of all the proposed equipments in a tabulated manner along with the un-priced BOM submitted with the technical bids. Score Scoring Logic 5 Percentile Basis 10 Percentile Basis (Maximum marks will be given to the solution with overall minimum power consumption of Server, SAN, Network equipments etc..) 4. Compliance to RFP specifications 4.1 Compliance to specifications mentioned in the Volume III of the RFP / NIT Compliance of the proposed solution Overall minimum deviation in ‘Noncritical’ items as in Volume III, will get maximum marks, rest bidder will get the marks accordingly. TOTAL 34 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 47 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table 03: Technical Presentation TABLE 3 : TEHNNICAL PRESENTATION S.No Parameter 1. Technical Presentation The bidder will have to make a detailed presentation on the proposed SAP and infrastructure solution Criteria To be presented by the sole bidder or Prime bidder of the consortium, to the Tender Committee of Coal India Response Supporting Documents Score Scoring Logic Technical presentation. 16 Marks to be awarded by the Committee TOTAL 16 Percentile computation: The best response in each category /parameter where scoring will be done on percentile basis (as mentioned in the column “Scoring Logic”) would score 100% and others would get their relative percentage. The percentage thus obtained would be converted into corresponding marks. The percentile computation will be limited to two places of decimal. Overall Score: The Total technical score (out of 100) would be rounded off to the nearest integer. The bidder scoring 75 marks or above would qualify for the next stage of evaluation. 4.1.4 Price Justification The bidder whose bid has secured the highest “Total Score” as per 4.1.2.4 (d) above will be considered as successful bidder. The successful bidder will be notified in writing by CIL and may be invited for price justification if required. Discussions will be held only at CIL’s corporate office. 4.1.4 Selected Bidder and Signing of Agreement On finalization, CIL shall invite the selected bidder through Letter of Acceptance (LOA) for the signing of the Agreement. The selected bidder shall execute the Agreement within a period of Thirty (30) days of receiving LOA from CIL. The Agreement is to be signed in English language in two originals, one each for CIL and the Bidder. Within 30 days of signing of the Agreement, the Bidder shall submit 6 photocopies of the entire contract document duly bound to CIL. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 48 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. The Bidder shall submit the following documents for signing of the formal Agreement: a) Copy of detailed LOA duly signed on all pages as a token of acknowledgement of receipt. b) Security Deposit as in the form of Bank Guarantee as per proforma Bank Guarantee for security deposit in the contract document. c) Non-Judicial Stamp Paper of value 100/- purchased in West Bengal, India for the signing of Agreement. d) Permanent Account Number of all consortium partners allotted by Income Tax Department. e) Self-attested Photostat copy of Notarized Power of Attorney by the Competent Authority or Board of Director’s resolution authorizing the individual(s), to sign the Agreement. f) Self-attested Photostat copy of the Registration under State VAT, Service Tax, as applicable. 4.1.5 Failure to Sign Agreement / Commence the Work Failure to sign the agreement and / or commence the Work within the date to be agreed upon after issue of LOA, the LOA will be terminated besides forfeiture of EMD. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 49 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix A: Bidding Reference Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 50 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix A1: Present IT Assets in CIL This section provides the list of IT assets available at CIL and its Subsidiary companies. The purpose of providing this list to the bidders is to appraise the bidders on the present IT asset scenario to enable them to assess the reusability of any IT asset, if feasible in their view, without compromising performance of various parameters mentioned in the NIT. It is also pertinent to mention that the IT asset scenario of CIL is dynamic in nature and does change from time to time to meet business continuity requirements. It may also be noted that any further detail with regards to the IT assets listed will be made available to the successful bidder ONLY. No queries with regards to IT assets will be entertained at this stage. The IT asset list is provided at the end of this volume. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 51 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix A2: Business Processes - Overview 1.0 Financial & Management Accounting & Corporate Planning As in any other Organization, in CIL, there are two main forms of accounting information: (1) Financial Accounting, and (2) Management Accounting and Corporate Planning Financial Accounting: Financial accounting is concerned with classifying, measuring and recording the transactions of a business. At the end of a period, the following financial statements are prepared to show the performance and position of the business: Profit and Loss Account Describing the performance of the business over the accounting period Balance Sheet Statement of assets and liabilities at the end of the accounting period (a "snapshot") of the business Cash Flow Statement Notes to the Accounts Directors' Report Describing the cash inflows and outflows during the accounting period Additional details that have to be disclosed to comply with Accounting Standards and the Companies Act Description by the Directors of the performance of the business during the accounting period + various additional disclosures, particularly in relation to directors' shareholdings, remuneration etc Financial accounts are geared towards external users of accounting information. Every company registered under the Companies Act is required to prepare a set of accounts that give a true and fair view of its profit or loss for the year and of its state of affairs at the year end. Annual accounts for Companies Act purposes generally include: x x x x x x A directors’ report An audit report A profit and loss account A balance sheet A cash flow statement Notes to the accounts Since CIL, is the "parent company", (the company owns other companies - subsidiaries) "consolidated accounts" is also prepared. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 52 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Management Accounting & Corporate Planning: Management accounting basically refers to the Internal Reporting requirements related to Budgeting, Costing and Profitability Analysis, to know, how efficiently and effectively the Business is performed. This High level process documentation on the Financial & Management Accounting and Corporate Planning covers the following Processes: a) Financial Accounting: 1. 2. 3. 4. 5. 6. Revenue Budgeting Accounts Payable Cash and Bank Accounts Receivable General Ledger Accounting, Consolidation, Closing and Reporting Asset Accounting b) 2. Management Accounting: 1. Costing and Internal Reporting c) 3. Corporate Planning 1. Capital Budgeting and Monitoring 2. Production Planning and Monitoring d) 4. Strategy Management 1. Balance Scorecard 1.1 Process: Revenue Budgeting Objective The objective of this process is to Compile, Consolidate and Prepare the Revenue Budget for the Coal India & its Subsidiaries and to have a control mechanism on the Actual Expenditure to check whether they are within the Budget limits. Description x x Every year, Finance Department at Coal India requests the Subsidiary companies to prepare and present the Revenue Budget for the forthcoming financial year and it also prepares its own Revenue Budget. The Revenue Budget is done with two dimensions 1. At the various Organization levels as shown below: Coal India HQ: For the various departments at the CIL Head Quarters Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 53 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Subsidiaries: For the various Departments at the Subsidiary Head Quarters, Area Offices, Sub Area Offices, Units and Projects. 2. For the various Budget items: Budget item is generally a group of two or more General Ledger accounts. x x x x These Budgetary estimates are prepared based on the Production plan released and circulated. The budgetary estimates received from the Subsidiaries undergo various iterations and approvals, so that the Budgeted Profit / Loss are arrived at suitably. Once the Revenue Budgeting exercise is completed the Budget details are communicated to the various units and the departments. Thereafter, on passing or approving the actual revenue expenditure, the Budget limits are checked and released. The following are the various sub-processes involved in this Revenue Budgeting to meet the process objective. Sub-Processes x x x x 1.2 Transfer of Budget – Budgets can be transferred from one head to another or from one Department to another while preparing the Revised Budget estimates with due approval of concerned Director.. Budget Supplement – Additional Budgets can be requested and sanctioned, while preparing the Revised Budget estimates. Budget Commitment – On raising the Indents / Purchase Orders, Budget Commitments need to be reserved. Budget Carry over – Budgets may be required to be carried over to the next Fiscal year. Process: Accounts Payable Objective The objective of this process is 1. 2. 3. 4. To properly account for the Goods and Services received and its related liabilities To comply with the various Tax and legal provisions – For example – TDS To make payment to the Employees / Vendors / Contractors on time To provide correct and timely information about payments made, advances received by maintaining proper Sub-ledgers – Vendor wise 5. To comply with the Period End closing and Audit related activities like Vendor Balance confirmation etc. Description x x x Department requiring the Service / Material initiates the proposal manually The proposal is sent for Administrative approval based on the Delegation of powers The proposal is sent to the Finance Department for Budget certification and Financial Concurrence Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 54 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x x x x x x x x x x x x x x x x x There after the proposal is sent to the Procurement department (for material purchase) or concerned department (for any other service). Subsequently, the Tendering related activities as explained in the Procurement process document takes place. The finalized proposal is put up to the competent authority for approval of Final Values and subsequently, it is forwarded to competent authority for approval of procurement proposal. Finalized proposal is put up to the Finance Department for certification of Final Values Manual Noting is made by the Finance Department for Budget consumption Purchase Order is prepared manually. Manual Hard copy of the Purchase order is received in the Bills Section. On receipt of the Goods / Services, the Concerned Department acknowledges the receipt by affixing the stamp on the Invoice received from the Vendor and forwards the Invoice to the Bills section. Bills received are entered into the Bills Register with date and time. Payment Voucher is prepared in the system, by posting the accounting entry manually – debiting the Stock Purchased / Expense account and crediting the Vendor sub-ledger account. Voucher is sent to the concerned officer according to the category of the bills for passing. Payment Vouchers are approved by the concerned Officers Hard copy of the Voucher along with the Bill is handed over to the Cheque section. The Cheque section reconciles the bill and the payment voucher and makes the payment Payment is made through cheques / Demand drafts / through Funds Transfer for all vendors and in exceptional cases by cash Cash payment is made to employees for certain claims. The following are the various sub-processes involved in this Accounts Payable activities to meet the overall process objective. Sub-Processes x x x x x x Advance Payments: – In case, the advance payments are agreed in the Purchase order, a payment voucher is prepared and processed in the similar manner as explained above. When the subsequent bills are paid, advance amount is adjusted. EMD and Security Deposits: - EMD and Security deposits received are accounted in the separate vendor / contractor sub ledger. TDS and other Statutory Deductions: - While processing the payments, various statutory deductions like TDS, Work Contract Tax etc. are deducted as per tax and legal requirements, tax deducted is remitted to the government on or before the due dates, appropriate certificates are issued to the vendors and Returns are filed with the respective departments as required by the law. Debit and Credit Notes: - On proper authorization and approvals, with necessary supporting, Credit notes / Debit Notes are created and posted into the vendor accounts. Creditor / Vendor Sub ledgers – Vendor sub ledgers depicting various transactions like purchase, payments, debit / Credit notes, advances paid / adjusted etc. are maintained Month end / Quarter end / Year end closing activities: - Various Month end / Quarter end and Year end closing activities like Regrouping of vendors having debit balances, Vendor Balances confirmation etc. are performed. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 55 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.3 Process: Cash and Bank Objective The objective of this process is 1. To make payment to the Employees / Vendors / Contractors on time and through proper mode. 2. To properly account for the cash received / paid and tally the physical cash balance with the books on daily basis 3. To properly account for the receipts and payments either by cash / cheque and maintain proper Cash and Bank books 4. To do periodic Bank reconciliations for all banks and account for the reconciliation entries 5. Obtain Periodic Balance confirmation statements from the Banks Description Payments x x x x Hard copy of the Payment Voucher prepared at the Bills section along with the Bill is handed over to the Cheque section. The Cheque section reconciles the bill and the payment voucher and makes the payment Payment is made through cheques / Demand drafts / through Funds Transfer for all vendors and in exceptional cases by cash Cash payment is made to employees for certain claims. Receipts x x All cash and cheque receipts or credits in the Bank Statements are accounted in the Cash and Bank books respectively. Hard copy of the Receipt Voucher prepared at the concerned department along with the supporting to be handed over to the cheques section for accounting after necessary approval. Bank Reconciliations x x x The Bank Statements are manually received from various Banks and the entries in the Bank book are reconciled with the Bank Statement to arrive at the un-reconciled entries. Based on the Un-reconciled entries, Bank Reconciliation Statements are prepared. Entries posted by the bank for interest, charges etc. are entered in the Bank book to clear the un-reconciled entries. Bank Balance Confirmation and Cash Tally x x Periodically Bank balance Confirmation Statements are obtained from the banks. Cash is tallied and closed on daily basis with denomination notings in the cash book. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 56 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.4 Process: Accounts Receivable Objective The objective of this process is: 1. To raise invoices for the dispatches made to the customers according to the prescribed timelines. 2. To properly account for the invoices raised in the customer sub ledgers 3. To account for the payments received from the customers on timely basis 4. To record the Bank Guarantees and Irrevocable Letter of Credits received from the customers 5. To check and ensure proper credit balance exists for the customers, before the coal is dispatched 6. To calculate the compensations to be given or incentives to be received based on the coal dispatched made 7. To follow up and recover the old dues and reduce the DSO – Days Sales Outstanding. 8. To include all necessary charges in the invoice according to the legal and local State Government requirements Description x x x x x x x x x x x x Coal distribution policy states that coal should be sold under cash and carry agreement. Various limits are defined for the Annual Contracted Quantity and Trigger for Compensation / Incentives. The percentages differ for Power sectors and for others. Different Models of cash and carry agreements are defined. For example, For Government Power Utility sector, 10 days advance should be received in three installments 1st, 11th and 21st of every month. In case of Private sector – Power utility or others, Bank Guarantees to be received for 15 days financial coverage. Necessary checks as per defined rules are made for Financial coverage before dispatches are made to the customers In case of rail mode, after loading the coal into the wagons, coal weighment is done and Railway Receipt is prepared by the Railway authorities. On receiving the RR from the railway authorities, it is forwarded to the area offices along with the delivery note and weighment slip for preparation of Invoices On preparation of Invoice, they are accounted in the customer accounts and revenue postings are made in to the General Ledger. Coal is sold at Notified price. In addition to the basic price all other charges like Royalty, Cess, Stowing Excide duty, VAT is charged in the invoice and accounted as per the local and legal requirements. Collections / Payments are received from the customers through various modes like Cheques, Drafts, through Core Banking Solution – Fund transfers at Regional Sales Offices or Headquarters. Necessary postings are to be made in the customers accounts for these receipts, so that Financial Coverage can be accurately computed and managed. Compensation / Incentives are computed periodically and accounted for based on various limits as defined in the Trigger for compensation. Apart from these Trade receipts, CIL Headquarters receives Apex Charges and Dividends from the Subsidiaries. Proper accounting for these revenues is made in the books. The following are the various sub-processes involved in this Accounts Receivable activities to meet the overall process objective. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 57 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x x x 1.5 Debit and Credit Notes: - On proper authorization and approvals, with necessary supporting, Credit notes / Debit Notes are created and posted into the Customer accounts. Customer Sub ledgers – Customer Sub ledgers depicting various transactions like Sales, Receipts, Debit / Credit notes, advances received, adjusted etc. are maintained. Month end / Quarter end / Year end closing activities: - Various Month end / Quarter end and Year end closing activities like Regrouping of customers having credit balances, Customer Balances confirmation etc are performed. Process: General Ledger Accounting, Consolidation, Closing and Reporting Objective The objective of this process is 1. To post all the accounting transactions into the system and maintain up-to-date books of accounts. 2. To ensure accurate accounting from all Vendor and Customer sub ledgers, postings from Payroll, Postings from Inventory Management. 3. To close the Books of accounts on time for Month end or Quarter end or Annual Accounts closing. 4. To post all period end closing entries and adjustments through Journal Vouchers. 5. To prepare Trial balance, Financial Statements and required Annexures periodically at the Subsidiary level. 6. To Consolidate all the Financial Statements of the Subsidiaries and incorporate them into the CIL Financial statements as per the Accounting Standard requirements 7. To prepare Trial balance, Financial Statements and required Annexures periodically at CIL level. Description x Following are the various sub-processes involved in this General Ledger and Closing activities to meet the overall process objective. x Postings into the General Ledger: - Accounting entries for all the transactions are posted into the General Ledger. These postings are directly through Financial accounting entries by ways of Journal Vouchers, or from Accounts Receivable, Accounts Payable, Asset accounting, Inventory Management, Payroll accounting, Sales, Procurement etc.. x Monthly or Quarterly or Annual closing: - The following Monthly or Quarterly or Annual closing activities are performed: o o o o x Foreign Exchange Revaluation Vendors / Customers Regrouping Provision for liabilities and Expenses and entries for Prepaid Expenses Inter unit / Inter Company Reconciliations Consolidation: - Once the Financial Statements of the subsidiaries are finalized, they need to be consolidated with the Financial Statements of the CIL. In this process, the following calculations and adjustment entries are posted for: Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 58 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. o o o x 1.6 Calculation of the Minority Interest Calculation of the Capital Reserve Elimination of profit on Internal transactions Reporting – Financial Statements are prepared as per the provisions of the Companies Act, 1956. Various reports that need to be generated for this are: Profit and loss account, Balance sheet, Cash flow statement, Notes to the accounts, and various Annexures attached to them. Process: Asset Accounting Objective The objective of this process is: 1. To maintain complete Fixed Assets Register for the Organization 2. To capture all the costs related to the asset till the date of commercial usage of the asset 3. To calculate the Cost of Capital, Work-in-Progress, if the asset is not ready on the closing date of the Financial statements 4. To have control over the capital budget on asset acquisitions 5. To compute and post accurate Depreciation as per the Corporate policy 6. To prepare the Fixed Assets Schedule as required in the part VI of the Companies Act 7. To account for the various asset transactions like, Transfers, Scrapping, and Retirement etc. Description x Following are the various sub-processes involved in this Asset Accounting to meet the overall process objective. x x x x x Capitalization: - All the capital expenditure incurred for the acquisition of the asset till the date of commercial usage is captured under capital work in progress account and it is capitalized on receiving the commercial usage certificate. Assets are grouped under various asset classes and entries are posted into the GL for capitalization. Complete Fixed Asset Register is maintained by updating all additions and deletions of the asset in the form of Scrapping, Retirement, and Transfer etc. Assets which are still in the WIP stage as on the date of accounts closing are accounted as capital work in progress in the books of accounts. Depreciation: - Depreciation is calculated as per the accounting policies of the company for the assets and posted in the General Ledger. Control over Budgeting: - As and when the assets / components are acquired, budgetary control is exercised to check whether the acquisition costs are within the limits. Reporting: - All the reporting requirements related to Fixed Assets including Fixed Asset Register, Fixed Assets Schedule etc are prepared as per the Company Law requirements. Miscellaneous Asset transactions: - All the necessary accounting entries are posted and adjustments are made in the books for various asset related transactions like Scrapping, Retirement, transfers etc. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 59 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.7 Process: Costing and Internal Reporting Objective The objective of this process is: 1. 2. 3. 4. To analyze unit / project wise cost of extraction coal of various grades. To analyze the various productivity factors and cost ratios To compare and analyze the cost structure of various Units, Areas and Subsidiaries Based on the results and analyzes, implement the cost effective methods in other units / projects / Areas / Subsidiaries 5. To reasonably allocate the cost at various levels uniformly to the products so that costs are comparable. Description x Following are the various costs of coal extraction compiled at the unit level: o o o o o o x Following are the various costs allocated from Area / Headquarters: o o x x x x 1.8 Direct labour costs from Payroll Direct Supervisor costs from Payroll Explosives and Consumables Costs Tyre consumption / depreciation costs Diesel / Oil consumptions costs Administrative costs allocated at the unit level allocable to the products on a predetermined basis Payroll costs identified as allocable to the units on a predetermined basis Other administrative costs identified as allocable to the units on a predetermined basis Production data compiled from the Production Registers on various grades of coal. Based on the production quantity and costs identified, Cost sheets are prepared on a monthly basis and submitted to the Senior Management. Based on the cost data, various productivity ratios are arrived at and submitted to the Senior Management for comparative Analysis. Based on subsidiary cost data, consolidation is done at CIL. Process: Capital Budgeting and Monitoring Objective The objective of this process is to Compile, Consolidate and Prepare the Capital Budget for the Coal India & its Subsidiaries and to have a control mechanism on the Actual Capital Expenditure to check whether they are within the Budget limits. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 60 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Description x x Every year, Corporate Planning Department at Coal India requests the Subsidiary companies to prepare and present the Capital Budget for the forthcoming financial year based on the various projects that are envisaged and production targets that are planned. Further it also prepares its own Capital Budget. The Capital Budget is done with two dimensions: 1. At the various Organization levels as shown below: Coal India HQ: For the various New Projects / Departments at the CIL Head Quarters Subsidiaries: For the various New Projects / Departments at the Subsidiary Head Quarters, Area Offices, Sub Area Offices and Units 2. For the various Capital Expenditure heads like Building, Plant & Machinery, Townships etc.. x x x These Budgetary estimates are prepared based on the Production plan estimated. The budgetary estimates received from the Subsidiaries undergo various iterations and approvals, so that the Final Capital Budgeting figures are arrived at suitably. Once the Capital Budgeting exercise is completed, the Budget details are communicated to the various Subsidiaries and the departments. Thereafter, on passing or approving the actual Capital expenditure proposals, the Budget limits are checked and released. Annual Action plan document in which month-wise comparison of Physical and Financial parameters of budgets and actual is prepared. The following are the various sub-processes involved in this Capital Budgeting to meet the process objective. Sub-Processes x x x 1.9 Transfer of Budget – Budgets can be transferred from one head to another or from one Department to another, one quarter to other, while preparing the Revised Budget estimates with due approval. Budget Supplement – Additional Budgets can be requested and sanctioned, while preparing the Revised Budget estimates. Budget Commitment – On raising the Indents / Capital Purchase Orders, Budget Commitments need to be reserved. Process: Production Planning Execution and Control Objective The objective of this process is: 1. To achieve the goal set by Coal India and the Government based on Long term Demand Plan and the Coal availability. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 61 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2. To do a fair and comprehensive Demand Assessment and Availability plan. 3. To provide inputs for the Investment Plan and Capital Budgeting. Description x Following are the various sub-processes involved in this “Production Planning Execution & Control” to meet the overall process objective. o Demand Assessment: - In association with the Sales and Marketing Department, complete Demand Assessment is done for the next year. o Availability / Supply Plan: - In line with the Five year plans and based on the inputs obtained from the Subsidiaries, Unit wise Targeted Production quantities are planned after considering the seasonal variations. This Annual production target is split into month wise targets. o Inputs for the Investment Plan: - Based on the inputs on Production plan, Investment plan will be prepared and communicated to the subsidiaries on the various Capital Investment projects. o Revised Budgetary Estimates: - In the mid of the year, Reassessment of the requirements is done and anticipated production plan for the current year is arrived at. 1.10 Reporting Requirements The various reports that are required at various Financial and Management accounting functions are given below: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Company wise, Area wise Sales Report Stock Balance Reports Financial statements Annexures like FOB Value of imports, etc. Report on Accruals and Prepaid Expenses Company wise, Area wise, Sub Area wise, Mine wise Cost of Production Report Area wise Profitability report Cash flow projection Report Capital budget utilization Report Capital Budget Variance Report Revenue Budget Utilization Report Revenue Budget Variance Report Cost Centre Budget vs Actual Reports Receivable Status of Customers Reports Non-moving/Slow Moving inventories Ageing Analysis of Debtors Vendor Payables Report and Summary Report on Liabilities on purchases made during the period, for which Provision is to be made. Asset Register, Asset Summary Statement, Asset Pending Commissioning, Asset Purchase or put to use - pending purchase orders Report on Asset Capital in Progress Salary Statement, Month wise, Section wise Salary Summary, Addition/Deletion Statement of Employees Expense Analysis Report Bank Reconciliation Statements Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 62 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 23. 24. 25. 26. 27. 28. 29. 30. Status Report on Audit Observations Costing reports Project Status Reports Customers Overdue statement Reports Daily Cash Balance report Overdue Advances given to vendors TDS certificates TDS Quarterly Returns Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 63 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2.0 Materials, Purchase, Tendering, Inventory Management 2.1 Material Management: In CIL HQ, the purchasing function is carried out by Materials Management Division, headed by Chief General Manager MM/GM MM, reporting to Director (Technical). In respect of Subsidiary Companies, this function is owned by Chief General Manager/General Manager (MM) reporting to Director-in- Charge of MM Dept. Purchasing is also carried out by User Department/Units as per powers delegated to them at different projects or collieries. CIL HQ is presently responsible for procurement of high value items like explosives, OTR’s and heavy equipment. All other items are procured by the subsidiary companies. There are some exceptions in procurement which need approval from Directors and other responsible authorities. 2.2 Purchasing Materials management activities like purchasing, Store Management and Inventory Control, Clearing & Forwarding, Progress and Follow-up are managed by different departments at HQ, Subsidiaries and Areas. Yearly Budget request from areas through subsidiaries are received in CIL HQ/ Subsidiary HQ’s where these are consolidated and get approved. The Items other than mentioned above, are procured centrally at Subsidiary HQ, otherwise they can be bought at respective areas subject their criticality. Purchasing is generally enabled through tendering procedure. Spot /cash purchases is carried out for low value buys or arisen due to some urgency. Operating Rate/ Running contracts can be finalized by CIL or its Subsidiary Companies for revenue items of high consumption and of recurring nature. These may also be used for some of the low value capital items whose requirement are frequent. Purchasing process in Coal India Limited can be divided in four major areas: x x x x 2.2.1 Purchase Requisition or Indent Processing Tendering, Evaluation and Vendor Selection Purchase Order Processing Other Processes Purchase Requisition or Indent Processing: All the subsidiaries raise requisition or indent subject to approvals based, mainly on purchase value. The approved indents along with technical specifications and budget certification are sent to MM department for further processing. There are multiple types of Indents such as Material Budget (M.B), Normal Indent, Emergent Indent etc. Material Budget is prepared by each area store six months in advance considering stock, consumption and production. The material Budget is approved by Area GM and sent to subsidiary HQ where all such M.B’s are consolidated and final quantity is approved and indent gets registered. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 64 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Processing of the indent is based on the information like annual consumption of the quantities as well as any project addition etc, the indent qty is decided. In case of centrally purchased items, this indent along with technical specification goes to CIL HQ or Subsidiary HQ as the case may be, where a registration number is allocated and sent to technical department for the technical specification or vetting of the same. Notice Inviting Tender is prepared after which normal tendering cycle is followed. 2.2.2 Tendering, Evaluation and Vendor Selection: Based on the approved purchase requisitions/indents Notice Inviting Tender is prepared. The types of tenders are: x x x Single Tender: For proprietary or single vendor OEM items Limited Tender: For preferred vendors, with value being within prescribed limits. These could be Limited Global and Limited Domestic. Open Tender: Open to all vendors and is generally advertised in journals, websites and newspapers. CIL mostly conducts two-envelope bidding - technical bid and price bid with clauses based on the tender committee recommendations. The suppliers submit tender fee and earnest money to CIL along with their responses. The responses from suppliers is evaluated technically and commercially based on set criteria’s. The technical and commercial evaluation/recommendations are recorded for all the bidders. The list of techno-commercially accepted suppliers is arrived at. Based on vetting by the finance department and the decision of the tender committee, a Comparison statement is generated and recommendation from tender committee is documented, which is the basis of the final purchase proposal. Multiple vendors might be selected. As per the CVC guidelines, negotiation with L1 supplier is not permissible, but price justification is sought sometimes. Multiple suppliers may be selected based on certain criteria’s. Generally 60% of total quantity is allocated to L1 and 40% to L2, provided L2 matches L1’s price. If total order is more than ` 10 Crore, approval from the Board is needed.. Currently, the average lead-time from indent to order placement is nearly 4-6 months. For all the rejected suppliers, EMD amount is refunded and for selected parties, it is converted to security deposit. Currently reverse auction is being carried out only for few items. This is expected to be extended to other items gradually. Reverse auction needs is to be implemented online for a more efficient price discovery. 2.2.3 Purchase Order Processing After approvals, purchase order is sent to selected vendors. A distribution list is prepared and purchase order or contract is sent to all concerned departments. In reply, vendors send purchase order acknowledgement. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 65 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Amendment of purchase order is also possible on the request from subsidiaries or suppliers, after requisite approvals. The foreign suppliers generally send shipping notification to CIL upon material dispatch from their end. Materials come along with LR/RR and other information. Normally, materials are delivered on FOB basis. The subsidiaries prepare PO-wise receipt details periodically for reconciliation purpose. If required, delivery status may also be sent to suppliers. Subsidiaries create rate contract, for fuel, oil and lubricants timbers etc, with preferred vendors selected through tender. Release orders are generated periodically and material is received. In some cases, emergency purchase order is created without tender and is to be approved by designated authorities. 2.3 Inventory Management: All subsidiaries have one or two Central storage locations, called Central Stores, commonly used by all the areas and units. Identified materials are delivered at this store. All areas have Regional Stores. All sites/units/projects/collieries also have their own store. Once material is issued to project/mines from Regional Stores, it is considered consumed and charged to accounts. When goods are supplied by vendor, gate entry is prepared done, followed by quality inspection process. The goods receipt is not done unless inspection done. The inspection acceptance is registered by creating a Store Receipt Voucher (SRV) in stores. Area Inventory Management for project: x x x Purchase Requisition (PR) is raised by users, authorized by Stores Manager and approved by Depot Officer. This is also called Store Requisition Voucher. It is checked whether material is available at regional store or not. If it is available, goods are issued to that unit. If goods are not available in central Store then other area’s store is checked.. If it is available, with the assistance of subsidiary HQ, material release order from respective Regional Store is obtained and depot transfer of material is done. If material is not available, then with the assistance of subsidiary HQ the purchasing cycle is invoked, which might be local in case of urgency or centralized at subsidiary/CIL level. CIL has introduced 11 digit material code for its spare parts and equipments. On an average 60 % of materials have been codified and rest are in provisional codes. Some of the subsidiaries like NCL, WCL have completed 100% codification. There is no formal material requirement planning. Reorder point or safety stock is not in use. This leads to inventory mismatch, high inventory carrying cost and hampers smooth operation/production. An Issue register is created monthly, based on which units/projects are charged. ABC, VED and FSN analysis is done annually. Nearly 10% materials are classified as A category based on consumption. This category contains items like spare parts, Iron & Steel, Timber etc. Nearly 15% materials like spare parts belong to B category. C category materials are low value items like oil, grease, fuel etc. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 66 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Physical Inventory is done annually in which survey is performed. This results to stock rectification with right quantity. The type of stock transfers happens as below: x x x x x Area to store mine Central Store to Regional Store One Regional Store to another Regional Store Subsidiary ( central store ) to Subsidiary ( central store ) Return from site to Area store Stock visibility and determination is a very important requirement. When any area raises material request, availability is checked in the area stores under the same subsidiary. Available quantity is calculated as the difference between total quantity at area store and already reserved quantity. If there is no quantity available then stock is also checked in other subsidiaries. Store Managers of all the subsidiaries check stock levels at different areas and decide from where material will be transferred. CIL HQ is responsible for any transfer from one subsidiary to another, if required. Batch Management is applicable for some consumables and explosives with shelf life check. Sometimes damaged materials are transferred to scrap store. At first it is checked whether any internal department or subsidiary needs these items. If yes, then it is issued to user department and proper accounting happens in finance. Otherwise it is mostly surveyed, its value decided and auctioned to any external interested parties through tender. 2.4 Invoice Verification and Payment Once invoice is received form a supplier, it is verified with respect to material receipt or service rendered, and payment gets initiated by Finance department. Purchasing department keeps track of payment status. During purchasing process sometimes CIL needs to create letter of credit (LC) in case of imports. Normally, CIL takes performance bank guarantee from suppliers which are 10% of total value. This is valid for 15-18 months. Liquidated damage is imposed in case of delayed delivery. Normally it is 0.5% per week subject to maximum 10%-15%. Liquidated damage is adjusted with security deposit or bank guarantee. In case of large project or equipment installation, generally, 80% of payment is on delivery of equipment and 20% after successful commissioning 2.5 Other Processes There are other relevant processes below, which corresponds to material management: Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 67 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2.5.1 Vendor Registration In order to have dependable sources of supply of stores, spares and equipments and of required quality at the appropriate time, suppliers are registered after qualifying certain criteria’s. Performance of such registered suppliers is reviewed from time to time. The list of registered suppliers is kept up-to-date by including any additions in the list or removing names of such firms whose performance is not found up to the mark. The names of suppliers added/deleted to/from lists are circulated to all the Subsidiary Companies. 2.5.2 Vendor Evaluation After selection of vendors/sources, consistent record of maintaining adequate quality and reliability standards in supply is an important activity in Materials Management in CIL. An objective assessment of Vendor Performance is arrived at based on three major parameters: x x x Quality Delivery Price The overall index is obtained by giving weight ages to the above three performance parameters as below: x x x Quality Performance - 40% Price Performance - 40% Delivery Performance - 20% Depending on the score, vendors are classified as A, B, C or D category. Vendors get notified of their performance and if needed vendors may be blocked for conducting any business with CIL or with its any subsidiaries. 2.6 Quality Management: Different type of quality inspections are done at different times. For incoming materials, the quality inspections that take place are: x x x x 2.8. Quality Inspection after gate in Source Inspection at some subsidiaries Source Inspection (before delivery) for capital goods Site inspection (before commissioning) for capital goods MIS Reports and Analysis There are many reports used in CIL and its subsidiaries. The list of reports below are relevant and indicative in MM area: 1. 2. 3. 4. List of Indent with status Lead-time analysis for Indent to PO/contract creation Lead-time analysis for delivery time taken by suppliers List of Indents lying with technical department for their response Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 68 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. List of vendors List of materials List of materials vendor-wise List of Purchase Orders with status List of Purchase Orders pending for approval Monthly purchase value analysis subsidiary-wise Vendor Evaluation report with marks for different criteria List of Purchase Order vendor-wise List of preferred vendors for a particular material Stock overview of different materials subsidiary-wise Stock Overview of all stocks under a subsidiary Stock with subcontractors Stock in Transit List of Store receipt vouchers List of pending invoices ABC consumption, XYZ analysis of stock Dead stock or non-moving stock Consumption report subsidiary-wise, area-wise or project-wise List of obsolete items Comparative analysis of subsidiary-wise inventory and production Stock overview of scrap subsidiary-wise Stores ledger Material consumption statement List of items scrapped with value List of items transferred to other stores Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 69 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.0. Sales & Distribution The Sales & Marketing department of CIL along with their counterparts in subsidiaries is responsible for assuring that quality coal is available to customers with right quantity. They work in close co-ordination with Indian Railways which is the major carrier of coal. Small quantity of coal is also transported via road directly to end customers. Policy is framed at corporate level keeping with the government directions and broad policies issued from time to time. For processed coke or for by-products, subsidiaries decide the price. 3.1 Demand Planning and Contract Creation Sale is performed by three channels mainly: A. Fuel Supply Agreement (FSA) with core sectors like Power, Steel and Fertilizers. FSA is created for power houses for 20 years whereas it is 5 years’ FSA in case of others. B. Sales Orders/Rate contracts with other non-core industries (like brick manufacturers) under different states C. e-auction for all private and public players. Approximately 10% of total sale is done through e-auction. This is governed by subsidiaries. The services of Metal Junction and MSTC are being used currently for spot and forward auctions to determine H1 and selling coals to highest bidder. The regulated sector vis power, fertilizer get some advantages vis-à-vis other. For an example, 100% of their demand is covered by FSA whereas 75% is covered for non-regulated sectors. For existing customers, old FSA continues with necessary modification as is implemented under NCDP (New Coal Distribution Policy), but for new consumers, CIL is contemplating FSAs with new demand planning so that they don’t face shortage and need to give penalty for being default. New Coal Distribution Policy is formulated in October, 2007. According to that, Annual Contracted Quantity (ACQ) is calculated as 75% of normative requirement. 