liilifiHiil5J` ~ Drainage Services Department 10 April 2015 By

advertisement
;;t;;~R*I~
OUR REF: (21) in Ax(2) to EP2/N4/F/43
Environmental Protection Department
*~·~~
Branch Office
YOUR REF :
'11
~
28th Floor, Southern Centre,
TEL. NO.: 2835 1155
IIIJ<:II:ei
liilifiHiil5J' ~
wil!)tl!H
H/6~m
-a=+~
j~iWj cp 'G' tt J\il
130 Hennessy Road,
FAX NO : 2591 0558
~7- ~f!l:
Wan Chai, Hong Kong.
E-MAIL:
vicyeung@epd.gov.hk
ttil
:t.tJ: .
HOMEPAGE: http://www.epd.gov.hk
10 April 2015
By Registered Post & Fax
Drainage Services Department
Environmental Impact Assessment (EIA) Ordinance, Cap.499
Application for Variation of an Environmental Permit
Project Title: Tuen Mun Sewerage- Eastern Coastal Sewerage Extension
(Application No. VEP-471/2015)
I refer to your above application received on 20 March 2015 for variation of an
enviromnental pennit under Section 13(1) of the EIA Ordinance.
Pursuant to Section 13(5) ofthe EIA Ordinance, we have amended the Environmental
Pennit (EP-068/2000). I attach the Environmental Pennit as amended (No. EP-068/2000/A)
for your use.
Under Section 15 of the EIA Ordinance, the amended Environmental Pennit will be
placed on the EIA Ordinance Register. It will also be placed on the EIA Ordinance website
(http://www.epd.gov.hk/eia/).
Please note that if you are aggrieved by any of the conditions imposed in tllis Pennit,
you may appeal under Section 17 of the EIA Ordinance within 30 days of receipt oftllis Pennit.
Should you have any queries on the above application, please contact my colleague Mr.
Johnson WONG at 2835 1107.
Yours sincerely,
(Victor YE
Acting Principal Environmental Protection Officer
for Director of Environmental Protection
Environmental Permit No. EP-068/2000/A
!liJU'fOJ~1UlU1f EP-068/2000/A
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
SECTIONS 10 & 13
llliJWW~-~J
499 Jlr)
1o& 13•
<m
m
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
~~&~~m~~~§~lllm~~m
PART A (MAIN PERMIT)
A$ ~~m1:~$7.t)
Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the Director of
Environmental Protection (the Director) granted the Environmental Permit (No. EP-068/2000) to the
DRAINAGE SERVICES DEPARTMENT (herinafter referred to as the "Permit Holder") on 25 July
2000. Pursuant to Section 13 of the EIAO, the Director amends the Environmental Permit (No.
EP-068/2000) based on the Application No. VEP-471/2015. The amendments described below are
incorporated into this Environmental Permit (No. EP-068/2000/A). This Environmental Permit as
amended is for the construction and operation of the designated project described in Part B of this
Permit subject to the conditions specified in and attached to Part C of this Permit.
fiR tl !I :f;Jt £!~ ~ ~~ {c!:i {~ 19U Cli ~~ {~ 19ll )~ 10 {I~ 8'g ;ijl ~ , !I !Jt {~ ~~ ~ ~
~ (~ ~ ) 1n 2000 if. 7 f] 25 B ~ !I :f;Jt ~lp PJ ~ (~i ij}ft EP-068/2000) :fit 7 9ft: 3% ~ (
"f fm "~ PJ ~ ~ 1¥ A. ") o fiR ~ !I ~ {1~ 19U ~ 13 {1~ 8'g
~ ~ ~ I2Sl ~ ~ ~
!I !Jt ~ PJ ~ 8'g Ej3 ~~ ~i 5J}E VEP-471 /2015 {I~ §J !I
~ PJ ~ (~j 5J}E EP-068/2000) o
tJ "f {I~ §J 8 -§ ?; ;(£ ::$: !I
~lp PJ ~ I*.J (~i 5J}E EP-068/2000/ A) o ::$: ~ {I~ §J 8'9
!I :tJt §lp PJ ~ {'F ~ ~ ~ Ez. '!' Wft
~ PJ ~ lUB pfl ~ Bjj 8'g :j:§ ~ I f¥ Jfi El
, ill ~JJ }!! !:iT ::$: ~ PJ ~ ~ rfl J'U ~ Ez. ~1 ~ 8'9 {1~ {tj:: o
m
m
m ,
*
The issue of this amended Environmental Permit is based on the documents, approvals or permissions
described below:
~~ 11~
8'g !I
§'f PJ ~ ~ 1:& ~ "f J"U
ftj:: - :fit >
t ~ §'f PJ fffl ~ ~:
*
n
m
x:
VEP-47112015
Application No.
$~ilii~
Document in the Register : (1) Tuen Mun Sewerage - Eastern Coastal Sewerage Extension Environmental Impact Assessment
!! §~ lffi J: ll'g ::><: {tf: :
(Register No. AEIAR-034/2000) [Hereinafter referred to as the
" EIA Report"]
"tB r~
$ 5HJ J1t 5'5 1.K 49:
~ ~JE 1$ M I t¥ l~
*
~~§~13
(~ §[, ~i
(2)
5ift :
*
AEIAR-034/2000)
m
["f ffl} "$
f& 15- "]
The Director's letter of approval of the EIA Report dated 7 June
2000 (Reference: Ax(2) to EP2/N4/F/43)
m
~ ~
2ooo if. 6 fl 1 a ~ tB
>t
{tj:: (m; ~ ~i iJm : Ax(2) to EP2/N4/F/43)
tn
(3)
~
A
!I
§~
¥&
'* as 1§
Environmental Permit No. EP-068/2000/A
Jlijl~PJ1t1UI~ EP-068/2000/ A
Holder on 26 June 2000 (Application No. AEP-068/2000)
8lf PJ Mf
PJ m Ef!
