Nova UAC Emergency Power Supply System IMPORTANT

advertisement
Nova UAC Emergency Power Supply System
650, 800, 1000W
Input/Output: 120VAC / 120 or 277 or 347VAC, 60Hz
277VAC / 120 or 277VAC, 60Hz
347VAC / 120 or 347VAC, 60Hz
INSTRUCTIONS
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should always be followed including the following:
1. READ AND FOLLOW ALL SAFETY INSTRUCTIONS
2. Disconnect power before performing work on electrical equipment.
3. Do not use outdoors.
4. Do not let power cords touch hot surfaces and do not mount near gas or electric heaters.
5. Use caution when servicing batteries. Battery acid can cause burns to skin and eyes. If acid is spilled on skin or
eyes, flush with fresh water and contact a physician immediately.
6. Equipment should be mounted in locations and at heights where unauthorized personnel will not readily
subject it to tampering.
7. The use of accessory equipment not recommended by Beghelli Canada Inc., may cause an unsafe condition,
and will void the unit’s warranty.
8. Do not use this equipment for other than its intended purpose.
9. Servicing of this equipment should be performed by qualified service personnel.
10. SAVE THESE INSTRUCTIONS!
INSTALLATION
Caution!
1. Verify on AC LOAD WIRING that the NEUTRAL conductor IS NOT BONDED OR CONNECTED to the GROUND WIRING.
2. Each inverter’s AC output MUST be wired by its own AC OUT line and neutral wires. DO NOT CONNECT the AC OUT
neutral wire to ANY neutral wires in the building. If more than one inverters are installed, DO NOT CONNECT both
neutrals of AC OUT together.
3. DO NOT CONNECT the AC OUT line and neutral to the City AC line and neutral.
4. OBSERVE BATTERY POLARITY. RED is “+” POSITIVE and BLACK is “-” NEGATIVE.
5. The BATTERY CHARGING CURRENT has been factory set. DO NOT adjust it.
6. Disconnect ALL electrical sources including the inverter’s AC and DC inputs before servicing.
7. Note: Airflow is vital to the performance of this product. Install with at least 12" (30cm) clear space on both
ends and do not block ventilation holes.
Hardwired Installation:
1. Extend un-switched 24 hour AC supply of rated voltage to the unit installed in accordance with all applicable codes
and standards.
Leave at least 8 inches of slack wire. This circuit should NOT be energized/live at this time.
2. Open the unit by unscrewing the cover screws on the sides of the unit. The front cover can then be lifted up
and removed (2).
3. Unit is supplied with knockouts stamped into the back and side of the cabinet. Knock out the appropriate hole(s)
and bring wires through the hole(s) into the cabinet.
4. Mount the unit securely into place. There are four keyhole mounting slots provided in the back of the unit for wall
mounting. Use optional Mounting Shelf (MS) or make an additional enclosure bottom support to the wall studs is
recommended for 650W, 850W, or 1000W unit.
5. Make proper wiring connections between the AC supply and terminal blocks within the unit (6)(figure 1).
6. Make proper load connection to the terminal block (6) (figure 1).
7. Batteries are shipped separately. Install batteries into the cabinet and complete the appropriate battery connection.
8. Uncoil the wire lead(s), connect the red wire to positive battery terminal (+) and connect the black wire to negative
battery terminal (-).
9. Route wires and secure in place.
10. Select Load Operation Mode from the internal toggle switch (13):
“Normally ON” means unit will always transfer AC supply to the AC load output, and provides AC back-up when
supply power fails.
“Normally OFF” will provide AC power inverted from DC battery to the load output only in emergency mode.
