Exhibit 8 ITB (RFP) ADDENDUM FORMAT

advertisement
August 26, 2016
ADDENDUM No. 1 TO ALL OFFERORS:
Request for Proposal: RFP # 16-07-05
Description: Commissioning Agent Services
Dated: August 11, 2016
For Delivery to: Alexandria City Public Schools (ACPS)
RFP Due: September 1, 2016

NOTE: This Addendum includes two Exhibits: SD Arch Plans & SD
System Narratives.
PATRICK HENRY PROJECT
COMMISSIONING AGENT RFP QUESTIONS/ANSWERS
1) Are there any drawings or more detailed descriptions of the mechanical
systems for the Patrick Henry Prek-8 School and Recreational Center
project that can be provided?
See attached architectural plans and engineering narratives from the
schematic design package.
2) Are there any lighting controls or daylight harvesting systems to be
included in the commissioning?
Yes, these are anticipated to be part of the final building design.
See system narrative.
3) Is the commissioning agent expected to participate in any design team
meetings, and if so, how frequently?
The CxA may occasionally be asked to attend or dial into a regular ownerarchitect-contractor progress meetings, however the CxA’s primary mode
of engagement will be through Commissioning-specific meetings
throughout the project. We anticipate these projects would occur on
average 1.5 times per month starting in September 2016 going through
project closeout which is scheduled for December 2018. These do not
include field visits required for duct testing and witnessing equipment
startups.
4) Are there any minority/women owned business participation goals
associated with this contract?
No
5) Are there any MBE goals for this scope of work?
No
6) Will there be a pre-bid meeting or walkthrough of the existing site?
No.
7) Will envelope commissioning be required for this project?
No.
8) Article 8 (Services Required), Item m requires written verification of the
owner/operator training. Will video recordings of the training sessions
also be required?
Yes.
9) Does ACPS have a preferred controls vendor, or is this scope being
competitively bid out upon completion of the Construction Documents?
The project will utilize Automated Logic controls.
10) Are any schematic level design documents available?
See response to #1 above.
11) Who is the A/E design team?
Moseley Architects are serving as architect and MEP engineers on the
building. Bidders are reminded that all inquiries on this RFP and the
project shall be directed to ACPS and that contacting the architect is
prohibited.
12) Bullet #1 “Equipment and Systems to be Commissioned – Plumbing
Equipment and Systems” references Solar “as applicable”. Is it anticipated
that Solar PV or Solar Hot water be included in the scope? If so – what is
the anticipated size/capacity?
Solar PV panels are not anticipated on this project.
13) Does ACPS or the City anticipate including Building Envelope
Commissioning as part of the scope? Should pricing reflect such efforts?
Envelope commissioning is not required or desired at this time.
14) Does ACPS or the City require the CxA to commission any electrical
systems including: generators, ATS, switchgear, lighting controls, etc. If
so – please specify what.
Yes. APCS and the City desire the commissioning agent to commission
the generator, ATS, switchgear, and lighting controls such as daylight
harvesting. See electrical system narrative.
15) Only Mechanical and Plumbing systems were included in the scope of the
RFP. Should all other systems not specified be excluded from the scope?
Bidders pricing shall address only the scope described. As requested in
the RFP, bidders are encouraged to provide additional line item pricing for
any additional services which they feel may benefit ACPS and the City
which were not included in the RFP scope.
16) Were any drawings, equipment lists, or any other documentation provided
as part of the package? Only the RFP document could be found on the
ACPS website.
See attached schematic level floor plans and exterior imagery.
17) A systems manual is usually delivered as a component of “Enhanced
Commissioning”, and ACPS has requested that our pricing separate
Fundamental from Enhanced. However, it appears that a mandatory
provision is to provide a systems manual no matter the chosen path. Is
this accurate? Would ACPS require delivery of a systems manual during
a fundamental only path?
Correct – ACPS and the City desire a Systems Manual regardless of
whether or not Fundamental or Enhanced Commissioning is chosen. This
should be included as a line item as required under Article 4-B-9-b.
18) Article 4. (B.)(9.)(a.) – Please clarify reference to section 2.03. No RFP
Body reference could be identified;
The reference to “section 2.03” should read “Article 8 – Services”.
19) Article 4. (B.)(9.)(b.) Is there any specific line by line cost matrix that ACPS
or the City would like to see attached in the cost breakdown to be
submitted? Please provide. Or, is the responder responsible for its own
format? If the latter, how does ACPS anticipate comparative analysis on
pricing submission by multiple vendors with a variety of line by line
categories?
Vendors shall provide their own format for ACPS and the City to review.
Comparative analysis will be performed based on information provided.
20) Article 4. (B.)(9.)(c.) Please clarify reference to section 5.01a. No RFP
Body reference could be identified.
The reference to “section 5.01a” should read “Article 4-B-9-a”.
21) Please confirm that LEED v2009 will be secured and not LEED v4. The
deadline for submission of 2009 is October 2016.
Confirmed.
22) Will audited financial statements be required?
No
23) Will ACPS consider extending the submission deadline?
No.
Note: A signed acknowledgment of this addendum should be received at the
location indicated on the RFP either prior to the due date and hour or attached to
your response. Signature on this addendum does not substitute for your
signature on the original RFP document. The original RFP document must be
signed.
Very truly yours,
Sharon T. Lewis M.P.S., VCO, CPPB
Director of Procurement
Phone: 703-619-8343
_____________________________________
Name of Firm/Contractor
______________________________________
Signature/Title
Date
Download