(4)
~ *I
g~ ( $
A m- 2ooo if. 6 B 26 E3 m x 81
~ ~ ~i 5fff : AEP-068/2000)
~ ~
8t
Environmental Permit (Permit No. EP-068/2000) issued on 25
July 2000
m- 2ooo if. 1 B 25 a
# t:e 91
~
:tJt 8t PJ m c8t PJ m
~i
5fff : EP-068/2000)
(5)
Application for Variation of an Environmental Permit including
all attachments submitted by the P~rmit Holder on 20 March 2015
(Application No. VEP-471/20 15)
gLf PJ m
:tJt 8t PJ
*I A m- 2015 if. 3 B 20 E3 m x 81 ]!! '& ~
m Ef! g-~ -eJ M ?!T ;pf ~1 ftt= cEf! ~ f!? ~i 5m :
~
VEP-471/2015 )
Application No. Date of Application
Ef!
g~
:m
~i
Ef!
g~
E3 WJ
e
5m
VEP-471 /2015 20 March 2015
2015 if. 3 B 20
List of Amendments Incorporated into
Date of Amendment
this Environmental Permit
{I~ g} E3 WJ
-eJ ~ 1£ :2$: !!l
8t PJ
r7q s'9 11~
:IJI El
Vary Scale and Scope ofDesignated 10 April2015
Project(s) in Part B of the
2015 if. 4 B 10 E3
Environmental Permit No.
EP-068/2000
~ "& ~ :tJt 8t PJ
~i 5m
EP-068/2000 81 B f5B 81 :j:l§ ~ I
E3
m
n
m
m
f~ r~
El 8'9
m t~ w me m
Add Condition 1.13 in Part C of the
Environmental Permit No.
EP-068/2000
1£ !I ~ 8t PJ m ~i 5fff.
EP-068/2000 C f5B 1.JD A
1.13
m
J~
fl* {tf:
Vary Conditions 2.2 and 2.11 in Part
C of the Environmental Permit No.
EP-068/2000
]!!"&~m8tPJm~i5m
EP-06812000 C
2.11 J~ 11* {tf:
f5B 81
m 2.2 &
Vary Figure l(b) of the
Environmental Permit No.
EP-068/2000
]!!'&~~gLfPJm~i5m
EP-068/2000
2
81
~
l(b)
Environmental Permit No. EP-068/2000/A
J:ll:f.i~PJmfiii$1f EP-068/2000/ A
10 April2015
2015 1¥- 4 FJ 10 B
Date
BWJ
Acting Principal Environmental Protection Officer
for Director of Environmental Protection
~±.lfw-@1~~-&
c~JJ.§~~m1w-~~::t 1Im~tt~1-t1~)
3
Environmental Permit No. EP-068/2000/A
Jl:f;l~filJll:lUI~ EP-068/2000/ A
PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B $ (j:§)EI~JJl § ®~f!f3)
Hereunder is the description of the designated project mentioned in Part A of this Environmental
Permit:(the Permit):
""f 5U ~
~51 ~
:
*
t~
!J!
~If
DJ m eT ff!J
"~If
DJ m
")A
fiB rff
m itlt 1¥1 :t§ ~ I
f~
Jfi El 1¥1
Sewage Pumping Stations at Tai Lam Chung Tsuen, Luen On San
Tsuen, Tai Lam Valley and Lok Chui Street near Castle Peak Villas
under the scope of "Tuen Mun Sewerage - Eastern Coastal
Sewerage Extension" [This designated project is hereinafter referred
to as "the Project"]
"TB F~ Jf! fiB >fi i$ 5'5
4)1: ~ ~ Me {$ g I f~ "lJii ""f
mm:*m~~·•Y:~ N ·*-~ w ~&~~
00 }11 N LlJ 73U ~ 1¥1 5'§
~ )Ir!J
[}§ :j:§ ~ I f~ lJii
El ""f ffl} "I f~ lJii § "]
Nature of Designated Project Construction and operation offour sewage pumping stations.
Title of Designated Project
-~I~~§®i!l
m
*
*
0
-~I~~§®tt
-~&-~~@~*~~
0
jf
Location of Designated
Project
-~I~~§®~
~
Tai Lam Chung Tsuen, Luen On San Tsuen, Tai Lam Valley and
Lok Chui Street near Castle Peak Villas.
Figures l(a) and 1(b) attached to this Permit shows the locations o
the proposed works.
*m~ N ·•Y:~ ~ -*~ w ~&~•ooili
w LlJ
73U ~
o
m
3i
~ I
f~ 8"1 fiT. !i ~ M: ;;$: ~lf DJ
8"1 ~N !il 1(a)&
1(b)
A sewage pumping station at Tai Lam Chung Tsuen of size
measuring about 17.2m x 12.7m x 6.6m(Height) with a pumping
capacity of about 3,980 m3 per day;
a sewage pumping station at Luen On San Tsuen of size measuring
about 10.5m x 7.0m x 6.7m(Height) with a pumping capacity of
about 2540 m3 per day;
a sewage pumping station at Tai Lam Valley of size measuring
about 19.0m x 13.0m x 6.7m(Height) with a pumping capacity of
about 6,230 m3 per day; and
a sewage pumping station at Lok Chui Street near Castle Peak Villas
of size measuring about 15m x 23m x 6m(Height) with a pumping
capacity of about 9,420 m3 per day.
- 1~ 1rr.
~ >m N .
1} ~ 11.2
x 12.1
x 6.6
er'@]
~
:i: ~"J 4jJ
3,98o JJ.. 15
1¥1 5'5
~
0
Scale and Scope of
Designated Project(s)
-~I~~§B"J;ijl
m®.SII.I
*frr!l '
-
*
m:
r.t ).
@ {IT.
er'@] r.t
~.
* ;&
-
@ {IT.
(~ N
~
-
@ {IT.
*m
***
** **
*
*
15 * 1¥1 5'5 1.K
*
*
15 * 1¥1 5'5 *
m: ~m; 11: ~JT N ' l j \ ~"] 10.5
). ~ ~~ ii: ~ e *- 2,54o JJ..
*
m LlJ
)·
:ii
m:
m:
~ ~F
*
e 7:.
