The Pennsylvania State University South Halls Renovations December 13th, 2011 Addendum #1 – Bid Package 2 Addendum #1 - Bid Package 2 To: ALL PROSPECTIVE BIDDERS From: Barton Malow Company 300 West Pratt St., Suite 310 Baltimore, MD 21201 443.757.1000 phone, 443.757.1011 fax Via: nicholas.umosella@bartonmalow.com The following information for the above referenced project is necessary in the preparation of the steel design-assist proposal. Proposing firms are reminded that they are to acknowledge the receipt of this clarification at the appropriate location on the proposal form. Failure to do so may subject the proposal to be considered as non-responsive. This Addendum #1 dated December 13th, 2011 consists of the following; 1. REVISED STAGE SUBMISSION DUE DATES: a. STAGE 1 TECHNICAL RESPONSE REVISED DUE DATE: JANUARY 10TH, 2012 @ 3:00 PM b. STAGE 2 PRICING RESPONSE REVISED DUE DATE: JANUARY 24TH, 2012 @ 3:00 PM c. STAGE 3 INTERVIEWS WEEK OF JANUARY 30TH, 2012 2. Pre-Bid Meeting Checklist (meeting minutes) – 3 pages 3. Pre-Bid Meeting Sign-In Sheet – 1 page 4. Copy of PowerPoint Presentation – 39 pages End of Addendum #1 Page 1 of 1 PRE-BID MEETING CHECKLIST PROJECT: PSU SOUTH HALLS DATE/TIME: 12/12/2011 @ 11 AM JOB NO. 110523 BID PACKAGE: 2 ATTENDEES: SEE SIGN-IN SHEET COMPANY: 1. State Purpose of Meeting Yes No Remarks: 2. Introduction. Yes No Remarks: 3. State Barton Malow’s Role Yes No Remarks: Design Builder 4. Review Scope of Work Yes No Remarks: RFP Section 00025 5. Review Bid Form Yes No Remarks: RFP Section 000400 Remarks: Email Stage 1 Qualifications Proposal to Individuals listed in RFP on January 10th @ 3PM (Revised by Addendum 1) 6. Review Bid Requirements Yes No 7. Review Tax Requirements Yes No Remarks: Include PA Sales Tax. Tax Exempt items per ACT 45 (see RFP for more detail) 8. Review Alternates Yes No Remarks: None at this time 9. Review Unit Prices Yes No Remarks: None at this time 10. Labor Rates Yes No Remarks: Prevailing rates included on FTP Site 11. Review Union/NMA Requirements Yes No Remarks: Prevailing rates included on FTP Site 12. Review Mark ups for add’l work Yes No Remarks: Will be clarified during short list stage 13. Review Warranty Requirements Yes No Remarks: Will be clarified during short list stage 14. Review Permit Requirements Yes No Remarks: Bidders responsible for trade permits 15. Review Safety Requirements Yes No Remarks: Will be clarified during short list stage Page 1 of 3 PRO 10.1 (12/16/02) 16. Review Insurance Requirements Yes No Remarks: Will be clarified during short list stage 17. Review who holds contracts Yes No Remarks: Barton Malow holds subcontracts. 18. Review Owner’s Facilities & pricing Yes No Remarks: Limit impact to student life. Tight site conditions. NO PARKING IS PROVIDED. See RFP for more detail.. 19. Review Project Schedule Yes No Remarks: RFP Section 00230 Remarks: Offhours work required for outages and noisey activities. 20. Review Overtime Requirements Yes No MINIMUM 15% PARTICIPATION REQUIRED FOR ALL BIDDERS. 21. Review MBE/WBE Requirements Yes No Remarks: 22. Confirm bid due date, time and location Yes No Remarks: Stage 1 proposal due January 10th @ 3pm (revised by Addendum 1) 23. Site Visit after meeting Yes No Remarks: Can be arranged for short listed firms after 1/10/2012 Remarks, Comments, Question and Answers (attach additional sheets, if required): 1. If 15% minority participation is not obtainable due to union labor restrictions, then an explanation needs to be provided in the proposal and another commitment percentage offered 2. All firms need to be prequalified with PSU and Barton Malow. The PSU list is posted on their website. Barton Malow will follow-up with those firms that need to complete our prequal process (Nick Umosella is the contact for Barton Malow). 