Finger Lakes Community College (FLCC) Capital maintenance with funding provided by County, State, and FLCC funds HVAC Renovations in the Fine Arts & Graphics Department Additional funding for the Geneva Campus Improvements to sanitary sewer at CMAC Maintenance of G Lot Fleet Management (F) Scheduled replacement and acquisition of both Highway Department and Non-Highway Department vehicles is budgeted. Highway Safety (HS)Intersection improvement for CR 8 at CR 41/Shortsville Road Bridges (B)Advance design services for future bridge preventive maintenance projects Highway Improvements Projects will include advance design services, CR 33 rehabilitation, Old Lincoln Hill Road reconstruction, CR 16 preventive maintenance, CR 9 preventive maintenance, CR 42 preventive maintenance and Ontario park dam rehabilitation. Highway Culverts (HC)Culvert repairs & replacements on CR 11 & CR 46 as well as other various culvert preventive maintenance work Sewer Districts (S)Planned improvements for the Canandaigua Lake County Sewer District (CLCSD) include, various wet well modifications & repairs, installation of pump station monitoring & control equipment, engineering future years’ projects, generator & control panel installations at various stations, sewer investigations & repairs, and pump station 1N sanitary sewer force main replacement. Honeoye Lake County Consolidated Sewer District (HLCCSD) work will include engineering future years’ projects, sewer investigations & repairs, replacing pump station tops & equipment, and backup generator installations at various pump stations. Major Construction and Renovation (CR)Projects include continuation of the remodeling of 74 Ontario Street, improvements at 3010 & 3019 County Complex Drive, Hopewell master plan improvements, an engineering study of the burn building, and the first phase of a comprehensive asbestos assessment project. Major Equipment Systems (EQ)Projects proposed include aerial/digital imaging (reserve), time and attendance software, and security system upgrade as well as the replacement of the intake finger print machine at the Jail. 2015 Budget 19.2 Adopted 11/13/2014