90% of ACQ is the trigger point for compensation in case of powerhouses. For others, 60% of ACQ is the trigger point. If this target is not made, CIL is liable to pay penalty. Penalty is payable annually. If subsidiaries supply more than this trigger point, they get incentive. Under FSA, a total annual quantity is allocated. Each month there is a Monthly Loadable Plan (MLP) for delivery of coal. Delivery is mainly done via railways. There are other ways like road and merry-go-round. Merry-go-round is mainly for powerhouses which are in close vicinity to subsidiary/projects. 3.2 Loading and Delivery Total load and wagon requirement information is given by CIL to Railway Authority 2 days before from actual delivery at railway sidings. Based on this information, rakes are arranged by Railway Authority. Coal is transported to railway sidings from mines. Loading is done manually or by machine or outsourced. If wagon is overloaded, the penalty from Railways is imposed. In Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 70 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. case of under-loading, anyways freight charges are incurred. Demurrage is imposed by railways for reasons of non-completion of loading within given time The whole procedure is a combination of five major tasks namely wagon allotment, wagon supply, loading of wagons, drawn out of rakes and weighment on weigh bridges. Weighbridge system has electronic facility to determine weight of loaded wagon. The difference of loaded wagon i.e gross weight and tare weight of each wagon is net coal quantity. After dispatch, railway personnel is supposed to send D-note (delivery receipt note at railway sidings ), Railway Receipt (RR) after loading and weighment, weighment slip to area finance head for bill and invoice preparation. It is expected that weight information will be directly communicated with back-end system for seamless process integration. In this process, there are four documents printed with following details ; x x x x Pilot Guard Register - This is the document which the pilot guard enters while visiting the siding for loading the rakes. This contains the name of consignee and nos of boxes along with arrival time of the rake at the siding. At the time of departure after loading, the departure time is also recorded and duly signed by both the railway guard and the concerned subsidiary company project staff. A copy of the pilot guard register is carried by the guard along with the train while another copy is retained at the project. Electronic printout of weighment – Pursuant to coal loading in all the wagons duly weighed on electronic in motion/static weighbridges, electronic print out of weighment is generated. Such electronic print out is handed over to railway base station along with forwarding note duly signed by the project. Forwarding Note – Forwarding note of the railways is issued at weighbridge office which contains details of the consignee and the wagons apart from other information. The forwarding note is annexed with electronic print out of weighment and handed over to the base railway station for issuance of railway receipt. Railway Receipt – Base railway station issues railway receipts on receipt of forwarding note and electronic weighment print out. Normally two copies of railway receipts are handed over by the railway authorities to the concerned projects for further commercial purposes. In case of e-auction, concerned authority (currently MSTC & Metal Junction) provides data to respective subsidiaries about customers who have been allotted coal in particular auction. The data contains customer name, code, grade of coal, quantity, rate, colliery etc. In case of new customer, master data is also provided. Once the coal value is deposited by way of demand draft /pay order, drawn in favour of the concerned coal company, along-with the debit advice issued by the bank, certifying that the DD/pay order has been issued, by debiting the account of the concerned Buyer, Sale/Delivery orders shall be issued within seven days by the coal company after encashment of buyer’s financial instrument. In case of successful bidders, if the coal value is deposited for less than the allotted Quantity but not below 50% of the allotted quantity or, 50 tonne whichever is higher, the coal company shall accept the payment for the said amount and forfeit the EMD for the failed quantity. However if the buyer fails to deposit the coal value for at least 50% of the allotted quantity or 50 tonnes whichever is higher then the entire EMD of the allotted quantity shall be forfeited. Coal Company shall issue Sale / Delivery Orders to the successful bidders in terms of above clause after realization of payment. The Buyer has to submit the option before the issue of the Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 71 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sale / Delivery Order for movement of the coal “within state” or “outside state” and the Sale / Delivery Order would indicate the same accordingly. However, the challan issued by the Coal Company shall indicate the destination. The validity period to complete lifting of coal by road shall be 45 days from the date of issue of Sale/Delivery Order. No extension of validity will be allowed in any case. 3.3 Invoicing and Collection Receivable and collections are managed by individual subsidiaries. Coal in general is sold on cash & carry basis. In case of government sector, generally payment happens on 10 days advance. Major consumer like electricity boards of different states are often not in a position to pay in advance. In that case, Coal India supplies coal to them against credit to meet social obligations with concurrence of concerned ministries. But the whole arrangement remains under full financial coverage. In case of private players, bank guarantee is taken with 15 days financial coverage. Invoice is raised on individual delivery basis in case of railway. The main price components are notified coal price, Royalty, cess on coal (in case of West Bengal only), stowing excise duty (due to subsidy received from government) etc. VAT adjustment is also applicable for subsidiaries. Collection happens through cheques or drafts primarily. In the invoice, all the details of different charges are mentioned like crushing charge, washing charge etc. In some cases one subsidiary sells coal to other subsidiary, but it is rare. Very rarely, CIL exports coal to Bangladesh or other countries for maintaining bilateral relationship and other commitments with those countries. 3.4 Quality Management in Sales & Distribution: For coal produced internally and outgoing products, following are the quality control processes . x Before raising coal, sample is taken and analysis is done thoroughly to decide which type and grade of coal is available in the mine. x After production happens, just after blasting two types of inspections happen. Those are o Proximate: It checks percentages of ash, moisture, volatile matter, carbon etc. o Ultimate: It determines other factors also like sulphur and nitrogen quantity. After raising coal, generally crushing and washing of coal happens. The washing facility is not available for all the subsidiaries which hamper quality of the coal. After crushing, coal might be kept in stock-yards or consumer truck is loaded and dispatched directly from there or it is transferred to railway sidelines for loading into wagons. In case of direct delivery, inspection happens for checking the grade before dispatch. After loading into wagon, a sample is taken from there and tested for deciding the grade and type of quality by CIL in front of customer representative and wherever applicable with association of third party sampling agencies. After delivery at customer’s place, customer and CIL representative jointly does quality check and testing once again. If there is any dispute (more than 5% discrepancy), an independent agency (called referee) tests the coal and referee’s decision is binding on both the parties. In both of the cases, the average of the two results is taken for final billing and realization. Presently, the sampling is done on useful heat-value determined from ash Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 72 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. and moisture. CIL is in process of migrating to internationally acceptable standards of GCV based analysis of coal through a lower bandwidth of heat-value. 3.5 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. MIS Reports and Analysis List of Sales Order subsidiary-wise Subsidiary-wise and area-wise allotment for delivery yearly, monthly and daily Subsidiary-wise allotment and actual delivery of coal Delivery details for subsidiary to core-sector and non-core sector Delivery details to steel, power and fertilizer sector per subsidiary Analysis of delivery through different channel like rail, road or ship etc.. Daily dispatch details Monthly delivery target vis-à-vis actual delivery subsidiary-wise Daily billing and collection analysis report List of invoices with status List of annual sales contract Overview of stock at railway sidelines Days Sales Outstanding Report List of customers Coal Production details day-wise subsidiary-wise and mine-wise Grade-wise Production Details Grade-wise dispatch details Grade-wise stock overview Consumer-wise dispatch report List of wagons available for a dispatch with capacities Wagon loading details FSA/LOA monitoring reports Consumer wise bill register Consumer wise sales ledger Sale order wise sales ledger(Road Sales) Daily MIS Reports Power house wise daily supplies Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 73 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4.0 Planning & Production 4.1 Corporate Planning: The corporate planning has the following existing processes: x x x x x x x x x The planning commission discusses with the working subgroup (which is a group of personnel from planning commission, CIL and subsidiaries) and prepares the 5-year plan Annual plans are drawn complementing the five years’ plan by the planning commission Five years past data and ten years projected data (on rolling basis) is also taken into consideration for drawing up the annual plans All plan data are compiled at the subsidiary level and sent across to CIL All the subsidiary plans are consolidated at CIL The consolidated plan is appraised by the respective departments and approved by the chairman thereafter Draft annual plan is sent to MOC for approval. MOC may consult the subsidiary & CIL heads, for this approval Adjustment to the plan data are done at CIL, if required and final annual plan is published Annual action plan is prepared on the basis of the final Annual plan The planning process involves the creation of following plans: Coal Demand Plan, Coal Supply Plan, Coal Movement Plan, Coal Production Plan, Manpower & Productivity Plan, Utilization Plan, Investment Plan, Detailed Drilling Programme, Promotional Exploration Programme, Status of Coal Resource Inventory, Upgradation of Coal Resource Inventory, Environmental Measures & Subsidence Control, Energy Conservation Program, Details of Identified Captive Blocks, Details of Captive Blocks Offered, Company wise Welfare measures, Scheme wise Coal Production Plan, Scheme Wise Expenditure & Investment Plan 4.2 Planning Process The corporate planning departments and different functional heads of CIL & all its subsidiaries prepare the annual plan which is duly scrutinized and approved by the MOC and appraised by planning commission. The annual plan and the annual action plan is produced as outcome of this exercise. These two plans act as the basis of target and control mechanism for all activities at CIL & its subsidiary companies. The annual plan is the overall plan for a year (annual bucket) and the annual action plan is a detailed breakup of annual plan. The annual action plans is broken into quarterly and monthly buckets. The steps of preparation of annual plan are as follows 4.2.1 x x x x x Annual Plan: CIL makes out the overall target for the year, from the 5 year plan and intimates the respective subsidiary companies. CIL also asks the subsidiary companies to make their annual plan with respect to their target and submit them All the subsidiary companies submit their annual plan to CIL and then they are consolidated The respective departments then appraise the consolidated annual plan The chairman of CIL/Board approves the annual plan and the draft version of it is sent to MoC At MoC all the subsidiary companies and CIL heads are called for a discussion on the annual plan Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 74 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x x x If some adjustments are to be done after discussion with MoC then above steps are repeated . Otherwise the annual plan is appraised by the planning commission After the appraisal of the planning commission the annual plan is considered to be final and it comes to CIL The annual plan is then circulated to the CIL and subsidiaries 4.2.2 x x x x Annual Action Plan: Annual Action plan are drawn on the basis of finalized annual plan CIL circulates the final annual plan to the respective subsidiary companies. CIL also asks the subsidiary companies to make their annual action plan with respect to the annual plan and submit them All the subsidiary companies submit their annual action plan to CIL and then they are consolidated The respective departments then appraise the consolidated annual action plan 4.3 Production Each subsidiary divides the annual action plan area wise which in turn divides the plan unit wise into quarterly, monthly and daily target. Apart from the annual action plan each subsidiary creates its own internal target. Coal mining is done by both underground and open cast method. 4.3.1 Underground Mining In underground mines, the bord and pillar method progresses along the seam, while pillars and timber are left standing to support the mine roof. The underground mines at CIL are worked mainly by conventional Bord and Pillar method, manually as well as semi-mechanized using SDLs/LHDs. Once bord and pillar mines have been developed to a stopping point (limited by geology, ventilation, or economics), retreat mining known as depillaring, is commonly started. The coal in the pillars is removed, thereby recovering as much coal from the coal seam as possible. Depending on surface area, after extraction of coal ie depillaring, either it is allowed to subside or filling with sand is done. Some of the principal methods that are employed in the mines are: x x x Blast mining uses explosives such as dynamite to break up the coal seam, after which the coal is gathered and loaded on to shuttle cars or conveyors for removal to a central loading area. This process consists of a series of operations that begins with “cutting” the coalbed so it will break easily when blasted with explosives. Longwall mining: It is a sophisticated machine with a rotating drum that moves mechanically back and forth across the coal seam. The loosened coal falls on to a pan line that takes the coal to the conveyor belt for removal from the work area. As the longwall mining equipment moves forward, overlying rock that is no longer supported by coal is allowed to fall behind the operation in a controlled manner. Once the coal is removed, usually 75 percent of the section, the roof is allowed to collapse in a safe manner. Continuous mining utilizes a machine with a large rotating steel drum equipped with tungsten carbide teeth that scrape coal from the seam operating in a bord and pillar system. Conveyors transport the removed coal from the seam. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 75 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Retreat mining is a method in which the pillars or coal ribs used to hold up the mine roof are extracted; allowing the mine roof to collapse as the mining works back towards the entrance. This is one of the most dangerous forms of mining owing to imperfect predictability of when the ceiling will collapse and possibly crush or trap workers in the mine. 4.3.2 Opencast Mining When coal seams are near the surface, it may be economical to extract the coal using open cast mining methods. Open cast coal mining recovers a greater proportion of the coal deposit than underground methods, as more of the coal seams in the strata may be exploited. Generally opencast mine of the company employs operating method with Shovel and Dumper combination for mining. In some cased mobile In pit crushing and conveying system with a pithead coal preparation plant has been also commissioned. Heavy Earth Moving Machines (HEMM) like Drag line, Drill, Shovel, Dumper, Dozer etc are used in O.C mines. Explosives are first use in order to break through the surface of the mining area. The coal is then removed by draglines or by shovel and truck. Once the coal seam is exposed, it is drilled, fractured and thoroughly mined in strips. The coal is then loaded on to large trucks or conveyors for transport to either the coal preparation plant or direct to where it will be used 4.3.3 Washery Coal Washing is a process of separation mainly based on difference in specific gravity of coal and associated impurities like shale, sand and stones etc so that we get relatively pure marketable coal without changing the physical properties of the coal. The main washing equipments used in Washeries are combination of: 1. 2. 3. 4. 5. 6. Deshaling Jig – Baum/Batac/Komag Jig Washing Jig – Batac Jig Heavy Media Bath – for coarse coal (+13mm size) Heavy Media Cyclone/Cycloid – single stage/double stage for 37mm to 0.5mm Froth Flotation – for treating fines, i.e., below 0.5mm. Water Only Cyclone/Hydrocyclone. Magnetite having specific gravity in the range of 4.8 to 5.4 is used in washery for washing process which is ground to –200 mesh and mixed in water to maintain the desired gravity in HM Bath or HM Cyclone for separation of coal with its impurities. The Froth Flotation Plant uses Light Diesel Oil and MIBC/Pine Oil/Nalco Frother as conditioning and frothing agents. The other main supporting equipments used in Washeries are: 1. 2. 3. 4. 5. 6. Rotary Breaker Feeder Breaker Gyratory Crusher, Single/double roll Crushers, Impact crushers, Hammer mill ,Ball Mill etc. Tipplers Vibro/Reciprocating feeders Vibrating Screens Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 76 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Various kinds of pumps Vacuum pumps Compressors Blowers Conveyor Beltings and gear boxes Bucket elevator, scrapper conveyor, flight conveyors etc. Magnetic Separator Thickeners Filters Gravity Controllers 4.4 Movement Coal is transported to railway sidelines from stockyards or mines internally or by hired transporters. 4.5 Production Monitoring The production department is responsible for capturing and monitoring of coal production data and other production related information of different subsidiaries. Various functional groups within the department include: x x x x x x x x Production monitoring Explosive handling Sand Stowing/ Protective work Coal stock verification Statistical analysis Reply to Parliamentary/ Committee questions Other activities (e.g. generation of different MIS reports) New technology The planning department for the subsidiaries divides the annual target to different areas. It is also divided into gradewise/monthwise target for each mine. A GM coordination meeting is held every month where actual commitments of production are arrived at. These commitments can vary from the plan figures. Monitoring of production is done daily at the subsidiary headquarters. Production is calculated based on average weight in a truck and the number of trips or it can be calculated based on the final receipt given by the railways. There are cases of variation between monthly report and daily production reports. The production monitoring being done by the statistical department at the subsidiary headquarters involves creation of many ad hoc reports. 4.5.1 Explosives/Detonators Performance Each subsidiary sends their current year’s requirement and the production target to the production department of CIL (HQ). This department compares such requirements with the previous year’s data. If the requirement set by the subsidiary is found correct, it is further processed, otherwise it will be followed up with the subsidiaries for re-estimation etc. The production department of CIL (HQ) consolidates all the requirement data coming from the different subsidiaries and send consolidated figure to MM division of CIL (HQ). The MM Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 77 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. division floats tender to purchase the explosive/detonators. The production department does the necessary technical scrutiny of the offer made by different parties and subsequently intimates the MM division about the technical scrutiny details. The production department maintains the records of technical specifications of the explosives The Materials department, CIL (HQ) sends the subsidiary wise allocation for different parties who will supply explosives/detonators and party wise actual delivery performance to production department Subsidiaries send their monthly explosive/detonator consumption data to the Production Department CIL (HQ). Data is compiled and different reports e.g. monthly performance based report etc are generated. Also, technology wise explosive/detonator consumption, powder factor/detonator factor information are also made available for CIL’s annual performance report. Production department also does the Random testing of the explosives/detonators. For this purpose they offload the job to 3rd parties like CMPDIL or CMRI. They individually visit the magazines and perform the random testing. The test reports prepared by them are received by the Production department. This information is used in future scrutinizing of offers made by same party. 4.5.2 Sand stowing/Protective Work Each subsidiary sends annually their requirements for sand to be stowed and their protective work to be done to the production department at CIL (HQ) The production department at CIL (HQ) consolidates the information and sends it to Coal Controller Office (an independent organization under ministry of coal). They in turn send this to CCDA subcommittee for scrutiny. This subcommittee after scrutiny recommends to CCDA committee for approval. CCDA committee sends the approval to the office of the Coal Controller. The Coal Controller Office in return intimates the production department, CIL (HQ) as well as the concerned subsidiaries for their approval against the requirement of sand. Each subsidiary sends their claims to the production department of CIL and also to Coal Controller Office quarterly. This department scrutinizes the figures and reconciles it with Coal Controller Office. Coal Controller Office then sends the claim to MOC and MOC in return issues a cheque to finance department, CIL distributes the amount to the concerned subsidiaries and intimates it to the production department, CIL. 4.5.3 Stock Measurement: Annual stock measurement is a routine activity of the Production department, CIL(HQ). Subsidiaries send their last year’s closing stock figure to this department. In addition, they send the list of personnel who can be assigned for the survey job. The Production department takes necessary actions to form survey teams. The formation of the team is then intimated to each of the subsidiaries. The coordinating officers at subsidiaries can modify the team. The team travels to the sites, verifies the physical stock with the book stock figure, and prepares a report. As per rule if the variance between two stocks is within 5% limit, it can be considered as OK. If the variation is more than the tolerance limit then the case is forwarded for some disciplinary actions. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 78 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4.5.4 Miscellaneous Activities Different types of MIS reports are prepared by the Production department at CIL (HQ), to meet the demands of the higher management. Moreover, the Production department maintains the necessary information to reply to the various unstructured queries raised during the parliamentary sessions. Different types of MIS reports prepared are: x x x x List of working mines Statistics of illegal mining Details of theft and pilferage in mines Mine mechanization report Mostly data is coming on a regular basis from the subsidiaries. The Production department of CIL(HQ) consolidates and prepares the final reports 4.6 MIS Reports and Analysis There are numerous reports used in CIL and its subsidiaries. Following is a list of reports relevant in Production and corporate planning. This list is not exhaustive, but indicative. I Corporate Planning: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Coal Demand Plan Coal Supply Plan Coal Movement Plan Coal Production Plan Manpower & Productivity Plan Utilization Plan Investment Plan Detailed Drilling Programme Promotional Exploration Programme Status of Coal Resource Inventory Upgradation of Coal Resource Inventory Environmental Measures & Subsidence Control Energy Conservation Program Details of Identified Captive Blocks Details of Captive Blocks Offered Company wise Welfare measures Scheme wise Coal Production Plan Scheme Wise Expenditure & Investment Plan II Explosive handling: 1. 2. 3. 4. 5. 6. Projected requirement of explosives and accessories of all subsidiaries Technology wise explosive, detonator consumption of all subsidiaries Random sampling and analysis of explosives Technical details of explosives (as submitted by parties) Generation of company wise explosive requirements Compilation of company wise powder factor, detonator factor Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 79 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 7. Compilation of company wise random testing report 8. Generation of technical scrutiny report III Sand Stowing, Protective work, Infrastructure development 1. Requirement of sand to be stowed with production target 2. Quarterly claims for sand stowing, protective works and infrastructure developments 3. Compilation of company wise statistics of sand stowing, protective works and infrastructure developments IV Production Monitoring: 1. Daily coal production, OBR and productivity figure from different mines and washeries 2. Compilation and generation of FORM-H report: subsidiary wise/ unit wise, area wise, mine wise 3. Book stock figure from stock measurement team 4. Generation of check measurement report 5. Capture of Fact finding record and generation of report 6. Departmental/Contractual Coal/OBR production 7. UG/OC Production 8. Equipment wise, Technology wise Coal/OBR production V Miscellaneous activities 1. 2. 3. 4. List of theft, pilferage information List of working mines Compilation of statistics of illegal mining Capture and generation of company wise mechanized production report VI Preparation of different statistical reports 1. 2. 3. 4. Daily production report Company wise production report Company wise monthly book containing all the production, despatch, sales figure etc Company wise annual book containing all the production, despatch, sales figure etc Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 80 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 5.0 Equipment Maintenance 5.1 Overview of Equipment and Engineering Department The Equipment Engineering department (EED) at Coal India Ltd. plans for equipments based on the production targets. EED along with Corporate Planning department track the new mine projects and its activities such as: 1. Equipment Mobilization 2. Equipment Availability 3. Spares Annual Maintenance Contracts are awarded to suppliers for spares procurement of new equipment. The Specifications for Equipments are prepared by the subsidiaries and accordingly the Purchase Indents are raised and EED scrutinizes the Purchase Indents before Purchase Orders are placed. It also acts as a monitoring organization for equipment productivity and performance. EED also tracks equipment availability, utilization and its health. EED tracks the Mechanization status of mines. They also assist the subsidiaries to plan for mine mechanization based on the labour and economic factors of the particular area or region. The procurement of equipments can be performed both at a centralized and decentralized level. Some of the key requirements of EED are as follows: 1. 2. 3. 4. 5. Equipment planning Equipment Availability Equipment Productivity and Utilization Track consumption of consumables Mechanization status of mines 5.1.1 Equipment Planning and Budgeting The Equipment Budget planning is performed in a bottom up manner. It starts from the Area level during the start of the year and based on the approval of the plan, funds are allocated. One of the key considerations for Fund Allocation is the production plan for the area or the subsidiary. The requirement for spares is also done on the basis of experience and historical trends. Since spare parts procurement cycle time varies from Area to Area, spares are stocked in stores based on their classification at the Central Store, Regional Stores and Site stores. However spares reorder levels are maintained centrally. 5.1.2 Equipment Procurement Procurement of equipment involves a high lead time. The key equipments procured by Coal India Ltd. and its subsidiaries are: 1. Shovels 2. Dumpers Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 81 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3. Dozers 4. Drills 5. DragLine Newly procured machines are under the MARC (Maintenance and repairing contract ) concept and it has been introduced in CIL recently. Procurement Requisitions can be raised for multiple reasons by the Mines/Areas/subsidiaries: 1. Increase in Production targets 2. Replacement of surveyed off Equipments 3. Initiation of new projects One of the sample processes for procurement of Excavation equipment is as follows: The Indents raised are scrutinized by the Equipment Engineering Department. The Materials Management department floats the tenders for procurement of the equipments. The invited bids are evaluated technically and commercially before award of the contract. Orders are given on the basis of L1 i.e. on the basis of lowest quoted price after the Vendors are qualified technically. The purchase cost is ex-works and the freight is paid by Coal India Ltd. The Inspection of the equipment is performed by the Coal India Ltd. personnel at the Manufacturer’s site and the final acceptance is granted after the equipment is commissioned and operational at site. Sometimes equipments need to be dismantled during the transportation process. Duty concessions are claimed by Coal India Ltd. for equipment purchases for new projects. 5.2 Maintenance Processing Maintenance activities are completely executed at the site. Currently, most of the Maintenance Processing is of the nature of Corrective and Breakdown maintenance. The extent of Preventive Maintenance differs from site to site, nature of working conditions, life of the equipment and availability of the equipment for maintenance. Broadly, the Maintenance Processing encompasses the following: 1. Preventive Maintenance : to maintain the ideal condition of an equipment a. Time Based 2. Corrective Maintenance : to restore the ideal condition of an equipment a. Condition based 3. Breakdown Maintenance: to restart and restore the ideal condition of an equipment A typical maintenance process at Coal India Ltd. is as follows: x x x Inspection performed by foreman Notification received by foreman of equipment breakdown Engineering team visits the site to evaluate the nature of the problem Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 82 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x x x x x Engineering team identifies the problem and checks for spares and resources availability Budget check is performed for execution of maintenance In case budgets are exceeded, request is forwarded to Head Quarters for approval If spares are not available, procurement cycle is initiated Maintenance Execution is performed at site by CIL personnel or is outsourced to external parties Subsidiaries have their own workshops for major repair and overhaul works. History cards are maintained at workshops for major sub-assemblies. Every item that is changed / replaced is maintained in Logbook as well. However the major challenge is to review the log book manually. A gang or groups of workers are associated with each equipment for its routine setup and running maintenance. Float stocks are maintained for spares for prompt replacement and to keep maximum uptime of equipments. Local procurement upto certain limits are allowed. There is also a separate budgeting department for maintenance budgeting. Some of the key challenges in the Maintenance Process are as follows: 1. 2. 3. 4. 5. 6. 7. Capacity and resource planning Manual Assessment and no systematic data capturing for Maintenance Spare part availability and planning Lack of standard Maintenance strategies for preventive maintenance Safety and Permit Management for working on equipments Lack of Standard Task Lists and networks to execute maintenances Warranty tracking is entirely manual. Some of the requirements that came up during the discovery process are as follows: 1. 2. 3. 4. 5. 6. 7. 8. Standard Maintenance Plans to be defined for various equipments Tracking of warranty status of equipments Define Critical Path for Maintenance Execution Perform Maintenance Planning and Costing Maintain Spares reorder level Provide Mobile Solutions to expedite maintenance process Maintain Equipment hierarchy and history Integrate Maintenance function with Materials Management and Finance/Costing 5.3 Reporting Requirements Some of the key reports are as follows: 1. Equipments and Machines on roll 2. Equipment planning and availability 3. Maintenance Order status Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 83 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4. 5. 6. 7. 8. 9. 10. 11. 12. Equipment Status report Bottlenecks in Maintenance Mean time to Repair Equipment history Area wise Drill Bit reporting Failure report before warranty expiry Maintenance costing and variance analysis Performance Monitoring of Spares such as tyres, drill bits, etc. Machine Performance and Productivity a. Group wise b. Model Wise c. Sub Group wise There are numerous ad-hoc reports which are made as per the reporting requirements for various managerial levels. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 84 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6.0 Human Resources & Payroll Human resource and payroll management is very important of CIL since it deals with more than 4 lakh employees with diverse background, qualification at different roles. Brief description of different aspects of human resource management at CIL is mentioned below. 6.1 Personnel function: The Personnel function is headed by Director (Personnel) who is supported by various staff members in his function handling all the below mentioned functions: 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. Manpower Planning & Recruitment Joining of a new employee Employee Master Confirmation Transfers Promotions Leave & Attendance Loans & Advances Salary Administration Benefits Training Industrial Relations Welfare Legal PF Trust Quarter Management Confidential report Terminal Benefits & Superannuation Reports / MIS This shows that the Personnel function is responsible for all the employee related issues. Can also be referred as, “Hire-to-Retire”. 6.1.1 Manpower Planning & Recruitment Manpower Planning is an annual exercise which helps CIL to organize their manpower and plan for the required recruitment for the next year. Based on the defined guidelines, a manpower plan is prepared which is put up for the approval of the concerned authorities. Once approved, the Recruitment function takes over and starts recruiting the required manpower. Various recruitment methods are used to recruit different manpower. Recruitment through media advertisements, through campus are the examples. In most of the cases even a written examination is conducted to assess the candidate which is followed by a personal interview. During campus recruitments, even Group Discussions are also conducted. Once selected, the candidate is given an offer letter and a mutually agreed upon joining date and location is decided. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 85 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6.1.2 Joining On the due date the candidate reports to the location of joining and, with the help of the personnel officer of the location, completes the joining formalities. The personnel officer creates the employee master in the existing CoalNet system which is being used at the CIL and some other subsidiaries as well. The subsidiaries which are not using CoalNet, creates the employee master in the system used by them at their respective location. 6.1.2.1 Employee Master The Employee Master within CoalNet was designed to cater to day-to-day requirements at CIL. Most of the employee details are captured in the employee master to facilitate various processes like Leave management, Attendance, Salary administration, etc. The system being used today does not maintain all the employee details at one place and not all the employees are covered under the CoalNet framework. For executive employees, data is maintained centrally, as well as at respective subsidiaries. Hence some of the details are available here and one has to either go to a different database or to the employee’s physical file to retrieve such information. 6.1.3 Confirmation Each employee joins the organization on probation for a pre-defined tenure; this tenure can vary from 6 to 24 months. The employee has to be confirmed in the employment after the successful completion of the probation period. Before the confirmation due date, the Establishment department initiates the confirmation process which includes a feedback from the department head of the individual’s department. If the feedback on the employee under consideration is positive, he is confirmed in the employment at CIL otherwise his probation period is extended for a pre-defined period and the feedback exercise is repeated. 6.1.4 Transfers There are various criteria for transfers of employees happening across areas, subsidiaries and HQ ; 1. Based on request 2. Transfer on promotion 3. Sensitive departments transfer 4. Administrative Transfer 6.1.5 Promotions The Promotion Committee is set up to assess the suitability of the candidates in the fray. The committee looks into the recruitment rules, seniority and on number of existing and anticipated vacancies to recommend the employees accordingly. The employee’s ACR (annual confidential report), EER(Executive Evaluation Report) is also looked into to assess his past performance record. The other important parameters are Vigilance cases & Disciplinary cases. The employee in the fray must not be having any such case pending against him at the time of consideration. Rosters are also considered to promote the necessary SC / ST candidates as per the government policy. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 86 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. The committee, after looking into all such criterions, decides on the list of the employees who can be promoted. The list is then made public and the process of executing the promotion on all the selected employees is executed by the personnel department. 6.1.6 Leave & Attendance All the employees of the organization are eligible for various types of leaves- Casual, Earned, Sick, Maternity, Half-pay, Study leave etc. Some of these leave types are quota based and some are not. Quota based leaves is credited to the employee’s account at the beginning of the year e.g. Casual leave. If CL is not consumed during calendar year, balance is not carried forward. The employee has to apply for a leave and should proceed on leave once the leave gets approved by the appropriate authority. The same gets debited from the quota of the employee. The employees have their respective work schedules based on which they are supposed to attend the office / plant / mine from time to time. Their respective attendance is recorded on a daily basis. There are different mechanisms to do so. At some places manual registers are kept where the employee has to sign his attendance and at some places, access machines are installed to punch the attendance. These details are shared with the payroll processing department because they play a vital role in the employee’s payroll processing cycle. 6.1.7 Loans and Advances All the employees of CIL are entitled to avail some loans and advances from the organization from time to time e.g. House Building Advance, Computer Loan, Two Wheeler Loan, Festival Advances as per company policy time to time. Some of these loans / advances are interest bearing loans and some are interest-free loans. The employee has to apply for a loan / advance to avail the facility. The application goes through an approval cycle and once approved the money is paid to the employee. This money is recovered from the employee in a fixed tenure from his salary on a monthly basis. Some of these loans / advances can be availed more than once in the employment history and some only once. 6.1.8 Salary Administration The salary administration department at CIL/ Subsidiary takes care of processing the salary of all the employees on a monthly basis. They are also responsible for applying the annual increments to the employees’ salary as per the guidelines. The salary fitment on promotion of the employee is also the responsibility of Personnel Department and the salary administration department (Finance Deptt) feed data to IT Department for entering into the system .Other important aspects of the salary administration department are to look into the correctness of the payroll for the month and ensure the salary is disbursed to the respective employees. The salary administration department at CIL is also responsible to process various payments, like Medical, TA/DA which are not part of the regular monthly salary. Deductions of the statutory components like CMPF, Income tax are also the responsibility of the salary administration department. This money is deducted from the employees’ salary and forwarded to the necessary authorities. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 87 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6.1.9 Benefits Other than routine salary, the employees at CIL are also entitled for Benefits like LTC, LLTC, Conveyance allowance, House Rent Allowance, etc. These benefits are paid to the employees based on their respective eligibilities which may depend upon their grade or their location of work or both. The employee has to apply to avail such benefit and after the necessary approval from the competent authority, such benefits are incorporated into the employees’ salary through sending the information to the salary administration department. The salary administration department will make necessary changes / additions to the employees’ salary master so that the next payroll run picks up the new data for disbursement. Benefits like LTC / LLTC have a different set of rules which must be followed by the employee to avail the benefit. The employee has to undergo a trip either to any location of his choice or to his declared base location to avail these benefits as prescribed in the income tax act of the country. 6.1.10 Training The HRD emphasis in CIL has been set up to deal with the development of existing Human Resources as well as looking ahead with clear perspective with reference to technological advances and growth of manpower to fulfill demand of production vis-à-vis technology. To cope up with the task emerging from strategic plan, Annual HRD plan is worked out every year to integrate HRD efforts in all the twenty six training centre located in different subsidiaries in following four segments. CIL has its corporate training centre for executives at Indian Institute of Coal Management (IICM), located at Ranchi. Every year training calendar is prepared after consulting all GM (HRD), for major disciplines. 6.1.10.1 Technical Training It is to provide requirement of training for technology being used in each subsidiary and any other technology being conceived at the corporate level for which preparedness is necessary to meet current shortage of skilled manpower and also preparing statutory personnel for meeting statutory obligation through training. To analyze and project requirement of personnel in critical and non critical categories as well as to prepare them so that capital and technology input to the project through capacity and new equipment or enrichment in the production process through particular systems in technology could provide appropriate return to the investment. 6.1.10.2 Management Training At the apex training Centre, Indian Institute of Coal Management, Ranchi, the executives recruited as MTs are imparted induction training. It also conducts specialized training like Advance Management Program for senior executives and executives of all levels get trained on need basis from time to time. This institute also imparts training to other organizations like NTPC, Sringreni Colliries, Neyvali Lignite etc. on chargeable basis. 