~ '
~"J
~"J 19.0
6,230 JJ..
lj \
~ ~ fij }11 ~ LlJ 73U ~ '
X
X
*
7.0
13.0
~"] 15
X
X
6.7
~
6.7
~
*
..-=..
~·..··~~
~--------~~~
4 ~~~~~~--~~~
lj \
X
Environmental Permit No. EP-068/2000/A
J.I:!Jli1filJil1Ui~ EP-068/2000/ A
23
* * *frti
57§ 7.)(
X
6
(~
f.i ) )
0
5
*
~~= ii
t0 tiJ 7:.
9,420 iL
15
* B"J
Environmental Permit No. EP-068/2000/A
JJm~OJiifUii!M EP-068/2000/A
PART C (PERMIT CONDITIONS)
c fm c~ormf&1Wf:)
1.
General Conditions
-§i~itf
1.1
The Permit Holder shall ensure full compliance with all conditions of this
environmental permit. Any non-compliance may constitute a contravention of the
EIAO and may become subject of appropriate action to be taken under the Ordinance.
~~mM~A~~~~~~~~*~~~~m~~w
G# o ~~~~~*~~m~M~ , ~~-~~&~~
-~~m~,®~~~m••~~~~~fi~ o
1.2
The Permit Holder shall ensure, from time to time, full compliance with all legislation
in force including but without limitation to the Noise Control Ordinance (Cap. 400),
Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap.
358) and Waste Disposal Ordinance (Cap. 354). This Permit does not of itself
constitute any ground of defence against any proceedings instituted under any
legislation.
~~mM~A~~m~~% ~ ~~mfi$~~m~,
19U:StD : Di :gr ~ FM 1~ 19U (~ 400 ~ ) ; ~ ~ 5'5 ~ ~ FtiU 11~ 19U (~ 311
~ ) ; 11<. 5'5 ~ ~ tU 11~ 19ll (~ 358 ¥ )_& M 1o/J J!1R 1I {I~ 19U (~ 354
~
0
)
*
P¥ m ~ 1:r
1.3
m * ~ ~ 11 J¥x
foJ rJL ro=¥ IJ. El3 °
~t ~
t~
• i:I
foJ
$ 19U
m ~ s'9 * 1l fj_
The Permit Holder shall make copies of this Permit together with all documents
referred to in this Permit or the documents referred to in Part A of this Permit readily
available at all times for inspection at all sites/offices covered by this Permit. Any
reference to the Petmit shall include all documents refened to in the Permit and also
the relevant documents in the Register.
~~mM~A~~~*~~m~•*'~~*~~~
ffiill~ffi~~~~*~~~ A Wffiill~~,~mfffoJ~
~~~*~OJ~ffi~-~ffi~I~ / ···-~
0
~
mill*~~m,~~~*~~~ffiill~ffi~~#~~
§c mr
1.4
~ ~
tEl
~m
x.
1tj:
0
The Permit Holder shall give a copy of this Permit to the person(s) in charge of the
site(s) and ensure that such person(s) fully understands all conditions and all
requirements incorporated by the Permit.
~~mM~A~~*~OJm~
ili·*~~~UI~
~~-A,~~~~®A±~~~8*~~~~ffi~
{I~
1.5
1tj:
~
j;J!
~
o
The Permit Holder shall display a copy of this Permit on the construction sites at all
vehicular site entrances/exits or at a convenient location for public information at all
times. The Permit Holder shall ensure that the most updated information about the
Permit, including any amended permit, is displayed at such locations. If the Permit
Holder sunenders a part or the whole of the Permit, the notice he sends to the Director
shall also be displayed at the same locations as the original Permit. The suspended,
6
Environmental Permit No. EP-068/2000/A
J::I~~PJ~1UI!m EP-068/2000/ A
varied or cancelled Permit shall be removed from display at the construction sites.
~~m~~A~~~HH~I~~ M ~- - ~~o~
- ~~~~~,B~~~~m~•~,~m0~~aw
~ ~~~-
o ~~m~~A~ ~ ~~~®~U~~H
~ §4= ~
§ t3 1± 16J ~! {I~ §J ~ glf 0J
)B'g
~Jf ~ 7f4 o ~D
*~~m ~ ~A~~~~m~M~~~M,~~~~
~~~~~~- , ~-~~~~~m~%•ffi~ ~ ~
~~ o m~~~M·~a~~~~~~m~~~H~I
m-
m(
m m:
tt!!,~T,
::f~~~
o
1.6
The Permit Holder shall design, construct and operate the Project as described in Part
B ofthis Permit.
~~lli~~A~*·*~OJm B M~~~~~ - H~&
~Wl¥It~r~ § o
1.7
The Permit Holder shall ensure that the Project is designed, constructed and operated
in accordance with the information and recommendations described in the EIA Report
(Register No. AEIAR-034/2000), the application documents including all attaclunents
(Applications No. AEP-068/2000 and VEP-471/2015), other relevant documents in
the Register; and the information or mitigation measures described in this Permit, or
mitigation measures to be recommended in submissions that shall be deposited with or
approved by the Director as a result of permit conditions contained in this Permit, or
mitigation measures to be recommended under on-going surveillance and monitoring
activities during all stages of the Project. Where recommendations referred to in the
documents of the Register are not expressly referred to in this Permit, such
recommendations are nevertheless to be implemented unless expressly excluded or
impliedly amended in this Permit.
~OJlli~~A~~~I~~§~~~-H~&~WJ¥,~
?.~ T Wt ~ *4 &
~m ~
$ gif ¥& ~ c~
*i 5JJt :
AEIAR-034/2000) ~ lftt ~ ~ *4
lifl ; $ §~
14 § 13 pJT ~ !Yft {tj::
($ ~ • *i 5J}t : AEP-068/2000 & VEP-471 /2015) ; ~ g[. ffi} ~ 8-'g ~ fit!. tEl
:
m nm
;fO H
*c
X.
w
HX.# ; &*~OJmM~~~-~~-Mm~ , ~m•
~~~m~•~~#~~¥~~~~a¥~ m *~m
~X.#MHliflB-'9•mm~ ; ~~I~~§% ~ m~fl
~~m~~;fO~~I~AADlifl~-Mnf~
14 PJT Wt
5j ~ ~ ~ 84= ~
~ ~
~
X.