3. Dates for All three stages of submission will be revised to January. Please see Addendum 1 Narrative for more information. Page 2 of 3 PRO 10.1 (12/16/02) Signed: Nick Umosella Date: 12/13/2011 Page 3 of 3 PRO 10.1 (12/16/02) SOUTH HALLS RENOVATIONS & NEW CONSTRUCTION BP #2 Pre-Proposal Conference December 12th , 2011 Project Team • • • • • • Owner: Penn State University Design-Builder: Barton Malow Architect / Engineer: Clark Nexsen Associate Architect: APArchitects Civil Engineer: Sweetland Design Assist Subcontractors – – – – – – Masonry: Harris Masonry Glazing/Curtainwall: Nittany Building Ext/Int Studs & Drywall: Penn Installations Mechanical & Plumbing: McClure Company Fire Protection: SA Comunale Electrical: Farfield Company Project Overview • Renovations $59M – 4 buildings, 250 beds each – 4 stories, plus basement & attic – Redifer Commons / College Avenue Improvements • New Building $15.5M – – – – 4 floors, plus basement 200 beds / 43,000 SF Standard double rooms w/ wet core Materials, finishes, systems similar to renovations • LEED Certified Master Phasing Plan NORTH O CR SS 1B ING EW CO O LY 1A-2 BS HIB 2C EN PH E ST 2A NS 2B 1A-1 ER LL A H ER OP YT HO RE ER DIF CO O MM NS S PHASING SCHEDULE New 200 bed Residence Hall 1A-1 5/17/2012 – 6/1/2013 1A-2 5/1/2012 – 7/31/2013 1B 5/17/2013 – 12/31/2013 2A 1/2/2014 – 7/31/2014 2B 3/1/2014 – 12/31/2014 2C 5/17/2014 – 12/31/2014 Why Design Assist? • • • • • • Early Involvement Team Collaboration / Problem Solving Enhanced Coordination (BIM) Prefabrication Schedule Cost Management Design Status • Phase 1 Renovations – – – – – Schematic Design Completed: 7/14/11 50% Design Development: 9/7/11 100% Design Development: 10/31/11 50% Construction Documents: 2/3/12 100% Construction Documents: 4/27/12 • Phase 1 New Building – Schematic Design: 10/7/11 – 100% Design Development: 12/20/11 – 100% Construction Documents: 4/19/12 • Phase 2 Renovations – Schematic Design: 10/31/11 – 100% Design Development: August 2012 – 100% Construction Documents: December 2012 North Halls Eastview Terrace SOUTH HALLS COMPLEX SITE PLAN Haller/Lyons Ground Floor Plan – Phase I (Earlier version) Haller/Lyons Ground Floor Plan – Phase I (Ewing/Cross mirror image) Phase I 122 beds/building 244 beds/pair – 488 beds 1,017 beds total 1,041 beds with commons/overflow Perspective with Flat Roof Exterior Wall Section New Building View from McKean and Shortlidge – One Story View from Courtyard – Brick Columns View from Shortlidge – Stone Base Ground Floor Plan Beds Ground First 2–4 Total 23 47 141 211 First Floor Plan 2 - 4 Floor Plans REDIFER DURING WINTER REDIFER DURING SUMMER Site Plan Site Plan Site Plan REDIFER COMMONS – WEST DINING EXPANSION 1 3 2 PROPOSED Bid Categories • • • • • • • 1.01 Masonry 1.02 Glass / Metal Panels 1.03 Exterior Metal Studs & Int. Drywall 1.04 Mechanical / Plumbing 1.05 Fire Protection 1.06 Electrical 2.01 Structural Steel & Misc Metals RFP Table of Contents Section Section Title 00005 Information and Identities 00010 Request for Proposal Table of Contents 00021 Project Introduction & General Requirements 00023 Request for Proposal Requirements 00025 Request For Proposal Scopes of Work 00200 Instructions to Design Assist Contractors 00230 Schedule and Phasing 00400 Proposal Form FTP Site (Section 00005) ftp.er.bartonmalow.com – UserID: bvrstad – Password: 5log42 • RFP • Phase 1 Renovations DD, Phase 2 SDs – Drawings & Basis of Design Narrative • • • • • Bridging Documents BIM Execution Plan Images Existing Building Plans PSU Design & Construction Standards http://www.opp.psu.edu/ RFP Process (Section 00023) • Stage 1 DUE 12/15/11 – Technical Proposal • PSU Pre-qualified • Barton Malow Pre-qualified – Project Management Plan • • • • Staff, site logistics Design-Assist role, drawing reviews, VE Schedule, QC, Safety, BIM Minority participation plan (15%) – Section 00400 Proposal Form (email) RFP Process (Section 00023) • Stage 2 (short list) DUE 01/12/12 – Initial GMP (iGMP) • • • • • Detailed Estimate Basis for Final GMP Contract (Open Book) 100% DD Drawings for Phase 1 Renovations Schematic Drawings for Phase 2 Renovations 50% DD Drawings for New Building • Stage 3 – Interviews 12/16/2012 Other Considerations • • • • • Minimize impact to student life 15% Minority Inclusion (Minimum) Prevailing Wage Include PA sales tax No parking on-site • To obtain a copy of the RFP, go to: http://www.opp.psu.edu/ Addendum 1 • Today’s meeting minutes • Copy of today’s presentation • Attendance log Questions? nicholas.umosella@bartonmalow.com