11. Replace cover and secure cover screws (2).
12. Turn on AC line voltage supply.
Beghelli Canada Inc., 3900 14th Avenue, Markham, ON L3R 4R3 Tel: (905) 948-9500 Fax: (905) 948-8673
926000144
08/16/2016
4
3
2
1
2
Figure 1
1
12
D
D
6
13
9
8
3
PARTS LIST
C
1. Cover
2. Cabinet
3. Optional Unit
Mounting Shelf
4. Inverter
5. Battery
6. Terminal Block
7. AT Board MT Shelf
8. Relay
9. AT Test Board
10. Test Switch
11. Optional
Transformer
12. Relay
13. Toggle Switch
4
5
B
C
11
B
10
7
277V/347V IN
ITEM
1
2
3
4
5
6
7
8
9
10
12
277V/347V OUT
120V IN FROM THE INVERTER
1
1
120V OUT TO THE INVERTER
Parts List
DESCRIPTION
COVER
CABINET
UNIT MOUNTING HSELF(NOT INCLUDED)
INVERTER
BATTERY
TERMINAL BLOCK
AT TEST BOARD MOUNTING SHELF
RELAY
AT TEST BOARD
TEST SWITCH
RELAY
PART NAME
A
3900 14Th. Avenue
Markham Ontario, L3R 4R3
Tel. # 905 948-9500 Fax # 905 948 8673
email: sales@beghellicanada.com
Web: http://www.beghelli.com
CAUTION
TOLERANCES:
.X = .020
.XX = .010
.XXX = .005
.XXXX = .003
FINISH
DATE
DRAWN BY
NOVA UAC WALL MOUNT
MATERIAL
REV
DWG NO
This equipment is furnished with a sophisticated low voltage battery dropout circuit to protect the battery from overdischarge after it’s useful output has been used. Allow 24 hours recharge time after installation or power failure for fullload testing.
PART #
4
3
LD
SIZE
7/23/2013
SCALE
REF NO
DO NOT SCALE
SHEET
2
MAINTENANCE
1. Code requires that the equipment be tested every 30 days for 30 seconds, and that written records be maintained.
Further, the equipment is to be tested once a year for the required duration as per Code. The battery is to be
replaced or the equipment repaired whenever the equipment fails to operate as intended during the duration test.
Written records of test results and any repairs made must be maintained. Beghelli Canada Inc. strongly recommends
compliance with all Code requirements.
NOTE: The servicing of any parts should be performed by qualified service personnel only. The use of replacement
parts not furnished by Beghelli Canada Inc., may cause equipment failure and will void the warranty.
Beghelli Canada Inc., 3900 14th Avenue, Markham, ON L3R 4R3 Tel: (905) 948-9500 Fax: (905) 948-8673
926000144
08/16/2016
Nova UAC Emergency Power Supply System
1440W
Input/Output: 120VAC / 120 or 277 or 347VAC, 60Hz
277VAC / 120 or 277VAC, 60Hz
347VAC / 120 or 347VAC, 60Hz
INSTRUCTIONS
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should always be followed including the following:
1. READ AND FOLLOW ALL SAFETY INSTRUCTIONS
2. Disconnect power before performing work on electrical equipment.
3. Do not use outdoors.
4. Do not let power cords touch hot surfaces and do not mount near gas or electric heaters.
5. Use caution when servicing batteries. Battery acid can cause burns to skin and eyes. If acid is spilled on skin or
eyes, flush with fresh water and contact a physician immediately.
6. Equipment should be mounted in locations and at heights where unauthorized personnel will not readily
subject it to tampering.
7. The use of accessory equipment not recommended by Beghelli Canada Inc., may cause an unsafe condition,
and will void the unit’s warranty.
8. Do not use this equipment for other than its intended purpose.
9. Servicing of this equipment should be performed by qualified service personnel.
10. SAVE THESE INSTRUCTIONS!
INSTALLATION
Caution!
1. Verify on AC LOAD WIRING that the NEUTRAL conductor IS NOT BONDED OR CONNECTED to the GROUND WIRING.
2. Each inverter’s AC output MUST be wired by its own AC OUT line and neutral wires. DO NOT CONNECT the AC OUT
neutral wire to ANY neutral wires in the building. If more than one inverters are installed, DO NOT CONNECT both
neutrals of AC OUT together.