~
1.8
B•
® D lifl , ~#;
~F
a
m
~
84=
~
m BJ3
*
o
, f!U
~~~ W
1JJ ~WJ W ~
~ ~ ~ ~ ~,k ~ {I~
gJ
o
All deposited submissions, as required under this Permit, shall be rectified in
accordance with the comments, if any, made by the Director, within one month of the
receipt of the Director's comments or otherwise specified by the Director.
M~~*~~mm~~~ ~ x_#,~~ma¥~B-'9•
~ (~D ~ ~ )1~ - {~
8'g • ~ :IJD t) {I~ lE o
1.9
J3
~ (~#; ~F ~ ~ ~
1:Y tl3
~
),
f~
•
~ ~
All submissions approved by the Director, all submissions deposited without
comments by the Director, or all submissions rectified in accordance with comments
by the Director under this Permit shall be construed as part of the permit conditions
7
Environmental Permit No. EP-068/2000/A
Jl:fliffilJlilf*i~ EP-068/2000/A
described in Part C of this Permit. Any variation of the submissions shall be approved
by the Director in writing or as prescribed in the relevant permit conditions. Any
non-compliance with the submissions may constitute a contravention of the EIAO.
~~ m *~m~m~~# · ~~~~~~-~~m~
~~~ #, ~m•* ~ ~mm~~~~~~• ~ •n
~ m~ m ~~#,~~~•~*~ ~ m c$ ~ ~~ ~~
m•# ~ - $ft o m ~~ # ~~ff~• n' ~~~~~
~•oo m *~N~~H ~ ~m•# n ~~m~ o ~~
~N~m~~#~m~ , ~~•~•&$~- ~ ~m
~
1.10
0
The Permit Holder shall release all finalized submissions, as required under this
Permit, to the public by depositing copies in the EIAO Register Office, or in any other
places, or any internet websites as specified by the Director, or by any other means as
specified by the Director for public inspection. For this purpose, the Pennit Holder
shall provide sufficient copies ofthe submissions.
~~-~~A~~m~~*~~mm~m~~~#~
M0~~0~A±~ili
,
~$~~~~~#m*~~
~~~~-~~-~~~w•••,~~~m~~ff
~ ~ ~~ ~,~~~ m ~~ff~~-~~~ , ~~~~
m~~ff~~~~$ , ~~0~-M o ~~ , ~~m~
~A ~~ m 1~JE~ffl~!i~:fl*
1.11
0
The Permit Holder shall notify the Director in writing the commencement date of
construction of the Project at least 4 weeks before the commencement of construction
of the Project. The Permit Holder shall notify the Director in writing immediately if
there is any change of the commencement date of the construction.
~~m~~A~~~OO~~I~ZM , ~~m• 4 @£
M~·®~~ ~ ~~I~~~IBM~~~~o ~ ~
I B M ~ 1:f fciJ ~ 25c , glf ~
~ ~ A 16, ~~ fL riP J;J • ® ~
m
~}m~~-&
1.12
o
All submissions to the Director required under this Pennit shall be delivered either in
person or by registered mail to the EIAO Register Office (currently at 27/F, Southern
Centre, 130 Hennessy Road, Wanchai, Hong Kong).
*~~mm~~~~ m ~~ m ~~#,~-~~~~
tJ Jt~ 5m ~ ~ !!!~ ~ ~ f~
:tll:: P.& : ~ ~ ~ fi- ~f Jb
1.13
MP- 19U ~ ~c w D • • CfJ?.
9=' ~ ~, 21 tt )
~Jt
0
For the purpose of this Permit, "commencement of construction" does not include
works related to site clearance and preparation, or other works as agreed by the
Director.
P.&~1J-*~~m , r ~~I;f~~~oo J ~1~JJ~~m~rtili~~f!.&ffi1i ~I;f~ , ~~
~ [0] ·~~1i!LI;f~
2.
m w~ • 8f 1ti
w m Bo 5m ~~
o
Measures for Construction and Operation of the Project
~~&B¥h¥IJilf{§ffi~f*I&®fiJ.i(g
8
Environmental Permit No. EP-068/2000/A
Jl:t.i~PJi11UI!t'f EP-068/2000/A
2.1
An Environmental Team (ET) shall be established at least one month before the
commencement of construction. The ET shall be headed by an ET Leader who has at
least 7 years' experience in environmental monitoring and audit (EM&A) or
environmental management. The ET Leader shall be responsible for the
implementation of the EM&A programme in accordance with the EM&A
requirements as contained in the EM&A Manual. In addition, the ET Leader shall be
responsible for certifying the environmental acceptability of permanent and temporary
works, relevant design plans and submissions.
1£ J& lffl ~ ~
f¥
~
@l J=.l f1X
{~ ~
;J, ~il o ~
nm
m J, ~ ~J!J rn - ~ 1± :£~
~ & ~ fi< Q,\(; ~ ijt ~ fJ. 11
0r ~ 1 1F ~! ~ ~ ~ m ,J, ~il ~il -& ti w :£~ m ,J, ~il ~il -&
.I
ym~
M
1
0
oo
~
~~
nt
$ijt~~&~~*oo~~~$m~~&~~m~·~
nfE ~ mm :Ei ijt ~ ~ & ~ ri< ~t m~
)7~ , :£~ ijt 'J' ~il ~il
~J!J ~
m*~&~~.I~1:E~m~~~* ~ ~~· ffi g~~
~t [11 ~u ;fO ~
ftt=
0
x :x:
2.2
llt
-&
0
An Independent Environmental Checker (IEC) shall be employed by the Permit
Holder at least one month before the commencement of construction of the Project.
The IEC shall have at least 7 years' experience in EM&A or environmental
management. The IEC shall audit the overall EM&A programme including the
implementation of all environmental mitigation measures, submissions relating to
EM&A, and any other submissions required under this Permit. In addition, the IEC
shall be responsible for verifying the environmental acceptability of permanent and
temporary works, relevant design plans and submissions.
