Form 5 Electrical Main Supply This form must be completed and returned to: exhibits16atce@spe.org P.O. Box 37679, Dubai, United Arab Emirates | Tel: +971 4 420 4028 Please print in block letters. Company Name: Stand Number: Hall Number: Contact Person: Designation: Address: Telephone Number: Fax Number: Email Address: Mobile Number: DB CEILING POWER MAIN POWER BUILD UP DESCRIPTION PRICE (USD) Before August 5 After August 5 15Amp Single Phase 185.00 222.00 30Amp Single Phase 324.00 388.80 15Amp Three Phase 510.00 612.00 30Amp Three Phase 850.00 1,020.00 15Amp Single Phase 300.00 360.00 30Amp Single Phase 530.00 636.00 15Amp Three Phase 840.00 1,008.00 30Amp Three Phase 1,500.00 1,800.00 60Amp Three Phase 2,382.00 2,858.40 100Amp Three Phase 4,500.00 5,400.00 24 Hours Supply +30% 15Amp Single Phase 975.00 1,170.00 30Amp Single Phase 1,205.00 1,446.00 15Amp Three Phase 1,515.00 1,818.00 30Amp Three Phase 2,175.00 2,610.00 60Amp Three Phase 3,057.00 3,668.40 24 Hours Supply +30% Single Phase Distribution Box 90.00 108.00 Three Phase Distribution Box 190.00 228.00 GRAND TOTAL QTY AMOUNT USD ALL SPACE ONLY Exhibitors are required to order power connection for build-up and power connection during the show. Main power supply to Space only stands includes consumption but does not include distribution box. Invoice will be sent once the order form is signed.50% surcharge is applicable for any onsite orders. *Please plot the location of distribution box in the grid plan (Form 5a). Date: Name: Stamp and Signature: 48 Form 5a: Electrical Layout Please indicate location of the mentioned items on the grid plan (1 square = 1 meter) Date: __________________________ Name: _________________________ Stamp and Signature: _________ POINTS TO NOTE FOR THE BUILD-UP POWER: Points to note: 1) Mains Power a. The rates quoted include consumption. b. Exhibition stands mains power will only be activated on the last day of build-up. c. Stand contractors are required to be present to activate their mains power 1 hour before and 1hour after the show opening times. 2) Build-up Power a. The distribution boards for build-up power will be located in each of the 4 corners of the halls b. Each hall will have four distribution boards c. The contractor will connect their own equipment and cables to the distribution board 49 d. Each distribution board will consist of single phase & three phase female commando or CEE Form sockets and 13 Amps plug tops e. For each order the contractor will be issued with a numbered socket f. Contractor build-up power is only to be used for stand construction purposes and not for stand testing g. Build-up power will be used for build-up and tear down only h. Build-up power cannot be shared with other stand contractors i. The contractor will need to order and pay the power Pico International LLC. j. Pico will provide duty technician for build-up power k. There will be a separate breaker for each socket, in case the power trips, the contractor needs to contact the Pico service desk to reset the breaker l. All extension cables should be protected by a 13 Amps fuse m. For orders of more than 15 Amps single phase, the contractor needs to supply their own male CEE form socket n. There will no other power source during build up, only the build- up power distribution boards will be live o. During the event the build-up power distribution boards will be turned off 3) General a. All orders for utilities must follow the required guidelines and be submitted with a clear and precise grid plan at the time of ordering. b. Any changes required due to incorrect grid plans will be subject to a surcharge. c. The rates quoted are per event based on a maximum 7 day rental basis only. PLEASE RETURN THE COMPLETED ORDER FORM BY EMAIL ON OR BEFORE 5TH AUGUST 2016. OTHERWISE, YOU WILL BE LIABLE TO THE APPROPRIATE SURCHARGE AS IMPOSED BY THE UTILITY AUTHORITIES. PICO INTERNATIONAL WILL SEND THE INVOICE BY RETURN TOGETHER WITH THE BANK DETAILS FOR PAYMENT. ITEMS WILL NOT BE SUPPLIED IF PAYMENT IS NOT RECEIVED IN ADVANCE I hereby confirm that the information on the form 5 is true and correct at the time the information is provided and understand the points mentioned on this page. SUBMIT 50