6.1.10.3 Transformation Training A planned attempt to help those who join CIL as part of management policy and for the workmen who are required to acquire skill for movement from conventional to semi-mechanized mines Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 88 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. with intermediate technology or at the instance of closure of mines and surplus manpower. These trainees are used as source of supply of manpower in critical and non-critical areas of skills for the technology specific to the subsidiary company. 6.1.11 Industrial Relations Unions are the dominant factor at CIL. The management has to deal with multiple unions as and when a settlement is to be brought into. Managing cordial relations which does not lead to productivity loss is the main motto of the organization. Reducing the number of strikes and bandhs are the main focus area. The IR department maintains record of employees attached to particular union to understand the union dynamics. The department also has to proactively ensure that no strike or bandh takes place. And if they do take place, the whole event is smooth and no accident / fight take place. A bipartite committee called JBCCI (Joint Bipartite committee for the coal industry) has been formed between the management and the union representatives at CIL to handle the issues raised by the employees from time to time. Wage agreement is one such example. 6.1.12 Welfare CIL, as an organization, also takes care of welfare aspects of not only the employees of the organization but also the family members of the organization. Activities like Hospitalization, Education and Medical fall into this category. The organization runs its own hospitals to take care of hospitalization needs of the employees and their family members. The employees can also be referred to other hospitals if the CIL owned hospital is not fit to treat the employee. The medical expenses are borne by CIL. Similarly, scholarship for the higher education is provided to the children of the employees based on the selection criterion. High performing children are selected for the scholarship program and their respective tuition fees are paid by the CIL for their higher studies. Medical facility is also extended to the employees and their dependents.. A detailed employee record is maintained for the reference purpose and for the MIS purpose. Other details like family details are also necessary to be maintained to realize the exact detail of the family members. 6.1.13 Legal The legal department at CIL and subsidiaries manages all the court cases of the organization. These cases can be related to the employees of the organization or can be related to the legal authorities like labour commissioner or any third party. The objective of this department is to maintain all the possible details of the court cases. This not only helps in responding to the MIS expectations but also helps in managing the court case from time to time. Various details are required to be maintained and hence a robust system is required which can facilitate the legal department’s requirements. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 89 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6.1.14 PF Trust CIL employee’s PF is maintained by CMPF organization largely. It is an organization under ministry of coal. Few employees are member of CCL PF also. Monthly deductions made through salary is forwarded to CMPF/CCL PF as the case may be. The trustees of the trust invest the money in the prescribed government securities and manage these investments from time to time to ensure maximum returns to the employees on their PF corpus. The trust is also responsible to declare rate of interest to be earned by the employees on their PF money on yearly basis. The trust also maintains complete details so that their day to day management can be as smooth as possible. 6.1.15 Quarter Management CIL manages their own residential colonies at different locations. These residential houses are allotted to the employees of the organization. There are different kinds of houses which are allotted to the employees based on their respective grades in the organization. A seniority list is created which helps the department to allot a house to an employee on a firstcum-first-serve basis. This list is created house type-wise as well as employee grade-wise. A token recovery as HRR (House Rent Recovery) is done from the employees’ salary based on the house type he/she occupies. Other recoveries can be done on the basis of electricity & water consumed in a particular month. This policy may differ from location to location or from subsidiary to subsidiary. 6.1.16 Confidential Report CIL follows the procedure for writing Annual Confidential Reports(ACR) for Non-Executives and EER for executives of their employees. This is an annual exercise and is done by the manager for the employee on a prescribed format and is kept in the employee master. An officer can also get an adverse remark which may either result in an Officer’s exclusion from the Select List or his being given a lower rank, even though it is expunged subsequently. It would, therefore, be in the interest of the employee concerned that adverse remarks are communicated and representations against the adverse remarks dealt with, expeditiously. A procedure has been laid to deal with such scenarios: I. the adverse remark is communicated to the Officer immediately; II. He is allowed six week’s time (from the date of communication of the remarks). III. unless there is satisfactory explanation for the delay, a representation submitted after the time limit specified above is not taken into consideration; and IV. Decision on the representation is to be taken expeditiously and, in any case, not later than six weeks from the date of submission of the representation. 6.1.17 Terminal Benefits & Superannuation At the age of 60 years, an employee superannuates from CIL. Benefits like Payment of CPF contribution, Pension, Gratuity, Leave encashment, Superannuation fund and post superannuation medical benefit are part of the Terminal Benefits. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 90 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. After obtaining a no-dues certificate from all the concerned departments, an employee becomes entitled receive all his terminal benefits. CMPF contribution, which is 12% of Basic plus DA, done by the employee as well as the employer will get paid to the employee along with the declared interest from time to time. Gratuity, which is 4.18% of Basic plus DA, will get paid to the tune of lakhs only). 1,000,000/- (Rupees ten Pension, which is 3% of Basic plus DA, will also get paid to the employee. Superannuation benefit, which is 6.84% of Basic plus DA, will also get paid to the employee. A post retirement medical scheme will also take care of the employees’ medical requirements even after he superannuates from CIL. 6.1.18 Reports / MIS The Personnel department of CIL generates good number of reports to satisfy their day to day reporting requirement. Reports pertaining to both internal and external requirements are generated and expected. Reports like monthly manpower MIS, SC/ST details, Pay Bill etc are some internal requirements. Many other reports are generated at subsidiaries and at CIL level. Today, a good amount of time is being spent to generate these reports as there is no integrated system to derive data for the reports and the available data is also not on a real time basis. Because of this neither do CIL gets a report on time nor do they get the correct real-time data. A pressing need is to have an integrated database where data resides on a real-time basis to fetch data for various reporting requirements. Custom dashboards for various stakeholders will also help them in a better faster decision making. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 91 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 7.0 Project Management 7.1 Project Identification and Feasibility The Planning Commission through its working group on Coal and Lignite formulates a demand plan for coal. Based on this demand plan, various projects are conceived to fulfill the demand of Coal. A preliminary study is performed and the feasibility report is discussed at the subsidiary. CMPDI prepares detailed Draft Project report and submits it to the subsidiary. On approval of the draft project report at the subsidiary, a Final Project Report is submitted by CMPDI for the Board’s approval and sanction. There is a mechanism for ongoing project review. There is a formal process for revised cost Estimates if there is a change in scope of the project. A revised project report is accordingly submitted for a fresh sanction of funds. The project is tracked phase wise or stage wise and is considered for completion on achieving certain major milestones such as: 1. Land Acquisition 2. Environmental and Other Statutory Clearances 3. Equipment Procurement 4. Infrastructure development 7.2 Project Approval and Sanction Once a project is approved by the Subsidiary board on the basis of the Final Project Report submitted by CMPDI, the Project Monitoring Division of CIL forwards the Project to Empowered Sub Committee (ESC) of CIL Board for its approval/Sanction. ESC deliberates and brainstorms on the project details and approves the same with their observations. CIL Board approves and sanctions the Project upto ` 100 crores. In case the Project needs investment of more than ` 1000 crores, the Project needs an additional approval and sanction from the Ministry of Coal. 7.3 Project Execution On sanction of the project, the project is released for Execution. Activities such as Land Acquisition, Environmental Clearances, Infrastructure creation at Site, Equipment Procurement etc are triggered in a phased manner. Some of the clearances and approvals required from various agencies and ministries are as follows: 1. Ministry of Environment 2. State Pollution Control Board 3. Ministry of Civil Aviation 4. State and Central Ground Water Clearance 5. Ministry of Forest 6. Mining Lease from State Government Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 92 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. The Land acquisition process is done under Land Acquisition Act, 1894, Forest Conservation Act, Coal Bearing Act. The Land acquisition process is initiated at the Subsidiary level and followed up by the subsidiary head quarters. Some of the key challenges in Project Execution are as follows: 1. 2. 3. 4. 5. 6. 7. 8. 7.4 Land Acquisition and its management Clearances from various agencies and ministries Timelines Date Planning Operation certification from the State Government Socio-Economic Impact Rehabilitation and Resettlement policy Public hearing for Pollution (presided by collector) Project Reporting and Monitoring As per the practice at CIL, a mandatory project review is carried out at the subsidiary level when the overall expenditure of the project exceeds 50% of the sanctioned cost. The Revised Cost Estimate report is submitted based on regular monitoring and appraisal of the project. Projects are frequently reviewed by CIL Board, and Project Execution strategy is charted out to control deviations in Project Execution. A project appraisal division at CMPDI also tracks the Project. The finance department at CMPDI performs planned project cost. All actual project costs are booked at the Subsidiary. There are coordination committee meetings for tracking project status between CMPDI and Subsidiaries. Some of the key reports required in Project Management are as follows: 1. 2. 3. 4. 5. 6. 7. Flash reports Quarterly Project Monitoring Report Status of Critical Milestones Slippage details of the projects Production targets and actual achievement Cost details of the project Overall delay in Project from the plan Apart from the aforesaid reports there are numerous ad-hoc reports which are used for reporting at various levels and status of project implementation is sent to MOC time to time. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 93 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 8.0 Environment, Health & Safety Coal India Limited has always given the highest priority towards “safety”. In CIL, safety is considered as a part of its core production process and is embodied in the mission statement. CIL has also framed a distinct and definite safety policy and formed multidisciplinary internal safety organization (ISO) in every subsidiary company and also at CIL HQ. Coal India Limited has always given the highest priority towards “safety”. In CIL, safety is considered as a part of its core production process and is embodied in the mission statement. CIL has also framed a distinct and definite safety policy and formed multidisciplinary internal safety organization (ISO) in every subsidiary company and also at CIL HQ. x x x x x 8.1 Commitment by the management, workers and regulators Well thought out and conscientious safety awareness drives Advanced and continuous training of the workforce Technological advances in the field of mining methods and better equipment design Strong oversight and required assistance from ministry of coal Safety Policy of CIL : CIL has formulated a safety policy for ensuring safety in mines and implementation of which is closely monitored at several levels: (1) Operations and systems will be planned and designed to eliminate or materially reduce mining hazards. (2) Implement statutory rules and regulations (3) To bring about improvement in working conditions by suitable changes in technology (4) Provide material and monetary resources needed for the smooth and efficient execution of safety plans (5) Deploy safety personnel wholly for accident prevention work (6) Organize appropriate forums with employee’s representatives for joint consultations on safety matters and secure their motivation and commitment in safety management (7) Prepare annual safety plan and long term safety plan (8) Set up a framework for execution of the safety policy and plans (9) Multilevel monitoring of the implementation of the safety plans through internal safety organization 8.2 Safety Monitoring agencies at different levels: There are many group/agencies who monitor and take action related to safety matters; x x x x x x Workmen’s inspectors Safety committee at mine level Area level tripartite committee Tripartite safety committee Coal India safety board Standing committee on safety in coal mines Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 94 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x x 8.3 Conferences on safety in mines Parliamentary committee Measures adopted to improve safety Major actions taken for enhancement of safety by CIL as below, A ) Disaster Prevention x x x Safety Audits Risk Assessment o Thrust on measures for prevention of inundation i. Check Surveys ii. Revamping survey organization iii. Trial of Geo physical methods for detection of waterlogged bodies Gas Detection i. Computerized environmental Tele monitoring systems ii. Modern Hand held/Portable digital Multi Gas B ) Emergency Response Systems x x x x Review of mine emergency action plans Mock rehearsals Escape route demarcation State of art rescue apparatus C ) For Reduction of Roof/Side falls x x x Preparation of systematic support rules/support plans based on rock mass rating Roof bolting and Roof stitching Resin bolting D ) Measures for reduction in fatalities To reduce casualties at opencast mines and at the surface, the comprehensive action is prepared with continuous risk assessment and training to contractor workers is planned. 8.4 Occupational Health Services CIL maintains a well staffed and equipped organization for occupational health surveillance every worker undergoes an initial medical examination and periodical medical examination ( PME ) once every five years of the standard laid down in mines rules by medical officers. Safety Apparatus used in mines x For methane gas detection Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 95 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. x x x o Flame safety lamp o Methanometer o Explosimeter o Local Methane Detector For Carbon monoxide o CO detector o CO tubes For Air Measuremement o Anemometer For Humidity o Whirling Hygrometer Personal Protective Equipments x x x x x x x Helmets Mining Shoes/Gum boot Dust Masks Hand Gloves Safety Hook Safety belts Self rescuer Type of Roof support used in UG mines x x x x 8.5 Timber props and cogs Roof bolt and roof stitching Steel props and chocks Hydraulic powered support for longwall face Environment and Pollution Control CIL is committed to the Environmental Conservation and Pollution Control. Environmental Management System (EMS) has been implemented in almost all operating opencast mines. The company has framed its own Environmental Policy and developed Effective Management Programme to minimize the impact on environment due to mining operations. Programme has also been adopted to train all employees with respect to Environmental Awareness and Mitigation Measures. Environment Policy In line with corporate Environmental Policy of sustainable development, CIL is committed to strive for environmental protection in all its mining projects through: x x x Minimizing impacts of mining operation on land, water and air Compliance with applicable environmental laws and regulations Optimum resource utilization viz. energy and water Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 96 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Continual improvement in environmental quality and prevention of pollution x Training of employees and creating general awareness regarding environment and prevention of pollution Clean development Mechanism Realizing the need of CDM, development of coal based non conventional environment friendly energy resource is high on the agenda of CIL. It is pursuing the development of CBM, CMM, VAM,UCG and other clean technologies. CIL and GAIL are jointly setting up of SCG projects for production of synthetic gases to be used. CIL and OIL are scouting for possible sources of coal in order to meet the requirement of a commercial liquefaction unit. The development of clean technologies helps in generating additional revenues with accrual of carbon credits 8.6 Major safety legislation The Mines and Minerals (Development and Regulation Act, 1957, ('MMDR') and the Mines Act, 1952, together with the rules and regulations framed under them, constitute the basic laws governing the mining sector in India. The health and safety of the workers is governed by the Mines Rules, 1955 created under the jurisdiction of the Mines Act, 1952. Some of the other acts and rules that have to be adhered to are as follows: x x x x x x 8.7 Coal Mines Regulation - 1952 Rescue rules - 1985 Vocational Training rules - 1965 Explosives act and rules Electricity act and rules - 1956 DGMS circulars MIS requirements To have monitoring and compliance related to DGMS around 20 reports are required, few of them are listed below; 1. 2. 3. 4. 5. 6. 7. 8. Tripartite safety committee ( TSC ) meetings Safety and rescue budget and expenditure Underground Mines Mechanization Status of last safety audit Status of Risk assessment Status of stowing lags Status of methanometer etc, other apparatus and their calibration Status of area level gas analysis lab and gas chromatograph Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 97 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 9. Status of roof bolting and other steel support and consumption of roof bolts and cement capsules 10. Status of mechanized roof drilling machines 11. Status of vocational training 12. Status of Man riding systems ( MRS ) 13. Status of Mining shoe 14. Status of stone dust barriers 15. Status of plank, board and stone dust in last 2 yrs 16. Severity index 17. List of different kind of grades in fiery, inundation prone and accident prone mines 18. Nos of mines with shaft and boiler etc 19. Nos of mines where joint survey plans maintained 20. Status of check survey Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 98 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 9.0 MIS & Reporting CIL is currently on manual MIS system and broadly dependent on manual data entry, excel sheets, etc. Many reports are delivered using physical ‘Mail Post” from various subsidiaries. Every department has different types and level of challenges faced by them, depending upon the source and type of information they receive. Following is current MIS framework for few departments at CIL HQ and challenges faced by them. 9.1 Engineering and Equipments Division (EED) sources information from excavation, E&M, and washery. The information scope is operational information of around 5000 machines and 19 washeries. Various KPIs tracked by EED department are: x Machine wise working hours and breakdown x Progressive hours till date x Hours clocked from date of commissioning x Capacity utilization of mine x Quick report for breakdown (For high capacity equipment) x History card reports for every machine x Power Interruption reports x Washery construction status x Performance of washeries on MTD and YTD comparisons x HEMM availability x Various challenges faced by EED department are because of manual data sourcing mechanism. Reports often come by DAAK, phone, mail etc from various subsidiary companies and are compiled at corporate level. This leads to lag of approximately 1 month and is error prone. 9.2 Production Department faces similar challenges because of manual nature of MIS. All of the production data including operational parameter data like downtime, availability, etc is recorded manually and sent to subsidiary. Few of the tracked KPIs by Production department are as follows x Production reports and trends company wise and on time (Actual vs Targets) x Dispatches – Company wise and month wise x Lost of Production analysis x Product wise / Area wise / Field wise / Washery wise / production analysis The major challenge faced by Production department is to collect as-on-yesterday production status for all subsidiaries. Currently it is happening over phone which is error prone and there is no SLA defined for the same. Monthly data comes by courier, or mail or phone. 9.3 Materials Management department is centralized procurement for some items like explosives, OTR tires, high capacity earth moving machines and in policy formulation. All procurements happen through a competitive bidding process. Inventory control is subsidiary of HQ and monthly report comes to CIL HQ. Various challenges faced by MM department include generation of exception reports for top management, statutory reports on value of purchase for vigilance and vendor rating on annual basis. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 99 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 9.4 QC Department is responsible to provide daily position of company wise aggregate information like off take, dispatch, delay, wagon loading, sales outstanding etc. Currently all reporting is manual and is not flexible enough for the top management to perform analysis. 9.5 Sales & Marketing Department is managing to create multiple manual reports for analysis. However, most of the time is spent on data compilation and consolidation. Few of the KPIs being tracked by them are as follows x x x Billing, outstanding, realization and disputed dues with aging Track of offer, allotment, supply, loading and left behind of wagons across various dimensions like field, company, time. Analysis on coal and coal products for various KPIs There is a need for strong MIS framework which can provide holistic view of CIL to top management, and ensures accurate and timely delivery of data from various sources to MIS system. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 100 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B: Bid Support Documents Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 101 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B1: Letter of Undertaking by Bidder PROFORMA OF LETTER OF UNDERTAKING TO BE SUBMITTED BY THE BIDDER ALONG WITH HIS BID (To be executed on non-judicial stamp paper of ` 50) Ref: Date: To Coal India Limited Coal Bhavan 10, Netaji Subhas Road Kolkata West Bengal – 700 001 (Hereinafter referred to as the Owner) I/We have read and examined the Bid documents relating to “Supply & Implementation of SAP ERP and IT Infrastructure along with post implementation support at Coal India Limited and all its subsidiaries.” I/We hereby tender for execution of the works referred to in the aforesaid documents upon the terms and conditions as stipulated in the RFP and proposal submitted. In consideration of I/We being invited to Bid, I/We agree to keep the Bid open for acceptance for 180 days from the due date of opening of bid A sum of `……………………… is hereby forwarded in shape of crossed Demand Draft drawn in favour of Coal India Ltd. and payable at par at Kolkata as Earnest Money in the manner prescribed in NIT enclosed. If I/We fail to keep the Bid open as aforesaid. I/We agree that the Owner shall, without prejudice to any other remedy, be at liberty to forfeit the said earnest money absolutely. If, after the Bid is accepted, I/We fail to commence the execution of the works as provided in the conditions, I/We agree that the Owner shall without prejudice to any other right or remedy be at liberty to forfeit the said earnest money absolutely. Signature of Bidder ………………… Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 102 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Duly authorized to sign the Bid on behalf of the (in block capitals)………………….. …………….. Dated……………………………………… Postal Address……………………………. Telegraphic Address…………………… Telephone No…………………………….. Fax No……………………………………. E-mail address …………………………… Witness…………….. Date……………….. Address…………… Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 103 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B2: This is left Intentionally Blank Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 104 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B3: Exclusions / Deviation Statement DEVIATION STATEMENT We confirm that the following are the only deviations to the requirements described in your Bid Document Number …………..dated ……….and as responded in our proposal / bid Number ………. dated ………. Except for these deviations / exclusions / variations, we confirm to all the other requirements of the said Bid Document. Sl. No. Deviation Reference RFP Volume Section/Table Deviation Description Deviation Impact: Positive (P), Negative (N) Description of Impact Page/Serial. No. We declare that any other deviations noted in other places in the bid documents / correspondences shall be ignored and construed as our acceptance of the respective tender terms, unless mutually agreed under seal and signature from both sides. I/We confirm that no deviation has been made in Critical components identified in the RFP document (Volume-III). Also NO DEVIATION will be allowed in the ‘Terms and Conditions’ of the RFP / NIT. Thanking you, Yours faithfully Name and Designation of Signatory: Name of Firm: Address Notes: a) This form has to be signed by authorised signatories of the Bidder. b) Please use separate sheets in case the deviation that cannot be adequately described in the table above clearly mentioning the reasons). c) The Bidders must comply with all requirements of this Bid Document. However, where the Bidder is unable to comply with specific requirements listed out in this document, he must specifically indicate these in the format given above. Anything contained in this Bid Document, which has not been specifically excluded, or for which deviations have not been indicated, will be regarded as being agreed to by the Bidder. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 105 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B4: Proforma for Bank Guarantee for Bid Security (EMD) PROFORMA BANK GUARANTEE IN LIEU OF EARNEST MONEY 1. In consideration of M/s. Coal India Limited having its office of 10, Netaji Subhas Road, Kolkata-700 001 (hereinafter called the Company which expression shall unless repugnant to the subject or context includes its successors and assigns) having agreed to accept from M/s………….having its office at……… (hereinafter called “the said tenderer” which expression shall unless repugnant to the subject or context includes its successors and assigns) the Bank Guarantee No. _______ Dated______ from ________ Bank (Nationalized / Scheduled ) in lieu of deposit of Earnest Money in cash/Bank Draft for fulfillment of the terms and conditions contained in the tender no……..dated……..for providing services pertaining to Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. We………Bank (hereinafter referred to as “the Bank” having its office at ………..do hereby undertake to pay to the Company an amount not exceeding Rs………on demand by the Company by reason of any breach committed by the said tenderer of any of the terms & conditions contained in the said tender. The decision of the Company as to whether any breach having been committed by the said tenderer shall be final and binding on us. 2. We ……… Bank do hereby undertake to pay an amount due and payable under this Guarantee without any demur merely on a demand from the Company stating that the amount claimed is due from the said tenderer by reason of breach by the said tenderer of any of the terms & conditions contained in the said tender or for the reason of the said tenderer failing to keep the tender valid. Any such demand made on the Bank shall be conclusive. As regards the amount due and payable by the Bank under this Guarantee shall be restricted to an amount not exceeding Rs_______ 3. We the said Bank further agree that the Guarantee herein contained shall come into force from the date hereof and shall remain in full force and effect till a demand or claim under this Guarantee is made on us in writing on or before____ (28 days beyond the validity of the Bid ). We shall be discharged from all liabilities under this Guarantee thereafter. 4. We the said Bank lastly undertake not to revoke this Guarantee during the currency except with the previous consent of the Company in writing and agree that any change in the constitution of the said Tenderer or the Bank shall not discharge our liability hereunder. 5. This Guarantee is issued by Sri…………who is authorized by the Bank. Dated…day of _____ (Month)_____(Year) For…………Bank Signature of the authorized person For and on behalf of the Bank Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 106 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B5: Consortium MOU Date: To ---------------------------------------------------------------------------------------------------------------Dear Sir, Sub: Notice of Intent to Respond to Bid Document (Bid Document Number ……………………; dated ………………..) We are a consortium with the following members: a) Company Name & Address b) Company Name & Address c) Company Name & Address Having examined the Bid Document we, hereby confirm our intention to collectively respond to the described Bid Document floated by your company as members of the above consortium. by submitting a consolidated Bid number ………….. dated ……….. offering to supply, install, test, pre-commission, commission, demonstrate and establish performance guarantee parameters of the solution in full conformity with the said bidding documents. <Company Name> will be the Prime Bidder of our consortium. They are authorized to sign all contract documents, receive instructions and incur liabilities on behalf of the consortium. A notarized copy of the duly executed Consortium Agreement to this effect is enclosed. We hereby confirm that <Company Name>, the Prime Bidder, will responsible for execution of the contract in such a manner that the Solution delivered meets the performance requirements as described in the Bid. We hereby confirm that information provided in this Bid is true and correct to the best of our knowledge and belief and nothing has been concealed, misrepresented, manipulated or exaggerated there from. Details of primary and secondary contact persons for each consortium member are as follows: Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 107 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. < Company Name & Address> < Brief Description of Company’s Key Role in the Project> Primary Name Designation Company Name Address Phone Fax Email id Secondary We undertake, if our bid is accepted, to commence execution of work of the Solution and to achieve completion within the respective times stated in the bidding documents / quoted by us in our bid. We understand that you are not bound to accept the lowest or any bid you may receive and in-turn we will not have any rights to raise any claim, whatsoever it may be, due to or arising out of rejection of our bids. Thanking you, Yours faithfully, <Seal and Signature of Authorized Signatory> <Name of Authorized Signatory> <Title of Authorized Signatory> Note: This form has to be signed by authorised signatories of all the members of the consortium Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 108 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B6: Profile of Bidder Note: This appendix contains the formats in which the bidder has to submit the information in response to the information sought on bidder’s credentials for the evaluation. This has been referred from Section “4.1.3 Evaluation Tables” A Organizational Details A. Background Information Name of the Implementation Partner Registered Office Address Operating in India since SEI CMM Level 5 certified (Y/N) List the Quality Certification like x Information Security Management System Standard BS 7799 Or ISO 27001 x ISO 9001:2000 standard/certified process framework Please confirm whether these quality related credentials is for the prime bidder (in case of Sole Bidder) or that of the Infrastructure Services partner (in case of consortium bidding). SAP Partnership Status B. Financials (Global) Financial Year (1st April – 31st March) Turnover (`Crores) Profit (`Crores) 2009-2010 2008-2009 2007-2008 C. Employee Strength Total No of Employees Total No of Employees in India Total No of consultants in SAP Practice Total No of consultants in SAP Practice in India Total No of Employees in Infrastructure Practice Total No of Employees in Infrastructure Practice (i.e. professionals in networking, systems integration, and prior experience in providing the Data Center Infrastructure maintenance services) Please confirm whether this employee base is for the prime bidder (in case of Sole Bidder) or that of the Infrastructure Services partner (in case of consortium bidding). Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 109 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. B Global SAP Delivery Experience Customer 1 Name of Customer Industry Vertical Country Customer Address Contact person with contact details SAP Modules Implemented Month, Year of Go-Live / Completion Number of SAP Users Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. C India SAP Delivery Experience Customer 1 Name of Customer Industry Vertical Country Customer Address Contact person with contact details SAP Modules Implemented Month, Year of Go-Live / Completion Number of SAP Users Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. D SAP Delivery Experience: Functional Customer 1 Name of Customer Industry Vertical Country Customer Address Contact person with contact details SAP Modules Implemented: any 5 out of the following modules in India: FICO, HCM, MM, PP, PM, QM, SD, Payroll, E-Tendering, BI, IS – Mining Month, Year of Go-Live / Completion Number of SAP Users Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 110 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. E Global SAP Delivery Experience in Mining & Metals Industry Customer 1 Name of Customer Industry Vertical Country Customer Address Contact person with contact details SAP Modules Implemented Month, Year of Go-Live / Completion Number of SAP Users Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. F Indian SAP Delivery Experience in Mining & Metals Industry Customer 1 Name of Customer Industry Vertical Country Customer Address Contact person with contact details SAP Modules Implemented Month, Year of Go-Live / Completion Number of SAP Users Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. G SAP Delivery Experience in Government / PSU in India Customer 1 Name of Customer Industry Vertical Country Customer Address Contact person with contact details SAP Modules Implemented Month, Year of Go-Live / Completion Number of SAP Users Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 111 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. H Infrastructure Services Experience in Data Center Customer 1 Name of Customer Country Industry Vertical Registered Office Address Contact person with contact details Scope of supply of Infrastructure Components Hardware OEM Suppliers for the project Name of Component OEM Supplier Network OEM Suppliers for the project Name of Component OEM Supplier Other Infrastructure Component OEM suppliers for the project Name of Component OEM Supplier Month, Year of Go-Live Value of the contract Please confirm whether this credential is for the prime bidder (in case of Sole Bidder) or that of the Infrastructure Services partner (in case of consortium bidding). Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. I Infrastructure Services Experience in WAN (Global and India) Customer 1 Name of Customer Country Industry Vertical Registered Office Address Contact person with contact details Scope of supply of Infrastructure Components Hardware OEM Suppliers for the project Name of Component Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 112 of 249 OEM Supplier Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Network OEM Suppliers for the project Name of Component OEM Supplier Other Infrastructure Component OEM suppliers for the project Name of Component OEM Supplier Month, Year of Go-Live Number of WAN nodes Please confirm whether this credential is for the prime bidder (in case of Sole Bidder) or that of the Infrastructure Services partner (in case of consortium bidding). Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used. J Team Composition (The personnel proposed to be deployed shall be professionally qualified from reputed university/institution like IIT/IIM/NIT etc. and shall have adequate experience in SAP implementation / System Integration). Sl No Name Designation Name of Organization / Serving Since Qualification Professional experience in years * Relevant experience details # Current Position in the firm 1 2 3 4 5 6 … * Enclose detail resumes of the personnel as per the CV format described below Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 113 of 249 Vol- I Task proposed to be assigned Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. K CV Format This format is to be used for CVs of SAP related resources Project Manager - 1 Name of Employee Task proposed to be assigned Tick against the appropriate task x Project Manager x Change Management Lead x Functional Integration Lead x Functional Lead Name of the Organization serving with Designation of Employee Serving in your organization since Professional Qualifications Certifications Date of Birth Whether serving in Indian Subsidiary of your organization. If No, please confirm that the said person will relocate to India for the duration of the project. Contact details Core area of expertise Number of end-to-end SAP implementation projects delivered of comparable size and complexity. Sl. No. Details 1 Name of Customer: Industry Vertical: Project Overview: Number of SAP Users: Number of Locations implemented: Duration of the project: 2 Name of Customer: Industry Vertical: Project Overview: Number of SAP Users: Number of Locations implemented: Duration of the project: .. .. Summarized Professional Experience over last 5 years in reverse chronological order. From To Company/Project/Position/Relevant Technical and Management Experience Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 114 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. This format is to be used for CVs of Infrastructure Management related resources Project Manager - 1 Name of Employee Task proposed to be assigned Infrastructure Management Lead Name of the Organization serving with Designation of Employee Serving in your organization since Professional Qualifications Certifications Date of Birth Whether serving in Indian Subsidiary of your organization. If No, please confirm that the said person will relocate to India for the duration of the project. Contact details Core area of expertise Number of IT Infrastructure related projects of comparable size and complexity. Sl. No. Details 1 Name of Customer: Industry Vertical: Project Overview: Duration of the project: 2 Name of Customer: Industry Vertical: Project Overview: Duration of the project: .. .. Summarized Professional Experience over last 5 years in reverse chronological order. From To Company/Project/Position/Relevant Technical and Management Experience Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 115 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix B7: Profile of Consortium Partner A. Background Information Name of the Consortium Partner Registered Office Address Operating in India since Office in Kolkata (Yes, No). If Yes, Pl provide details on the operations carried out. B. Financials (Global) Financial Year (1st April – 31st March) Turnover (`Crores) Profit (`Crores) 2009-2010 2008-2009 2007-2008 Total No of Employees in Infrastructure Practice Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 116 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Appendix C: General Conditions of Contract (GCC) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 117 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1 Definitions & Interpretations 1.1 Definitions The following words and expressions shall have the meanings hereby assigned to them except where the context otherwise requires. “Agreement” shall have the same meaning as ascribed to it in the cover page of the Agreement (Annexure 8) “Approval of the Owner” shall mean the written approval to a document, a drawing or other particulars of matters in relation to the Agreement by the Owner or his authorized representative. “Contract Price” means the price payable to the Vendor under the Agreement as per Annexure - 4 for the full and proper performance of its contractual obligations. “Core SAP Product” means the standard features provided by the modules of the SAP ERP application. “Delivery” shall have the same meaning as ascribed to it in the Annexure-2 & Annexure-3 of Appendix-C. “Day” means calendar day of the Gregorian calendar consisting of 24 hours from midnight to midnight irrespective of the number of hours worked in that day. “Effective date” shall mean the date of signing the Agreement. “FMS” shall have the same meaning as ascribed to it in the cover page of the Agreement. “Final Acceptance” shall have the same meaning as ascribed to it in the clause-9.6. “Go-live” shall have the same meaning as ascribed to it in the clause-9.5.1(a). “Go-live Acceptance” shall have the same meaning as ascribed to it in the clause-9.5.1. “Hardware Manufacturer” means the original manufacturer of hardware based in India or its Indian office in case the manufacturer is located outside INDIA. “IT Solution” shall have the same meaning as ascribed to it in the cover page of the Agreement. “Intellectual Property Rights” means any and all copyright, moral rights, trademark, patent, and other intellectual and proprietary rights, title and interests worldwide, whether vested, contingent or future including without limitation all economic rights and all exclusive rights to reproduce, fix, adapt, modify, translate, create derivative works from, extract or re-utilize data from, manufacture, introduce into circulation, publish, distribute, sell, license, sublicense, transfer, rent, lease, transmit or provide access electronically, broadcast, display, enter into computer memory, or otherwise use any portion or copy, in whole or in part, in any form, directly or indirectly, or to authorize or assign others to do so. “Infrastructure” shall have the same meaning as ascribed to it in the clause-9.2 “Materials” means all the deliverables to be provided to Owner under the Agreement. “Month” means calendar month of the Gregorian calendar. “Owner” shall have the same meaning as ascribed to it in the cover page of the Agreement. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 118 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. ‘Offices’ shall mean corporate office, regional offices, branch offices and locations wherever business activities are conducted by the Owner. “Project” shall have the same meaning as ascribed to it in the cover page of the Agreement. “Project Manager” shall have the same meaning as ascribed to it in clause-4.1.1. “Project Plan” shall have the same meaning as ascribed to it in clause-5.1.1 “Project Site” shall mean CIL HQ / SHQ / AHQ as applicable. “Scope” shall have the same meaning as ascribed in clause 2 of the Agreement. “Services” means all technical, logistics, management, and any other services to be provided by the Vendor under the Agreement to develop, install, implement, customize, integrate, and make operational the IT Solution. Such services may include, but are not restricted to installation, commissioning, Go-live, testing, stabilization and Training. “Stabilization Acceptance” shall have the same meaning as ascribed to it in clause-9.5.2. “System” means any hardware component, software component, application component, developed application or module of the SAP proposed to meet the technical requirements that may be supplied, installed, tested, and commissioned individually. “Sub-contractor” shall have the same meaning as ascribed to it in clause-8.2. “Tests” shall have the same meaning as ascribed to it in clause-9. “Test Plan” shall have the same meaning as ascribed to it in clause-9.1 “Term of Agreement” shall have the same meaning as ascribed to it in clause-18.1 “Vendor” shall have the same meaning as ascribed to it in the cover page of the Agreement. “Week” means five (5) consecutive working Days, beginning the said day of the week “Year” means a period of twelve (12) consecutive Months 1.2 Interpretation 1.2.1 Language: The Agreement shall be construed and interpreted in accordance with the English language. 