@l
m
m
~m ~ ~ I f¥ M ~ 0r J=.J • ~Lf ~
~ ~ A. {~ ~
- ~~n~~~~A o ~~~n~m~~A~1:E~m
~ ~ JSz.-~Q,\(;~ijt~fJ.1J[§]~jr~ 7 $~~ o ~JL$ijt
1± J&
~~A~-~--~~m~ ~& ~~~~
~
~~-~
m~~ijt•mm~·m~~g~m~•&•~~x#·
tJ- & ~
~ ~
f'lJT ~ >.~<: ~ ~ ft!?.
ftt=
)7~ • ~
~
~~A~~-*~&~~.I~1£~ijt~~~m ~ ~
~ • if§ ~m ~ ~)t: §t lil ~u ;fO
ftt=
x
*
:x:
m
m x :x:
2.3
0
n
llt
m
0
At least 4 weeks before the commencement of the construction of the Project, the
Permit Holder shall submit to and obtain approval from the Director an EM&A
Manual for the construction of the Project.
1:E~~.I~~IfflM~0/ 4 @l~M·~~m~~A~~~
-&mx - ffi~m~~&•~*oo·~m~-&m* · Y ~
}l fr I t¥ r~ El
0
2.4
Before the submission of the EM&A Manual under Condition 2.3 to the Director, the
EM&A Manual shall be certified by the ET Leader and verified by the IEC as
conforming to the information and recommendations contained in the EIA Report. All
measures recommended in the EM&A Manual shall be fully implemented in
accordance with the requirements and time schedule(s) set out in the EM&A Manual.
1± :Eg ~ ~ ~ & ~ fi<
fAT f~ tf 1~ ftt= ~ 2.3 r~ ~
~
~
-& M ·
~~
7t rn
:£~
*
m ;J,
~ ~il
-& fi<
m~
rn
1~
m mx
m ~ fi< A
n :Ei
~W·m~~N~~~~*M•~•~&~• o ~ijt
9
~~
Environmental Permit No. EP-068/2000/A
!l:f.l~PJMf$1~ EP-068/2000/A
•&•~*w••~m~m~ , ~~m~~~~•&
•~*Wffi~m~w~oo~~~~fi o
2.5
The Pennit Holder shall, within 4 weeks after the commencement of construction of
the Project, inform the Director in writing the management organization of the main
construction companies and/or any form of joint ventures associated with the
construction of the Project. The submitted information shall include at least an
organization chart, names ofresponsible persons and their contact details. The Permit
Holder shall inform the Director in writing any subsequent changes within 2 weeks of
such changes.
~~mm~A~~-~I~R~~ 400 £M~,m~¥
-~0~& / ~WI~~§ffi~ff~m~~~-~­
~fi~~-,~-®~~-~ o m~~W~~¥~~~
ffi~B~·~·A~ft~&-~W~ o ~~ff~&
•,~~mM~A~~~®£M~~-®~~~~ o
2.6
Three sets ofWaste Management Plan for the construction stage of the Project shall be
deposited to the Director within 6 weeks after the commencement of construction of
the Project. The Plan shall be certified by the ET Leader and verified by the IEC as
confonning to the information and recommendations contained in the EIA Report. The
Plan shall describe the arrangements for avoidance, reuse, recovery and recycling,
storage, collection, treatment and disposal of different categories of waste to be
generated from the construction activities and shall include the recommended
mitigation measures on waste management in section 7 of the EIA Report. Such a
management plan shall include the designation of areas for segregation and temporary
storage of reusable and recyclable materials and disposal location of different
categories of waste. All measures in the approved Waste Management Plan shall be
fully implemented throughout the entire construction period.
~ • ~ I t~ B 1ffl ifft 6 {~ £ M ~ , ~~ t~ 3 ~ I t~ J~ § • ~ ~~
~~ ~ JJ~
!jo/.J fi
~
*t jliU m ~ •
~
t¥
-n:x.
0
*t mu
~~
m~
~
J\
1
~].
~~~m~El3~n~~~~A~~,m~~M~~~
ft~ffi·~-~&-• o *~~~~-~~-ffi~~
~~--!jo/.]~-~~~·~~ffl·@®·~~~~·~
~
~ JJ.
~
'f}; ~~ , ~ ~~ ~ ~ ~ ~1
~ ~ 1 ~ ?JT
••~R!jo/.]fi~•mm~ o ~fi~~~~~~ffl~ft
t¥ · 4:X.
w m
·
ft
~w~~~ff:~~~mw~~~~!jo/.J~~m~~~,
~&~•R!jo/.J~~m~~ o mm*~R!jo/.Jfi~*E~
m~m~ , ~~~-~-~m~~~~fio
2. 7
At least 4 weeks before the commencement of the architectural finishes, landscape
works or compensatory planting of the project whichever is the earlier, the Pennit
Holder shall notify the Director of the commencement date and deposit with the
Director 5 sets of architectural finishes drawings, landscape plan including
compensatory planting. The architectural finishes drawings for the pumping stations
and landscape plan shall be certified by the ET Leader and verified by the IEC as
confonning to the requirements set out in section 10 of the EIA Report before deposit.
~
B !m •
m¥
Y
4@
~
£
:ttt
~
I
t~
· ff ®.
m (PJ ~ £f. ~
~
10
~
$ ),
11:, I
~ ~
t~ ~
:fm
{~
mM ~ A
fl ti
I
~~ t~
1ifE I
fl=
Environmental Permit No. EP-068/2000/A
JJm~OJ~lUI~ EP-068/2000/ A
8 ~ w~
f!: 11 tl 8'9
-& , :ME rtJ ~ -& 1¥ nfx. 5 ~ ~ ~ :ttt ~ !i1 flU & ~ ~
ID'l ~ 1t fll f!U ~ M B'g ~ ~ :ttt ~ Ill f!UEz. jjt- ID'l
~ 1t !i1 f!U1± 1¥ 11x. Z. M , {~ E13 I~ tJ[ 1j \ ~Ji ~Ji -& ti< m :ME E13 1mJ
n I~ tJ[ ~ ti< A ti< 1l , m E!lj ~ r-i= ~ I~ ~¥ ~
~ 10 w B'g tYl
~
jjt-
o
'*
JEo
2.8
At least 2 weeks before the Project commences operation, the Permit Holder shall
notify the Director of the operation conunencement date.