3. DO NOT CONNECT the AC OUT line and neutral to the City AC line and neutral.
4. OBSERVE BATTERY POLARITY. RED is “+” POSITIVE and BLACK is “-” NEGATIVE.
5. The BATTERY CHARGING CURRENT has been factory set. DO NOT adjust it.
6. Disconnect ALL electrical sources including the inverter’s AC and DC inputs before servicing.
7. Note: Airflow is vital to the performance of this product. Install with at least 12" (30cm) clear space on both
ends and do not block ventilation holes.
Hardwired Installation:
1. Extend unswitched 24 hour AC supply of rated voltage to the unit installed in accordance with all applicable codes
and standards.
Leave at least 8 inches of slack wire. This circuit should NOT be energized/live at this time.
2. Open the unit by unscrewing the cover screws on the sides of the unit. The front cover can then be lifted up
and removed (1).
3. Unit is supplied with knockouts stamped into the back and side of the cabinet. Knock out the appropriate hole(s)
and bring wires through the hole(s) into the cabinet.
4. Mount the unit securely into place. The 1440W unit is floor mount only. DO NOT mount unit on wall without
additional support.
5. Make proper wiring connections between the AC supply and terminal blocks within the unit (10)(figure 1).
6. Make proper load connection to the terminal block (10)(figure 1).
7. Batteries are shipped serarately. Install batteries into the cabinet and complete the appropriate battery connection.
8. Uncoil the wire lead(s), connect the red wire to positive battery terminal (+) and connect the black wire to negative
battery terminial (-).
9. Route wires and secure in place.
10. Select Load Operation Mode from the internal toggle switch (8):
“Normally ON” means unit will always transfer AC supply to the AC load output, and provides AC back-up when
supply power fails.
“Normally OFF” will provide AC power inverted from DC battery to the load output only in emergency mode.
11. Replace cover and secure cover screws (1).
12. Turn on AC line voltage supply.
Beghelli Canada Inc., 3900 14th Avenue, Markham, ON L3R 4R3 Tel: (905) 948-9500 Fax: (905) 948-8673
926000324
08/16/2016
Figure 1
4
3
2
1
1
D
D
1
3
2
C
C
PARTS LIST
1.Cover
2.Cabinet
3.Screws
4.Test Switch
5.Diagnostic
6.Inverter
7.AT Board MT Shelf
8.Toggle Switch
9.Relay
10. Terminal Block
277 347V Option
11. Transformer
12. Battery
13. Inverter Display
6
13
4
B
5
7
8
9
10
11
12
PART NAME
A
3900 14Th. Avenue
Markham Ontario, L3R 4R3
Tel. # 905 948-9500 Fax # 905 948 8673
email: sales@beghellicanada.com
Web: http://www.beghelli.com
CAUTION
TOLERANCES:
.X = .020
.XX = .010
.XXX = .005
.XXXX = .003
A
FINISH
DATE
DRAWN BY
NOVA UAC INSTRUCTION
MATERIAL
REV
DWG NO
This equipment is furnished with a sophisticated low voltage battery dropout circuit to protect the battery from overdischarge after it’s useful output has been used. Allow 24 hours recharge time after installation or power failure for fullload testing.
PART #
4
3
2
LD
SIZE
6/19/2013
SCALE
REF NO
SHEET
DO NOT SCALE
1
MAINTENANCE
1. Code requires that the equipment be tested every 30 days for 30 seconds, and that written records be maintained.
Further, the equipment is to be tested once a year for the required duration as per Code. The battery is to be
replaced or the equipment repaired whenever the equipment fails to operate as intended during the duration test.
Written records of test results and any repairs made must be maintained. Beghelli Canada Inc. strongly recommends
compliance with all Code requirements.
NOTE: The servicing of any parts should be performed by qualified service personnel only. The use of replacement
parts not furnished by Beghelli Canada Inc., may cause equipment failure and will void the warranty.
Beghelli Canada Inc., 3900 14th Avenue, Markham, ON L3R 4R3 Tel: (905) 948-9500 Fax: (905) 948-8673
926000324
08/16/2016
Download