1.2.2 Headings: The headings are included for ease of reference and shall neither constitute a part of the Agreement nor affect its interpretation. 1.2.3 Party or Parties: The Owner and the Vendor shall be individually referred to as “Party” and collectively as “Parties”. 1.2.4 Persons: Words importing persons shall include firms, companies, corporations, associations or body of individuals whether incorporated or not. Words importing masculine gender or singular number shall also include the feminine gender and plural number and vice-versa where the Agreement so requires or permits. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 119 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.2.5 Entire Agreement: The Agreement constitutes the entire Agreement between Owner and Vendor with respect to the IT Solution and supersedes all communications, negotiations, and Agreements (whether written or oral) between the Parties with respect to the IT Solution made prior to the date of Agreement. 2 Scope of Agreement The Scope of Agreement covers work to be executed as indicated in the detail scope of work at Annexure 2 along with the supporting information provided under Annexure – 3 to Annexure – 8 a) b) Unless otherwise expressly limited, the Vendor’s obligations involve supply of SAP licenses, Engines and other products as detailed, necessary software, requisite hardware, network hardware and services, product, implementation, integration, testing, acceptance, achieving go-live, training, change management, stabilization of the Project, provision of all the Project components and materials as well as performance of all Services, as tendered in this document & in accordance with the plans, procedures, specifications, and any other documents specified in the Agreement and the Project Plan, at no additional cost. The Vendor shall, unless specifically excluded in the Agreement, perform all such work and / or supply all such items, service materials not specifically mentioned in the Agreement but that can be reasonably inferred from the Agreement as being required for attaining Go-live Acceptance and stabilization acceptance of the Project as if such work and / or items and Materials were expressly mentioned in the Agreement, at no additional cost. 3 Obligation of Vendor 3.1 Obligation of Vendor towards the Project 3.1.1 The Vendor has the overall responsibility of implementing, conducting Tests, successful running and stabilization of the Project. The Vendor shall be responsible for timely provision of all resources, information, and decision making under its control that are necessary to reach a mutually accepted Project Plan as per Annexure-1 and the detailed Scope of work at Annexure – 2. The Vendor shall appoint its representative within Thirty (30) days of signing of the Agreement after mutual discussions and written approval of Owner. The request must be accompanied by a detailed CV for the nominee, as well as a description of any responsibility other than Project responsibilities the nominee would retain while performing the duties as the Vendor’s representative. The Vendor’s representative shall have the authority to represent the Vendor on all day-to-day matters relating to the Project. The Vendor shall provide the key personnel namely the project leader, module leaders, quality assurance personnel any specialist / analysts required as appropriate, and having sufficient experience in terms of relevance and number of years required to implement the Project. Should the profile of any personnel not be acceptable to Owner, Owner will require the Vendor to suitably replace such personnel. The key personnel are to be assigned to the project on full time basis and to the satisfaction of Owner. If for any reason beyond the control of the Vendor, there arises a need to replace any personnel, the Vendor shall provide a replacement person of equivalent or better qualification and experience, subject to the written approval of Owner. Further, at any time in the opinion of the Project Manager, any additional, qualified, experienced engineer is considered necessary; they shall be deployed by the Vendor without any additional charge. The Vendor shall ensure to the satisfaction of the Project Manager competent and efficient supervision in the Implementation of the Project. 3.1.2 3.1.3 3.1.4 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 120 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.2 Obligation of Vendor towards the FMS 3.2.1 The vendor has overall responsibility of providing post implementation support services for the successful running of the System(s) as per the scope outlined in this Agreement and any further terms and conditions as may be stipulated at the time of execution of the contract for FMS. The vendor shall appoint a new representative after mutual discussion and written approval of the Owner or may keep the representative of the Project as a single point contact for the FMS. For new representative Vendor shall make the request which must be accompanied by a detailed CV for the nominee, as well as a description of any responsibility other than FMS responsibilities. The vendor’s representative shall have the authority to represent the vendor on all day-to-day matters relating to the FMS. The Vendor shall ensure that the faulty network devices, servers, PCs and peripherals etc are repaired / brought back to service within specified resolution time by himself or by OEM. Vendor’s representative posted during the FMS period will ensure that the down time for individual node does not exceed the time of failure reporting as detailed in Annexure - 3. The Vendor shall provide all the personnel required as appropriate, and having sufficient experience in terms of relevance and number of years in providing FMS. Should the profile of any personnel be not acceptable to Owner, the vendor is to suitably replace such personnel. The Vendor shall provide the Services to meet or exceed the service levels specified in Annexure3. The Vendor’s obligation to perform the Services to meet or exceed the service levels continues despite any increase or other variation in any Service volumes. The Vendor in consultation with the Owner shall review the Service Levels once each year and will adjust the service levels in accordance with the change control procedure to meet the continuous improvement objective. Where the Vendor anticipates that there will be a significant delay to the performance of any of its services for which it considers an extension of time is required, then it must immediately notify Owner of its request, the reasons for an extension and steps taken or to be taken to minimize the delay and as soon as practicable, notify the Owner promptly in writing of the period of the delay caused and give details of the extension of time which it reasonably considers will be required. If there is delay on part of the owner in according approval of any milestone/ document submitted, beyond specified timeline, the project shall be deemed to be extended by the delayed period of approval and the vendor will intimate in writing to the owner. The Vendor must, at its own cost obtain the relevant network connections (including redundant network connections) that are required to connect from the Vendor’s sites to Owner’s. The Vendor shall ensure that all technology and equipment used to perform and deliver the Services is not obsolete / or refurbished and is kept in good working order at all times. The Vendor will provide Authenticity Letter for such goods from the OEM. The vendor has to supply materials / equipments, which shall have minimum life expectancy of 8 (Eight) years from the date of Installation. If any equipment(s) gets end of the support life within 8 (eight) years during execution of the project, Vendor has to replace the same equipment(s) with latest / newer version equipments, free of cost. Owner will not pay any charge for the same. 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.3 Obligation of Vendor towards the IT Solution 3.3.1 The Vendor’s representative and staff are obliged to work closely with Project Manager / Owner’s representative and act within their own authority, and abide by directives issued by Owner that are consistent with the terms of the Agreement. The Vendor’s representative is responsible for managing the activities of its personnel. In the event if any discrepancy with respect to the qualifications of the employees of the Vendor is detected by Owner then the Vendor shall appoint a replacement to such objection immediately in accordance with this clause. The Vendor’s representative may, subject to the written approval of Owner (which shall not be unreasonably withheld), at any time delegate to any person any of the powers, functions, and authorities invested in him. Any such delegation may be revoked at any time with prior notice signed by the Vendor’s representative and shall specify the powers, functions, and authorities 3.3.2 3.3.3 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 121 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 thereby delegated or revoked. No such delegation or revocation shall take effect unless and until a copy of such a notice has been delivered to the Project Manager / Owner’s representative. Any act or exercise by any person of powers, functions and authorities so delegated to him or her shall be deemed to be an act or exercise by the Vendor’s representative. The Vendor shall acquire in its name all permits, approvals, and/or licenses from all local, state, or national government and other statutory authorities and/or public service undertakings that are necessary for the performance of the Agreement. However, Bandwidth license will be obtained by the Vendor in the name of Owner. During the term of this Agreement, the Vendor shall not redeploy any Critical resource deployed for this project, without the explicit permission of CIL. The Vendor is responsible for performing and safely storing, timely and regular backups of its data and Software in accordance with accepted data management principles, except where such responsibility is clearly assigned to Owner elsewhere in the Agreement. Vendor’s Staff and their Conduct a) If any of the Vendor’s employee, in the opinion of Project Manager / Owner’s representative, be found guilty of any misconduct or be incompetent or insufficiently qualified or negligent in the performance of their duties or that in the opinion of the Project Manager / Owner’s representative, undesirable for administrative or any other reasons, for such person(s) to be employed for providing desired services, then at the directions of the Project Manager / Owner’s representative, the Vendor shall at once remove such person (s). Vacancy so created shall be immediately filled at the expense of the Vendor by a qualified and competent substitute. Should the Vendor be requested to repatriate any person or removed from this Agreement, he shall do so and shall bear all costs in connection therewith. b) The Vendor shall be solely responsible for the proper behaviour of his employees and staff employed by him/deputed by him to provide IT Solution. The Vendor shall exercise proper degree of control over them and in particular without prejudice to the said generality the Vendor shall be bound to prohibit/prevent any of his employees (as stipulated above) from trespassing or acting in anyway detrimental or prejudicial to the interest of the community or the properties or occupiers of land or properties in the neighbourhood. In the event of such trespassing, the Vendor shall be responsible for all consequent claims or actions for damages or injury or any other grounds whatsoever. The decision of the Project Manager / Owner’s representative upon any matter arising under this clause shall be final. c) If the Vendor or their employees damage, break, deface the property belonging to the Owner or others during the execution of the Agreement, the same shall be made good by the Vendor at his own expense and in default thereof, the Project Manager may cause the same to be made good by other agencies and recover expenses from the Vendor for which the certificate of the Project Manager shall be final. d) All Vendors’ personnel entering Owner’s premises shall be properly identified by badges of a type issued by Owner as per prevailing rules and must be worn at all times on Owner’s premises. e) It is made clear that no relationship of Owner and employee is created between Owner and the Vendor’s resident engineers, employees and no claim for employment of any such personnel shall be tenable or entertained. Security, Statutory and Safety Regulations a) The Vendor shall abide by all the safety and security regulations of Owner in force and promulgated from time to time and other statutory requirements. The Vendor shall be responsible for the safety of all employees and/or workmen employed or engaged by them on and in connection with the work and shall report to Owner and other local authorities concerned all cases of accidents howsoever caused and wherever occurring on the works and shall make adequate arrangements for rendering immediately all possible aid to the victims of the accidents. b) Owner shall not be in any way held responsible for any accident or damages incurred and claims arising there from during the period of installation, testing, commissioning and Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 122 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. stabilizing IT solution. The Vendor shall be responsible for following the provisions of all safety laws and rules made there-under and other statutory requirements at his own cost. c) The Vendor shall arrange to obtain from Owner the required gate pass for entry and exit to Owner’s plant site and other protected areas for each one of its engineers/specialists, representatives/ agents, supervisors, workmen and staff as per Owner’s prescribed procedure and format. Each entry and exit gate pass shall contain the photograph of the person concerned. In the event of loss and/or damage to the gate passes, the Vendor shall pay to Owner the prescribed penalty before a new entry and exit gate pass can be issued. Owner’s security department and the concerned officer/ engineer shall have the right to refuse the entry and exit gate passes to any worker or representatives of the Vendor without assigning any reason. d) The Vendor shall register all equipment that may be taken inside the CIL’s premises in order to facilitate the issue of exit gate permits for such items to be taken out after the completion of work. e) The Vendor shall not employ for the purpose of the Work, any person below the age of 18 years. Owner shall have the right to decide whether any person employed by the Vendor is below the age limit, and to refuse to allow any person, whom he considers to be under-aged to be employed by the Vendor. f) Factories Act, 1948: The Vendor shall follow the provisions of Indian Factories Act, Contract Labour (R&A) act 1970, workman Compensation Act 1923 and other Acts and rules made there under from time to time as applicable, and shall indemnify Owner against all claims of compensations under the provisions of the Act in respect of workmen employed by the Vendor in carrying out the works and against all costs and expenses or penalties that may be incurred by Owner in connection therewith. g) The Vendor shall submit labour license (if required). h) The Vendor shall ensure that no explosive or inflammable material are used or stored at the Project Site. In the event such material are essential as part of execution of the Project work, written permission shall be sought from the Project Manager / Owner’s representative and it shall be the sole responsibility of the vendor to ensure acquisition of necessary statutory permits and clearances and proper storage and handling of such material. 3.3.9 Environmental, Health & Safety clause The following environment, safety & health points are to be adhered: a) The Vendor must adhere to all the applicable statutory laws pertaining to safety, health and environment. b) The Vendor must ensure that there is no wastage of water and power at the work site c) All the motor vehicles of the Vendor used for transporting materials/machinery etc should have pollution control certificates and the same should be submitted at the time of obtaining gate passes. A copy of the same must be exhibited/pasted on the vehicle also d) The Vendor must ensure proper housekeeping at work station / site by keeping the work-areas free from unwanted material. e) The Vendor must ensure that any debris generated during the work is transported safely to dump yard such that there is no spillage of debris on the road during transportation (by covering with a plastic sheet/tarpaulin) f) All the material which may be recycled / reused should be transported to the designated place for reuse/recycling. g) Generally, it shall be the responsibility of the Vendor to complete with all the statutory enactments, regulations, directions, notifications etc. issued by the Central and State Governments or any other Pollution Control Authorities from time to time. 3.3.10 Employees Provident Funds and Miscellaneous Provisions Act 1952 & Employees State Insurance Act 1948 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 123 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. a) The Vendor shall ensure strict compliance of provisions of the Employees’ Provident Funds and Miscellaneous Provisions Act 1952 and the schemes framed there under so far as they are applicable to their establishments and agencies engaged by them. The Vendor is also required indemnifying Owner against any loss or claims or penal damages whatsoever resulting out of noncompliance on the part of the Vendor with the provisions of the aforesaid Act and the schemes framed there under. b) The Vendor agrees to maintain all statutory records as required under various labour laws in respect of employees and payments. Any expenses incurred for the contributions, making contribution or maintaining records shall be to the Vendor’s account. 3.3.11 Vendor Responsibility with Other Agencies a) Without repugnance to any other condition, it shall be the responsibility of the Vendor not to divert or withdraw the people working for IT solution for any other service contract with Owner. No claim shall be entertained on account of above. b) The Vendor shall conform in all respects with the provisions of any statutory regulations, ordinances or byelaws of any local or duly constituted authorities or public bodies which may be applicable from time to time to the consulting services work. 3.3.12 All notices, instructions, information, and other communications given by the Vendor to Owner under the Agreement shall be given to the Project Manager / Owner’s representative, except as otherwise provided for in this Agreement. 3.3.13 The Vendor shall make its own arrangements for movement of personnel and equipment, within and outside the sites / units / offices at the various locations covered by the Agreement. 4 Obligation of Owner 4.1 Obligation of Owner towards Project 4.1.1 Owner shall appoint a Project Manager and notify the Vendor in writing the name of the Project Manager within Thirty (30) days of signing of the Agreement. Owner may also from time to time appoint one other person as the Project Manager in place of the person previously so appointed and shall give a notice of the name of such other person to the Vendor without delay. The Project Manager shall have the authority to represent Owner on all day-to-day matters relating to the Project or arising from the Agreement. All notices, instructions, orders, certificates, approvals, and all other communications under the Agreement shall be given by the Project Manager, except as otherwise provided for in this Agreement. Owner shall be responsible for timely constitution of core team and provision of resources, necessary access, and information for the installation, commissioning and Go-live of the Project as identified in the Project Plan, except where provision of such items is explicitly identified in the Agreement as being the responsibility of the Vendor. Unless otherwise specified in the Agreement or agreed upon by the Parties, Owner shall provide personnel, to properly carry out commissioning, Go-live (including successful running and stabilization of the system), at or before the time specified in the Project Plan. Owner will designate its appropriate staff for the training courses to be given by the Vendor and shall endeavour to make all appropriate logistical arrangements for such training as specified in the Project Plan. 4.1.2 4.1.3 4.1.4 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 124 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4.2 Obligation of Owner towards FMS 4.2.1 Owner shall designate its representative responsible for the FMS. The representative so designated shall have the authority to represent Owner on all day-to-day matters relating to the FMS. Owners shall provide updated contact listing as a one-time activity for use by help desk personnel in contacting Owner’s appropriate personnel for assistance/notification and shall provide an adequate level of system authority for all hardware, software and resources for which the Vendor has problem resolution responsibility and communications access Owner shall assist the Vendor in the development of help desk operational procedures by providing input to, and review and approval of such procedures and shall allow the Vendor to utilize remote access capability to remotely diagnose problems if required. Owner shall allow access by vendor maintenance personnel to Owner’s designated locations for purposes of problem diagnosis and repair and shall provide secured storage area for Vendor’s spare parts inventory. 4.2.2 4.2.3 4.2.4 4.3 Obligation of Owner towards IT Solution 4.3.1 Owner shall ensure the availability of all information and/or data to be supplied by Owner to the Vendor. The Project Manager / Owner’s representative may at any time delegate/revoke to any person any of the powers, functions, and authorities vested in him or her of which due notice in writing will be given. Failure of the Project Manager to reject any part of the IT Solution viz., software modules, equipment, Materials, workmanship etc., or to disapprove any service or materials shall not prejudice the Owner to reject such software module, equipment, Materials, workmanship etc., or to disapprove such work or materials and to order re-supply of such software module, equipment & Materials or to pull down, remove or break up such disapproved service at the cost of the Vendor, provided the Vendor fails to comply with the direction and requirement of the Owner there off. The decision, opinion, certificates or valuation of the Owner in respect of any matter under this clause shall be final, binding and conclusive. If the Vendor is dissatisfied by reason of any decision, opinion, direction, certificate or valuation of the Project Manager / Owner’s representative, they shall be entitled to refer the matters to the Owner who shall thereupon confirm, reverse or vary such matters. Owner by notice to the Vendor may object to any representative or person employed by the Vendor in the execution of the Agreement who, in the reasonable opinion of Owner, may have behaved inappropriately, be incompetent, or be negligent. Where upon the Vendor shall remove such person from work on the Project. If any representative or person employed by the Vendor is removed, the Vendor shall, where required, promptly appoint a replacement. Workplace/Facilities for Vendor’s Site Office a) Owner shall provide the office space and other essential work facilities within its premises for the Vendor’s team. b) Suitable workspace in the respective sites/offices may be provided to the Vendor subject to the availability, free of charge. However, providing such space and store is for the smooth execution of Agreement and non provision of such space does not bind Owner and make Owner liable to the Vendor in any manner except as specifically provided in the Agreement terms. Owner is not liable for any loss or damage to the Vendor’s equipment/material as a result of variation in voltage or frequency or interruption in power supply or other loss to the Vendor arising there from. c) Though efforts will be made by Owner to maintain regular power supply, Owner shall not be responsible for any failure in power supply and any consequences arising there from. The Vendor shall obtain the approval of the Project Manager / Owner’s representative for installation of machinery and electric power supply connection to them. The Vendor shall be responsible for any defect therein. d) Any defects pointed out by the Owner in the distribution system shall be rectified forthwith to the satisfaction of Project Manager / Owner’s representative by the Vendor, failing which the power supply may be cut off by the Owner. 4.3.2 4.3.3 4.3.4 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 125 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4.3.5 Residential accommodation if available, will be provided by Owner wherever possible, to the staff of Vendor on chargeable basis, as applicable to CIL executives. 5 Implementation Plan 5.1 Implementation Plan for Project 5.1.1 Project Plan a) In close cooperation with Owner and based on the preliminary Project Plan included in the Vendor’s bid, the Vendor shall develop a project plan hereinafter referred to as “Project Plan” encompassing the activities specified in the Agreement. b) The Vendor shall formally present to the Owner the Project Plan in accordance with the technical requirements. The Vendor has to specify the strategy and methodology with time frame and the synchronization of various phases of the Project to ensure completion of the Project in time. The Project Plan shall also include a PERT chart describing the activities, resources required on the time for completion. The Project Plan shall also bring out the critical areas needing continuous attention of Owner. c) The Vendor shall undertake to supply, install, implement, integrate, commission and ensure the go-live and stabilization of the System in accordance with the Project Plan. d) The progress and other reports specified shall be prepared by the Vendor and submitted to Owner in the format and frequency specified in the Project Plan. e) Changes to the Project Plan, if required, shall be made with the mutual consent of Owner and the Vendor. 5.1.2 Design and Development Vendor shall execute the basic and detailed design and the implementation activities necessary for successful implementation of the Project in compliance with the provisions of the Agreement or where not so specified, in accordance with best industry practice. The Vendor shall be responsible for any discrepancies, errors or omissions in the specifications, and other technical documents that it has prepared, whether such specifications, drawings, and other documents have been approved by the Project Manager or not, provided that such discrepancies, errors, or omissions are not because of inaccurate information furnished in writing to the Vendor by or on behalf of Owner. 5.1.3 Approval/review of technical documents by Project Manager a) The Vendor shall prepare and furnish to the Project Manager the documents as specified in the technical requirements for the Project Manager’s approval or review. b) Within twenty one (21) days after receipt by the Project Manager of any document requiring the Project Manager’s approval, the Project Manager shall either return one copy of the document to the Vendor with its approval endorsed on the document or shall notify the Vendor in writing of its disapproval of the document and the reasons for disapproval and the modifications that the Project Manager proposes. c) If the Project Manager disapproves the document, the Vendor shall modify the document and resubmit it for the Project Manager’s approval. If the Project Manager approves the document subject to modification(s), the Vendor shall make the required modification(s), and the document shall then be deemed to have been approved. The procedure set out above shall be repeated, as appropriate, until the Project Manager approves such documents. d) The Vendor shall not depart from any approved document unless the Vendor has first submitted to the Project Manager an amended document and obtained the Project Manager’s approval of the document. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 126 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. e) 5.1.4 The Project Manager’s approval, with or without modification of the document furnished by the Vendor, shall not relieve the Vendor of any responsibility or liability imposed upon it by any provisions of the Agreement except to the extent that any subsequent failure results from inaccurate information furnished in writing to the Vendor by or on behalf of Owner. Packing, Protective Painting and Marking of hardware and other equipment or material a) The Vendor shall include and provide for securely protecting and packing the equipment in accordance with the best established practices so as to protect the contents from damage during transit from point of manufacture until after arrival at Project Site under conditions which may involve multiple handling, transport by ship, rail and road, reshipment, storage, exposure to heat, moisture, rain etc. and possibility of pilferage. All packing shall allow for easy removal and checking at Project Site. The Vendor shall stick/paste list of its contents on top of the Package. The Vendor shall ensure packing of all items as listed in the packing list before finally dispatching the Package. b) Fragile items shall be wrapped in crepe cellulose wadding or some equally efficient cushioning materials and floated in excelsior and packed in substantial wooden covers with special precaution against risk or breakage. c) Wherever necessary the packages shall be marked with special markings such as “TOP, “BOTTOM”, “DO NOT OVERTURN”, “FRAGILE”, “HANDLE WITH CARE”, “KEEP DRY”, etc. as well as a special symbol indicating the top. d) Packing lists: Each package shall have inside it a detailed packing list quoting specifically the name of the Vendor member, number and date of the Agreement, the name of the Owner and the detailed list of contents packed within the package indicating the nomenclature of the Stores and a schedule of parts of each complete Equipment, giving the part numbers with reference to the assembly drawings and the quantity of each part, drawing numbers and tag numbers. A duplicate copy of the packing list shall be put in a water proof envelope and fastened securely to the outside of the package as well as to unpacked pieces or bundles. e) Notwithstanding anything stated in the clause, the Vendor shall be entirely responsible for missing, shortage, damage, loss or depreciation to the Materials occasioned by faulty, defective or insecure packing or due to improper or insufficient protective system. 5.1.5 Record Maintenance: The Vendor shall maintain accurate records of works executed as per the scope of the Agreement in a format that will permit audit. 5.1.6 Review of Progress: The work shall be executed strictly as per the time Schedule, indicated in the Bid documents. Monthly / weekly work programme will be drawn up by the Vendor before commencement of work & submitted to Project Manager for approval. The programme & progress will be reviewed from time to time and if required, the programme may be re-scheduled by Project Manager. The Vendor shall also be responsible to provide materials within his scope in time to achieve the programme. In all matters concerning the extent of programme set out weekly and monthly, the decision of the Project Manager will be final and binding on the Vendor. Both Parties shall agree to a planned review of the progress of the works executed under the scope of the Agreement, in a periodic interval with a view to, a) b) c) d) Review the progress Resolve pending issues Plan for resources required for ongoing and future works. Evaluate all escalated issues and address mechanisms to remedy them. During the term of this Agreement Owner reserves the right to formally audit and evaluate the performance of the Vendor upon reasonable notice and at reasonable times. 5.2 Implementation Plan for FMS Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 127 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. a) The Vendor shall prepare a transition plan that sets out the steps to assume the provision of the relevant Services and ensure an effective and orderly transfer of responsibility for the management and provision of the Services to the Vendor. b) The Vendor shall prepare a detailed Schedule for preventive maintenance of all the systems of the Project. 7 Product Updates 7.1 Vendor is expected to notify the Owner about the patches and updates as and when available from the OEM and apply the same after receipt of approval from Owner 7.2 The Vendor shall not supply any software that Owner is not licensed to use, unless the product is activated by a required license key. The Vendor shall also certify that all their products and updates as supplied to Owner shall be free from viruses, worms, Trojans, spy-ware etc. 8 Assignment and Subcontracting 8.1 Assignment The Vendor shall not transfer or assign the Agreement or any part thereof or any benefit or interest therein or there under without the written consent of the Owner. In the event of the Vendor contravening this condition, the Owner shall be entitled to place the Agreement elsewhere on the Vendor's account and at his risk and cost, and the Vendor shall be liable for any loss or damage which the Owner may sustain in consequence or arising out of such replacing of Agreement. This shall not relieve the Vendor of any responsibility under this Agreement. 8.2 Subcontracting The Vendor shall not sub-contract the SAP implementation and SAP rollout for this project to any person or firm or company hereinafter referred as “Sub-Contractor”. Effective and proper WAN design and its implementation will be backbone of proper SAP implementation. Vendor shall get the LAN/WAN design approved by CIL authorized person. Any deviations found from approved design, the vendor has to rectify/replace the same during specified time at no additional cost to CIL. Vendor will not subcontract LAN/WAN execution work except where deemed essential and in such circumstances vendor should obtain written permission from CIL, and vendor will be totally responsible for execution of the work. 9 Tests 9.1 After mutual consultation with the Owner, the vendor shall prepare and submit a detail plan containing test schedule, test procedures & the various performance parameters for testing as per industry standards & best practices for conducting various tests, hereinafter referred to as the “Test Plan”. Necessary instruments, automated testing tools, consumables, personnel and other facilities required for conducting the tests shall be arranged by the Vendor. All acceptance parameters as agreed between Owner and the Vendor will be demonstrated during the tests. Some of the important performance parameters are mentioned in Annexure-3. The Tests to be carried out shall include but not be limited to the following. 9.2 Acceptance tests for installation & commissioning of infrastructure Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 128 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Acceptance tests shall be carried out for the following infrastructure components in line with the cl.no -9.2.1 & 9.2.2. i. Data Center equipments. ii. Hardware equipments iii. Networking components iv. Video conferencing system v. IP telephony system. The above infrastructure components shall be collectively referred to as “Infrastructure”. 9.2.1 Preliminary acceptance tests for Infrastructure components. a) Preliminary acceptance test shall be conducted individually for the Infrastructure components. b) As soon as the installation of individual components with all its auxiliary facilities including its final connections is completed, Owner, jointly with the Vendor, shall proceed with preliminary tests to check and ensure that all the units have been properly installed and are fit to be operated. The Vendor shall be responsible for any defective functioning/ workmanship, if any and the resulting damages while conducting the test. Defects found during the testing due to faulty installation shall be rectified by the Vendor at his own cost and to the satisfaction of Owner. c) All Infrastructure components will be tested for 72 hours of continuous working in confirmation to specifications of the systems. The Vendor shall conduct commissioning test and establish 100% satisfactory performance of the system supplied by him during this period. If the test is interrupted due to any reason attributable to the Vendor, the system has to be started again for 72 hours continuous testing. Any defect/malfunctioning found during this period shall be rectified and defective part if any, shall be replaced immediately without any extra cost to Owner. In such case, the commissioning test of the system shall be demonstrated again for the next 72 hours on a continuous basis. d) Should the tested Infrastructure component or its system fail to conform to the specification, Owner may reject the System, and the Vendor shall within a period of 14 (fourteen) days either replace the rejected System, or make alterations as necessary so that it meets the required performance, without any additional cost to the Owner. e) As soon as the preliminary acceptance tests have been carried out individually and the results are found to be satisfactory, Owner shall issue the preliminary acceptance certificate for the individual Infrastructure components. Such certificate however shall be deemed to be on account and shall in no way relieve the Vendor from the liabilities in respect of the work as a whole. 9.2.2 Final acceptance test for Infrastructure a) After the issue of the preliminary acceptance certificate of all the individual Infrastructure components, the Infrastructure shall be ready for the final acceptance test to ensure the integrated operation. The final acceptance test for the Infrastructure shall be carried out during the Go-live acceptance test at full load on the Infrastructure components with all the applications running so as to meet the standard of performance parameters as per Annexure-3. b) The Vendor shall use all reasonable endeavors to promptly remedy any defect and/or deficiencies and/or other reasons for the failure of the final acceptance test of Infrastructure as notified by the Owner. Once the Vendor has made such remedies, it shall notify the Owner, and shall use all reasonable endeavors to promptly carry out retesting of the System. 9.3 Upon the successful final acceptance test of the Infrastructure, the Owner shall issue the final a acceptance certificate for the Infrastructure. 9.4 Acceptance Tests for SAP 9.4.1 Conference room pilot Tests for SAP application Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 129 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. a) Conference room pilot tests of SAP implementation shall be carried out through solution prototype to check the fulfillment of functional requirements configured as per accepted business blue print. The prototype validation will go through multiple iterations. The feedback provided to the Vendor after each round of validation / conference room pilot must be documented and signed off by the Owner nominated users. Changes to the solution must be presented to the users in next round of solution validation or conference room pilot. This will be an iterative process till the solution prototype is signed off as acceptable by the Owner. b) Conference room pilot test certificate shall be issued on successful demonstration of all critical functional requirements and at least 80 % of essential functional requirements as per agreed blue print. 9.4.2 User acceptance Tests for SAP a) User acceptance Tests of the SAP implementation shall be completed by the Vendor as specified in the Test Plan. b) Owner shall deploy the operating and technical personnel and all materials and information reasonably required to enable the Vendor to carry out its obligations with respect to commissioning. Production use shall not commence prior to the formal User acceptance testing. c) The User acceptance tests (and repeats of such tests) shall be the primary responsibility of the Vendor, but shall be conducted with the cooperation of Owner before the roll out of the implementation of the SAP applications in production environment, to ascertain whether the System(s) conforms to the Technical Requirements and meets the standard of performance parameters as specified in the Annexure-3, including, but not restricted to, the functional and technical performance requirements. The User acceptance Tests shall be conducted in accordance with the test scenarios provided by Owner. At Owner’s discretion, user acceptance Tests may also be performed on updates and new version releases that are added or modified after user acceptance of the System. 9.4.3 User acceptance for SAP a) Subject to clause 9.4.4 below, user acceptance shall occur in respect of the implementation of SAP applications, when the user acceptance Tests have been successfully completed. b) At any time after any of the events set out in clause 9.4.2 have occurred, the Vendor may give a notice to the Project Manager requesting the issue of an user acceptance certificate. c) After receipt of the Vendor’s notice, the Project Manager shall within a reasonable period of time(within 14 days): i. Issue a user acceptance certificate or ii. Notify the Vendor in writing of any defect for deficiencies or other reason for the failure of the user acceptance Tests. d) The Vendor shall use all reasonable endeavours to promptly remedy any defect and/or deficiencies and/or other reasons for the failure of the user acceptance Test that the Project Manager has notified the Vendor of. Once the Vendor has made such remedies, it shall notify Owner and shall use all reasonable endeavours to promptly carry out retesting of the System. Upon the successful user acceptance Tests, the Vendor shall notify Owner of its request for user acceptance certification, in accordance with clause 9.4.3(b). Owner shall then issue to the Vendor the user acceptance certification or notify the Vendor of further defects, deficiencies, or other reasons for the failure of the user acceptance test in accordance with clause 9.4.3(c). e) The procedure set out in this clause shall be repeated, as necessary, until a user acceptance certificate is issued. f) If the System fails to pass the user acceptance Test, then Owner may consider terminating the Agreement, pursuant to clause 18. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 130 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 9.4.4 Partial User Acceptance a) User acceptance shall be carried out individually for each identified System of the SAP application. In this event, the provisions in the Agreement relating to the user acceptance Test, shall apply to each such System individually, and user acceptance certificate(s) shall be issued accordingly(within 14 days) for each such System of the SAP and non-SAP application, subject to the limitations contained in clause 9.4.4(b) Delay beyond 15 days in communication from Owner side would result in deemed acceptance. b) The issuance of user acceptance certificates for individual Systems pursuant to clause 9.4.4(a) shall not relieve the Vendor of its obligation to obtain a user acceptance certificate for the SAP and non-SAP application as a whole once all Systems have been implemented. 9.5 Go-live and Stabilization Acceptance of Project 9.5.1 Go-live Acceptance a) After the issue of the user acceptance certificates the Vendor will ensure that the Project is rolled out for production environment, hereafter referred to as “Go-live”, in accordance with the timelines specified in the Project Plan. b) Owner shall deploy the operating and technical personnel and all materials and information reasonably required to enable the Vendor to carry out its obligations under Go- Live as specified in the Project Plan. c) Different modules rolled out for Go-live will be operated in an integrated environment as per the Project Plan. Upon successful operation of the Project in the production environment, Go-live acceptance certificate will be issued. d) After issue of Go-live Acceptance certificate Owner shall take over the Project implemented. However, taking over by Owner shall relieve the Vendor of its obligations under this Agreement, but maintenance of the system would be carried out by the vendor. Taking over means taking over physical possession and the Project shall be operated under the supervision and guidance of the Vendor till the Stabilization Acceptance Tests are carried out and the Stabilization Acceptance Certificate is issued as per clause No. 9.5.2 here in below. 