1±I~~§¥UM~~ 2 00£~,~~m~~A~~­
¥JJ¥ 8 ~
~ -&
wm
2.9
0
At least 2 weeks before the Project commences operation, the Permit Holder shall
deposit
with
the
Director
5
sets
of
detailed
architectural
fmishes/landscape/compensatory planting as-built drawings showing the final finishes
and locations of all planting within the project boundary to demonstrate compliance
with the submissions under Condition 2.7. This final set of as-built submission shall
be certified by the ET Leader and verified by the IEC to demonstrate that Condition
2.7 is fulfilled. The final finishes and locations of all planting as shown in the
architectural finishes/landscape/compensatory planting as-built drawings shall be fully
implemented.
1±I~~§¥UM~~ 2 00£~,~~m ~ ~A~fciJ­
-& ff 1fx. 5 ~ ~~ ~ffi 8'9 ~ ~ :t!:t ~ I~ lf5l ~ 11:, I~ f~ ~ fl lr~ I liiJ '
•~I~~§E~~B'g•~ m ~&m~m•~u , ~
m E!lj r-i= ~ t~ ~ 1~ 14 ~ 2.1 r~ t£
14 8'9 tYl ;E
~
1~
B'g tr~ I lil {~
fft tJ[ 'J \ ~ii ~ -& fi< m :ME
1mJ n ~ tJ[ ~ ti< A
tffi: ~ , m B
A e 1:-i= ~ 11~ 14 ~ 2.1 r~ B'g tYl ;E
~~
~ & P
IT ~
tt
~ ~~ 1:& ~.~ ~ ~
~ ;jjt- ID'l ~ 1t ~~ 1~ ~ tt rr~ I !il
x: x.
m
0
m
0
5G
2.10
wr ttt u
~
¥A fj
:ttt
:ttt
0
rs, ~'x
~g
B'g
~ ~
0
The Permit Holder shall implement the following measures during the operation ofthe
pumping stations to minimize noise impacts:~~m ~ ~A~tt~M¥U~~ ¥A ffT~m~,~I
I?
_,
(a)
(b)
Do:'f'c ::ft. .!i!.~ ~
mB.!Tvl':'f'
:
the walls of the pumping station shall have thicknesses of at least 150mm; and
~ Jtti B'g !mY m
f.l ~~ ~ ~ :F.& t5o ~
&
the submersible pump(s) and the stand-by pump(s) shall be housed below
ground level and under a cover.
1.K @: ~ Ez. 1~ ffl ~ ~~ 11x.
1± tfu 00 W- T , :ME 1JD ...t ~ o
*:
w.
m
2.12
•
The Permit Holder shall install de-odorizing plants in each of the pumping stations to
minimize potential odour impact during operation.
~ ~m~~A~1±@00~M~~~~~-,~-~­
¥JJ¥ ~
2.11
•
m:
Environmental Permit No. EP-068/2000/A
Jlijl~'filJi«f$1tJ[ EP-068/2000/ A
~~m~~A~~~MWUM M ~fiTMm~
y
(a)
w:-
·
~~
7_K ~ ~
the overflow bypasses at the pumping stations shall be used in emergency
situations only and no effluent shall be discharged during regular maintenance;
and
~M~-~~R~~~~M~T~ffl·~~~~
M ~t
(b)
11~
I fF
~
ff M Fs, /F
1~ ~I=
t±\ jg 1.K ; Ez.
each of the pumping stations shall be equipped with stand-by pump(s),
emergency power supply and telemetry system to cater for the failure of the
duty pumps during operation.
§OO~M~~~~•m~~~~m•&•~~
~·~fiWUMM~~~~%*~tl:lm~-~~
tJ
1~
m
0
3.
Environmental Monitoring and Audit (EM&A) during the Construction Period
W!
I Ji M Fd1 ((9 :El il § 5~U & If ~
3.1
The EM&A programme shall be implemented in accordance with the procedures and
requirements set out in the EM&A Manual. Any changes to the programme shall be
certified by the ET Leader and verified by the IEC as conforming to the requirements
in the EM&A Manual and shall be approved by the Director.
m
~m§•&•~~-~~~~m§ • &•~*wma
fE
m~
1:r
1f:
*t
rn
~
YW :$<o ~
foJ ~ & , ~fJ
ii tJ[ 1J\ ~ ~Ji
~~m~rn~~~m~~A~W · m~~~~$m§
ff &
0
•&•~*WMam~·~&~m~~ m * o
3.2
Samples and measurements for noise and air quality shall be taken in accordance with
the requirements ofthe EM&A Manual by:
~~~~tj[§•&•~*$~m~·~fi~fi&~•
t~
Ez.
)~U
:!i I fF :
~ ~
8'9 E&
(a)
conducting baseline noise and arr monitoring at specified locations and
frequencies;
~m~ ~ ~~fim~*•~~fi&~-~~~­
§
(b)
(c)
)~U
conducting impact monitoring on noise and air quality at specified locations
and frequencies;
~ m~~~~fim~*•~~fi&~-~~~•
§ )J!U ;
carrying out remedial actions, in cases where specified criteria in the EM&A
Manual are exceeded, in accordance with the Event and Action Plan as set out
in the EM&A Manual; and
~*m~fflm~•&•~*$m~~•$·~~
~~*iim~•&W~* WM ~ ~ -#&fi~~
flU ·
(d)
;
i* E& *ifft1:S: ~;
&
logging and keeping detailed records of (a) and (b) above, within 3 working
days after collection of data or completion of remedial action, for the
preparation and submission of the EM&A Reports and to make available the
12
Environmental Permit No. EP-068/2000/A
JI~~PJmli~ EP-068/2000/ A
information for inspection on site.
