Siemens your Partner for Power Solutions PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 1 2 Perspectives of T&D Network Developments Generation Transmission HV Today Today&&Tomorrow: Tomorrow: More Moredispersed dispersedGeneration Generationin inthe theDistribution DistributionSystem System Distribution MV Distribution Power Generation Bio Mass Power Generation PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions Solar Power Generation PTD M 3 / Kruska 02.2006 Wind Power Generation Solar Powered Solutions for Distribution Systems • Solar Solar Power Power • Micro Micro Networks Networks PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 Grid Grid Supply Supply • 3 Alternative Power Supply for Rural Electrification integrated in the secondary distribution system for private consumers, as standalone systems or even with grid connection. Energy storage with batteries or back up power with diesel generator sets. Rural Electrification in Urban Areas power supply for consumers in very remote areas. Solar powered systems with low energy demand without grid connection. Standalone systems with batteries for energy storage. Grid connected Solar Systems large solar systems inclusive network connection as an alternative power generation. Solar powered systems with out batteries for basic load supply or peak load energy demand. Key Questions about Solar Powered Solutions ■ What is the market size of distributed generation for Solar Systems? Market Development 700 Micro-Networks Anal Growth MW 600 Grid Supply 30 % 500 400 Ö Micro Networks for developing countries 300 70 % 200 100 0 1998 1999 2000 2001 2002 Ö Grid Supply as alternative power generation 2003 ■ What about integration of mini-grids (solar systems) in national networks? Ö Micro Networks are standalone solutions with max. 2000 Wp – integration not applicable. Ö Grid Supply (large systems) are connected to national grids – if not , connection can be arranged easily with standard components. PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 ■ What are the benefits or disadvantages of solar solutions (grid connection)? Ö Micro Networks provides power for consumers in very remote areas where grid supply is very costly; disadvantage: reconstruction in case of future national network supply. Ö Grid Supplies (large systems) to be considered as alternative power generation or for peak load coverage only. 4 5 Expected Cost Development and Output Factors Regional Output-Factors Development of Tariff costs for Electric Energy Solar power costs versus prices for peek power costs and constant power costs 1 Solar Power EUR / kWh 0,8 PTD PTD M M3 3 0,6 Constant Power 1800 h / a *): 0,30 € / kWh 0,4 0,2 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 Peak Power 900 h / a *): 0,60 € / kWh 0 Reference: RWE Schott Solar GmbH (EW Magazine 25 - 29.11.2004) 1990 2000 2010 2020 2030 2040 *) Solar radiation per year Standalone Solar Power Systems – Micro Networks 6 Technical Data = Charger Circuit Breaker (Overvoltage Protection) 3 x 230 V ~ 50 Hz or 60 Hz DC/AC Converter Led-Acid Battery ► Solar panels • Life time 25 years (maintenance free) Photovoltaic ► Charger / Converter • Life time 15 - 20 years (maintenance free) ► Battery System / Lead-Acid (low maintenance) PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 Module peak power (55 or 75 or 110 Wp) • Capacity 5 days >autarky< Life time till 10 years at Ø ϑ = 30°C • Capacity 2 days >autarky< Life time max. 5 years at Ø ϑ = 30°C 7 Micro Networks – Areas of Application Water tank and pump Photovoltaic generator Clean Drinking Water Technical Data: Solar module 85 Wp / pc, 16 module system Low maintenance battery 185 Ah PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 DC / AC converter 2,4 kW Stainless steel pump, max. production 5m³/ h Well depth max. 97 m Water Filter System UV-Light Sterilization Sand filter system with automatic cleaning UV-Light Sterilization 40 W, capacity max. 2,2m³/ h Micro Networks – Areas of Application PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 Photovoltaic generator Battery-Box Lighting centre 8 9 Hybrid Power System – Solar / Diesel Generator Solar Solar Power Power SINVERT SINVERT Solar Solar Modul Modul Concept Concept ET 200 DC Profibus DP S7-300 Hybrid Solution: • Diesel Gen-Set 300 kVA • UPS 60 kVA • Solar 50 kW • Energy-Management / Control = = 3~ PLC = 3~ = 3~ AC 300 kVA G NS-Netz PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 3~ Sub-Station Sub-Station with with Peak-Load Peak-Load Generation Generation MV - Network Hybrid Power System – Solar / Diesel Generator Solar- Hybrid Plant Africa Size of Solar Array 360m² Solar Power installed 51,6 kWp Diesel-Genets 136 kVA UPS provides 4 days of autonomy PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions Capacity 300 kVA PTD M 3 / Kruska 02.2006 Capacity 165 kWh LV Switchboard 10 Grid connected Solar Power Plants 0,4 kV Bavaria Solarpark Germany 57,600 Solar panels 10 Megawatts system capacity Solar Plant 20 kV 62 acres total surface area Y Y ≈ = PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 Solar Plant Public Network 11 Energy Demand of an Office Building (Example) Grid connected Solar Systems for office buildings as an alternative power supply. Solar modules for basic load supply or peak load energy demand. Energy Demand Office Building LOW HIGH LOW 250 Energy demand 200 Solar power Sub-Station Sub-Station Reverse supply 150 Y < 630 kVA Y 100 OPTION 00:00 22:00 20:00 18:00 16:00 14:00 12:00 10:00 08:00 06:00 04:00 02:00 24 h Load Demand Solar Power PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions Battery Solar Roof System Holland Solar Power installed 500 kWp 3,400 Solar panels PTD M 3 / Kruska 02.2006 LV-System LV-System Commissioning Dec. 2003 = 0 00:00 50 ≈ Electric Energy Demand kWh Tariff costs for electric energy 300 12 Private Private Power Power Generation Generation World Bank Energy Week 2006 PTD PTD M M3 3 Power Supply Systems Distribution & Turn-key Solutions PTD M 3 / Kruska 02.2006 Open Forum: Questions? 13