9.5.2 Stabilization Acceptance a) During the stabilization period, the Vendor shall provide hand holding services (post Go-live support) to Owner for optimum utilization of the Project. b) The Stabilization Acceptance Tests (and repeats of such tests) shall be the primary responsibility of the Vendor, but shall be conducted with the cooperation of Owner after stabilization period of the Project, to ascertain whether the Project meets the standard of performance as specified in Annexure-3 and functional requirements as desired by Owner. The Stabilization Acceptance Tests shall be conducted as per the Test Plan in consultation with Owner. At Owner’s discretion, Stabilization Acceptance Tests may also be performed on updates and new version, releases that are added or modified. Stabilization Acceptance Test shall be of 21 days. The Stabilization Acceptance certificate shall be issued by the Owner after achieving defined performance levels during Stabilization Acceptance Tests within 15 days, delay beyond which will be deemed to be accepted by the Owner. c) If, for reasons entirely attributable to the Vendor, the Project does not conform to the Scope of Agreement or does not conform to all /any other aspects of the Agreement, the Vendor shall at its cost and expense make such changes, modifications, and/or additions to the Project as may be necessary to conform to the Scope of the Agreement and meet all functional and performance standards. The Vendor shall notify the Owner upon completion of the necessary changes, modifications, and/or additions and shall request the Owner to repeat the Stabilization Acceptance Tests until the Project achieves Stabilization Acceptance. d) If the Project or its System(s) fails to achieve Stabilization Acceptance, due to reasons entirely attributable to the Vendor, Owner may consider termination of the Agreement, pursuant to clause Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 131 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 18, and forfeiture of the Vendor’s security deposit for the project in accordance with clause 12.5.2 in compensation for the extra costs and delays likely to result from this failure without prejudice to other rights of Owner available under the Agreement. 9.6 Final Acceptance of the Project Once the Owner issues the Stabilization Acceptance Certificate, the Project represents a complete solution to the Owner’s requirements set forth in the Scope of Agreement and it conforms to all other aspects of the Agreement and stands finally accepted by the Owner, hereinafter referred to as “Final Acceptance”. 10 Performance Guarantee / Warranty / AMC 10.1 The Vendor shall provide AMC / PG / Warranty for all components provided as a part of this contract for a period of 2 years from Go Live and after one year of warranty period. Go-Live to be completed by 36 months from date of signing of contract. CIL reserves the right to further extend the AMC for a period of two years. 10.2 The Vendor shall guarantee to Owner the performance of the Project for a period as stated above. This Performance Guarantee (PG) shall be applicable to all components of the solution including hardware, network and implementation services. For the performance guarantee / warranty, Vendor shall provide security deposit as per clause 12.4.1. 10.3 Owner shall measure the performance of the Project against the technical parameters and performance levels as indicated at Annexure -2 and Annexure-3. The Vendor should provide performance levels at normal and peak load and Owner’s decision in this respect shall be final and binding on Vendor. 10.4 Detailed scope of Performance Guarantee/Warranty The details provided below as part of the services to be covered under the performance guarantee / warranty, shall not be limiting in the sense that the Vendor shall endeavor to provide such services in conformation with industry best practices, which may be equal to or better than the level of services provided herein. 10.4.1 Annual Technical Support (ATS): The ATS should cover the services which the Vendor provides normally under technical support and shall include minimally the following support including RDBMS, and all SAP and other supplied applications wherever applicable: a) Provide patches / hot fixes / updates b) User & Technical support c) Technical Support for integration or installation of any patch or product update for any third party software. d) Site visit on a need basis 10.4.2 Performance Guarantee/Warranty / AMC for hardware and Network hardware to be provided by the Vendor, wherever applicable. The Prime Bidder to ensure compliance as per agreed SLA 10.4.2.1 Activities to be covered are as under Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 132 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. a) Provide comprehensive guarantee / warranty / AMC for the supplied systems/subsystems for the said period b) If any document/manual supplied by the Vendor is found to be inadequate/ incomplete within the period of the Agreement, the Vendor shall replace/complete such document/manual at their cost within 15 days time. c) Warranty shall cover the following: i. Repair / replacement of hardware and other supplier items inclusive of all types of spare parts including batteries, plastic parts, sprockets, glass items, picture tubes, print heads, etc. Only consumables like printer ribbons, Ink cartridge, etc. are excluded. ii. installation / re-installation / maintenance of OS, system software and other supplied software. iii. installation of system software, patches, updates, service packs etc. iv. Supply of all system software updates and patches. v. Supply of future release of all OS and related system software vi. Supply and install security patches and bug fixes vii. 24 x 7 x 365 national telephonic support viii. Access to raise technical assistance request at hardware vendors /supplier website. 10.4.2.2 The Vendor shall be required to provide the following services based on standards and the best practices to meet or exceed the uptime/performance requirements:: a) 24 x 7 x 365 Support for DC, DR and NR. b) Manpower at on-Site: For manpower deployment during post go-live of Phase 1.2, please refer to Table 11 of Volume III. This is a guideline for providing minimum number of resources. However, Vendor needs to provide adequate manpower to meet the SLA. The Manpower should be available on site (at DC, DR and NR) 24 x 7 x 365 for infrastructure support. SAP application support has to be provided during office hours 9 AM to 6 PM six days a week at CIL project office in Kolkata, to be designated by CIL. For rest of the period of the day, the application support manpower can be contacted on telephone. c) The SLA and related penalty will be governed by terms mentioned under Annexure 3 of Volume III. 10.5 Defect Liability 10.5.1 The Vendor warrants that the Project, including all the System(s) and other Services provided, shall be free from any defect or deficiency in the material, design, engineering, and performance/workmanship that prevent the Project and/or any of its Systems(s) from fulfilling the technical requirements or that limit in a material fashion the performance, reliability, or extensibility of the Project and/or any of its System(s) as per the performance guarantee / warranty period defined at clause 10.1. If during the warranty period any defect or deficiency is found in the material, design and performance/workmanship of the Project and other Services provided by the Vendor, the Vendor shall promptly, in consultation and agreement with Owner, and at the Vendor’s sole cost repair, replace, or otherwise make good (as the Vendor shall, at its discretion, determine) such default, defect or deficiency as well as any damage to the Project caused by such default, defect or deficiency. Any defective System that has been replaced by the Vendor shall remain the property of the Vendor. If the Project or any of its System cannot be used by reason of such default, defect or deficiency and/or making good of such default, defect or deficiency, the warranty period for the Project shall be extended by a period equal to the period during which the Project or any of its System could not be used by the Owner because of such defect and/or making good of such default, defect or deficiency. 10.5.2 10.5.3 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 133 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 10.5.4 The warranties provided herein are in lieu of all other warranties, both express and implied, and all other warranties, including without limitation that of merchantability or fitness for intended purpose is specifically disclaimed. 11 Waiver Failure of Owner to insist upon strict performance of any terms and conditions of the Agreement will not be deemed a waiver of any rights or remedies that Owner may have and will not be deemed a waiver of any subsequent default under the terms and conditions of the Agreement. No right or remedy of Owner will be exclusive of any other right or remedy and Owner will have all the rights and remedies given under the Agreement and now or hereafter, existing in law or by statute. The shipping or delivery by the Vendor or receiving of payment by Vendor for the work under this Agreement will not be deemed a waiver of any rights for any prior failure by the Vendor to comply with any of the provisions of the Agreement. 12 Price and Payment For the performance of the IT Solution, the Owner shall pay to the vendor the price as stipulated in Annexure-4 and as per the Payment Milestone given at Annexure-5. 12.1 Price 12.1.1 The FOR unit rates accepted by the Vendor as per the price schedule under Annexure-4 shall remain firm and binding during the Term of Agreement subject to the variations stipulated hereinafter. The Vendor shall perform all his works as envisaged in the Agreement. Should the actual physical supplies and services are found more than those indicated by the Vendor in the price schedule, the Vendor shall not be entitled for any additional amount from Owner. However in the event of decrease in actual supplies/services/installation & commissioning, the Contract Price shall be proportionately adjusted for the decreased supplies/services/installation & commissioning based on the break-up furnished by the Vendor as annexure in the price schedule. The prices are intended to provide for all the Scope duly and properly completed in accordance with the terms and conditions of Agreement. Any additional items that are essential for execution and satisfactory implementation of IT Solution shall be deemed to be included and covered but not limited to inter-alia, the following: 12.1.2 12.1.3 a) The Prices shall include cost of delivery of all items for successful implementation of IT solution. Items / Materials delivered by the Vendor for which payment was made by Owner shall remain the property of Owner whether those are used or not. b) The delivery terms for all supplies/services shall be on F.O.R. at Owner’s site. Payment against supplies shall be released only on receipt and acceptance of material as per payment terms referred under this clause. Before commencement of delivery of supplies/services, shipment clearance has to be obtained from competent authority at CIL. c) The prices shall be inclusive of all Taxes, duties, levies etc. 12.1.4 12.1.5 The cost of all superintendence of labour, materials, tools, equipments, mobilizing and demobilizing equipment, fixtures, transport charges, insurance charges, bank guarantee charges, temporary and permanent works, testing, handling of materials, stocking and removal charges of any rejected materials, power arrangement and satisfactory maintenance of the same for the full and satisfactory completion of the works intended are all inclusive in the price. All fees, duties, royalties, rent and compensation to Owner for surface damage or taxes and impositions payable to local authorities in respect of all materials supplied for the work or other duties or expenses for which the Vendor may become liable or may be put to under any provision Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 134 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. of the law for the purpose of or in connection with the execution of the Agreement including levies payable on all transactions are all inclusive in the price. 12.2 Taxes & Duties 12.2.1 The price shall be inclusive of all taxes, duties, service tax and education cess thereon, imposed by State/Central/Local governments Introduction/upward variation in taxes, duties, cess and levies, if any applicable shall be paid by Owner subject to production of necessary documents by the Vendor. Similarly withdrawal/downward revision in variation in taxes shall be adjusted in the price and benefit shall be passed to Owner. Fresh taxes & levies, if any, as may be applicable on this Agreement, shall be reimbursable against documentary proof to be submitted by the Vendor. The Vendor has to consider all taxes & duties applicable on this Agreement. Any omission, or non-inclusion, either declared or not declared, of any taxes and duties that are applicable at the time of submission of price bid/revised price bid /revision in prices shall not be considered as a reason for reimbursement of such taxes and duties at a later date. If the work is delayed for the reasons attributable to Owner and extension of the time for completion is granted, variation in taxes and duties enacted during Contractual completion/execution period, the adjustment in contract price shall be allowed within the extended period of the Agreement. Similarly, if the work is delayed for the reasons attributable to the Vendor, variations in taxes and duties will not be paid. The Vendor shall bear and pay all the liabilities in respect of non-observance of all legal requirements as per various statutory provisions. The adjustment in the Contract Price towards imposition of new taxes or abrogation of existing taxes shall be applicable only if the new tax is enacted or existing tax is abrogated within Contractual delivery/execution period. For any variation due to enactment of new tax or abrogation of existing tax after Contractual delivery / execution period, adjustment in the Contract Price shall not apply. 12.2.2 12.2.3 12.2.4 12.3 Billing and Payment Terms All Billing and Payments related to the entire project shall be carried out centrally from CIL. The paying authority shall be CGM/GM (Finance) of CIL. All interactions regarding the execution of the Agreement, submission of bills and correspondence on any matter shall be done with the Project Manager / Owner’s representative. 12.3.1 Billing 12.3.1.1 Vendor shall submit running account bills as per the payment milestone with supporting documents for having achieved the designated milestone activities. 12.3.1.2 All bills/invoices must be raised in `only taking into account the prevailing taxes & duties with reference to the Payment milestone. 12.3.2 Payment 12.3.2.1 12.3.2.2 Owner shall release payments based on the Payment Milestones as indicated in the Annexure-5. Payment shall be released on submission of the bill with supporting documents duly certified by the Project Manager / Owner’s representative after deducting taxes at source as prescribed by the legislative authorities, penalty and other recoverable if any. If such payment release day falls on a holiday of Owner, payment will be released on the next working day. Against deduction of statutory taxes, tax deduction certificates where ever applicable shall be issued as per the applicable provisions of the statute. The Project Manager may recover any amount wrongly paid in excess in any previous bills certified by him. All payments shall be made direct to the Vendor or his authorized representative in the shape of crossed A/c payee Cheque / Demand Draft less Bank Charges on certification of Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 135 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. the Project Manager/Owner’s representative and on compliance of contractual terms & conditions. In case of shortage/missing/damage/ failure of any material identified at any point of time within the period specified by the Agreement including guarantee period, the agency shall supply/replace the same without any financial implication to Owner. The taxes, duties, clearing & forwarding and other charges incurred by Owner in this regard shall be recovered from the Vendor’s pending bills and in case no bills are pending the same shall be made good by the Vendor. The Vendor shall accordingly submit the subsequent invoices. 12.3.2.3 12.4 Performance Security and Bank Guarantee 12.4.1 Performance Security and Bank Guarantee Within thirty (30) days of receipt of the notification of Contract award, the successful Bidder shall furnish Performance Security (inclusive of all taxes) to the Purchaser for an amount of 10% of the total contract value. The performance security will be refundable after expiry of the Post Implementation Support Period (i.e Six years) , if the performance of the system is satisfactory. The proceeds of the Performance Security shall be payable to the Purchaser as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract. The purchaser shall notify the supplier in writing of its invocation of its right to receive such compensation within 7(seven) days, indicating the contractual obligation(s ) for which the supplier is in default. The Performance Security shall be denominated in the currency of the Contract, and shall be in one of the following forms: o o o Such a Bank Guarantee is required to be issued by a RBI recognized scheduled bank (other than co-operative bank) located in India, in the form provided in the Bidding Documents. The format of the Bank Guarantee is given at Annexure-6 before signing the Agreement. In case the Bank Guarantee is issued by any private scheduled bank the same is required to be issued by branch of the said Bank under the jurisdiction of Kolkata. A Bank Draft in favor of the Owner. The Performance Security will be discharged by the Purchaser and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty and maintenance obligations, under the Contract. Bank Guarantee against Payment to be made by Supplier Before commencement of any payment, supplier shall submit to CIL centrally, Bank Guarantee issued by a RBI recognized scheduled bank in India in the format provided by the purchaser for a value of 30% of the contract value which will be valid for a period of 24 Months from the date of submission of the same. On successful and satisfactory performance of the system and on expiry of first 24 months, this Bank Guarantee for 30% value will be replaced by the supplier by another Bank Guarantee of 20% of the contract value, valid for another 24 months. On successful and satisfactory performance of the system and on expiry of second 24 months (i.2 48 months from the commencement of the first Bank Guarantee), this Bank Guarantee for 20% Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 136 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. value will be replaced by the supplier by another Bank Guarantee of 10% of the contract value , valid until the completion of the Post Implementation Support Period . The replacement of the Bank Guarantees as above by a fresh Bank Guarantee of substituted value will be allowed only on satisfactory performance of the system in the previous one year. If the performance is not satisfactory in the previous one year, the Bank Guarantee of previous year will have to be extended by the supplier for another one year or more. This residual 10% Bank Guarantee will be discharged by the purchaser and returned to the supplier not later than 30 days from the date of completion of all of the supplier’s obligations, under the contract. 12.5 Forfeiture of Security Deposit 12.5.1 Whenever any claim against the Vendor for the payment of a sum of money arises out of or under the Agreement, Owner shall be entitled to recover such sum by in part or whole from the security deposits. In the event of the security deposit being insufficient or if no other security has been taken from the Vendor, then the balance or the total sum recoverable as the case may be, shall be deducted from any sum then due or which at any time thereafter may become due to the Vendor. The Vendor shall pay to Owner on demand any balance remaining due. In the event of any material breach by the Vendor or any loss or damage suffered by Owner which in the opinion of Owner that the loss or damage has arisen due to reasons attributable to Vendor or in the event of the termination of the Agreement for any such breach, the security deposit is liable to be forfeited. The decision of forfeiture by Owner shall be final and binding on the Vendor. 12.5.2 13 Liquidated Damages Time is the essence of the agreement and the delivery dates are binding on the vendor. In the event of delay, for causes attributable to the vendor, in meeting the deliverables, the owner shall be entitled at its option to recover from the Vendor as agreed, liquidated damages, a sum of 0.5% of the value of the deliverable which suffered delay for each completed week or part thereof by which the deliverable has been delayed subject to a limit of 5% of the contract value. 14 Insurance a) The comprehensive insurance and safety of all men and material of the Vendor shall be the responsibility of the Vendor. The comprehensive insurance should cover for full value against loss, damage or destruction by fire, lightning, earth quake, theft, pilferage, non-delivery of package/packages and all other risks including strikes, riots and civil commotions during transit, storage, testing & commissioning and guarantee tests to protect Owner and the Vendor from any loss arising out of such condition. b) The insurance policy shall be tripartite, Owner being the beneficiary. The insurance cover shall remain in full force up to the time the Project is accepted and Stabilization Acceptance Certificate is issued by the Owner. The Vendor shall produce the insurance policy and receipts for the premium at the appropriate time. All money received under any such policy shall be applied in or towards the cost incurred for the damage/deficiency but this provision shall not affect the Vendor liabilities under the Agreement. c) The Vendor shall maintain in full force and affect all such insurances as above and required by the law for the purpose of the Agreement at the cost of the Vendor. d) The Vendor shall furnish to the Project Manager/Owner’s representative with evidence of such insurance a copy of the issued policy and any cancellation or termination thereof. Should the Vendor default in paying any premium when due, Owner, without prejudice to other remedies set forth in this Agreement shall be at liberty to pay such premium and recover the same from Vendor. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 137 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. e) The provisions contained within this clause are not intended to and do not impair or in any manner limit the liabilities or obligation assumed by Vendor as may be set forth more fully elsewhere in the Agreement. f) The Vendor’s services shall include the filing and pursuance of all insurance claims on behalf of Owner and the entire Work incidental thereto till realization of Claim. g) Owner shall be the principal holder of the policy along with the Vendor. Owner reserves the exclusive right to assign the policy. h) The Vendor shall be responsible for effecting insurance under the Indian Workmen’s Compensation Act and any other insurance in accordance with the Indian laws and regulations at his own cost. i) If any Agreement Scope including supplies and services perishes or becomes unserviceable due to any cause whatsoever, including missing, shortage, loss or damage and/or various destructions and risks as mentioned above, the Vendor shall on demand by Owner make replacement at his own cost and in such a way as to avoid disturbances in the general progress of IT Solution. This shall apply irrespective of the question whether or not the risk has passed to Owner or who shall be responsible for such unserviceable condition as aforesaid. j) Upon arrival at Project Site, all equipment, Materials, commissioning spares, special tools & tackles, all consumables, etc., the Vendor shall assume custody thereof and remain responsible therefore, until the physical possession taken by the Owner. k) The Vendor shall, as custodian, be responsible for communicating to the project manager / Owner’s representative any shortages, missing, breakages, damages, etc. as soon as they come to his notice without prejudice to his obligation under Agreement. l) The insurance policy obtained by the Vendor shall also cover liability for accidents resulting in death, injury, damage to property of Owner or any third party including employees of third parties’ and / or Owner employees within the premises and precincts of Owner. 15 Indemnity The Vendor assumes responsibility for and shall indemnify and save harmless the Owner, from all liability, claims, costs, expenses, taxes and assessments including penalties, punitive damages, attorney's fees and court cost which are, or may be required with respect to any breach of the Vendor’s obligations under the Agreement, or in respect of all salaries, wages or statutory dues or any other compensation or dues of whatsoever, nature of all persons employed by the Vendor in connection with performance of the Scope of this Agreement. Owner shall the vendor to take sole control of the defense of such claims. The vendor shall execute and deliver such other further instruments as may be necessary to comply with all the requirements of such laws and regulations as may be necessary there under to confirm and effectuate the Agreement and to fully protect and indemnify the Owner. The Vendor shall not indemnify Owner to the extent that such liability, damage, claims, fines, penalties, and expenses were caused or contributed to by the sole fault of the Owner. The Owner shall not be in any way held responsible for any accident or damages incurred or claims arising there from during discharge of the obligations by Vendor under this Agreement. However, it is clarified that the liability to indemnify shall be in respect of immediate and proximate damage and not extend to remote damage or to loss of profit, goodwill and reputation. 16 Patent Infringement Intellectual property right of the owner or its customers shall not be interfered in any manner by the Vendor or its associates and /or sub-ordinates. The Vendor and /or its associates shall not interfere with the right of the Owner and /or its customers or third party’s right under the Trade Mark Act, 1999, The Patent Act, 1971, Design’s Act 2000 and the Copy Right Act, 1957 or in any manner interfering with the intellectual property right as stated hereinabove. In the event of Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 138 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. causing such interference by the Vendor the Owner shall have the right not only to terminate this Agreement but also to recover damages including costs. 17 Settlement of Disputes The Agreement shall in all respects be construed and carried into effect and rights and liabilities of the Parties hereto shall be regulated according to the laws of India. 17.1 Mutual Settlement of Disputes Except where otherwise provided for in the Agreement, other than excepted matters all questions and dispute relating to any matter directly or indirectly connected with this Agreement shall in the first place be resolved through mutual discussions, negotiations, deliberation and consultations between both the Parties. 17.2 Conciliation If the effort to resolve all or any of the disputes other than excepted matters through mutual settlement fails, such disputes shall be referred to the conciliator to be appointed by the mutual agreement of both Owner and the Vendor. The conciliator shall make the settlement agreement after the Parties reach agreement and shall give an authenticated copy thereof to each of the Parties. The settlement agreement shall be final and binding on the Parties. The settlement agreement shall have the same status and effect of an arbitration award. The venue of Conciliation shall be Owner’s Corporate Office, Kolkata. 17.3 Arbitration If a dispute arises out of or in connection to the Agreement, or in respect of any defined legal relationship associated therewith or derived therefrom, the parties agree to submit that the dispute to arbitration under the ICADR Arbitration Rules, 1996 The Authority to appoint the sole arbitrator shall be the International Centre for Alternative Dispute Resolution. The International Center for Alternative Dispute Resolution will provide administrative services in accordance with the ICADR Arbitration rules 1996. x x x x The number of arbitrators(s) shall be One. The language of arbitration proceedings shall be English Specific qualifications of the arbitrator will include (but not limited to) knowledge of ERP Implementation and commissioning of IT infrastructure. The place of arbitration proceedings shall be New Delhi. 18 Term and Termination 18.1 Term of Agreement The Term of this agreement is for 72 months from the date of Signing of Agreement, the implementation and rollout phase being 36 months for all modules and all locations of the Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 139 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. subsidiaries, followed by 24 months of post implementation support / AMC after 1 year warranty. CIL reserves the right to further extend the AMC for a period of two years. 18.2 Extension of Time If, for any special circumstances, an extension of time is required, then the Vendor shall inform to the Project Manager/Owner’s representative, within 15 days from the date of occurrence of such circumstances, request with full particulars for extension of time for which it may consider itself entitled in order that such request may be examined. The decision of the Project Manager / Owner’s representative, shall be final and binding in this aspect and no additional remuneration shall be payable for the extended period for the scope of work covered under this Agreement. 18.3 Termination of the Agreement 18.3.1 Termination of Agreement on Vendor's Default The Owner, without prejudice to any other remedy for breach of Agreement, by written notice of default sent to the Vendor, may terminate this Agreement in whole or in part: a) If the Vendor fails to deliver any or all of the products and services specified in the Agreement, or within any extension thereof granted by the Owner. b) If the Vendor fails to perform any other obligation(s) under the Agreement. c) If the Vendor, in the judgment of the Owner has engaged in Corrupt Practices or Fraudulent Practices in competing for or in executing the Agreement. For the purpose of this clause: "Corrupt Practices" means the offering, giving, receiving or soliciting of any thing of value to influence the action of any official, be it from the Owner’s organisation or any other Govt. or non-govt. body, in the procurement process or in Agreement execution. "Fraudulent Practices" means a misrepresentation of facts in order to influence a procurement process or the execution of a Agreement to the detriment of the Owner and includes collusive practice among bidders (prior to or after bid submission) designed to establish bid prices at artificial non-competitive levels and to deprive the Owner of the benefits of free and open competition". In the event the Owner terminates the Agreement in whole or in part, the Owner may procure / get repaired, upon such terms and in such manner as it deems appropriate, Goods or Services similar to those undelivered / un-repaired, and the Vendor shall be liable to the Owner for any excess costs for such similar Goods or Services. However, the Vendor shall continue performance of the Agreement to the extent not terminated. 18.3.2 Termination for Insolvency of the Vendor The Owner may at any time terminate the Agreement by giving written notice to the Vendor if the Vendor becomes bankrupt or otherwise insolvent. In this event, termination will be without compensation to the Vendor, provided that such termination will not prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the Owner. 18.3.3 Termination of Agreement on Owner's Initiative The Owner reserves the right to terminate the Agreement either in part or in full due to reasons other than those mentioned under clause entitled "Vendor's Default" or due to the outbreak of war. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 140 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. The Owner shall in such an event give thirty (30) days notice in writing to the Vendor of his decision to do so. The Vendor upon receipt of such notice shall discontinue the work on the date and to the extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Agreement to the Owner, stop all further sub-contracting or purchasing activity related to the work terminated, and assist the Owner in storage, maintenance, protection, and disposition of the works acquired under the Agreement by the Owner. 18.3.4 Termination of Agreement on Vendor's Initiative Vendor will have the right to terminate the agreement by giving one-month notice to the Owner upon situations arising due to non-compliance of stipulations of the contract. This termination will be held valid only if it is preceded by a corresponding non-compliance notice issued at least thirty days prior to date of the termination and if the non-compliance has continued upto the date of termination letter 19 Force Majeure If at any time during the continuance of the Agreement, the performance in whole or in part by either party or any obligations under the Agreement shall be prevented or delayed by reason beyond reasonable control of the party including without limitation such as any war, hostilities, act of public enemy, civil commotion, sabotage, fire, floods, earthquake, explosions, epidemics, quarantine restrictions and acts of God (hereinafter referred to as 'Events') and provided notice of the happening of any of the above mentioned Event is given by either party to the other within 21 days from the date of occurrence thereof, the agreed timelines shall be extended by the Owner on receipt of application from the Vendor without imposition of penalty and the services under the Agreement shall be resumed after such event has come to end/ceases to exist. Should one or both the Parties be prevented from fulfilling their contractual obligations by a state of force majeure lasting continuously for a period of at least 3 months and the Owner not having terminated the Agreement by that time, the two Parties shall consult each other regarding the further implementation of the Agreement with the provision that if no mutually satisfactory arrangement is arrived at within a period of 2 months from the expiry of 3 months referred to above, the Agreement shall be deemed to have expired at the end of the 2 months referred to above. The above mentioned expiry of the Agreement will imply that both the Parties have obligations to reach an agreement regarding the winding up and financial settlement of the Agreement. 20 Ownership 20.1 Ownership of Documents and Copy Rights All study documents, data and specification prepared by the Vendor subject to the Scope of Agreement shall be the property of Owner. As and when required or upon termination of the Agreement, the aforesaid documents of all versions shall be handed over to Owner. Vendor shall take all necessary steps to ensure confidentiality in handling of all the matters pertaining to business process studies, data, specifications, methods and other information developed or acquired or furnished by Owner by means of this Agreement or in the performance thereof. Ownership and the terms of usage of the software and Materials supplied under the Agreement shall be governed by this clause. The vendor shall grant Owner a perpetual license to use the software without any additional payment or obligations to enter into a contact for maintenance or support. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 141 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 20.2 Transfer of Ownership The Project and its System(s) shall be deemed to have passed onto the Owner when the Project is tested for its performance, validation and acceptance by Owner. However the Licensing rights with regard to Core SAP Product and the third party software shall be governed by the End User License Agreement (EULA) of respective OEM. 21 Limitation of Liability 21.1 21.2 21.3 21.4 Notwithstanding anything to the Contrary in the Agreement or any other document, the aggregate liability of the vendor for any damage shall be limited to the Contract Price In no event, neither party shall be liable to the other party for any indirect, special, punitive, consequential or incidental damages including without limitation, loss of revenue, profits, business, goodwill, anticipated savings or data or third party claims. No Director or official or employee of Owner or Vendor shall in any way be personally bound or liable for the acts or obligations of the Owner or Vendor under the Agreement or answerable for any default or omission in the observance or performance of the acts, matters or things which are herein contained. The Vendor shall not be entitled to any increase on the scheduled rates or any other rights or claims whatsoever by reason of any representation, explanation, statement or alleged understanding, promise or guarantees given or to have been given to him by any person. 22 Time of the Essence Time is of the essence of this Agreement. The acceptance of a late performance with or without objection or reservation by Owner shall not waive any rights of Owner or constitute a waiver of the requirement of timely performance, of any obligations remaining to be performed. 23 Confidential Information In the performance of its obligations under this Agreement or in the contemplation thereof, the Vendor and its employees may have access to private or confidential information, including but not limited to information concerning costs, charges, operating procedures and technical information, which may be owned or controlled by Owner or its parent or affiliates. With respect to any such information so accessed or acquired, the Vendor and Owner, mutually agree as follows: a) all information provided by Owner shall be and shall remain the exclusive property of Owner or its parent or affiliates; b) the Vendor shall limit access to such information to its employees who have a need to know, consistent with the Vendor's authorized use of such information; c) the Vendor shall keep, and have its employees having access keep, all such information confidential; d) the Vendor shall not copy, publish or disclose to others, or permit its employees or anyone else to copy, publish or disclose to others, any such information; e) the Vendor shall return such information to Owner at its request; f) the Vendor shall use such information only for the purpose of performing its obligations hereunder; The Vendor at all times shall maintain appropriate internal policies and procedures reasonably sufficient to satisfy its obligations under this provision. If the Vendor is required to disclose any confidential information of Owner or its parent or affiliates pursuant to any governmental or legal proceedings, the Vendor shall not be liable for Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 142 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. such disclosure provided that it gives Owner written notice of the proceeding and seeks an appropriate protective order at least ten (10) business days prior to its disclosure of the aforementioned confidential information. 24 Miscellaneous 24.1 The Vendor represents and warrants to the Owner that as of the effective date of this Agreement,(a) it is a corporation duly organized, validly existing and in good standing under the laws of Country of India, (b) it has all requisite power and authority to enter into and perform its obligations under this Agreement, and (c) there are no actions, suits or proceedings pending, or currently not blacklisted by any Govt. / PSUs of India or to the best of its knowledge threatened, which may have a material adverse effect on its ability to fulfill its obligations under this Agreement or on its operations, business, properties, assets or condition. 24.2 The Vendor shall comply with all laws in force in India. The laws will include all national, provincial, municipal, or other laws that affect the performance of the Agreement and are binding upon the Vendor. The Vendor & the Owner agree that the Courts of West Bengal shall have the exclusive jurisdiction for any and all disputes, differences and claims arising out of, regarding or in relation to this Agreement or any work issued hereunder. 24.3 If any provision of this Agreement is found to be illegal or unenforceable then, notwithstanding such illegality or unenforceability, this Agreement shall remain in full force and effect and there shall be substitution for such illegal or unenforceable provision a like but legal and enforceable provision which most nearly effects the intention of the Parties. In the event a like but legal and enforceable provision cannot be substituted, the illegal or unenforceable provision shall be deemed to be deleted and the remaining provisions shall continue in full force and effect, provided that the performance, rights and obligations of the Parties under this Agreement are not materially adversely affected by such deletion. 24.4 Notwithstanding any provisions in the contrary which may be contained elsewhere herein, any stenographic, typographic or clerical errors found in this Agreement shall be deemed as automatically corrected without necessity of written amendment. 24.5 No amendment or other variation of the Agreement shall be effective unless it is in writing, is dated, expressly refers to the Agreement, and is signed by a duly authorized representative of each party to the Agreement. 24.6 Neither party shall, during the term of this Agreement and for a period of three (3) months thereafter directly or indirectly, solicit or hire the personal of the other party. 24.7 If at any time should there be any evidence or any lien, claim for which Owner might become liable, which is chargeable to the Vendor, and then the Owner may pay and discharge the same and deduct the amount so paid from any amount which may be or may become due and payable to the Vendor. If any lien or claim remains unsettled after all payments are made, the Vendor shall refund or pay to Owner the cost of such lien or claim including all payments and reasonable expenses. Owner reserves the right to the same. 24.8 This Agreement shall inure to the benefit of and be binding upon the respective successors and permitted assigns, if any, of the Parties, provided that this provision shall not be construed to permit any assignment which would be unauthorized or void pursuant to any other provision contained herein. 24.9 If a work is transferred from the jurisdiction of Owner to any Successor, while the Agreement is in subsistence, the Agreement shall be binding on the Vendor and the Successor in the same manner and take effect in all respects as if the Vendor and the Successor were parties there-to from the inception and then corresponding office of the competent authority of the Successor will exercise the same powers and enjoy the same authority as conferred to Owner under the original Agreement entered into and the Project Manager so appointed shall have the same powers as envisaged in the Agreement. 24.10 Any notice to be given to the Vendor under the terms of the Agreement shall be considered as duly served if the same shall have been delivered to, left for, or posted by registered post to the address of the Vendor at their registered office. Similarly, any notice to be given to the Owner shall be Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 143 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. considered as duly served, if the same shall have been delivered to, left for, or posted by registered post to the Owner’s office. All notices shall be delivered or sent to the other party at the address(s) shown below or at any other address(s) as the party may designate subsequent to signing of this Agreement. If to Owner: ______________________ 24.11 If to Vendor: ________________________ Changes of location of site/offices do not invalidate the Agreement and Vendor shall have no claim for any compensation for such changes. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 144 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 1: Preliminary Project Implementation Plan CIL has decided to implement its envisaged IT roadmap in two waves, however the current scope of RFP includes only Wave 1. Wave 2 is related to “Integration with 3rd Party Applications/Systems” and is a part of the overall SAP implementation roadmap but will not be part of the scope deliverables of this tender. Examples of third party applications are: TDS, Mine Planning Scheduling, Washery automation systems etc. However, the bidder will need to give an undertaking to execute this job at the discretion of CIL on mutually agreed terms at a future date. Wave – I: In the first wave, CIL will concentrate to build up basic ERP backbone for Process automation and implementation of “must to have” interfaces. Wave 1 will be done in 2 phases to cover all the geographical locations. Wave – II After successful completion of Wave – 1, Wave 2 will be carried out to: ƒ ƒ ƒ Optimize the processes and to develop interfaces with third party applications e.g. mine planning and scheduling, washery automation systems and Truck dispatch system etc. Advanced application implementation in IICM to take care of on line training registration, room booking etc for external parties. Solution for Coal Videsh Limited which manages overseas operations. Coal Videsh will own different overseas subsidiary level companies. These entities along with different local JV partners would own coal mining assets in different countries. The business would include sourcing the coal from its own mines, from the spot market, swapping of coal etc. It will cover all possible normal trading activities along with logistics, shipping, Railway, customs and barging processes. 