SCHEDULE: ELECTRICITY CONNECTION CONTRACT
PART 2 OF 2 – CONTRACT DETAILS: OVERHEAD
SERVICE, SINGLE PHASE, SINGLE SPAN
Part A – The Customer
Part 8 – Access to Premises
The Customer is the person or persons named at Part 1 of
the Application Form; the premises named at Part 2 of the
Application Form.
Refer to clauses 4.3(b), 4.3(c), and 4.3(d)(iii).
Part 1 – Formation of Connection Contract
Refer to clauses 4.3(d)(iv) and 4.3(d)(v).
The Connection Contract is formed in accordance with clause
1.3.
Part 10 – Connection Charges
Part 9 – Accommodation of Connection Equipment
A Dedicated connection assets
Part 2 – Connection
A Connection Point
load side of the low voltage fuses
protecting your connection
B Maximum Capacity
Up to & including 100A per phase
C Maximum Demand
Up to & including 100A per phase
D Entry Services
max 10kW per phase
E Exit Services
max 100A per phase
F Connection Assets
As per Part 3 of this schedule
$557.70
B GST
$55.77
C Total
$613.47
Terms of Payment
Payment for the connection services will be invoiced to the
Customer upon completion and are payable to TasNetworks
in accordance with the terms of the invoice.
Part 11 – TasNetworks’ Monetary Obligations to Customer
None.
Part 3 – Additional equipment to be installed
Part 12 – Information about Connection
A Item
overhead service wire plus service
fuse
B Work completed by
TasNetworks
Should the Customer require any further information in
respect of the connection or the connection services, contact
TasNetworks on 1300 13 7008.
C Timeframe
Within ten (10) business days of
the commencement date.
Part 4 – Network Extension or Augmentation Required
None.
Part 5 – Undertaking
Refer to clause 2.
Part 6 – Metering
The meter will be a type 6 meter; costs are in accordance
with TasNetworks’ approved metering tariff.
Part 7 – Technical Requirements
Part 13 – Amendment of Connection Contract
Refer to clause 15.4.
Part 14 – Protection, Controls, Alarms
None.
Part 15 – Other Obligations
None.
Part 16 – Liability Cap
A Cap amount
$250,000.00
B Overall cap amount
$500,000.00
C Threshold
The Customer will ensure that the electrical installation and
other of their electrical equipment meets the requirements
set out in clause 8.6 of the Code. The Customer will also
meet any technical requirements set out in Part 1 of 2 of the
Connection Contract.
$5,000.00
Part 17 – Transitional Matters
None.
The Electricity Connection Contract is provided in 2 parts:
Version 2, 1 Nov 2015
Part 1 – Electricity Connection Contract - Standard Terms and Conditions.
Part 2 – Schedule to the Electricity Connection Contract – Contract Details (this document).
Words in italics or bold italics have the special meanings provided in clause 1 of Part 1 of the Electricity Connection Contract.