tt~---~~~M~fi ~ ~ 3@ I ~ *~~-~
1¥J
}ill (a) ~ (b) ~
&-~~~
3.3
gt
·
~~
1'F
, ffl
~
{m
fD
m: x
m F.l
:£~
m~
~
~ - ~~ g ~~~~tti ~ ~ ~ o
All environmental monitoring and audit data submitted under this Permit shall be true,
valid and conect.
m•*~~mm:xi¥Jffi~~m~•&•~• • ~~•
m
:ffit ~0
Q
~
0
1' 1 \ \
3.4
Two hard copies and one soft copy of the Baseline Monitoring Report shall be
submitted to the Director at least 4 weeks before the commencement of any
construction works. The submissions shall be certified by the ET Leader and verified
by the IEC. Additional copies of the submission shall be provided upon request from
the Director.
ttff~-~I~~~M~~ 4 00£M·~~~~~x~
G~~ft~I¥J~ffi~m*W - ffi~•*
~~~~~
r~
!J\ ~JJ. ~JJ. ~ :ft
~o 1§ll
r~
~ :tt A :tt
~ ~ ~ ~
m
m
n
* ?ff m: x ~ ~ 8~ ~ )1~ *
•
3.5
w
m
0
o
Two hard copies and one soft copy of monthly EM&A Report shall be submitted to
the Director within 2 weeks from the end of the reporting month. The submissions
shall be certified by the ET Leader and verified by the IEC. Additional copies of the
submission shall be provided upon request fi·om the Director.
rr~m:xft~I¥JF.Jffi~*~ 2@ £M~ · ~~~~m:x
a F.J ~m~~&•~~~~¥J~ffi~m*W - ffi~m
~ ~ ~ ~~
I.W
;J\ ~Jl ~Jl ~ :tt
~o 1§ll
r~
~ :ft A
:ft ~ o ~ -& ~ ~
?ff
~ ~
~ )1~ :fi 7-fs: o
*;
3.6
rn
*
m
m:
x
I¥J
m
n
m
The actions described in the Event and Action Plans of the EM&A Manual shall be
fully and properly canied out, in accordance with the time frame as set out in the
Event and Action Plans, or as agreed by the Director.
~m~•&•~*$ 1¥J 5# / fi~*~ffi~~I¥Jfi
~·~~~5# / fi~* E ffi D ~I¥J~~~ ~ ~~ ffi
roJ ~ tt\ f=J
0
4.
Electronic Reporting of EM&A Information
!llf!~~&!fff<1i?IS!e'91:r~¥H
4.1
To facilitate public inspection of the Baseline Monitoring Report and monthly EM&A
Reports via the EIAO Intemet Website and at the EIAO Register Office, electronic
copies of these Reports shall be prepared in Hyper Text Markup Language (HTML)
(version 4.0 or later) and in Portable Document Format (PDF version 4.0 or later)
unless otherwise agreed by the Director and submitted at the same time as the hard
copies as described in Conditions 3.4 and 3.5 above. For the HTML version, a content
page capable of providing hyperlink to each section and sub-section of these Reports
shall be included in the beginning of the document. Hyperlinks to all figures, drawings
and tables in these Reports shall be provided in the main text from where the
13
Environmental Permit No. EP-068/2000/A
Jl:fjtf!FPJlM$1~ EP-068/2000/ A
respective references are made. All graphics in these Reports shall be in interlaced
GIF format unless otherwise agreed by the Director. The content of the electronic
copies of these Reports must be the same as the hard copies.
~~~0~m~~~~~~-~~M®~~m~•~
~~~~~w•••~M~-~~Q~&~~~m~
~ & ~ lt Q ~ ' J;) ~X*
7G §R ~ (HTML)(~ 4.0 ~ ~ 1~ 11&
)® ~ tf& ~ X ft ;f~ ~ (PDF)(~ 4.0 ~ ~ 1~ J:\&
)t! fF ~ ~ 8'9
fX fl 2Js: , ~~ ~ F ~ -& g 1:Y J\3 7G , ~fJ W _t f~ ft ~ 3 .4 & ~ 3. s
rfi PIT ~>t sJJ 8'9 lil! 1~
[0] s~
mm
HTML 8'9 ~&
~ ® , DJ
W Q ~ ~ W & 1J\ W f'F tB ~ 2Js: }I ~5 8'9 El tfR ~fJ ~ ft 1*1
triffi ;IJO A o Q ~ ~ ~ ~f4 Ill
~fJ ~ ~ 1?£ ;f§ mm ~ 7¥4 8'9 lE
~
}i ff
2Js: ~ ~5 o ~ ~F ~ -& g 1:Y J\3 7G , ~ ~ ~ PIT 1?£ IMl tf~
~ ~fJ tJ X ~ f¥. 1& 8'9 GIF ;f~ ~ fM 5E o ~ ~ 8'9 fX 1~ 2js: ~ ?& , 16,
~~Wlil!1~2Js:B'9~?& - i5( o
tw
*
*
mx
x
m-
0
x
*
*
*
mx
x
x
Notes:
tt
1.
This Permit consists of three parts, namely, PART A (Main Permit), PART B
(Description of Designated Project) and PART C (Permit Conditions). Any person
relying on this Permit should obtain independent legal advice on the legal implications
under the Ordinance, and that the following notes are for general information only.
§lf DJ
~ 1?£ 3 ~~ , ~P : A ~~
§t DJ
.:t ~ g~ 5t ) : B ~~
( J\3 5E I l~ Jfi § 8'9 ~>t ~ ) ; & C f5~ ( glf CiJ m {1~ ft ) o {I
*
m
si
c
m
* glf DJ m 8'9 A ±
~~ gt 1~ ~u 8'9 >~ ~
$~~~ · ~WttmRm - &•~m o
foJ ti
2.
-a
~ ~ ~ 1§JJ
-n
The Permit Holder may apply under section 13 ofthe Ordinance to the Director for a
variation of the conditions of this Permit. The Pennit Holder shall replace the original
Permit displayed on the construction site by the amended Permit.
glf DJ m ~ 1?£ A DJ t~ ~ 11~ ~u ~ 13 11~ 8'9
5E 1c1 ~ -& Ef! *ri ]!!