1.1 Implementation Schedule – Wave 1 It is expected that SAP implementation for wave 1 will be completed within 36 months in total. Once wave 1 implementation completes in 36 months, Bidder has to provide one year warranty along with 2 years of maintenance support services. Implementation scope of modules in wave 1 and roll out locations will be subject to change during project preparation phase with the successful bidder depending on the quick wins, ease of roll out and geographical constraints. In order to derive benefits out of SAP system quickly, CIL wants to operationalize it in one of functions, for data capture and monitoring. This may be done for production figures recording which helps management to drill down and monitor production performance at various locations upto collieries and take corrective action. This may also be implemented in maintenance management for monitoring HEMM utilization and availability. There could be other option to have demand planning in system which provides visibility for requirements and fulfilment from CIL, to other subsidiaries. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 145 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. The detailed scope will be discussed and finalized in project preparation phase with successful bidder. The indicative timelines for Wave 1 for SAP Implementation and Infrastructure commissioning are as follows: Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 146 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1.2 Project Governance CIL is in the process of setting up a strong Internal IT Department for managing all IT projects and initiatives. An IT Policy for the organization has been approved by the CIL. In addition to these general measures, specifically for this project CIL shall take following measures. 1.2.1 Project Committees As part of the project governance, CIL shall appoint two committees: ƒ A Steering Committee, which shall evaluate the business solutions proposed by the bidders as well as the project timelines ƒ A Core Committee, which will evaluate the fit of the workflows as proposed by the Bidder. In addition, this team will be involved in the UAT during the implementation phase. 1.2.2 Post Implementation Team The successful Bidder shall, in consultation with CIL, appoint a post implementation team of appropriate size for post implementation support as per mutual agreement during Pilot implementation phase. The structure of the team could be follows: ƒ ƒ ƒ ƒ ƒ Project Manager Functional Consultants Basis Consultants ABAP Developers Onsite Help Desk (User support, First level S/W support etc However the Bidder should ensure that the team size is sufficient to provide the best possible service to CIL. 1.4 Implementation Methodology CIL will follow SAP ASAP methodology for entire implementation. The each of the sub-project will have following phases. x x x x x x Project Preparation Business Blueprint Realization Final Preparation Go-Live and Support The corresponding deliverables, roles & responsibilities are further detailed in Annexure E. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 147 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 2: Detailed Scope of Work (Refer Volume II & III) Volume II: A2.1 to A2.6 Volume III: A2.7 to A2.8 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 148 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 3: SLAs 1. Definitions. a) “Scheduled Maintenance Time” shall mean the time that the System is not in service due to a scheduled activity as defined in this SLA. The scheduled maintenance time would not be during 16 X 6 timeframe. Further, scheduled maintenance time is planned downtime with the prior permission of CIL. b) “Scheduled operation time” means the scheduled operating hours of the System for the month. All scheduled maintenance time on the system would be deducted from the total operation time for the month to give the scheduled operation time. The total operation time for the systems and applications within the DC, DR, and NR and critical client site infrastructure will be 24X7X365. The total operation time for the client site systems shall be the business hours of CIL. c) “System or Application downtime” means accumulated time during which the System is totally inoperable within the Scheduled Operation Time but outside the scheduled maintenance time and measured from the time CIL and/or its employees log a call with the SI team of the failure or the failure is known to the SI from the availability measurement tools to the time when the System is returned to proper operation. d) “Availability” means the time for which the services and facilities are available for conducting operations on the CIL system including application and associated infrastructure. Availability is defined as: {(Scheduled Operation Time – System Downtime) / (Scheduled Operation Time)} * 100% e) “Helpdesk Support” shall mean the 16x6 basis support centre for SAP support and the 24x7 for all other services which shall handle Fault reporting, Trouble Ticketing and related enquiries during this contract. f) “Incident” refers to any event / abnormalities in the functioning of the Data Centre Equipment / Services that may lead to disruption in normal operations of the Data Centre, System or Application services. 2. Interpretations. a) The business hours are 9:00 AM to 6:00PM on all working days (Mon-Sat) excluding Public Holidays or any other Holidays observed by CIL. The SI however recognizes the fact that the CIL offices will require to work beyond the business hours on need basis. b) "Non-Business Hours" shall mean hours excluding “Business Hours”. c) 16X6 shall mean hours between 7.30AM -11.30PM on all working days (Mon-Sat) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 149 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. excluding Public Holidays or any other Holidays observed by CIL d) If the operations at DC are not switched to DR within the stipulated timeframe (Recovery Time Objective) in the event of a disaster, it will be added to the system downtime. e) The availability for a cluster will be the average of availability computed across all the servers in a cluster, rather than on individual servers. However, non compliance with performance parameters for infrastructure and system / service degradation will be considered for downtime calculation. f) The SLA parameters shall be monitored on a monthly basis as per the individual SLA parameter requirements. However, if the performance of the system/services is degraded significantly at any given point in time during the contract and if the immediate measures are not implemented and issues are not rectified to the complete satisfaction of CIL or an agency designated by them, then CIL will have the right to take appropriate disciplinary actions including termination of the contract. g) A Service Level violation will occur if the SI fails to meet Minimum Service Levels, as measured on a half yearly basis, for a particular Service Level. Overall Availability and Performance Measurements will be on a monthly basis for the purpose of Service Level reporting. An “Availability and Performance Report” will be provided by the SI on monthly basis in the CIL suggested format and a review shall be conducted based on this report. A monthly Availability and Performance Report shall be provided to the CIL at the end of every month containing the summary of all incidents reported and associated SI performance measurement for that period. The monthly Availability and Performance Report will be deemed to be accepted by the CIL upon review and signoff by both SI and CIL. Where required, some of the Service Levels will be assessed through audits or reports e.g. utilization reports, measurements reports, etc., as appropriate to be provided by the SI on a monthly basis, in the formats as required by the CIL The tools to perform the audit will need to be provided by the SI. Audits will normally be done on regular basis or as required by CIL and will be performed by CIL or CIL appointed third party agencies. h) EMS system as specified in this RFP shall play a critical role in monitoring the SLA compliance and hence will have to be customized accordingly. The System Integrator (SI) shall put sufficient emphasis on ensuring the capability of EMS system to capture SLA compliance correctly and as specified in this RFP. The selected SI must deploy EMS tool and develop additional scripts (if required) for capturing the required data for SLA report generation in an automated way. This tool should generate the SLA Monitoring report in the end of every month which is to be shared with CIL on a monthly basis. The tool should also be capable of generating SLA reports for a half-year. CIL will audit the tool and the scripts on a regular basis. i) There shall be a SLO – Service Level Observation Period of 1 month from the date of golive of each Phase i.e Phase 1, Phase 2 – Roll out: Track 1 and Phase 2 – Roll out: Track 2. The system performance shall be closely monitored during this period and penalties related to SLA shall not be applicable in this period. Based upon the observations in the SLO period the SLA’s may be appropriately modified by mutual consent. The SLAs will prevail from the end of the SLO period till the end AMC period. After the start of the Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 150 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Operations and Maintenance Phase SLAs will be subject to being redefined, to the extent necessitated by field experience at the SHQ/ Areas Offices /Project Offices and the developments of technology practices globally. The SLAs may be reviewed on an annual/bi-annual basis as CIL decides after taking the advice of the SI and other agencies. All the changes would be made by CIL in consultation with the SI. j) The SI is expected to provide the following service levels. In case these service levels cannot be achieved at service levels defined in the tables below, it shall result in invoking the penalty clause. Payments to the SI are linked to the compliance with the SLA metrics laid down in the tables below. The penalties will be computed and calculated as per the computation explained in section 3-c of this Annexure. During the contract period, it is envisaged that there could be changes to the SLA, in terms of addition, alteration or deletion of certain parameters, based on mutual consent of both the parties i.e. CIL and SI. k) Table 1 in this section outlines the key service level requirements for the system, which needs be ensured by the SI during the operations and maintenance period. These requirements shall be strictly imposed and either CIL or a third party audit/certification agency shall be deployed for certifying the performance of the SI against the target performance metrics as outlined in the tables. TABLE 1: Service Level Description and Measurement Sl. No. A. 1. Service Level Description INFRASTRUCTURE AVAILABILITY ERP Systems Measurement Availability of production ERP systems shall be at least 99% Severity of Violation: High Availability over the six-month period < 99% & >= 98.5% < 98.5% & >= 98% < 98% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 98%, one (1) additional violation will be added for each such month to the overall violations for this service level. 2. non-ERP Systems Availability of non-ERP systems in production and non-production systems shall be at least 97%. Severity of Violation: Medium Availability over the six-month Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 151 of 249 Violations for calculation of Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement period < 97% & >= 96.5% < 96.5% & >= 96% < 96% penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 96%, one (1) additional violation will be added for each such month to the overall violations for this service level. 3. RTO RTO shall be less than or equal to six 6 hours for DR Site and RTO shall be less than or equal to 2 hours for NR Site Severity of Violation: High 4. RPO Each instance of non-meeting this service level will be treated as one (1) violation. RPO shall be Zero minutes for NR and RPO shall be less than or equal to 10 minutes for DR Severity of Violation: High Each instance of non-meeting this service level will be treated as two (2) violations. 5. Availability of Power (UPS, Panels, Connectors…) Availability of Power (UPS, Panels, Connectors,…) shall be at least 99% Severity of Violation: High This service level will be monitored on a monthly basis. Availability over the six-month period < 99% & >= 98.5% < 98.5% & >= 98% < 98% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 98%, one (1) additional violation will be added for each such month to the overall violations for this service level. 6. Non-IT Infrastructure (CCTV, BMS, Fire Alarm System…) The availability of the Non-IT infrastructure systems at the Data Centers such as CCTV, Building Management System, Fire Alarm System that fall under the scope of the SI shall be at least 98%. Severity of Violation: High This service level will be monitored on a monthly basis. Availability over the six-month period < 98% & >= 97% Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 152 of 249 Violations for calculation of penalty 1 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement < 97% & >= 96% < 96% 2 3 In addition to the above, if the service level in any month in the six-month period falls below 96%, one (1) additional violation will be added for each such month to the overall violations for this service level. B. 1. INFRASTRUCTURE PERFORMANCE Peak CPU Utilization Sustained period of peak CPU utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes. Severity of Violation: High Each occurrence where the peak CPU utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance. Number of instances over the six month period < 97% & >= 96.5% Violations for calculation of penalty 1 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. 2. Peak I/O Utilization of Server Sustained period of peak I/O utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes. Severity of Violation: High Each occurrence where the peak I/O utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance. Number of instances over the six month period < 97% & >= 96.5% Violations for calculation of penalty 1 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. 3. Peak Memory Utilization Sustained period of peak memory utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 153 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement Severity of Violation: High Each occurrence where the peak memory utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance. Number of instances over the six month period >0 & <=3 >3 Violations for calculation of penalty 1 2 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. 4. Sustained period of rack temperature Sustained period of rack temperature (PAC,…) staying outside the allowed range of within 10 of 22 Centigrade and Relative Humidity remaining within range of 50% ± 5% Severity of Violation: High Each occurrence where the temperature OR Relative Humidity stays beyond the allowed range for time equal to or more than 30 minutes will be treated as one (1) instance. Number of instances over the six month period >0 & <=3 >3 Violations for calculation of penalty 1 2 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. NETWORK AVAILABILITY & PERFORMANCE Network Availability Severity of Violation: High This service level will be monitored on a monthly basis. Network Segment CIL HQ – SHQ AHO AHQ – PO / Other Location Network availability over the six-month period < 99.5% & >=99.25% < 99.25% & >=99% <99% < 99% & >=98.75% < 99.75% & Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 154 of 249 Violations for calculation of penalty 1 2 3 1 2 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement >=98.5% <98.5% 3 In addition to the above, if the service level in any month in the six-month period falls below 99% or 98.5% for respective network segments, one (1) additional violation will be added for each such month to the overall violations for this service level. WAN Backbone Latency (in Milliseconds) The Latency on the WAN Backbone shall be maintained at 90 milliseconds or less up to the Area Level Network Severity of Violation: Medium This service level will be monitored on a monthly basis. Network Segment DC – DR – NR – CIL HQ - SHQ - AHQ Latency performance over the six-month period < 95 & > 90 Violations for calculation of penalty 1 < 100 & > 95 >100 < 125 & > 120 < 130 & > 125 > 130 AHQ - PO 2 3 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 100 milliseconds or 130 milliseconds for respective network segments, one (1) additional violation will be added for each such month to the overall violations for this service level. WAN Backbone Packet Loss The Packet Loss on the WAN Backbone shall be maintained typically at less than 1% measured on a monthly basis. Severity of Violation: Medium This service level will be monitored on a monthly basis. Network Segment WAN WAN Jitter Packet Loss over the six-month period > 1% Violations for calculation of penalty 1 Average Jitter on the WAN Backbone typically to be 20 microseconds or less; and for Maximum Jitter typically not to exceed 30 milliseconds. Severity of Violation: Medium This service level will be monitored on a monthly basis. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 155 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement Each occurrence where the average jitter crosses 20 microseconds or maximum jitter crosses 30 Milliseconds 30 minutes will be treated as one (1) instance. Network Segment Entire WAN Number of Instances over sixmonth period >0 & <=3 >3 Violations for calculation of penalty 1 2 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. Internet Availability Overall internet availability shall be more than 98% Severity of Violation: Medium This service level will be monitored on a monthly basis. Network Segment Entire WAN Resolution time over the six-month period < 98% & >=96.5% < 96.5% & >=95% <95% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 95%, one (1) additional violation will be added for each such month to the overall violations for this service level. Firewall Outage Firewall outage to be maintained at 0% Severity of Violation: High This service level will be monitored on a monthly basis. Each instance of non-meeting this service level will be treated as two (2) violations. IDS Outage IDS outage to be maintained at 0% Severity of Violation: High This service level will be monitored on a monthly basis. Each instance of non-meeting this service level will be treated as two (2) violations. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 156 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Denial Of Service (DoS) Measurement The SI shall respond to DoS attacks reported by users or WAN maintenance personnel shall be resolved within 20 minutes of intimation to the helpdesk. Severity of Violation: Medium This service level will be monitored on a monthly basis. Network Segment Entire WAN Resolution time over the six-month period < 25 Min & >=20 Min < 30 Min & >=25 Min >30Min Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 30 Min, one (1) additional violation will be added for each such month to the overall violations for this service level. C. 1. APPLICATION AVAILABILITY ERP Solution Availability of ERP solution components measured within the Data Center shall be at least 99.5% Severity of Violation: High This service level will be monitored on a monthly basis. Availability over the six-month period < 99.5% & >= 99.3% < 99.3% & >= 99.0% < 99% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 99%, one (1) additional violation will be added for each such month to the overall violations for this service level. 2. Non-ERP Solution Availability of non-ERP solution components measured within the Data Center shall be at least 97% Severity of Violation: Medium This service level will be monitored on a monthly basis. Availability over the six-month period Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 157 of 249 Violations for calculation of penalty Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement < 97% & >= 96% < 96% 1 2 In addition to the above, if the service level in any month in the six-month period falls below 96%, one (1) additional violation will be added for each such month to the overall violations for this service level. D. 1. APPLICATION PERFORMANCE Average Application Response Time Average Application Response Time during peak usage hours as measured within the server environment shall not exceed 2 seconds. Severity of Violation: High The list of critical business functions and peak usage hours will be identified by CIL during the Supply and System Integration Phase. This service level will be monitored on a monthly basis. Average Application Response Time over the six-month period > 2s & <= 3s > 3s & <= 4s > 4s Violations for calculation of penalty 2 4 5 In addition to the above, if the average application response time in any month in the six-month period goes beyond 4s, one (1) additional violation will be added for each such month to the overall violations for this service level. 2. Average application response time during peak usage hours Average application response time during peak usage hours as measured from a client terminal within the Data Center shall not exceed 4 seconds. Severity of Violation: High The list of critical business functions and peak usage hours will be identified by CIL during the Supply and System Integration Phase. This service level will be monitored on a monthly basis. Average Application Response Time over the six-month period > 4s & <= 5s > 5s & <= 6s > 6s Violations for calculation of penalty 2 4 5 In addition to the above, if the average turnaround time in any month in the six-month period goes beyond 6s, one (1) additional violation will be added for each such month to the overall violations for this service level. E. CLIENT SITE INFRASTRUCTURE Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 158 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. 1. Service Level Description Measurement Critical client site infrastructure components (Critical client site infrastructure means the IT infrastructure at client site which are shared by multiple users i.e., Core Switch, Core Routers, etc. ) Availability of the critical client site infrastructure components at all the implementation sites shall be at least 99% Severity of Violation: High This service level will be measured on a monthly basis for each Implementation site. If the availability in a month for an implementation site falls below the minimum service level, it will be treated as one (1) violation. The total number of violations for the six-month period will be the cumulative number of violations across all the months across all sites in the six-month period. F. 1. CLIENT SITE SUPPORT Non-SI Supported Incidents 100% of the non SI supported incidents at every site shall be routed to the appropriate service provider within 30 minutes (business hours). Severity of Violation: Medium This service level will be measured on a monthly basis for each implementation site. If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six-month period. Average number of instances per month = (Total number of instances for the six-month period) / 6 Average number of instances per month >0 & <=4 >4 & <=8 >8 & <=12 >12 2. Level 1 Incidents ( The failure to fix the incident/issue reported has an immediate impact on CIL ability to service its users and inability to perform critical backoffice functions) Violations for calculation of penalty 1 2 3 4 80% of the Level 1 Incidents at each site should be resolved within 2 business hours from the time call is received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 8 business hours. Severity of Violation: Medium This service level will be measured on a monthly basis for each implementation site. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 159 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six-month period. Average number of instances per month >0 & <=4 >4 & <=8 >8 & <=12 >12 3. Level 2 Incidents ( The failure to fix the incident/issue reported has an impact that while not immediate can cause user service to degrade if not solved within reasonable timeframes) Violations for calculation of penalty 1 2 3 4 80% of the Level 2 Incidents at each site should be resolved within 6 business hours from the time call is received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 48 hours. Severity of Violation: Medium This service level will be measured on a monthly basis for each implementation site. If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six-month period. Average number of instances per month = (Total number of instances for the six-month period) / 6 Average number of instances per month >0 & <=4 >4 & <=8 >8 & <=12 >12 4. Replacement of Hardware Violations for calculation of penalty 1 2 3 4 Replacement of hardware equipment shall be done within 7 days of notification by CIL. These equipments should have failed on four or more occasions in a period of less than three months or six times in a period of less than twelve months. (Mean Time Between Failure Condition) Severity of Violation: High Each instance of non-meeting this service level will be treated as one (1) violation. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 160 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. G. 1. Service Level Description APPLICATION SUPPORT Critical Defects (A critical function is not available or very seriously impaired; the impact on business is severe; a large number of end users are unable to perform their normal work; and/or no readily available alternative exists) Measurement 95% of the Critical defects shall be resolved within 2 business hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six-month period < 95% & >= 90% < 90% & >= 85% < 85% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 85%, one (1) additional violation will be added for each such month to the overall violations for this service level. 2. Urgent Defects (A critical service is unavailable or seriously impacted by a problem; no realistic workaround is available and financial, customer related impacts could occur) 95% of the Urgent defects shall be resolved within 8 hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six-month period < 95% & >= 90% < 90% & >= 85% < 85% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 85%, one (1) additional violation will be added for each such month to the overall violations for this service level. 3. Medium Defects (A non critical service is unavailable or impaired by a problem. There is no direct immediate impact on business. Work can continue with minor disruptions or loss of efficiency. Alternative ways of performing normal work are available) 100% of the Medium defects shall be resolved within 72 hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six-month period < 100% & >= 90% < 90% & >= 80% < 80% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 80%, one (1) additional violation will be added for each Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 161 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement such month to the overall violations for this service level. HELPDESK AND DATA CENTER SUPPORT H. 1. Time taken to answer calls 98% of the calls shall be answered within 45 seconds. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six-month period < 98% & >= 90% < 90% & >= 80% < 80% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level. 2. Level 1 Calls ( The failure to fix the incident/issue reported has an immediate impact on CIL ability to service its users and inability to perform critical backoffice functions) 80% of the Level 1 calls shall be resolved within 2 hours from call received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 8 business hours. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six-month period < 80% & >= 70% < 70% & >= 60% < 60% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. 3. Level 2 Calls ( The failure to fix the incident/issue reported has an impact that while not immediate can cause user service to degrade if not solved within reasonable timeframes) 80% of the Level 2 calls shall be resolved within 6 hours from call received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 48 hours. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six-month period < 80% & >= 70% Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 162 of 249 Violations for calculation of penalty 1 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement < 70% & >= 60% < 60% 2 3 In addition to the above, if the service level in any month in the six-month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. 4. Level 3 Calls ( The failure to fix the incident/issue reported has no direct impact on CIL’s ability to service its users or perform critical back-office functions) 80% of the Level 3 calls shall be reported on status and action to be communicated within 24 hours from call received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 72 hours. Severity of Violation: Low This service level will be monitored on a monthly basis. Performance over the six-month period < 80% & >= 70% < 70% & >= 60% < 60% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. 5. Non-SI Supported Incidents 98% of the non SI supported incidents shall be routed to the appropriate service provider within 30 minutes. Severity of Violation: Medium This service level will be monitored on a monthly basis. Performance over the six-month period < 98% & >= 90% < 90% & >= 80% < 80% Violations for calculation of penalty 1 2 3 In addition to the above, if the service level in any month in the six-month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level. 6. Replacement of Hardware Equipment Replacement of hardware equipment shall be done within 15 days of notification by CIL. These equipments would have failed on four or more occasions in a period of less than three months or six times in a period of less than twelve months. (Mean Time Between Failure Condition) Severity of Violation: High Each instance of non-meeting this service level will be treated as one (1) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 163 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement violation. 7. Civil Works – Minor Repairs Civil works related to minor repairs shall be performed within 24 hours of reporting the problem. Severity of Violation: Medium Each occurrence non-meeting the service level will be treated as one (1) instance. Number of instances over the six month period >0 & <=3 >3 Violations for calculation of penalty 1 2 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. 8. Civil Works – Replacements Civil works related to replacements shall be performed within 2 days of reporting the problem. Severity of Violation: Medium Each occurrence non-meeting the service level will be treated as one (1) instance. Number of instances over the six month period >0 & <=3 >3 Violations for calculation of penalty 1 2 In addition to the above, if the number of instances in any month in the sixmonth period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level. I 1. REPORTING Monthly SLA Compliance Reports Provide monthly SLA compliance reports, monitoring and maintenance related MIS reports by the 5th of the following month. Severity of Violation: Medium This service level will be monitored on a monthly basis. If the monthly SLA compliance report related to the service level metrics is not provided in the given timeframe, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months in the six-month period. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 164 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No. Service Level Description Measurement Number of instances over the six month period >0 & <=3 >3 Violations for calculation of penalty 1 2 3. Violations and Associated Penalties a) The primary intent of Penalties is to ensure that the system performs in accordance with the defined service levels. Penalties are not meant to be punitive or, conversely, a vehicle for additional fees. b) A monthly performance evaluation will be conducted. c) Penalty Calculations. The framework for Penalties, as a result of not meeting the Service Level Targets are as follows: i. The performance will be measured for each of the defined service level metric against the minimum / target service level requirements and the violations will be calculated accordingly. ii. The number of violations in the reporting period for each level of severity will be totaled and used for the calculation of Penalties. iii. Penalty applicable for each of the high severity violations is one (1) % of respective half yearly payment to the SI. iv. Penalty applicable for each of the medium severity violations is three-quarter (0.75%) of respective half yearly payment to the SI. v. Penalties applicable for each of the low severity violations is one-quarter (0.25%) of respective half yearly payment to the SI. vi. Penalty applicable for not meeting a high (H) critical performance target in two consecutive half years on same criteria shall result in additional deduction of 1% of the respective half yearly payment to the SI. Penalty shall be applicable separately for each such high critical activity vii. Penalty applicable for not meeting a medium (M) critical performance target in two consecutive half yearly periods on same criteria shall result in additional deduction of 0.75% of the respective half yearly payment to the SI. Penalty shall be applicable separately for each such medium critical activity Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 165 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. viii. Penalty applicable for not meeting a low (L) critical performance target in two consecutive half yearly periods on same criteria shall result in additional deduction of 0.5% of the respective half yearly payment to the SI. Penalty shall be applicable separately for each such medium critical activity ix. It is to be noted that if the overall penalty applicable for any of the review period during the currency of the contract exceeds 3% or if the overall penalty applicable for any of the successive half year periods during the currency of the contract is above 15%; then CIL shall have the right to encash the Warranty Guarantee or terminate the contract or both. 4. Enforcement of SLA’s SLA’s would be enforced after observing a one month SLO period after Go-Live of each phase i.e Phase 1, Phase 2 Roll out: Track 1, Phase 2 Roll out: Track 2. Penalties for these phases (if any) will be accumulated and deduction towards these penalties will be made on commencement of AMC period. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 166 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 4: Schedule of Requirement and Price Form for Price Bid Having examined the Bid Document Number ………………………... dated ………………, the receipt of which is hereby acknowledged, we, the undersigned, offer to supply, implement, commission, integrate and put into operation the Solution under the above-named Bid in full conformity with the Bidding Documents for the sum quoted in price schedule. The following is the total bid price for the scope of work described in our response to your Bid Document. i) In figures __________________________________________ ii) In words __________________________________________ (Please quote the price in Indian Rupees only) The break-up of the above lump sum price is given in the Price schedule attached herewith and is made part of this bid. Thanking you, Yours faithfully, <Seal and Signature of Authorized Signatory> <Name of Authorized Signatory> <Title of Authorized Signatory> Note: In case of bid by a consortium, this form has to be signed by authorized signatories of all the members of the consortium. Rates for all items must be quoted in the following proforma. The description of taxes quoted should be given clearly along with the percentage. NOTE: 1. The BoM mentioned below has to be mandatorily quoted by all the bidders and will be used for TCO calculation for evaluation purpose. The quantities for certain components viz. Desktops, LAN items, VSATs and wireless items etc. may vary. The successful bidder will perform a site survey for quantity finalization of items at the time of execution of the project execution. However, the unit rate quoted will be applicable for making the necessary payment to the bidder. The successful bidder and CIL will jointly decide and signoff on the actual quantities as may be required at various locations. 2. Regarding Wireless and VSAT TCO calculation, it is presumed that around 20% of applicable locations may have to be provided with VSAT due to non availability of line of sight even with wireless repeaters and other topographical constraints. Quantity finalization process for VSAT’s and Wireless will be as mentioned in Point No. 1 above. 3. However the unit price of the quoted items shall be firm and binding on the successful bidder. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 167 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4. Any additional items required by the Bidder for the completeness of the solution has to be quoted under “Any other item (give detailed break-up)”. 5. All rates should be in Indian Rupees. 6. The total value of bid should be given in figures as well as words. In case of any discrepancy between the two values, the amount given in words will be taken as correct. 7. Technical bid (bid packet-1 Part-B) should contain an un-priced bid which should be similar to the price bid without any prices mentioned. Additionally, bidder has to mandatorily provide a detailed line item wise BoM in their technical bid. 8. Any additional item must be given at the end of each sub-heading. 9. All AMC charges of all equipment/components & post implementation support of individual phases (Ph 1 & 2) until Go-live of the final phase (Ph 2, Roll out – Track-II) have to be included in the prices quoted by bidder. CIL will not pay AMC separately for this period. Bidders to note that equipments and software licenses needs to be supplied in a staggered manner as per the phased plan and necessary maintenance and support cost needs to be included in the supply & services cost. 10. The Bidder is to quote for AMC/ATS of all components and post implementation support for a period of 2 years after 1 year warranty from the date of Go-Live of Phase 2, Roll-out TrackII. 11. For Facility Management Services, Bidders need to quote as per the guideline provided in Table 12 of Volume III. However, these are the minimum manpower to be quoted. 12. Training needs to be imparted and quoted as per section “A2.2 Training & Knowledge Transfer – SAP Applications” of Volume II of the RFP. In case additional training is required, the same will be impacted by the Vendor at the rate quoted in the Price Bid. 13. Supply and replacement of equipment shall be made by successful bidder free of all charges at the various locations of CIL including freight, insurance and other incidental charges. 14. Acronyms Used in tables below: a. APBS: As per Bidders Solution b. I & C: Installation and Commissioning c. LS: Lumpsum Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 168 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table A: Supply, Installation & Commissioning – Infrastructure Sr. No. A.1 a.1 Item Name I & C of a.1 b.1 Relay Server for Antivirus and Domain Controller / Patch Management (at DC,DR, SHQ & AHQ) b.2 I & C of b.1 c.1 Administrators Console c.2 I & C of c.1 Domain Controller / Back-up Domain Controller I&C of d.1 SAN Storage system I & C of d.1 Rack Mountable Fiber Channel SAN Switch d.2 e.1 e.2 f.1 Make & Model Qty Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Supply, Installation & Commissioning - Hardware and Devices SAP Production, Development, QA & Nos. APBS Testing Servers a.2 d.1 UOM FOR Unit rate in ` exclusive of Taxes & Duties f.2 I & C of e.1 g.1 Tape Library (Back-up Device) Drive and Backup software g.2 I & C of f.1 h.1 Virtual Tape Library, Cartridge Tape Library & Backup Software h.2 I & C of g.1 Nos. APBS Nos. APBS Nos. APBS Nos. 3 Nos. APBS Nos. 3 Nos. 3 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 169 of 249 Vol- I Total Amount in ` Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name i.1 Miscellaneous Server for DNS, Proxy, Antivirus etc i.2 j.1 I & C of h.1 Desktop PC j.2 I & C of i.1 k.1 EMS / NMS / Backup Servers k.2 l.1 l.2 m.1 I & C of j.1 Line Printers (1500 lpm) I & C of k.1 Network LaserJet Printers - Color m.2 I & C of l.1 n.1 Network LaserJet Printer – Black & White / Monochrome n.2 I&C of n.1 UOM Make & Model Qty Nos. APBS Nos. 10000 Nos. APBS Nos. 593 Nos. 103 Nos. 473 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Any other item (give detailed break-up) SUB-TOTAL - A.2 Supply, Installation & Commissioning - Networking Components a.1 a.2 DC / DR Core Switches I & C of a.1 DC / DR Server Farm Switches I & C of b.1 DC / DR DMZ Switches I & C of c.1 LAN Distribution Switch - Type I for DC / DR / NR / SHQ I & C of d.1 LAN Core Switches for SHQ & AHQ b.1 b.2 c.1 c.2 d.1 d.2 e.1 e.2 Nos. 4 Nos. 4 Nos. 6 Nos. 65 Nos. 99 - I & C of e.1 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 170 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. f.1 f.2 g.1 g.2 h.1 h.2 i.1 i.2 j.1 j.2 k.1 k.2 l.1 l.2 m.1 m.2 n.1 n.2 o.1 o.2 p.1 p.2 q.1 q.2 Item Name LAN Access Switch – Type I (DC, HQ, SHQ, AHQ) I & C of g.1 LAN Access Switch – Type II for Project Office / Mines , Central Stores /Workshop / Hospitals I & C of h.1 LAN Access Switch – Type III for other location I & C of i.1 Core Routers at DC, DR I & C of j.1 NR,SHQ Routers I & C of k.1 Area Office Routers I & C of l.1 Project Office, Central Stores Workshops / Hospitals and Other Locations Routers I & C of m.1 Internet Routers I & C of n.1 VSAT Hub Routers I & C of o.1 Server Load Balancer I & C of p.1 AAA Server I & C of q.1 Internet Link Load Balancer UOM Make & Model Qty Nos. 410 Nos. 1488 Nos. 829 Nos. 4 Nos. 20 Nos. 162 Nos. 1325 Nos 4 Nos 5 Nos 4 Nos 4 Nos 4 I & C of r.1 Nos Any other item (give detailed break-up) Nos FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` SUB-TOTAL A.3 a.1 Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: - - Supply, Installation & Commissioning - Security Components Internal / Server Farm Nos. 4 Firewall Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 171 of 249 Total Amount in ` Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. a.2 b.1 Item Name I & C of a.1 External / Perimeter Firewall b.2 I & C of b.1 c.1 Network Intrusion Prevention System c.2 I & C of c.1 d.1 Host Intrusion Prevention System d.2 e.1 e.2 f.1 f.2 g.1 I & C of d.1 Mail Security I & C of e.1 Gateway Web Security I & C of f.1 Security Correlation Appliances g.2 I & C of g.1 h.1 Network Data Loss Prevention System h.2 I & C of h.1 UOM Make & Model Qty Nos. 4 Nos. 6 Nos. APBS Nos. 4 Nos. 4 Nos. 4 Nos. 4 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Any other item (give detailed break-up) SUB-TOTAL A.4 a.1 a.2 b.1 b.2 c.1 c.2 d.1 d.2 e.1 e.2 f.1 - - Supply, Installation & Commissioning - Voice Components (Installation & Commissioning should include costs of liaison services for link set-up) IP PBX Lot 5 I & C of a.1 Voice Messaging Syste 2 System m. I & C of b.1 Audio Conferencing Nos. 2 I & C of c.1 IP Phones Type - I Nos. 3400 I & C of d.1 IP Phones Type - II Nos. 1200 I & C of e.1 Helpdesk System Nos. 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 172 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name f.2 I & C of f.1 g.1 IP Gateway or Equivalent g.2 I & C of g.1 UOM Nos. Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 94 Any other item (give detailed break-up) SUB-TOTAL A.5 a.1 Supply, Installation & Commissioning – Wireless Connectivity Components (Installation & Commissioning should include cost for components like earthing, grounding, TVSS, etc.) Point-to- Point and point to Multipoint wireless broadband equipment Nos. 243 for base Station /Area offices. a.2 I & C of a.1 b.1 Point-to- Point and Point to Multipoint wireless broadband systemRemote Subscriber b.2 I & C of b.1 c.1 Point-to- Point and point to Multipoint wireless broadband equipment for repeater stations c.2 I & C of c.1 d.1 Lightning Protection Unit d.2 I & C of c.1 e.1 e.2 f.1 f.2 Nos. 1100 40 Nos. 1221 Antenna Nos. 1383 I & C of e.1 36 Mtr. Self supported Tower for Mounting Wireless Equipment with Earthing Strip, Grounding Wire, Transient Voltage Surge Suppression (TVSS) I & C of e.1 Nos. 236 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 173 of 249 Vol- I - Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. g.1 g.2 h.1 h.2 Item Name 18 Mtr. Self supported Tower for Mounting Wireless Equipment with Earthing Strip, Grounding Wire, Transient Voltage Surge Suppression (TVSS) I & C of e.1 55 Mtr. Self supported Tower for Mounting Wireless Equipment with Earthing Strip, Grounding Wire, Transient Voltage Surge Suppression (TVSS) I & C of e.1 i.1 Online UPS 1 KVA with SMF battery for 2 hrs backup i.2 I & C of i.1 UOM Make & Model Qty Nos. 955 Nos. 15 Nos. 1221 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Any other item (give detailed break-up) SUB-TOTAL A.6 a.1 a.2 b.1 b.2 c.1 c.2 d.1 d.2 e.1 e.2 - - Supply, Installation & Commissioning – Network Passive Components Heavy Duty Racks for Servers/ SAN/ Storage/ Nos. APBS Backup/ LAN switch/ Structured cabling I & C of a.1 Category 6A outlets Nos. 21850 I & C of b.1 Category 6A UTP, 4 Km 1093 Pair Laying of CAT 6 UTP with casing and capping / PVC Pipe as required (c.1) Category 6A Modular Nos. 2558 Patch Panels I & C of d.1 Category 6A Patch Cords Nos. 21850 I & C of e.1 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 174 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. f.1 f.2 g.1 Item Name 50μm multimode armored fiber optic building cable - riser Laying of Armored Fiber Cable with necessary pipes and terminations at the ends (f.1) High-Density, Preterminated, Modular Fiber Patching System g.2 I & C of g.1 h.1 Real Time Infrastructure Management Intelligent Patch Panel System h.2 I & C of h.1 i.1 6 U Rack for mounting the switches in the floor i.2 I & C of g.1 Any other item (give detailed break-up) UOM Make & Model Qty Meters 38750 Nos. 994 Set 2 Nos 2295 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Nos. SUB-TOTAL A.7 Supply, Installation & Commissioning – LCD Displays for EMS a.1 LCD Displays for EMS a.2 I & C of a.1 - - - - 4 Any other item (give detailed break-up) SUB-TOTAL A.8 a.1 Supply, Installation & Commissioning - VSAT Equipment Extended C Band FTDMA VSAT (IDU + ODU including Nos. 300 Antenna) Terminal with data speed upto 512 Kbps. