PURCHASE DIVISION DEPARTMENT QUALITY MANUAL Revision No. Dt of Revision : 02 : 17.9.2012 Issue No : 2 Issue Dt. : 30.06.2003 Page No. : 1 OF 3 Section Topic Issued by : QA : 0 : FORMAT 6 OF PROCUREMENT PROCEDURE OF CPRI (NON-WORKS) Document : DQM-01 FORMAT NO.:PUR/TENDDOC/P6/06 CPRI www.tenderwizard.com/CPRI Section II -Technical Specification Tender Enquiry No : PUR/ID-19/16-17 Name of the Equipment: AC Three Phase Phantom Load Static Source Note :The Offers should be submitted only in this format otherwise the offer will be liable for rejection A detailed technical catalogue/literature/phamplet and any other technical details shall be sent in hard copy in a sealed cover superscribing enquiry number and due date so as to reach the following address with the due date and time. This is very much essential to evaluate your offer. Name of the Vendor Offer Number and Date Sl.No. Parameters CPRI Specification / Requirements 1 Supply to CPRI, Bangalore 2 Scope 1) Supply, Installation, Commissioning, Demonstration and Training of “AC Three Phase Phantom Load Static Source”. 2 Nos. 2) The intended source shall be suitable to perform accuracy test on single phase and three phase smart meters / prepaid meters / energy meters / wattmeters, as a standalone unit. 3 Construction Qty 1) Portable, Modular, Compact & table top mountable. 2) The intended source shall have variable voltage source, variable current source & variable Phase shifter (for power factor setting). The working concept shall be on phantom load principle. Test parameters shall be displayable by large LCD on the front panel of the source. Page 1 of 5 To be completed by the Bidder Guaranteed Deviation/ Technical Remarks Specify if Particulars (GTP) any 3) The intended source shall be operable by easy key operation, provided on the front panel and / or by remotely from computer. The operation of the source (in both manual and remote mode) shall be user friendly. The source shall be provided with continuous display of instantaneous test parameters (viz. voltage, current, frequency, phase angle (of all three individual phases), power factor (of all three phases). 4) It shall have a three position portable mounting rack for mounting Single phase / Three phase meters of 5kg weight each. 4 Types of Meters intended to be tested 3 Phase 4 Wire LT CT, HT CT PT & Whole current Active, Reactive and Apparent Energy Meters/Prepaid Meters / Smart Meters (in both balanced and unbalanced conditions) in both import and export modes. 3 Phase 3 Wire Active, Reactive and Apparent Energy Meters (in both balanced and unbalanced conditions) in both import and export modes. 1 Phase 2 Wire Whole current Active, Reactive Energy Meters / prepaid meters / Smart Meters, in both import and export modes. 5 Phantom load Source It shall be feasible for variation of test values of various parameters (viz., voltage, current & phase angle) for all three phases independently by using front panel key operation and / or remotely in both balanced & unbalanced modes. 6 Output Voltage range 0 to 300V (L-N) continuous Voltage Accuracy ≤0.05% of range. Overload voltage output Up to 125%. 7 Voltage output distortion Output voltage compliance Output current range < 0.5% (under linear load condition) Overload current output 120A Current accuracy ≤0.05% of range ≥ 100VA 1mA to 100A Page 2 of 5 Current output distortion < 0.5% (under linear load condition) Output current compliance ≥ 200VA Output Voltage to Current phase shift 0-359.99° in R/Y/B phases. Predefined power factor settings UPF, 0.5 lag, 0.8 lead & ZPF. Phase angle accuracy ≤ 0.1° Output frequency 45 to 65 Hz with 0.01Hz resolution. Accuracy ≤0.1% 10 Output Stability Better than 0.02% / hr with integration time of 60 sec. 11 Communication Interface Suitable communication port RS 232/USB shall be provided on the source for interfacing to computer. If RS 232 interface is provided, suitable converter i.e., RS 232 to USB converter shall be provided. 12 Software Suitable control software shall be provided compatible for Windows 7 and higher version. Software shall be user friendly & all the parameters (viz. voltage, current, frequency, phase angle / power factor, vector. Bidder may indicate other parameters also) shall be programmable and displayable on the computer screen. Software shall be supplied in CD media along with Operating manual. 13 Mains Single Phase AC 240V ± 10%, 48-52 Hz power supply. Mains ON/OFF switch shall be provided. 14 Protections Input protection shall be provided by Fuse. Output protection against external short circuit for voltage circuit & external open circuit for current circuit shall be provided. 15 Output terminals Insulated terminals of suitable rating for voltage (R-Y-B-N) and current (R-Y-B) shall be provided on the source. 16 Three Phase Isolation Current Transformer (ICT) Characteristics: 8 9 Page 3 of 5 16 Three Phase Isolation Current Transformer (ICT) Current range:10mA - 120A Nominal frequency : 50 Hz Class 0.1 or better for current ratio and 5min or better for phase angle error. Output power: 60VA (max.) Overload indication shall be provided on the front panel. Auxiliary supply voltage: Single Phase AC 240V ± 10%, 48-52 Hz power supply. 17 Ambient conditions Operating range : 10°C to 40°C Storage temperature range : 10 °C to 45°C 18 Connecting Cables Flexible colour coded cables and / or terminals of suitable rating shall be supplied along with the equipment. Single phase main supply cable of length 2 meters suitable for connecting to Indian type sockets shall be provided. Two sets of output voltage cables (R-Y-B-N) shall be supplied. One end with safety banana plug and other end with insulated crocodile clip. One set of current cables (includes incoming and outgoing cables for all three phases - of current rating 120A continuous) shall be supplied. One end with suitable pin type lugs of suitable rating for connecting to meter terminals shall be provided. 19 Calibration certificate After supply of Phantom load source, calibration will be carried out by CPRI, Bangalore (before installation & commissioning).The calibration results shall adhere to the specification of Phantom load source, failing which the equipment will be rejected. CPRI is NABL accredited laboratory. 20 Accessories Bidder shall specify and quote separately, if any other required accessories are required for proper operation of intended source. 21 General Terms and conditions After supply, the equipment shall be demonstrated to CPRI engineers. Page 4 of 5 21 General Terms and conditions Operating Manual and Service Manual with trouble shooting chart, cables, standard accessories, recommended spares, carrying case shall be supplied along with equipment. Quotation without detailed specifications / drawings are liable to be rejected. Bidder shall quote the cost of manuals, cables, accessories, spares, carrying case etc. separately if they are not included in the basic price. 22 Dimension & weight To be specified by the bidder. 23 Delivery period Within 2 months from the date of our purchase order. 24 Warranty One year from the date of satisfactory installation. PN : 1. A detailed technical catalogue/literature/pamphlet and any other technical details shall be sent in hard copy in a sealed cover super scribing tender enquiry number and due date so as to reach the following address within the due date and time. This is very much essential to evaluate your offer. 2. The supplier shall fill all the points in GTP columns as per the above format given in the specification. 3. The supplier shall submit the offer in the above format only with compliant statement, failing which the offer will not be considered for evaluation. Address : Joint Director (Purchase) Central Power Research Institute, Sir C.V. Raman Road, P.B.No.8066, BANGALORE-560 080. PH. No.080-23602919/23602829. Extn: 2271/2274. Fax : 080 - 2360 4446 Page 5 of 5