&2Js:~CiJm8'9~# o ~DJm~1?£A~~~-&8'9~CiJ
m·~-~~~I~~~7GB'9~1?£~DJm o
m
3.
A person who assumes the responsibility for the whole or a patt of the designated
project may, before he assumes responsibility of the designated project, apply under
section 12 of the Ordinance to the Director for a further environmental permit.
~•m5Eim~EIB'9•~~$5tim8'9•ff8'9A·~
7¥ t~ J\3 5E I l~ r~ El if f:I Z M , DJ t~ ~ f~ ~U ~ 12 f'* 8'9 tJ! 5E
1c1 ~ -& Ef! *jl *JT 8'9 :r~
§"lf DJ m
m
4.
0
Under section 14 ofthe Ordinance, the Director may, with the consent ofthe Secretary
for the Environment, suspend, vary or cancel this Permit. The suspended, varied or
cancelled Permit shall be removed from the display at the construction site.
t~ ~ f'* ~u ~ 14 11~ 8'9 tY! 5E , ~ -& DJ :tE :£-;
FoJ FoJ -& 8'9 [0] ~ ~
~~m~ · ]!!&~I&~~m~DJm o m~~m~·~
~1&~8'9~DJm~~~~~I~~~·~~~/G 0
m
~~
14
Environmental Permit No. EP-068/2000/A
Jl:l.ft~filJlilU19/l EP-068/2000/ A
5.
If this Permit is cancelled or surrendered during the construction or operation of the
Project, another environmental permit must be obtained under the Ordinance before
the Project could be continued. It is an offence under section 26(1) of the Ordinance to
construct or operate a designated project listed in Part I of schedule 2 of the Ordinance
without a valid environmental permit.
~ **~~m~ I m~El~~~-UMOO~~~~
@J , ~U ~ ~ f!t ~ f:S: I f~ r~ § L JW , !16, ~~ )le ~~ tJt 1'* ~U x~ J£
Irx:
1~ ~ ~ ~ ~
m
0
~~
tJt
11~ ~u ~
m J£
26(1)1'* 8'9
, {f:
foJ A ~
~~~~~~~~m8'9m~~~~~••• mm ~ 2 ~
fiB pfT )'U I3Jl 8'9 1§ }£ I f~ r~ El , ~p lia ~8 ~ o
I
6.
Any person who constructs or operates the Project contrary to the conditions in the
Permit, and is convicted of an offence under the Ordinance, is liable(i)
on a first conviction on indictment to a fme of $2 million and to imprisonment
for 6 months;
on a second or subsequent conviction on indictment to a fine of $5 million and
(ii)
to imprisonment for 2 years;
(iii)
on a first summary conviction to a fme at level 6 and to imprisomnent for 6
months;
(iv)
on a second or subsequent summary conviction to a fine of $1 million and to
imprisonment for 1 year; and
(v)
in any case where the offence is of a continuing nature, the court or magistrate
may impose a fine of$10,000 for each day on which he is satisfied the offence
continued.
~ff foJ A~~&*~~m8'9.#T~~&WUim~
~~ ~ ~ §SJZ {I~ 19U ' ~p Ji ~8 ~
El '
-
*! 11 0 m *~ Ff 1§ =:x J£ ~
*! 11 0 m *~ ~ ~ =:x ~
Ci)
~ 6@1 Fl;
Cii)
ff~ 500 ~
:n: &
f! 11§ fMj
6{~ Fl ;
=
~ ~ 2 if
~ f~ ~ [§
~ I!1R iU w~
~ 1~
;
=:x JE
~
'
~ ~ ~ 6
~
~
,
OJ
~
~
&
~ ~
fl itJ
:n: & ~
M
(iii)
-
~
~mM~m~~=*~~~FJ*:xE~,OJ•M
ff~ 100 ~ :n: & ~ ~ 1 if ; &
(v)
{f: foJ ~~ 55L T ~o ~ ~ 1:S: ~ M frl
#U '§: ~ ~yt ~ f§ ~P3 ~ W 1:S: M ~ll
~
'ti
~
8'9 FJ
:n; o
7.
FJ =:x J£
2oo
7;.
,
55
~U
1!1&
$
M
~;t ~ ~
~
1o,ooo
The Permit Holder may appeal against any condition of this Pe1mit under section 17 of
the Ordinance within 30 days of receipt ofthis Permit.
§t ~ M ~ A ~ ~ :Ji ~~ §t ~ 1~ 30 7;. pq , ~~ ~ {I~ 19U ~
11 11~ ~yt
§t ~ s~ {f: foJ 11~ 1tJ: ~ tB _t
m
*
m
*
Environmental Permit No. EP-068/2000/A
!J:ljt~OJm~~ EP-068/2000/A
5
m
m
0
· ~.
,.:..:·
;
._
-I
-! ..,
~--·~ - ·.'
....
..,
/
.·
.·---..
. ·-·
--,
The Pumping Locations of the Proposed Sewage Pumping Stations at Tai Lam Chung Tsuen,
Luen On San Tsuen and Tai Lam Valley
~~*~~M-8~~M&*~w~~-~~*~*M
·~:~~.
\L..!
.r
i
Environmental Permit No.: EP/A
06812000
ftl.!jlgtfPJm$i~ :
Figure 1 (a)
lf,fJ 1 (a)
.
~
I
I
l
I
I
I
+
-.
+
l
t
.,
1.J-
J
'
•
•
..
tllt~fi.J
l at CIIIJ
1
,...~!
srl/f.( f
~
liSJ~
•
~
, ...
,_
......
•
l1llLI.
I
Project Boundary
;fE~J
I~JJt§W~
+
\
\
>
\
\
\
/
+
-/
/
\
/
•
/
·\....-/ /
\
f"
•
- ..
B.ff
elf
+
<l!lt.!.
+
+
Castle Peak Villas
1f"LIJ ]j~~
Environmental Permit No. : EP-
Location of the Proposed Sewage Pumping Station at Lok Chui Street near Castle Peak Villas
~M~ • •fi• w ~~®•m~*•*~
Iti.!Jt~ CJ~!Ui~
Figure 1 (b)
:
/A
06812000
~ 1 (b)