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 175 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. a.2 Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` I & C of a.1 Any other item (give detailed break-up) SUB-TOTAL A.9 a.1 a.2 b.1 b.2 c.1 c.2 d.1 - - - - Supply, Installation & Commissioning - Video Conferencing Equipment Video Conferencing Nos. 2 MCU I & C of a.1 HD Conference Room Nos. 24 System I & C of b.1 HD Desktop Endpoint Nos. 65 I & C of c.1 Video Digital Recording Nos. 2 System d.2 I & C of d.1 e.1 Video Conferencing Manager e.2 I&C of e.1 Lot. 1 Any other item (give detailed break-up) SUB-TOTAL TOTAL Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 176 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table B: Supply, Installation & Commissioning – DR & NR Design, Civil and Electrical & other related works Sr. No. B.1 1) a.1 a.2 b.1 b.2 c.1 c.2 d.1 d.2 e.1 e.2 f.1 f.2 g.1 g.2 h.1 h.2 i.1 i.2 j.1 j.2 k.1 k.2 l.1 l.2 2) a.1 Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Supply, Installation & Commissioning – DR & NR Design, Civil and Electrical & other related works Disaster Recovery Center - 1500 Sq Ft. Civil & Architectural I & C of a.1 Electrical I & C of b.1 Precision Air Conditioning System (PAC) I & C of c.1 Comfort Airconditioning I & C of d.1 Fire Detection and Suppression System I & C of e.1 Access Control System I & C of f.1 CCTV System I & C of g.1 Water Leak Detection System I & C of h.1 Rodent Repellent System I & C of i.1 UPS System I & C of j.1 Data Safe I & C of k.1 Building Management System I & C of l.1 Near Disaster Recovery Center Civil & Architectural Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot. 1 Lot 1 Lot 1 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 177 of 249 Vol- I Total Amount in ` Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. a.2 b.1 b.2 c.1 c.2 d.1 d.2 e.1 e.2 f.1 f.2 g.1 g.2 h.1 h.2 Item Name I & C of a.1 Electrical I & C of b.1 Precision Air Conditioning System (PAC) I & C of c.1 UPS System I & C of d.1 Access Control System I & C of e.1 Fire Detection and Suppression System I & C of f.1 Water Leak Detection System I & C of g.1 Data Safe I & C of h.1 Any other item (give detailed break-up) UOM Make & Model Qty Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` SUB-TOTAL Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: - - TOTAL Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 178 of 249 Total Amount in ` Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table C: Supply, Installation & Commissioning – Data Center (3000 Sqft) (To be shifted to CIL Rajarhaat Data Center Premises after 3 years) Sr. No. C.1 a) Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Supply, Installation & Commissioning – Data Center (3000 Sqft) (To be shifted to CIL Rajarhaat Data Center Premises after 3 years) Shifting , recommissioning and migration charges at CIL DC at Rajarhaat (eg: Servers, SAN Storgae, Routers, Switches, UPS, Data Safe, laying of network and LAN etc.) Lumps um 1 Any other item (give detailed break-up) SUB-TOTAL TOTAL Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 179 of 249 - - - - Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table D: Software Sr. No. D.1 a.1 a.2 b.1 b.2 D.2 a.1 a.2 b.1 b.2 c.1 c.2 D.3 a) b) c) Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` EMS & NMS Software (inclusive of AMC/ATS costs until completion of warranty period) Storage Management Lot 1 I & C of a.1 Network & Enterprise Management System (including Database Lot 1 Monitoring, Server & Desktop Management & Service Desk) I & C of b.1 Any other item (give detailed break-up) SUB-TOTAL Gateway Level Antivirus, Patch Management, Desktop Antivirus, Domain Controller (inclusive of AMC/ATS costs until completion of warranty period) All required software for Gateway Level Antivirus Lot 1 andDesktop antivirus for 20,000 Desktops. I & C of a.1 All required software for Patch Management for 20,000 Lot 1 Desktops. I&C of b.1 Domain Controller Software Lot 1 for 20,000 Desktops I&C of c.1 Any other item (give detailed break-up) SUB-TOTAL SAP Licenses & run-time RDBMS (inclusive of AMC/ATS costs until completion of warranty period) Phase 1 Phase 2 – Track 1 Phase 2 – Track 2 Lot Lot Lot 1 1 1 SUB-TOTAL - - Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 180 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table E: SAP Implementation, Services from SAP & Material Codification & Data Preparation Services Sr. No. E.1 1 Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Phase 1 2 Phase 2 Rollout – Track 1 Rollout – Track 2 Any other item (give detailed break-up) LS 1 LS LS 1 1 SUB-TOTAL 1 2 3 4 1 2 Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` - - Services from SAP Solution Quality Review Services (1180 Mandays) Expert Consulting Services (869 Mandays) TQM Program Management Services (240 Mandays) Technical Quality Management Services (280 Mandays) LS 1 LS 1 LS 1 LS 1 SUB-TOTAL E.3 Taxes & Duties in ` (VAT/ CST) SAP Implementation a) b) E.2 Taxes & Duties in ` (Service Tax) - - Material Codification, Data Preparation/entry Material Codification Data preparation/ entry job Any other item (give detailed break-up) Manmonths Manmonths 200 200 SUB-TOTAL - - TOTAL Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 181 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table F: Training Table F1 Sr. No. 1 a b c d e Item Name Training Core User/Team Training Power User Training Senior Management Training End User Hands on Training Infrastructure Training UOM Make & Model Qty LS 1 LS 1 1 LS LS LS FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/C ST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 1 1 Any other item (give detailed break-up) SUB-TOTAL - - TOTAL - - Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 182 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table F2 (This will not be included in the TCO) Sr. No. 1 a b c d e Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/C ST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Training - Per Additional Man-day Core User/Team Training Power User Training Senior Management Training End User Hands on Training Infrastructure Training Man-day 1 Man-day Man-day 1 Man-day Man-day 1 1 1 Any other item (give detailed break-up) SUB-TOTAL - - TOTAL - - Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 183 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table G: Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) Infrastructure Sr. No. G.1 a) b) Item Name UOM AMC - Hardware and Devices SAP Production, Development, QA &Testing Year Servers Relay Server for Antivirus and Domain Controller / Year Patch Management c) Administrators Console Year d) Domain Controller / Back-up Domain Controller Year e) SAN Storage system Year f) g) h) i) Rack Mountable Fiber Channel SAN Switch Tape Library (Back-up Device) Drive and Backup software Virtual Tape Library, Cartridge Tape Library & Backup Software Miscellaneous Server for DNS, Proxy, Antivirus etc Year Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Any Other Tax or levies in ` Tax %: Tax %: Tax %: 2 2 2 2 2 2 2 Year Year Year k) EMS / NMS / Backup Servers Year l) Line Printers (1500 lpm) Year m) Network LaserJet –Printers Color Year n) Network LaserJet Printers – Black & White / Monochrome 2 2 2 2 2 2 Year Any other item (give detailed break-up) SUB-TOTAL - - AMC - Networking Components DC / DR Core Switch Total Amount in ` 2 Desktop PC a) Taxes & Duties in ` (VAT/CST) Year j) G.2 Taxes & Duties in ` (Service Tax) Year 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 184 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. b) c) d) e) f) g) h) i) j) k) l) m) n) o) p) q) G.3 a) b) c) d) e) f) g) h) Item Name DC / DR Server Farm Switch DC / DR DMZ Switch LAN Distribution Switch Type I for DC / DR / NR / SHQ LAN Core Switches for SHQ & AHQ LAN Access Switch – Type I (DC, HQ, SHQ, AHQ) LAN Access Switch – Type II for Project Office / Mines , Central Stores /Workshop / Hospitals LAN Access Switch – Type III for other location Core Routers at DC, DR NR,SHQ Routers Area Office Routers Project Office, Central Stores Workshops / Hospitals and Other Locations Routers Internet Routers VSAT Hub Routers Server Load Balancer AAA Server Internet Link Load Balancer Any other item (give detailed break-up) SUB-TOTAL AMC - Security Components Internal / Server Farm Firewall External / Perimeter Firewall Network Intrusion Prevention System Host Intrusion Prevention System Mail Security Gateway Web Security Security Correlation Appliances Network Data Loss Prevention System UOM Year Year Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 2 2 2 Year Year Year 2 2 2 Year Year Year Year Year 2 2 2 2 2 Year Year Year Year Year Year 2 2 2 2 2 - Year Year Year Year Year Year Year Year - 2 2 2 2 2 2 2 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 185 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Any other item (give detailed break-up) SUB-TOTAL G.4 a) b) c) d) e) f) g) G.5 a) b) c) d) e) f) g) h) Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` - - - - AMC - Voice Components IP PBX Year Voice Messaging System Year Audio Conferencing Year IP Phones Type - I Year IP Phones Type - II Year Helpdesk System Year IP Gateway or Equivalent Year Any other item (give detailed break-up) SUB-TOTAL AMC – Wireless Connectivity Components Point-to- Point and point to Multipoint wireless Year broadband equipment for base Station /Area offices. Point-to- Point and Point to Multipoint wireless Year broadband system- Remote Subscriber Point-to- Point and point to Multipoint wireless Year broadband equipment for repeater stations Lightning Protection Unit Year Antenna Year 36 Mtr. Self supported Tower for Mounting Wireless Equipment with Earthing Year Strip, Grounding Wire, Transient Voltage Surge Suppression (TVSS) 18 Mtr. Self supported Tower for Mounting Wireless Equipment with Earthing Year Strip, Grounding Wire, Transient Voltage Surge Suppression (TVSS) 55 Mtr. Self supported Tower for Mounting Wireless Equipment with Earthing 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Year Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 186 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` Strip, Grounding Wire, Transient Voltage Surge Suppression (TVSS) i) G.6 a) b) c) d) e) f) g) h) i) Online UPS 1 KVA with Year SMF battery for 2 hrs backup Any other item (give detailed break-up) SUB-TOTAL AMC – Network Passive Components Heavy Duty Racks for Servers/ SAN/ Storage/ Year Backup/ LAN switch/ Structured cabling Category 6A outlets Year Category 6A UTP, 4 Pair Year Category 6A Modular Patch Year Panels Category 6A Patch Cords Year 50μm multimode fiber armored optic building cable Year - riser High-Density, Preterminated, Modular Fiber Year Patching System Real Time Infrastructure Year Management - Intelligent Patch Panel System 6 U Rack for mounting the Year switches in the floor 2 a) a) - - - - 2 2 2 2 2 2 2 2 AMC – LCD Displays for EMS LCD Displays for EMS Year 2 Any other item (give detailed break-up) SUB-TOTAL G.8 - 2 Any other item (give detailed break-up) SUB-TOTAL G.7 - AMC: VSAT Components Extended C Band FTDMA VSAT (IDU + ODU including Antenna) Terminal Year 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 187 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` with data speed upto 256 Kbps. Any other item (give detailed break-up) SUB-TOTAL G.9 a) b) c) d) e) AMC: Video Conferencing Equipment Year Year Video Conferencing - MCU HD Conference Room System HD Desktop Endpoint Video Digital Recording System Video Conferencing Manager Any other item (give detailed break-up) SUB-TOTAL Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` - - - - 2 2 Year Year 2 2 Year 2 TOTAL for 1 Year TOTAL for 2 Years Table H: Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – DR & NR Sr. No. H.1 1) a) b) c) d) Item Name UOM Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: AMC – DR & NR Disaster Recovery Center Civil & Architectural Electrical Precision Air Conditioning System (PAC) Fire Detection and Suppression System Year Year Year Year 2 2 2 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 188 of 249 Vol- I Total Amount in ` Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. e) f) g) h) i) j) k) 2) a) b) c) d) e) f) g) h) Item Name Access Control System CCTV System Water Leak Detection System Rodent Repellent System UPS System Data Safe Building Management System Near Disaster Recovery Center Civil & Architectural Electrical Precision Air Conditioning System (PAC) UPS System Access Control System Fire Detection and Suppression System Water Leak Detection System Data Safe Any other item (give detailed break-up) SUB-TOTAL UOM Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 - - TOTAL for 1 Year TOTAL for 2 Years Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 189 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table I: Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – Datacenter (at Rajarhaat) Sr. No. Item Name UOM Make & Model I.1 AMC of Data Center ( at CIL Rajarhaat) a) AMC for Data Center Any other item (give detailed break-up) SUB-TOTAL TOTAL for 1 Year TOTAL for 2 Years Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 2 Year - - Table J: Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – Software Sr. No. Item Name J.1 AMC – EMS & NMS Software a) Storage Management b) J.2 a) Network & Enterprise Management System (including Database Monitoring, Server & Desktop Management & Service Desk) Any other item (give detailed break-up) UOM Make & Model Qty Year 2 Year 2 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: AMC – Gateway Level Antivirus, Patch Management, Desktop Antivirus, Domain Controller All required software for Gateway Level Antivirus and Year 2 Desktop antivirus for 20,000 Desktops. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 190 of 249 Vol- I Total Amount in ` Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name All required software for Patch Management for 20,000 Desktops. Domain Controller Software for 20,000 Desktops Any other item (give detailed break-up) b) c) UOM Make & Model Qty Year 2 Year 2 J.3 AMC – SAP Software & RDBMS a) SAP Software & RDBMS Year FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 2 Any other item (give detailed break-up) SUB-TOTAL TOTAL for 1 Year Total for 2 Years Table K: Post Implementation support services (after completion of warranty period) for running SAP Application, Non-SAP Applications and Infrastructure Facility Management Services Sr. No. K.1 1 Item Name SAP Application support SAP Application Support Any other item (give detailed break-up) UOM Make & Model Year Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` 1 2 Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: - - Infrastructure and Facility Management Services Helpdesk Management Security Administration Year Year Total Amount in ` 2 SUB-TOTAL K.2 Taxes & Duties in ` (Service Tax) 2 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 191 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sr. No. Item Name UOM Make & Model Qty 3 Network Administration Year 2 4 Year 2 5 System Administration Database Administration Year 2 6 Field Support Year 2 7 Liaison services for link maintenance Year FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 2 Any other item (give detailed break-up) SUB-TOTAL - - TOTAL - - Table L: Data Center Related Charges for 3 years at Rented/Leased Premises Sr. No. 1 Item Name Data Center Premises Lease /Rent Charges (including power of approximately 150 KVA) Any other item (give detailed break-up) SUB-TOTAL UOM Sqft/Annum Make & Model Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in ` 3000 TOTAL Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 192 of 249 - - - - Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table M: Total VSAT Bandwidth Pool & Hub Usage Charge Sr. No. 1 2 Item Name UOM Extended C Band Space Segment in CUG for exclusive use of CIL with all hub facilities to cater to FTDMA terminals Extended C Band Space Segment in CUG for exclusive use of CIL with all hub facilities to cater to FTDMA terminals Any other item (give detailed break-up) No, of Years Qty Kbps 2 4096 Kbps 3 8192 FOR Unit rate in ` exclusive of Taxes & Duties SUB-TOTAL Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: - - TOTAL Total Amount in ` - - Table N: Total Bandwidth Charges No. 1a 1b 2a 2b Item Name Project / Mine Office to MPLS Cloud for Phase I Project / Mine Office to MPLS Cloud for Phase II Area Office to MPLS Cloud for Phase I Area Office to MPLS Cloud for Phase II UOM Mbps No of Years No. of Loca tions Qty 5 124 2 4 347 2 5 23 4 4 58 4 FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Mbps Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 193 of 249 Vol- I Total Amount in `No. Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. No. Item Name 5 Subsidiary Head Quarter to MPLS Cloud DC to MPLS Cloud DR to MPLS Cloud 6 NR to MPLS Cloud 3 4 7 8 VSAT Hub to DC & DR Leased Internet (1:1) connectivity from two different service provider terminating at DC and DR on load sharing basis. UOM No of Years No. of Loca tions Qty FOR Unit rate in ` exclusive of Taxes & Duties Total Base Price in ` Taxes & Duties in ` (Service Tax) Taxes & Duties in ` (VAT/ CST) Any Other Tax or levies in ` Tax %: Tax %: Tax %: Total Amount in `No. Mbps 5 10 32 Mbps 5 1 130 Mbps Mbps 5 1 32 5 1 32 5 1 8 5 2 32 Mbps Mbps Any other item (give detailed break-up) SUB-TOTAL TOTAL Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 194 of 249 - - - - Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Table O: Summary Price Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13a 13b 14a 14b Item Name Supply, Installation & Commissioning – Infrastructure Supply, Installation & Commissioning – DR & NR Design, Civil and Electrical & other related works Supply, Installation & Commissioning – Data Center (3000 Sqft) (To be shifted to CIL Rajarhaat Data Center Premises after 3 years) Supply, Installation & Commissioning – Software SAP Implementation, Services from SAP & Material Codification & Data Preparation Services Training (Table 4.1 Only) Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) Infrastructure Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – DR & NR Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – Datacenter (at Rajarhaat) Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) - Software Post Implementation support services (after completion of warranty period) for running SAP Application, Non-SAP Applications and Infrastructure Facility Management Services Data Center Related Charges for 3 years at Rented/Leased Premises Total VSAT Bandwidth Pool & Hub Usage Charges (Table M – Sl. No. 1 : 2 Years) Total VSAT Bandwidth Pool & Hub Usage Charges (Table M – Sl. No. 2 : 3 Years) Total Bandwidth Charges (Table N – Sl. No. 1a, 2a, 3,4,5,6,7,8 : 5 Years) Total Bandwidth Charges (Table N – Sl. No. 1b, 2b : 4 Years) TOTAL (Rupees in Figures) TOTAL (Rupees in Words) Total Base Price (`) Total Amount after all Taxes & Duties (`) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 195 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Note: For the purpose of PV calculations, payment commencement quarter for items (7,8, 9, 10, 11, 12, 13a, 13b, 14a, 14b)) will be considered as follows: x Sl. No: 7: 17th Quarter x Sl. No 8: 17th Quarter x Sl. No 9: 17th Quarter x Sl. No 10: 17th Quarter x Sl. No 11: 17th Quarter x Sl. No 12: 1st Quarter x Sl. No 13a: 5th Quarter x Sl. No 13b: 13th Quarter x Sl. No. 14a: 5th Quarter x Sl. No. 14b: 9th Quarter Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 196 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 5: Payment Schedule Payments shall be released on submission of the bills with supporting documents duly certified by by the Project Manager/ Owner Representative after deducting taxes at source as prescribed by the legislative authorities, penalty and other recoverable if any. A. Supply, Installation & Commissioning – Infrastructure Sl. No Item Description 1. Supply, Installation & Commissioning – Hardware & Devices Supply, Installation & Commissioning - Networking Components Supply, Installation & Commissioning - Security Components Supply, Installation & Commissioning - Voice Components Supply, Installation & Commissioning – Wireless Connectivity Components Supply, Installation, Commissioning – Network Passive Components Supply, Installation & Commissioning – LCD Displays for EMS Supply, Installation & Commissioning - VSAT Components Supply, Installation & Commissioning - Video Conferencing Equipment & Software 2. 3. 4. 5. 6. 7. 8. 9. Payment Milestone & Payment % 50% payment of value of such items, with taxes and duties as applicable, will be made on delivery and physical verification / certification by Project Manager at site. Documents to be submitted:a) b) c) d) e) f) Pre-Receipted and stamped Invoices in triplicate Consignee’s copy of the dispatch documents from the carrier (Road / Railway) for proof of dispatch at site. Challan in duplicate. A certificate from the project Manager of each site that the items have been delivered at site in safe and sound condition. Manufacturers’ Guarantee and warranty certificate from respective manufacturers of all Hardware items. A certificate from the project Manager of each site that the items have been delivered at site in safe and sound 30% payment of value of such items, with taxes and duties as applicable, will be made installation and commissioning at site. Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate. A certificate from the project Manager of each site that the items have been successfully installed and commissioned at site. 10% payment of value of such items, with taxes and duties as applicable, will be made on Go-Live of all phases Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the entire system has successfully gone live. 10% payment of value of such items, with taxes and duties as applicable, will be made after the expiry of warranty period Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the entire system has successfully performed during the warranty period. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 197 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. B. Supply, Installation & Commissioning – DR & NR Equipments Sl. No Item Description 1. Supply, Installation & Commissioning – DR & NR Equipments Payment Milestone & Payment % 70% payment of value of such items, with taxes and duties as applicable, will be made on the commissioning of the DR & NR Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the DR & NR have been commissioned successfully. 20% payment of value of such items, with taxes and duties as applicable, will be made on Go-Live of all phases Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the DR & DC have been performing successfully until the Go-Live. 10% payment of value of such items, with taxes and duties as applicable, will be made after the expiry of warranty period Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the entire system has successfully performed during the warranty period. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 198 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. C. Supply, Installation & Commissioning – Data Center (3000 Sqft) (To be shifted to CIL Rajarhaat Data Center Premises after 3 years) Sl. No Item Description 1. Supply, Installation & Commissioning – Data Center (3000 Sqft) (To be shifted to CIL Rajarhaat Data Center Premises after 3 years) Payment Milestone & Payment % 70% payment of value of such items, with taxes and duties as applicable, will be made on the commissioning of the DR & NR Documents to be submitted:- a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the DR & NR have been commissioned successfully. 30% payment of value of such items, with taxes and duties as applicable, will be made after the expiry of warranty period Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the entire system has successfully performed during the warranty period. D. Supply, Installation & Commissioning – Software Sl. No 1. 2. 3. Item Description Supply, Installation & Commissioning of EMS & NMS Software Gateway Level Antivirus, Patch Management, Desktop Antivirus, Domain Controller Supply & Installation of SAP Licenses & RDBMS Payment Milestone & Payment % 70% payment of value of such items, with taxes and duties as applicable, will be made on delivery, porting, testing and trial run of the software: Documents to be submitted:a) b) c) Pre-Receipted and stamped Invoice in triplicate License from the original manufacturer of the software as per metrics proposed by bidder. A certificate from the project Manager at site that the software has been delivered, ported, tested and trial run completed successfully. 20% payment of value of such items, with taxes and duties as applicable, will be made on Go-Live of all phases Documents to be submitted:a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the project Manager at site that the entire system has been successfully installed and commissioned. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 199 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No Item Description Payment Milestone & Payment % 10% payment of value of such items, with taxes and duties as applicable, will be made after the expiry of warranty period Documents to be submitted:a) b) Pre-Receipted and stamped Invoice in triplicate A certificate from the project Manager at site that the entire system has successfully performed during the warranty period. E. SAP Implementation, Services from SAP, Master Data Codification and Data Preparation Services Sl. No 1 Item Description SAP Implementation Services SAP Implementation for Phase 1 Payment Milestone On Project Preparation phase sign off On Business Blueprint phase sign off Payment % 10% of Phase 1 20% of Phase 1 25% of Phase 1 On Realization phase sign off On Final Preparation and Go live phase sign off SAP Implementation of Phase 2 – Track 1 On Completion of 2 months after Go-Live of Phase 1 On Blueprint phase sign off On Realization phase sign off 25% of Phase 1 20% of Phase 1 20% of Phase 2 – Track1 25% of Phase 2 – Track1 25% of Phase 2 – Track1 On Final preparation and Go live phase sign off SAP Implementation of Phase 2 – Track 2 On Completion of 2 months after Go-Live of Phase 2 – Track 1 On Blueprint phase sign off On Realization phase sign off On Final preparation and Go live phase sign off On Completion of 3 months after Go-Live of Phase 2 – Track 2 2 30% of Phase 2 – Track1 20% of Phase 2 – Track 2 25% of Phase 2 – Track 2 25% of Phase 2 – Track 2 30% of phase 2 – Track 2 Services from SAP On actual mandays consumed on a quarterly basis Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 200 of 249 70% Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Sl. No 3 Item Description Payment Milestone Payment % On Completion of Warranty period. On completion of 2 years AMC. Material Codification, Data Preparation/Entry On actual man-months consumed on a quarterly basis On Completion of Warranty period. On completion of 2 years AMC. 20% 10% 70% 20% 10% The following documents will need to be submitted for release of payment: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager at site that the respective services have been completed satisfactorily as per Schedule and technical specification. F. Training Sl. No 1 Item Description Payment Milestone Payment % Training On submission of detailed training schedule for entire training plan. On completion of training Core User/team Training On Completion of Power User Training On Completion of Senior Management Training On Completion of Infrastructure Training On Completion of End User Training On completion of all the above training and final go-live of all phases 10% of total training cost 60% of core user/team training cost 60% of power user training cost 60% of Senior management of training cost 60% of infrastructure training cost 60% of end user training cost Balance payment The following documents will need to be submitted for release of payment: a) Pre-Receipted and stamped Invoice in triplicate for each phase of training b) A certificate from the Project Manager at site that the respective training as per schedule have been completed satisfactorily Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 201 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. G. Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – Infrastructure Sl. No Item Description 1 AMC - Hardware and Devices 2 AMC - Networking Components 3 AMC - Security Components 4 AMC - Voice Components Payment Milestone On completion of each quarter of AMC/ATS Pro-rata payment On completion of each quarter of AMC/ATS Pro-rata payment On completion of each quarter of AMC/ATS Pro-rata payment On completion of each AMC – Wireless Connectivity Components On completion of each AMC – Network Passive Components On completion of each ATS – LCD Displays for EMS On completion of each AMC - VSAT Components On completion of each AMC - Video Conferencing Equipment On completion of each 5 6 7 8 9 Payment % quarter of AMC/ATS Pro-rata payment quarter of AMC/ATS Pro-rata payment quarter of AMC/ATS Pro-rata payment quarter of AMC/ATS Pro-rata payment quarter of AMC/ATS Pro-rata payment quarter of AMC/ATS Pro-rata payment Payment will be made with taxes and duties, as applicable, on quarterly basis after expiry of the quarter and on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager at site that the respective AMC & ATS as per schedule and technical specification have been completed satisfactorily H. Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – DR & NR Sl. No 1 Item Description Payment Milestone Payment % On completion of each quarter of AMC/ATS Pro-rata payment On completion of each quarter of AMC/ATS Pro-rata payment AMC of DR & NR Payment will be made with taxes and duties, as applicable, on quarterly basis after expiry of the quarter and on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager of the Data Center at CIL that the respective AMC & ATS as per schedule and technical specification have been completed satisfactorily Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 202 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. I. Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – Data Center (at CIL Rajarhaat) Sl. No 1 Item Description Payment Milestone Payment % AMC of Data Center (at CIL Rajarhaat) On completion of each quarter of AMC/ATS Pro-rata payment Payment will be made with taxes and duties, as applicable, on quarterly basis after expiry of the quarter and on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager of the Data Center at CIL that the respective AMC & ATS as per schedule and technical specification have been completed satisfactorily J Annual Maintenance Contract (AMC) & Annual Technical Support (ATS) – Software Sl. No 1 Item Description Payment Milestone Payment % AMC – EMS & NMS Software On completion of each quarter of AMC/ATS AMC – Gateway Level Antivirus, Patch Management, Desktop Antivirus On completion of each quarter of AMC/ATS AMC – SAP Software & RDBMS On completion of each quarter of AMC/ATS 2 3 Pro-rata payment Pro-rata payment Pro-rata payment Payment will be made with taxes and duties, as applicable, on quarterly basis after expiry of the quarter and on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager at site that the respective AMC & ATS as per schedule and technical specification have been completed satisfactorily Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 203 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. K. Post Implementation support services (after completion of warranty period) for running SAP Application, Non-SAP Applications and Infrastructure Facility Management Services Sl. No Item Description Payment Milestone 1 SAP Application Support 2 On completion of each quarter of Services Infrastructure and Facility Management Services On completion of each quarter of Services Payment % Pro-rata payment Pro-rata payment Payment will be made on quarterly basis on expiry of the quarter on submission of the following documents. a) Pre- Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager at site that the respective services have been completed satisfactorily as per technical specification. L. Data Center Charges for 3 years Sl. No 1 Item Description Data Center Premises Lease /Rent Charges (including power of approximately 150 KVA) Payment Milestone On completion of each quarter of Services Payment % Pro-rata payment Payment will be made on quarterly basis at the beginning of each quarter on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager of the Data Center at CIL that the respective Data Center services have been provided successfully as per SLA requirement. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 204 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. M. VSAT Bandwidth Pool & Hub Usage Charges Sl. No Item Description 1 Extended C Band Space Segment of 4/8 Mbps in CUG for exclusive use of CIL with all hub facilities to cater to above FTDMA terminals Payment Milestone After completion of 3 Month period Payment % Pro-rata payment Payment will be made on quarterly basis at the end of each half on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager of the Network Operation center at CIL that the respective bandwidth services have been provided successfully as per SLA requirement. N. Bandwidth Charges Sl. No 1 2 3 Item Description Project / Mine Office to MPLS Cloud After completion of 3 Month period upon Area Office to MPLS Cloud 4 Subsidiary Head Quarter to MPLS Cloud DC to MPLS Cloud 5 DR to MPLS Cloud 6 7 8 Payment Milestone NR to MPLS Cloud VSAT Hub to DC & DR Leased Internet (1:1) connectivity from two different service provider terminating at DC and DR on load sharing basis. commencement of bandwidth services After completion of 3 Month period upon commencement of bandwidth services After completion of 3 Month period upon commencement of bandwidth services After completion of 3 Month period upon commencement of bandwidth services After completion of 3 Month period upon commencement of bandwidth services After completion of 3 Month period upon commencement of bandwidth services After completion of 3 Month period upon commencement of bandwidth services Payment % Pro-rata payment Pro-rata payment Pro-rata payment Pro-rata payment Pro-rata payment Pro-rata payment Pro-rata payment Payment will be made on quarterly basis at the end of each half on submission of the following documents: a) Pre-Receipted and stamped Invoice in triplicate b) A certificate from the Project Manager of the Network Operation center at CIL that the respective bandwidth services have been provided successfully as per SLA requirement. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 205 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 6: Proforma for Performance Bank Guarantee (PBG) Messers_________________________________ a company having its office at ________________ (herein after called “the seller,”) has entered into a contract no . ___________________ dated ____________ (hereinafter called “the said contract”) with Coal India Ltd., with its registered office at 10, N.S. Road, Kolkata-700001 (hereinafter called purchaser ) for the “Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries” on turnkey basis on the terms and conditions contained in the said contract. It has been agreed that the seller will furnish to the purchaser a bank Guarantee for the sum of `--------------- equivalent to ---% of the total contract value as security for the due and faithful performance of the terms of the said contract and against any loss or damage caused to or charges or expenses caused or would be caused to or suffered by purchaser by reason of any breach or breaches by the said Seller of any of the terms and conditions contained in the said Contract. The ------ Bank having its office at ----------- has at the request of seller agreed to give the guarantee hereinafter contained. 2. We, ______________ Bank Ltd., do hereby undertake to pay the amount due and payable under this guarantee without any demur merely on receipt of a first written demand from the purchaser stating that the amount claimed is due by way of loss or damage caused to or would be caused to or suffered by the purchaser by reason of any breach by the said Seller of any of the terms and conditions contained in the said Contract or by reason of the Seller’s failure to perform the said contract. Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. We shall not withhold the payment on the ground that the Seller has disputed its liability to pay or has disputed the quantum of the amount or that any arbitration proceeding or legal proceeding is pending between purchaser and the seller regarding the claims. However, our liability under this guarantee shall be restricted to an amount not exceeding ______ 3. We, ____________________ Bank Ltd, further agree that the guarantee herein contained shall come into force from the date hereof and shall remain in full force and effect up to………….(specify the date). Unless a demand or claim under this guarantee is made on us in writing on or before the ____________ (date to be given) (twelve months from the date of the Bank Guarantee) we shall be discharged from all liability under this guarantee thereafter. 4. We ____________________ Bank Ltd, further agree with the purchaser, that the purchaser, shall have the fullest liberty without our consent and without affecting in any manner any obligation hereunder to vary any of the terms and conditions of the said contract or to extend time of performance of the contract by the said seller from time to time or to postpone for any time or from time to time any of the powers exercisable by the purchaser, against the said seller Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 206 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. and to forebear or enforce any of the terms and conditions relating to the said contract and we shall not be relived from our liability by reason of any such variations or extension being granted to the said seller or for any forbearance act or omission on the part of the purchaser, or any indulgence by the purchaser to the said seller or by any such matter or thing whatsoever, which under the law relating to sureties would, but for this provision have effect of so relieving us. The Bank further agree that in case this guarantee is required for a longer period and it is not extended by the bank beyond the period specified above, the Bank shall pay to the purchaser the said sum of __________ ( specify the amount ) or such lesser sum as may then be due to the purchaser as the purchaser may demand. 5. We, ___________ Bank Ltd, lastly undertake not to revoke this guarantee during its currency except with the previous consent of the Purchaser in writing. 6. The Bank under its constitution power to give this guarantee and Mr._________ , Manager, who has signed it on behalf of the Bank has authority to do so. 7. This Bank Guarantee will not be discharged due to any change in the constitution of the Bank or the seller. Dated ________ day of _______ 20 _ _ For __________ Bank Limited. Signature of the authorized person For and on behalf of the Bank. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 207 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 7: Bidder Check List Sl. No. Description of Check Item 1. Submission of documents related to Mandatory Qualification Criteria (Table 3.2.1) in the required format duly signed by Authorized Signatory where required. Duly executed Consortium Agreement (if applicable) clearly delineating the roles and responsibilities of each consortium partner and dispute resolution arrangement. A Covering / Forwarding Letter indicating the submission of the Bid. The letter should be signed by an authorized person holding the Power of Attorney Submission of Power of Attorney Draft / Bank Guarantee towards EMD as per details in Section 3.5.8 Draft towards Bidding Document as per detail mentioned in “Invitation to Bid” Section Para 2. Submission of certified copy of valid VAT/Sales Tax Registration Certificate and IT PAN. Submission of certified copy of Provident Fund Registration No. and Service Tax Registration No. of appropriate category issued by competent authority. Submission of Certified copy of the Registration of Firm / Company. Letters of Authorization from OEM for SAP Applications, Computer Hardware, System Software, Network & Communication Equipments etc. All pages of Bid Document duly stamped and signed by Authorized Signatory. All pages of “Response to Bid” Document duly stamped and signed by Authorized Signatory. Submission of all documentary evidence for each of the Parameter mentioned in the Evaluation Table 4.1.3 duly stamped and signed by Authorized Signatory. Submission of Authenticity Letter from OEM that all active equipments/components are original and not re-furbished and their support life is minimum 8 years from the date of supply. Submission of Price Schedule WITHOUT any prices to mentioned in Technical Bid Part B. Submission of Compliance Tables duly filled and completed with NO Deviations in the “Critical Components” of Section A2.8 of Volume III and “Functional Specification Compliance Tables” – Section A2.4 of Table Volume II. Submission of Compliance to SLA’s (Refer Annexure 3) Deviation/Exclusion statement (if any) Submission of CD/DVD for both Part A and Part B of “Response to Bid” Submission of Integrity Pact in the format provided in Annexure 9 No Deviations has been taken on any ‘Terms & Conditions’ mentioned in the tender document 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 208 of 249 Compliance (Y/N) Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 8: Contract Document AGREEMENT FOR IMPLEMENTATION OF SAP ERP AND IT INFRASTRUCTURE ALONG WITH POST IMPLEMENTATION SUPPORT AT COAL INDIA LIMITED AND ALL ITS SUBSIDIARIES. Agreement No: Made on this day of Between M/s Coal India Limited, a company incorporated under Companies Act. 1956 having its registered office at Coal Bhavan,10 Netaji Subhas Road, Kolkata, West Bengal – 700 001 hereinafter referred to as the “Owner” (which expression shall unless repugnant to the context or meaning thereof include its administrators, successors, executors and assigns) On the one part And M/s hereinafter referred to as the “Vendor” ( which expression shall unless repugnant to the context or meaning thereof include its administrators, successors, executors and assigns) On the other part WHEREAS the Owner is desirous of executing the work comprising of supply of hardware, design, installation & commissioning of infrastructure, implementation of SAP application, implementation of nonSAP software, project management, change management and training (hereinafter referred to as the “Project” ). AND WHEREAS the Owner is desirous of availing the post implementation support services for running the SAP application, and the Infrastructure Facility Management Services (hereinafter referred to as the “FMS”) AND WHEREAS the Owner has invited two part bids through open tender vide NIT No -###### Dated ###### 2010 for both the Project and FMS (hereinafter referred to as the “IT Solution”) AND WHEREAS the Vendor has submitted his offer vide No________dated______. AND WHEREAS the Owner after evaluating the said offer and negotiating with the Vendor entered into this agreement on terms and conditions more specifically contained in this agreement and the documents & correspondences referred to therein which have been unequivocally accepted by the Vendor resulting into a concluding agreement, hereinafter referred to as the “Agreement”. Witnesseth that Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 209 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. IN WITNESS WHERE OFF, both the Owner and the Vendor through their duly authorised representatives, have executed these presents (execution thereof has been approved by the competent authority by both the Owner and Vendor) on the day, month and year mentioned herein. For & on behalf of Coal India Limited For & on behalf of . ___________________________________ In presence of In presence of [General Conditions of Contract] [Project Implementation Plan] [Scope of Work] [Deliverables and Performance Parameters] Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 210 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Annexure 9: Integrity Pact INTEGRITY PACT Between Coal India Limited (CIL) hereinafter referred to as “The Principal” And “-------“hereinafter referred to as “The Bidder/Contractor” Preamble The Principal intends to award, under laid down organizational procedures, contracts for -------------------------. The Principal values full compliance with all relevant laws and regulations, and the principles of economic use of resources, and of fairness and transparency in its relations with its Bidder/s and Contractor/s. In order to achieve these goals, the Principal cooperates with the international Non Governmental Organisation” “Transparency International” (TI). Following TI’s national and international experience, the Principal will appoint an external independent Monitor who will monitor the tender process and the execution of the contract for compliance with the principles mentioned above. Section 1 – Commitments of the Principal (1) The Principal commits itself to take all measures necessary to prevent corruption and to observe the following principles :1. No employee of the Principal, personally or through family members, will in connection with the tender for, or the execution of a contract, demand, take a promise for or accept, for him/herself or third person, any material or immaterial benefit which he/she is not legally entitled to. 2. The Principal will, during the tender process treat all Bidders with equity and reason. The Principal will in particular, before and during the tender process, provide to all Bidders the same information and will not provide to any Bidder confidential/additional information through which the Bidder could obtain an advantage in relation to the tender process or the contract execution. 3. The Principal will exclude from the process all known prejudiced persons. (2) If the Principal obtains information on the conduct of any of its employees which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, the Principal will inform its Vigilance Office and in addition can initiate disciplinary actions. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 211 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Section 2 – Commitments of the Bidder/Contractor (1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. He commits himself to observe the following principles during his participation in the tender process and during the contract execution. 1. The Bidder/Contractor will not, directly or through any other person or firm offer, promise or give to any of the Principal’s employees involved in the tender process or the execution of the contract or to any third person any material or immaterial benefit which he/she is not legally entitled to, in order to obtain in exchange any advantage of any kind whatsoever during the tender process or during the execution of the contract. 2. The Bidder/Contractor will not enter with other Bidders into any undisclosed agreement or understanding, whether formal or informal. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or any other actions to restrict competitiveness or to introduce cartelisation in the in the bidding process. 3. The Bidder/Contractor will not commit any offence under the relevant Anti-corruption Laws of India; further the Bidder/Contractor will not use improperly, for purposes of competition or personal gain, or pass on to others, any information or document provided by the Principal as part of the business relationship regarding plans, technical proposals and business details including information contained or transmitted electronically. 4. the Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, is committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract. (2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences. Section 3 – Disqualification from tender process and exclusion from future contracts If the Bidder, before contract award has committed a transgression through a violation of Section 2 or in any other form such as to put his reliability or credibility as Bidder into question, the Principal is entitled to disqualify the Bidder from the tender process or to terminate the contract, if already signed, for such reason. (1) If the Bidder/Contractor has committed a transgression through a violation of Section 2 such as to put his reliability or credibility into question, the Principal is entitled also to exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder and the amount of the damage. The exclusion will be imposed for a minimum of 6 months and maximum of 3 years. (2) the Bidder accepts and undertakes to respect and uphold the Principal’s absolute right to resort to and impose such exclusion and further accepts and undertakes not to challenge or question such exclusion on any ground, including the lack of any hearing before the decision to resort to such exclusion is taken. This undertaking is given freely and after obtaining independent legal advice. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 212 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. (3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, the Principal may revoke the exclusion prematurely. (4) A transgression is considered to have occurred if in light of available evidence no reasonable doubt is possible. Section 4 – Compensation for Damages (1) If the Principal has disqualified the Bidder from the tender process prior to the award according to Section 3, the Principal is entitled to demand and recover from the Bidder liquidated damages equivalent to 3% of the value of the offer or the amount equivalent to Earnest Money Deposit/Bid Security, whichever is higher. (2) If the Principal has terminated the contract according to Section 3, or if the Principal is entitled to terminate the contract according to Section 3, the Principal shall be entitled to demand and recover from the Contractor liquidated damages equivalent to 5% of the contract value or the amount equivalent to Security Deposit/Performance Bank Guarantee, whichever is higher. (3) The bidder agrees and undertakes to pay the said amounts without protest or demur subject only to condition that if the Bidder/Contractor can prove and establish that the exclusion of the Bidder from the tender process or the termination of the contract after the contract award has caused no damage or less damage than the amount of the liquidated damages, the Bidder/Contractor shall compensate the Principal only to the extent of the damage in the amount proved. Section 5 – Previous transgression (1) The Bidder declares that no previous transgressions occurred in the last 3 years with any other Company in any country conforming to the TI approach or with any other Public Sector Enterprise in India that could justify his exclusion from the tender process. (2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason. Section 6 – Equal treatment of all Bidders/Contracts/ Subcontractors (1) The Bidder/Contractor undertakes to demand from all subcontractors a commitment in conformity with this Integrity Pact, and to submit it to the Principal before contract signing. (2) The Principal will enter into agreements with identical conditions as this one with all Bidders, Contractors and Subcontractors. (3) The Principal will disqualify from the tender process all bidders who do not sign this Pact or violate its provisions. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 213 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Section 7 – Criminal charges against violating Bidders/Contractors/Subcontractors If the Principal obtains knowledge of conduct of a Bidder, Contractor or Subcontractor, or of an employee or a representative or an associate of a Bidder, Contractor or Subcontractor which constitutes corruption, or if the Principal has substantive suspicion in this regard, the Principal will inform the Vigilance Office. Section 8 – External Independent Monitor/Monitors (three in number depending on the size of the contract) (to be decided by the Chairperson of the Principal) (1) The Principal appoints competent and credible external independent Monitor for this Pact. The task of the Monitor is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. (2) The Monitor is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairperson of the Board of the Principal. (3) The Contractor accepts that the Monitor has the right to access without restriction to all Project documentation of the Principal including that provided by the Contractor. The Contractor will also grant the Monitor, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his project documentation. The same is applicable to Subcontractors. The Monitor is under contractual obligation to treat the information and documents of the Bidder/Contractor/Subcontractor with confidentiality. (4) The Principal will provide to the Monitor sufficient information about all meetings among the parties related to the Project provided such meetings could have an impact on the contractual relations between the Principal and the Contractor. The parties offer to the Monitor the option to participate in such meetings. (5) As soon as the Monitor notices, or believes to notice, a violation of this agreement, he will so inform the Management of the Principal and request the Management to discontinue or heal the violation, or to take other relevant action. The Monitor can in this regard submit non-binding recommendations. Beyond this, the Monitor has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. (6) The Monitor will submit a written report to the Chairperson of the Board of the Principal within 8 to 10 weeks from the date of reference or intimation to him by the ‘Principal’ and, should the occasion arise, submit proposals for correcting problematic situations. (7) Monitor shall be entitled to compensation on the same terms as being extended to/provided to Outside Expert Committee members/Chairman as prevailing with Principal. (8) If the Monitor has reported to the Chairperson of the Board a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairperson has not, within reasonable time, taken visible action to proceed against such offence or reported it to the Vigilance Office, the Monitor may also transmit this information directly to the Central Vigilance Commissioner, Government of India. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 214 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. (9) The word ‘Monitor’ would include both singular and plural. Section 9 – Pact Duration This Pact begins when both parties have legally signed it. It expires for the Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged/determined by Chairperson of the Principal. Section 10 – Other provisions (1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the Registered Office of the Principal, i.e. Kolkata. (2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made. (3) If the Contractor is a partnership or a consortium, this agreement must be signed by all partners or consortium members. (4) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions. ----------------------------- ------------------------------------- For the Principal For the Bidder/Contractor Place……………….. Witness 1 :…………………. Date………………. Witness 2 :………………… Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 215 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. …Appendix 1: Present IT Assets…Continued 1. Servers at CIL Subsidiary MCL BCCL ECL CIL WCL CMPDI NCL NECL SECL CCL Make & Model Sun Fire V480 HP D-Series IBM RS 6000 SUN V490 IBM P610 IBM 520 SUN Ultra Sparc 450 HP-Proline Description RISC based server RISC based server HP-UX RISC based server RISC based server RISC based server RISC based server RISC based server Quad-Core Xeon Intel based server RISC based server Intel based server No. of Servers 1 17 1 12 1 1 1 2 8 IBM P series 615 Dell Poweredge 2900 2900 Xeon Acer Altos G530 NA Infiniti Global line Dual Core Intel® Xeon™ 2.0 2700 HN GHz CPU based server HP Proliant DL 380 G4 Dual Core Intel® Xeon™ Infiniti Global line 2800 SUSE Linux Enterprise Server TG CommPlete 4000 Remote Access Server Sun Fire V480 RISC based server HP LH6000 Pentium III Pentium III server server Compaq Proliant Proxy and Messaging server Compaq Proliant 1600 Intranet Server HP Proliant LH3000 Pentium III processor Compaq Proliant ML Intel based server 370 1 12 Wipro net-power Server Intel based server SUN V490 RISC based with clustering & auto backup. SUN V490 RISC based with clustering &auto backup COBALT CVBE Proxy and Mail server 1 1 IBM RS 6000 270P IBM RS 6000 630P PCS workstation Windows Server RISC based server RISC based server Intel based server Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 216 of 249 Location HQ & Area Moonidih Area HQ & Area Rajmahal Area Sonepur Area Kolkata HO HO 3 1 HQ (Nagpur) HQ (Nagpur), Areas, Store, Central Store Area offices CMPDI IT Server Room CMPDI IT Server Room CMPDI IT Server Room 1 1 1 CMPDI IT Server Room HQ HQ 2 2 2 8 HQ HQ Bina & Kakri Area JRD, KAK, KHD, DCH, JNT, CWS, NGH, AML Areas. Margherita Area HQ 10 2 12 1 Respective Areas HQ 2 1 8 HQ HQ HQ Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2. Desktop SNO Subsidiary 1 2 3 4 5 6 7 8 9 10 CIL CMPDIL WCL NCL BCCL NECL SECL CCL MCL ECL Number of PC’s 300 273 1327 802 350 29 350 359 267 250 3. Network and Network Equipments Subsidiary Connected to (WAN) Link Speed Medium CMPDIL CIL (HO), CCL, Regional Institutes(RI) of CMPDIL 2 Mbps (CCL), Dial-up connectivity with RI MPLS scheme (RI) NCL Central Store, Workshop & Hospital CMPDI CCL Switches Layer2,Unmanaged/L3 28 Lease line(Areas) 2 Mbps (CMPDI) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 217 of 249 Lease Line(CMPDI) 30 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 4. Internet, Corporate Email, Firewall & Antivirus Subsidiary ISP Number of Internet users Internet Link speeds 2 Mbps Email server present Yes 128 Kbps (Low) CIL BSNL /Tulip CMPDIL BSNL All in managerial & executive cadre and limited staff All WCL NCL NIC,DSL,BSN L BSNL Managers and Executives Limited users BCCL BSNL Limited users 128 Kbps SECL BSNL Limited users 256 Kbps CCL STPI(HQ) & Dial up in Areas Limited users Through CMPDI MCL BSNL Limited users 128 Kbps ECL BSNL Limited users 128 Kbps Fire wall Hardware Antivirus Software 3 Juniper (Managed with IPS) ISA on proxy server Yes D-Link DFL-900 VPN firewall D-Link default on Proxy server 2 Mbps No 2 Mbps Yes Through Service provider Corporate Email through CMPDI Yes(throug h Qmail server) No Linux Squid Proxy Server No Linux Squid Software CA Firewall installed on proxy server Not standardized CA Inoculate IT/ Norton D-Link VPN Workgroup Firewall D-Link default on proxy server No No Norton Antivirus 2005(Enterprise Edition) NA* 3COM(Man aged Firewall) No No No No No No No Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 218 of 249 Vol- I McAfee Symantec Endpoint Protection ver11.0 Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 5. Database Environment Subsidiary CMPDIL Application CoalNet Function Financial Control System, HR System Database Oracle 10g WCL Financial Accounting System Payroll System Corporate accounting Oracle 9i Pay-Roll preparation for 60,000+ employees monthly Oracle 9i Oracle 9i Materials and Stores Management (OLMMS) Stores Issue/Receipt and MIS Oracle 9i Asset Management and Tracking (AMS) Asset accounting at Areas & HQs Oracle 9i Sales Release order process, Sales billing at areas, Sales bill MIS Forwarding at HQ Oracle 9i Integrated Finance Management System(IFMS) All business process activities of Finance Department Oracle 9i CoalNet Production data process Oracle 9i IBS Finance, Materials, Maintenance, Production, Purchase, Sales, MIS Executive/Non Executive Information System SQL Server 2000 Enterprise Payroll System Salary & Wages Oracle 10.2.0.1.0 BCCL CoalNet Financial, HR, Project Planning and Scheduling, MIS, Purchase, Sales, Stores Management Oracle 9i NECL In-House developed application SECL CoalNet Financial Control System, Sales, Materials and Stores Management, Payroll NA NCL HR System Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 219 of 249 Cobol File System Oracle 9i Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Subsidiary Application Function Database CCL CoalNet Sales, Materials and store management. Financial Control system Oracle 9i PIS, Payroll, Sales A/C, Materials Management System, Financial A/C, Project Monitoring System. Oracle 9i In house programs MCL CoalNet ECL Personnel Information System (PIS) Oracle Material Management System (MMS) Oracle Financial Management Oracle Management Information System (MIS) Oracle CIL CoalNet Sales & Marketing Oracle 9i CoalNet Financial Control System, HR System, Scheduling/Project Planning, MIS, Purchases, Sales Oracle 11g Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 220 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6. CoalNet Usage CoalNet Modules CIL BCCL Personnel Information Production Information Monitoring * Financial Information Sales & Marketing Materials Management * Payroll Equipment Monitoring * Project Monitoring * Corporate Planning VVIP Grievance Monitoring * MoC(Ministry of Coal) Parliamentary Affairs B2B Portal CCL SECL ECL WCL ** MCL CMPDI NEC NCL * * * GIS * - implemented in production but not used ; ** - implemented in Kolkata office 7. Major software applications other than CoalNet Application Name Minex SURPAC DynaMine IBS GIS CIL HO BCCL CCL SECL ECL WCL HQ* MCL CMPDI NCL HQ Wani North HQ NEC Gevra HQ HQ HQ HQ HQ HQ* - installed at subsidiary HQ but not used Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 221 of 249 Vol- I Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 8. Voice details for NECL, Margherita Sl. No. 1 Name of SHQ N/A Name of Area, Regional Store, Regional Hospital, Central Store , Central Wksp, Central Hosp ENTITY (TYPE) Margherita Area Name of Project, Mine, Stores Hospitals, Workshops etc. Existing Type of Exchanges (Make & Model) Existing Voice Link No. of Subscriber Lines Area HQ 1.EPABX Make Crompton Graves Ltd Model - Coral - II 2.ITI Make Intercom (1987 Model EPAX) BSNL 96 Land line 200 BSNL 100 Land line 30 BSNL 32 2 Baragolai Colliery 3 Tikak OCP 1.EPABX 2.U/G Commn: Make - Mimec Model -MIC-102-AT EPABX Make - BPL Model - Sigma Indx 150 4 Ledo & Tirap OCP EPABX Made - TATA Telecom Model - PSX 100 5 Tipong Colliery 1.EPABX Made - TATA Telecom Model - PMX 200 Land line BSNL Land line BSNL Page 222 of 249 50 Land line 2.U/G Commn: Make - Mimec Model -MIC-102-AT Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 50 40 Vol- I Nos. Proposed IP Phone Users - 2 New Kenda Colly Bahula Colly Ch.Block Incl. Lower Kenda colly C.L.Jambad Colly Siduli Colly Chora 7/9 Colly Chora 10 Colly Haripur Colly CH OCP(extn) Sankarpur OCP West KendaOCP Bahula CHP Regional Hos., 2 km Area Store, 1 km - - Kenda Area Office Bankola Aea Office - Name of Project, Mine, Stores Hospitals, Workshops etc. Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) - Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 - ECL,HQ Office 1 3 Name of SHQ Sl. No. 9. Voice details for ECL, Sanctoria Vol- I TATA Nil ITI 128 port Cdot ITI 128 port Cdot ITI 128 port Cdot Nil Nil Nil Nil Nil Nil Nil Nil Nil Epabx. Extn. Nil Nil Coral IRIS IVDX Existing Type of Exchanges (Make & Model) BSNL Radio + 100 Nil 48 48 32 Nil Nil Nil Nil Nil Nil Nil Nil Nil 1 Nil centrex facility Nil Nil Radio+Bsnl Radio+Bsnl Nil Radio+Bsnl Bsnl Radio+Bsnl Bsnl Nil Bsnl Bsnl Nil Nil Epabx Extn. - 660 No. of Subscri ber Lines BSNL phones Radio + BSNL Existing Voice Link 19 1 4 4 4 4 4 4 4 4 4 4 4 4 1 4 13 30 Nos. Proposed IP Phone Users Name of SHQ Nil Area Hospital,0.2km Page 224 of 249 Vol- I EPAX , ITI ITI 128 port Cdot BPL Indigo 250 Matrix,Eternity Nil Nil Nil Nil Nil Nil Nil Nil Area Store,0.2 km Satgram Project Nimcha Colly Kalidaspur Project J.K. Nagar Satgram Incline Rati Bati Colly. ChapuiKhas Colly. Kuardi Colly. Mithapur Colly. PureSearsole Colly. Jemehari Colly. ITI 128 port Cdot Nil SAX , ITI SAX , ITI SAX , ITI SAX , ITI EPAX , ITI EPABX, ITI EPABX, ITI Nil Nil Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio Radio+Bsnl Radio+Bsnl Bsnl Bsnl Bsnl Bsnl EpabxExtn. Radio+Bsnl Nil Radio+Bsnl Bsnl Bsnl Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Bsnl Nil Nil Moira Colly. S S Pur Colly Kumardih-A Kumardih-B Tilaboni Colly Bankola Colly Khandra Colly Nakrakonda Sankarpur Existing Voice Link Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. Satgram Area Office Area Store, 2 km Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Area Hospital, 3 km Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 4 Sl. No. 50 100 100 64 Nil Nil Nil Nil Nil Nil Nil Nil Nil 100 N/A 50 50 50 50 50 50 50 N/A N/A N/A No. of Subscri ber Lines 5 5 5 5 3 5 3 4 3 2 2 2 11 7 5 7 7 7 5 7 7 5 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Aria 1000 EPABX Extn EPABX Extn Area Store Hospital, RJML Area Page 225 of 249 Vol- I Aria 1000 EPABX Extn Nil Nil Urjanagar Colony CHP/Loading point Simlong Colly.,65km PPT Siding, 30km Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Aria 1000 Rajmahal ocp,Wshop Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Rajmahal Area Office Ningha SSI K.D.I W.Block Bhanora New Ghusic Muslia C.M.Ghusic G.M.Ghusic Kalipahari Colly Kalipahari Agnt.of Ghusic W/Shop Satgram Siding Nil Nil Tirat Colly Coal Depot. 6 KM BPL P30Y Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. 6 Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Sripur Area Office Name of SHQ 5 Sl. No. BSNL Radio+WLL Radio+WLL Radio+BSNL WLL WLL BSNL BSNL Radio+BSNL BSNL BSNL Radio+BSNL BSNL Nil Nil Nil Radio+BSNL Nil Nil Nil Radio+Bsnl Bsnl Nil Existing Voice Link 528 Nil Nil Nil 238 Nil Nil 64 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 95 Nil Nil No. of Subscri ber Lines 1 2 1 14 1 1 15 5 5 5 5 5 5 5 5 5 7 1 13 3 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Vol- I Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Page 226 of 249 Nil ITI SAX ITI SAX Nil Nil Chibnakuri-I Colly. Chinakuri-III Colly. Chinakuri Lding.Pt. Sodepur 9&10 pit 8 Area Store KunustoriaColly.Manager Off. Amritnagar Colly.Mngr. Off. Mahabir OCP Manager Off. Parasea Colly.Manager Off. ITI PAX ITI SAX ITI SAX ITI SAX ITI EPAX Nil BSNL Bsnl Bsnl Nil Radio Radio+Bsnl BSNL Radio+Bsnl BSNL Radio+Bsnl BSNL BSNL Nil 50 50 Nil Nil 48 50 50 50 50 50 Nil Nil 5 1 5 5 13 3 4 2 4 1 4 1 2 1 1 3 4 3 4 1 Nil Area Store,0.2 km 1 17 Nos. Proposed IP Phone Users 1 50 100 No. of Subscri ber Lines TB Hospital, Searsole Parasea Agent off. Belbaid colliery. Kunustoria Agent Off. Bansra Agent Off. Amritnagar Colly. North Searsole Parasea 6&7 incline Mngr.Off Amrasota Icline Manager Off. Bansra Colly. Manager Off. NorthSearsoleColly.Mngr.Off ITI EPAX Area Hospital, Bansra EPABX Extn Radio+BSNL Coral IRIS (ITI) BSNL Existing Voice Link Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Kunustoria Area Office ITI 128 port Cdot Name of SHQ Sodepur Area office 7 Sl. No. Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name of SHQ Chakballavpur Colly. Monoharbahal Colly. Begunia Colly. Khoirabad Colly. Dabar Colly. Sangramgarh Colly. Mohanpur OCP Bonjemehari OCP Gourandi OCP Barmundia(A) Loading Point,Rly Page 227 of 249 Vol- I Area Store Hospital Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil ITI SAX Nil Nil Nil ITI SAX Nil Nil Dubeswari Colly. B.M.P. Agent Office Methani Colly. Bejdih Colly. Patmohana Colly. Dhemomain Pit Dhemomain Colly. Ld.Point, Radhanagar Ld.Point, Dubeswari Area Store Hospital Nil Nil Nil Sodepur 3 A pit. Mouthdih Colly. Parbelia Agent Off. BPL,P30Y1 Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. Salanpur Area office Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 9 Sl. No. Nil BSNL Bsnl Nil Radio+Bsnl Radio Radio+Bsnl Nil Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Bsnl WLL Radio+Bsnl Nil Nil Bsnl Radio Radio+Bsnl Radio+Bsnl Radio+Bsnl Nil Nil Bsnl Bsnl Radio+Bsnl Existing Voice Link Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 50 Nil Nil 50 Nil Nil Nil 50 Nil Nil Nil Nil Nil No. of Subscri ber Lines 1 1 5 5 5 5 5 5 6 6 6 6 13 5 7 5 5 5 5 5 5 5 7 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name of SHQ Mugma Area office ITI CDOT ITI CDOT TATA PSX50 TATA PSX50 Nil Nil Nil Parascole(west) Khaskajora Jambad Naba Kajora Jambad OCP Area Workshop0.7km Weigh Bridge,2.5km Page 228 of 249 Vol- I Matrix,Eternity ITI CDOT BPL TATA PSX50 Nil TATA PSX50 Nil Area Hospital,4.6km Lachipur Central kajora Madhavpur Madhujore Parascole(east) Nil Area Store,4.6 km Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Bsnl Nil Nil Nil Bsnl Bsnl Bsnl Nil Bsnl Bsnl Bsnl Radio+Bsnl Nil Nil Radio+Bsnl Nil Nil Nil Radio+Bsnl Aria 1000 EPABX Extn EPABX Extn Jhanjra Project MIC, 3 km 3 & 4, 5 km Siding, 6 km Existing Voice Link Existing Type of Exchanges (Make & Model) Accord AD600 Jhanjra Project MIC, 3 & 4 Incline Siding Name of Project, Mine, Stores Hospitals, Workshops etc. Kajora Area office Area Store Hospital Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Jhanjra Area Office Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 12 11 10 Sl. No. 150 96 96 50 50 Nil Nil Nil 96 64 50 Nil 50 Nil Nil 96 Nil Nil 64 Nil Nil Nil 992 No. of Subscri ber Lines 16 5 5 5 5 6 1 5 5 5 5 5 1 1 14 1 1 8 10 6 17 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name of SHQ Hospital Store S.P Mines Area office Area Store Area Dispensary Sonepur Bazari Area office Hospital, 0.5 km Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Area Store, 0.5 km Chitra Colly. Workshop Loading Point,25km S.B. Projet V.N. Colony Workshop Khoodia Colly. Gopinathpur Colly. Shyampur B Colly Mandman Colly Kumardubi Colly Lakhimata Colly. Baramuri OCP Rajpura OCP Chapapur Colly Badjna Colly Hariazam Colly. Name of Project, Mine, Stores Hospitals, Workshops etc. Page 229 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 14 13 Sl. No. Vol- I EPABX Extn EPABX Extn EPABX Extn EPABX Extn EPABX Extn Aria 1000 ITI IRIS AccordADX400 EPABX Extn EPABX Extn Nil Nil Nil Nil Nil Nil Nil Nil Aria 1000 Nil Nil Nil Nil Nil BSNL BSNL Radio+Bsnl Nil Nil Radio Radio+Bsnl Radio Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Nil Radio+Bsnl Radio Radio+Bsnl Nil EPABX Extn EPABX Extn Nil Nil Nil Existing Voice Link Existing Type of Exchanges (Make & Model) Nil Nil Nil Nil Nil 100 100 20 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 150 Nil Nil Nil Nil Nil No. of Subscri ber Lines 1 1 1 1 6 1 5 12 5 5 5 5 5 5 6 6 14 1 5 5 5 1 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Nil Panthnagar Ares Hospital Page 230 of 249 Vol- I Nil Punihati Regional Workshop 18 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 ITI Ukhra Regional Workshop 17 Station 1/7 Haripur Stabilisation Stn.1/1,1/3,1/5 Stn. 2/1,2/3,2/5,2/7 Stn. 1/10, 2/26, 2/9 Stn. 1/9 & 2/8 Narayani Sand Plnt ITI 128 port Cdot EPABX Extn EPABX Extn Magneto Tele. Magneto Tele. Magneto Tele. Magneto Tele. Magneto Tele. Magneto Tele. Magneto Tele. Siemens Hipath Coral IRIS Coral IRIS Procorement due EPABX Extn Area Store Khottadih project Dalurband Colly. Manderboni Colly. Madhipur Colly. Pandaveswar Colliery Kendra Colliery Khottadih OCP South Samla Colliery Bsnl Karel DS200 BSNL BSNL Radio+Bsnl Nil Nil BSNL BSNL Nil Nil Nil Nil Nil Radio+Bsnl Radio+Bsnl Radio+Bsnl Radio+Bsnl Nil Bsnl Existing Voice Link Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Pandaveswar Area office J.K.Ropeways Area Store Hospital Name of SHQ 16 15 Sl. No. Nil 50 80 Nil Nil Nil Nil Nil Nil Nil Nil Nil 200 64 64 64 Nil Nil 128 No. of Subscri ber Lines 1 1 10 1 1 5 5 5 5 5 5 5 5 1 17 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Nil Nil Nil Nil Intellicon DS200 Nil Nil Intellicon DS200 Nil ITI 128 port Cdot Nil Sodepur Workshop Neamatpur Workshop Barakar Engineering Works Sodepur Central Store Kalla Central Hospital CISF, HQ, Seetalpur HRD Traning centre, Dishergarh Mines Rescue Station,Sitarampur VIP Guest Housem,Seetalpur ECL Sales office, Kolkata CMPDIL, Asansol RI-1 21 22 23 24 25 26 27 28 29 30 31 Page 231 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Vol- I Nil Ratibati Workshop 20 Radio BSNL BSNL Radio+Bsnl BSNL Radio+Bsnl BSNL BSNL BSNL BSNL BSNL BSNL BSNL SiemensHipath1190 19 Existing Voice Link Name of Project, Mine, Stores Hospitals, Workshops etc. Existing Type of Exchanges (Make & Model) Name of SHQ Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Mugma Regional Workshop Sl. No. Nil 80 Nil 32 Nil Nil 64 Nil Nil Nil Nil Nil 30 No. of Subscri ber Lines 1 1 1 1 1 1 1 1 1 1 1 1 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. No Yes No Urjanagar Colony CHP/Loading point Simlong Colly. PPT Siding No Yes Rajmahal ocp,Wshop Yes No Area Store Hospital, RJML Area Yes (Unmanaged ) Availability of LAN (Yes, No) Yes Name of Project, Mine, Stores Hospitals, Workshops etc. Rajmahal Area Office Name of Area, Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Page 232 of 249 Vol- I 4. Workshop Mezzanine floor office - 16 nodes connected through Motorola Radio, Canopy from Project office ( Switch : 24 port - 1 no, Cygnus make ) 5. Area Store - 8 nodes connected through OFC from Mezzanine floor office. ( Switch : 12 port - 1 no, Cygnus make ) 6. Workshop - 8 nodes connected through OFC from Mezzanine floor office ( Switch : 12 port - 1 no, Cygnus make ) All the PC nodes are working under same LAN group, there is no routing amongst the LAN at different buildings. LAN was established in 1992 - '93 and subsequently modified during 1999-2000. ( Switch : 24 port - 2 nos, Cygnus make ) 3. Area Office - 30 nodes connected through Motorola Radio, Canopy from Project office ( Switch : 12 port - 1 no, Cygnus make ) 2. CHP - 8 nodes connected through Motorola Radio, Canopy from Project office 1. GM/Project office - 50 nodes ( Switch : (a) 24 port - 2 nos, Cygnus & Nortel make (b) 8 port - 1 no, D-Link make ) If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following: a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & year of purchase About 40 PC nodes with 4 nos unmanaged switch as follows : 1) Nortel 16 port ( model-AL2012A18) , 3Com 16 (model-DES-1024D) installed in the Finance dept., 2nd floor. port ( model- 3C16470) , D-Link 16 port ( model-DF816TP) in the System dept. , 1st floor and 2) D-Link, 24 port LAN with unmanaged switch and PC nodes are working as follows : Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 ECL, HQ Sanctoria 1 2 Name of SHQ Sl. No. 10. LAN Details for ECL, Sanctoria Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 300 (OFC backbone based LAN WiFi connectivity proposd) If No, No of LAN nodes Proposed 7. Reg. Store 6.Bhurkunda 5.Saund D 4.Urimari 3.Central Saunda 2.Barkakana 1.GM Office Page 233 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Area 3. Barka-Sayal a.GM Office 2. Rajrappa Area 3. G.N. Hospital 1.HQ Name of Project, Mine, Stores Hospitals, Workshops etc. 2. Jawahar Nagar CCL, RANCHI 1 Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) 1.HQ, Ranchi Name of SHQ Sl. No. 11. Voice details of CCL, Ranchi Vol- I BPL(SIG. IND. 150) AVAYA (PMX400) Cromp Gr.(NE-1100) CORAL (IRIS-IVDX) BPL (P-250) ERICSSON (BP250) BPL (P-250) CORAL (IRIS-IVDX) Intelicon KAREL (DS250) CORAL (IRIS-IVDX) CORAL (IRIS-IVDX) Existing Type of Exchanges (Make & Model) -do- -do- -do- -do- -do- -do-* -do-* -do-* -do-* -do-* Bsnl* Existing Voice Link 24 70 80 80 50 100 150 170 180 200 900 No. of Subscriber Lines 1 2 1 2 1 2 4 4 6 6 30 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6. DHORI AREA 5. HAZARIBAG AREA 4. ARGADA AREA Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) 2.Kalyani(SDQ1) 1.GM Office 6.Jharkhand 5.kedla washery 4.Kedla 3.Parej 2.Tapin North 1.GM Office 4. Giddi Washery 3.Giddi C 2.Argada Colly. 1.GM Office Name of Project, Mine, Stores Hospitals, Workshops etc. Page 234 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Name of SHQ Sl. No. Vol- I CORAL (IRIS-IVDX) AVAYA (ARIA 1000) ERICSSON(BP250) Intelicon(MS48) ERICSSON(BP250) BPL (P30X) CORAL (IRIS-IVDX) Intelicon KAREL (DS250) SIEMMEN ERICTION (BP 250) AVAYA(ARIA 300) AVAYA (ARIA 1000) Existing Type of Exchanges (Make & Model) -do- -do-* -do- -do- -do- -do-* -do- -do-* -do- -do- -do- -do-* Existing Voice Link 36 192 70 70 80 80 100 150 20 50 65 125 No. of Subscriber Lines 2 4 2 2 2 2 2 4 2 2 2 4 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 8. B & K AREA 7.KATHARA AREA Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) 4.Bokaro Colly. 3.Khas Mahal 2.Karo 1.GM Office 6. Swang washery 5. Kathara Washery 4.Jarangdih 3. Swang Colly 2. Kathara Colly. 1.GM office 4. Amlo 3. Tarmi (SDQ3) Name of Project, Mine, Stores Hospitals, Workshops etc. Page 235 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Name of SHQ Sl. No. HCL(BP250) HCL (BP250) Vol- I AVAYA (ARIA 300) CORAL (IRIS-IVDX) Intelicon KAREL (DS250) BPL( SIG. IND 150) HCL( BP 250) Intelicon KAREL (DS250) HCL(BP250) Intelicon KAREL (DS250) BPL(SIG. IND 150 CORAL (IRIS-IVDX) Existing Type of Exchanges (Make & Model) -do- -do- -do- -do-* -do- -do- -do- -do- -do- Bsnl* -do- -do- Existing Voice Link 40 35 48 100 80 24 80 90 80 200 85 64 No. of Subscriber Lines 1 1 1 4 1 1 1 1 2 4 1 2 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. AREA 14. Mines Rescue stn. 13. Central Hospital 12. Central W/S Karanpura Area 11. North 10. PIARWAR Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) 9.KUJU AREA Ramgarh Naisarai Barkakana 4.R/R/Shop 3.Churi 2.karkatta 1.GM Office 2.Piparwar Proj. Page 236 of 249 Vol- I CORAL (IRIS-IVDX) ALCATEL BPL (SIG. IND 250) BPL( SIG. IND 150) AVAYA (ARIA 300) AVAYA (ARIA 300) SIEMEN(HICON300H) AVAYA (ARIA 300) AVAYA (DEFINITY) AVAY (ARIA 300) 1.GM Office SIEMENS 5.Karma AVAYA (ARIA 300) ERICTION (BP250) ERICTION (BP250) CORAL (IRIS-IVDX) Existing Type of Exchanges (Make & Model) 6.Kuju Colly. 4.Sarubera 3.Pundi 2.Topa 1.GM Office Name of Project, Mine, Stores Hospitals, Workshops etc. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Name of SHQ Sl. No. -do- -do-* -do-* -do- -do- -do- -do-* -do- -do-* -do- -do- -do- -do- -do- -do-* Existing Voice Link 55 65 100 24 50 70 200 80 400 80 15 90 35 90 100 No. of Subscriber Lines 2 2 2 1 2 2 6 2 6 2 1 2 2 2 4 Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Central Coalfields Ltd. Ranchi do do 1 2 3 North Karanpura Piparwar Barka Sayal Argada Kuju Hazaribagh Rajrappa Kathara B&K Dhori Cental stores, CCL,Barkakana Darbhanga House CCLHead Quarters, Name of Area,Regional Store, Regional Hospital, Central Strore, Centeal Wksp, Central Hosp ENTITY (TYPE) Dakra Bachara Sounda Giddi Kuju Parej Rajrappa Jarangdih Jarangdih Dhori Name of Project, Mine, Stores Hospitals, Workshops etc. Page 237 of 249 do do do do do do do do do do Yes 12 nodes Yes 200nodes Availability of LAN (Yes, No) Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Name of SHQ Sl. No. 12. LAN details of CCL, Ranchi. Vol- I do do do do do do do do do do Completed 4 years of rental agreement and last and 5th year of rental agreement expires between 10/10 and 08/11 Completed 5 years of rental agreement and also completed 1 year rental extention and now is under 2nd year rental extention till 03/2011 If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following: a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & year of purchase Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. MCL/ Sambalpur 1 CO (2 W ) - 08 Nos IDX-1250 No Epabx No Epabx No Epabx No Epabx v)Mine No-2 vi)Mine No-3 vii)Mine No-4 3) IB Valley Area CO (2 W ) - 08 Nos IDX-650 ii) Budhijam Exchange (for Mine no2,3,colony) iii) Rampur Sub. Area iv)Mine No-1 ARIA-1000/Tatatelecom ii)Samaleswari O.C.P Page 238 of 249 Vol- I ARIA-1000/Tatatelecom i) Area Office E&M (4 W ) - 8 Nos CO (2 W ) - 16 Nos E&M (4 W) 8Nos E&M (2 W) 4Nos E&M (4 W) 4Nos CO (2 W ) - 16 Nos CO (2 W ) -16 Nos E&M (2 /4 W) 32 Nos CORAL IRIS IVDX Coral IRIS IVDX i) Orient Area Office Existing Voice Link 2) Orient Area Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. Hq Unit Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) 1.MCL Hqrs Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Name of SHQ Sl. No. 13. Voice details of MCL, Sambalpur 100 Lines 400 Lines 128 Lines 200 Lines 250 Lines 600 Lines No. of Subscriber Lines Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name of SHQ 6) Talcher Area 5) Jaggannath Area 4) Lakhanpur Area Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) Page 239 of 249 Vol- I SIMMENS,Hipath,4000 No Epabx iv)B.O.C.P i) Area Office No Epabx iii)Ananta O.C.P (15 years old) Unitel,CDOT-Simplex No Epabx iv)Lilari O.C.P ii) Jaggannath PO Office No Epabx iii)Balpahar O.C.P CORAL IRIS IVDX No Epabx ii)Lakhanpur O.C.P i) Area Office CORAL IRIS IVDX E&M (2 -W) - 4 Nos E&M (4 -W) - 4 Nos CO (2 W ) - 02 Nos E&M(2/4 W ) - 8 Nos CO (2 W ) - 16 Nos E&M (2/4 W) -32 Nos CO (2 W ) - 16 Nos IPGC-32 Channel CO (2 W ) 8Nos Mode-CS-1000 D2 No Epabx Existing Voice Link Existing Type of Exchanges (Make & Model) i)Area Office iii)Lajkura O.C..P Name of Project, Mine, Stores Hospitals, Workshops etc. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Sl. No. 200 Lines 64 Lines 400 Lines 400 Lines No. of Subscriber Lines Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name of SHQ 8)Hingula Area 7)Bharatpur Area Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) i) Area Office Page 240 of 249 Vol- I CORAL IRIS IVDX No Epabx No Epabx vi)Deulbera Coliery iii)Chhendipada O.C.P No Epabx v)Handidhua Colliery No Epabx No Epabx iv)Talcher Colliery ii)Bharatpur O.C.P CORAL IRIS IVDX iii) Talcher Hospital CORAL IRIS IVDX Exchange under procur ii) Nandira Coliery i) Area Office Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Sl. No. E&M (2 -W) - 4 Nos E&M (4 -W) - 4 Nos CO (2 W ) - 08 Nos CO (2 W ) -16 Nos E&M (2 / 4 -W ) -8 Nos E&M (2 -W) - 2 Nos E&M (4 -W) - 2 Nos CO (2 W ) - 08 Nos CO (2 W ) - 16 Nos Existing Voice Link 128 Lines 200 Lines 200 Lines No. of Subscriber Lines Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name of SHQ 11)Kaniha Area 10) Basundhara Area 9) Lingaraj Area Name of Area,Regional Store, Regional Hospital, Central Store, Central Wksp, Central Hosp ENTITY (TYPE) No Epabx No Epabx No Epabx No Epabx i)Area Office ii)Kaniha O.C.P CWS IB Valley Area CWS Talcher No Epabx No Epabx iii)Kulda O.C.P iv)Garjanbhal O.C.P No Epabx ii)Basundhara O.C.P Page 241 of 249 Vol- I 6000 Digital Epabx CG FLEXICO4 No Epabx ii)Lingaraj O.C.P i) Area Office CORAL IRIS IVDX No Epabx iii)Hingula O.C.P i) Area Office No Epabx Existing Type of Exchanges (Make & Model) Name of Project, Mine, Stores Hospitals, Workshops etc. ii)Balaram O.C.P Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Sl. No. E&M (2 -W) - 16 Nos E&M (4 -W) - 16 Nos CO (2 W ) - 32 Nos E&M (2 -W) - 4 Nos E&M (4 -W) - 4 Nos CO (2 W ) - 24 Nos Existing Voice Link 400 Lines 450 Lines No. of Subscriber Lines Nos. Proposed IP Phone Users Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. MCL Name of SHQ Jagannath Area HQ Name of Area, Regional Store, Regional Hospital, Central Stores, Central Workshop, Central Hospital ENTITY (TYPE) Jagannath OCP Ananta OCP Bhubaneswa ri OCP Area Office Name of Project, Mine, Stores, Hospitals, Workshops etc. Yes Yes Availability of LAN (Yes/No) Page 242 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 2 1 Sl. No. 14. LAN details of MCL, Sambalpur Managed Fast Ethernet Switch DES3624iF Fast Managed HUB DFE2624ix (Master) Fast Managed HUB DFE2624x (Client) Fast Managed HUB with Network Management DFE2624ix (Master) Ethernet Transceivers DE854 Media Converter DE855 HCL HCL HCL HCL HCL HCL Managed Hub Dlink DE1824i HCL Vol- I 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Intec Intec If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following : a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & Year of Purchase 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Supplier / Vendor 1 5 2 8 4 3 3 1 No of Switch 18 119 250 No of I/O Points Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 1999 2007 2001 2001 2001 2007 Year of Purchase Hingula Area 5 Hingula OCP Reg. Stores Area OCP Reg. Stores Nandira UG Talcher UG Yes Yes Yes Yes Reg. Stores Area Office Availability of LAN (Yes/No) Name of Project, Mine, Stores, Hospitals, Workshops etc. Page 243 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Talcher Area 4 Name of Area, Regional Store, Regional Hospital, Central Stores, Central Workshop, Central Hospital ENTITY (TYPE) NSCH, Talcher Name of SHQ 3 Sl. No. 24 Port Managed Hub Dlink DE809TC HCL Vol- I 24 Port Managed Hub Dlink DFE2624ix HCL Intec 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Intec 24 Port Managed Hub Dlink DFE2624ix Managed Hub HCL HCL Ethernet Transceivers DE854 HCL Unmanaged 16 Port Switch - 2 nos. 24 Port Managed Hub Dlink DFE2624ix HCL Intec 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Intec Intec If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following : a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & Year of Purchase 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Supplier / Vendor 2 4 2 2 1 4 1 4 2 4 No of Switch 6 20 53 18 10 25 54 15 16 No of I/O Points Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2002 2007 2002 2002 2007 2002 2007 Year of Purchase CWS Talcher IB Valley Area 8 9 Area Office Yes Lingaraj OCP Reg.Stores Yes Yes Yes Yes Bharatpur OCP Reg.Stores Area Office Yes Availability of LAN (Yes/No) Area Office Name of Project, Mine, Stores, Hospitals, Workshops etc. Page 244 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Lingaraj Area 7 Name of Area, Regional Store, Regional Hospital, Central Stores, Central Workshop, Central Hospital ENTITY (TYPE) Bharatpur Area Name of SHQ 6 Sl. No. Managed Hub HCL Vol- I 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Ethernet Transceivers DE854 HCL Intec 24 Port Managed Hub Dlink DFE2624ix HCL 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Unmanaged 16 Port Switch - 4 nos. Intec Intec 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Intec Unmanaged 16 Port Switch - 2 nos. 24 Port Managed Hub Dlink DFE2624ix HCL Intec 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) 24 Port Managed Hub Dlink DFE2624ix Intec Unmanaged 16 Port Switch - 4 nos. HCL If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following : a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & Year of Purchase 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Intec Intec Supplier / Vendor 1 2 1 18 1 4 1 2 1 4 1 4 3 No of Switch 71 24 27 16 10 62 11 58 No of I/O Points Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2007 2002 2007 2007 2002 2007 2007 2007 Year of Purchase Lakhanpur Area 12 Lakhanpur OCP Lilari OCP Area Office Reg.Stores Orient SubArea Rampur Sub-Area Orient Area Lajkura OCP Samleswari OCP Reg. Stores Name of Project, Mine, Stores, Hospitals, Workshops etc. Yes Yes Yes Yes Yes Availability of LAN (Yes/No) Page 245 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Orient Area 11 Name of Area, Regional Store, Regional Hospital, Central Stores, Central Workshop, Central Hospital ENTITY (TYPE) Central Hosp, IB Valley Name of SHQ 10 Sl. No. 24 Port Managed Hub Dlink DFE2624ix HCL Intec Vol- I Unmanaged 16 Port Switch - 1 nos. Unmanaged 16 Port Switch - 3 nos. Unmanaged 16 Port Switch - 2 nos. Intec Intec 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Unmanaged 16 Port Switch - 7 nos. Intec Intec 1 3 1 2 2 7 71 15 12 52 45 20 10 No of I/O Points HCL 1 1 No of Switch 5 24 Port Managed Hub Dlink DFE2624ix If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following : a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & Year of Purchase 24 Port Managed Hub Dlink DE1824i Intec HCL Supplier / Vendor Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2007 2002 2007 2002 2007 2000 Year of Purchase Reg. Stores Kulda OCP Basundhara West Area Office Reg. Stores Belpahar OCP BTI Name of Project, Mine, Stores, Hospitals, Workshops etc. Yes Yes Yes Yes Availability of LAN (Yes/No) Page 246 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Basundhara Area 14 Name of Area, Regional Store, Regional Hospital, Central Stores, Central Workshop, Central Hospital ENTITY (TYPE) CWS-IB Valley Name of SHQ 13 Sl. No. Unmanaged 16 Port Switch - 3 nos. 24 Port Managed Hub Dlink DFE2624ix Intec HCL Vol- I Unmanaged 16 Port Switch - 3 nos. 24 Port, 10/100 Base Tx Managed L2 Switch (Nortel Baystack 425) Intec Intec 1000Base LX Module for 10/100 Base Tx Managed L2 Switch Intec 24 Port Managed Hub Dlink DFE2624ix Managed Hub HCL HCL 24 Port Managed Hub Dlink DFE2624ix HCL Unmanaged 16 Port Switch - 7 nos. Ethernet Transceivers DE854 HCL Intec Managed Fast Ethernet Switch DES 3624F If Yes, Pl provide: 1. LAN Architecture (Diagram) detailing the following : a) Switch Distribution b) User Distribution c) Type of Uplink d) Make and Model of Existing Switch & Year of Purchase HCL Supplier / Vendor 3 1 3 3 2 1 7 1 1 2 1 No of Switch 12 11 80 20 45 20 No of I/O Points Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 2007 2002 2007 2002 2007 2002 Year of Purchase 19" Steel rack 6U(with proper ventilation & locking facility 19" Steel rack 17U(with proper ventilation & locking facility H23 based 4 ports FXS Station Gateway----VOIP Network Security VPN work group Fire Wall Rock mountable Line extender (for 2 KMs distance) Router (2600 series) Modem CISCO 2811 Router Modem RAD ASMi 52 5 6 7 8 9 10 11 12 13 Page 247 of 249 Vol- I 12 Port (6 in+6 out)Rack mounted SC-SC Fibre Optic Patch panel 4 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Unmanaged Ethernet Switch(Rack Mountable) with 16x10/100 Base TX ports Managed Layer 3 Ethernet Switch(rack Mountable) with 24x10x100 Base TX + 2x 100 Base FX(with SC Port) Unmanaged Ethernet Switch(Rack Mountable) with 24x10/100 Base TX ports LANDetailsofExistingInfrastructure 3 2 Sr.No 1 15. LAN Details of BCCL, Dhanbad 1 1 1pair 1 1 2pairs 2 1 21 3 2 17 3 Quantity Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. 6 - BelPahar OCP LAkhanPur OCP Lilari OCP - Bhubaneswari OCP - 1 2 Connected To Network - 4 - - - 1 3 - Connected To Network Page 248 of 249 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 4 Ananta OCP Rail Weigh Bridge - Bundia Projects - Rampur Area 1 Orient Sub-Area 6 3 LajKura OCP Jagannath OCP - Rail Weigh Bridge Samleswari OCP Projects Jagannath Area LakhanPur Orient IB Valley Area - 3 Not Connected To Network 4 - 2 - Vol- I Road Weigh Bridge 2 6 6 1 10 3 1 - 1 1 3 - - 6 Road Weigh Bridge - Not Connected To Network - 4 Connected To Network 3 1 2 2 1 1 1 1 4 Connected To Network 2 2 Not Connected To Network 3 - 8 1 - - - 2 2 Not Connected To Network 16. Status Of Connectivity Of CoalNet Network With Road & Rail Weigh Bridges As on 01.07.2010 OF MCL Remarks Remarks Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries. Name 2 Basundhara OCP 1 - 2 Nos. 9 Nos. 2 Nos. 13 Nos. 8 Nos. 9 Nos. Nil 17 Nos. Page 249 of 249 Vol- I Total No. Of Road Weigh Bridges 26 Nos. 39 Nos. 16 Nos. 81 Nos. 11 2 Not Connected To Network 5 5 - - 6 7 - - 2 4 - 2 Connected To Network - - - - - 4 - 2 Tender no. CIL/C2D/SAP/2010-11/110 dated 02.11.2010 Total No. Of Rail Weigh Bridges 10 Nos. 18 Nos. 2 Nos. 30 Nos. - Kulda OCP - Hingula OCP - Chendipada OCP - 4 Bharatpur OCP Balram OCP - 4 Talcher UG Lingraj OCP Ib Valley Coal Fields Talcher Coal Fields Basundhara Area Total MCL Area Basundhara Area Hingula Area Talcher Area Bharatpur Area Lingraj Area 4 1 13 Nos. 14 Nos. 4 Nos. 31 Nos. Connected To Network - - - 2 2 2 13 Nos. 25 Nos. 12 Nos. 50 Nos. Not Connected To Network 7 5 5 5 1 5 - 2 Supply, Implementation of SAP ERP and IT Infrastructure along with Post Implementation Support at Coal India Limited and all its Subsidiaries.