18 Institute for Plasma Research Survey no. 35/D, 36/K, Village

advertisement
18
Institute for Plasma
Research
Survey no. 35/D, 36/K, Village: Bhat, Taluka &
District- Gandhinagar.
EC amendment &
expansion
The SEIAA, Gujarat has accorded environmental clearance to Institute for Plasma Research for building
construction project at Survey no. 35/D, 36/K, Village: Bhat, Taluka & District- Gandhinagar, vide order no.
SEIAA/GUJ/EC/8(a)/266/2014 dated 30/09/2014 for the built up area of 61,027.97 m2.
The project proponent, vide proposal no. SIA/GJ/NCP/41784/2016 dated 20/01/2016 submitted revised Form I
& Form IA and requested for amendment of Environmental Clearance order dated 30/09/2014 for the
proposed changes in the project.
The request for amendment in terms of proposed expansion was considered during the meeting. Details of the
project as per the EC granted and details of the project after the proposed expansion, as presented before the
committee, are tabulated below:
Description
Details as per EC granted.
Name of the project
Proposed Construction expansion
of Laboratory & Auxiliary building
project “Institute for Plasma
Research” at survey no. 35/D,
36/K, Village: Bhat Taluka &
District- Gandhinagar
Institute for Plasma Research
Survey no. 35/D, 36/K, Village:
Bhat, Taluka & DistrictGandhinagar.
Name of the developer
Location address
Details of the project after proposed
changes.
Proposed Construction expansion of
Laboratory buildings project
“Institute for Plasma Research” at
survey no. 35/D, 36/K, Village: Bhat
Taluka & District- Gandhinagar
Institute for Plasma Research
Survey no. 35/D, 36/K, Village: Bhat,
Taluka & District- Gandhinagar.
Plot area (sq. m.)
Ground Coverage (sq. m.)
Built – up area (sq. m. )
FSI area (sq.m.)
Number of buildings
Number of Units
No. of floors
2,02,344
33,372.67
61,027.97
59,440.08
34
62
Maximum - Ground + 5 floors,
Maximum height 24 m
2,02,344
33,372.67+2,400.17= 35,773.44
61,027.97 + 2,800.40 = 63,828.37
59,440.08 + 2,692.75 = 62,132.76
34 + 5 = 39
62+ 5 = 67
Proposed Construction Ground + 1
Floor and Proposed Construction
height up to – 11.1 m
Basement area (sq. m.)
Hollow plinth area (sq. m.)
Parking requirement as per
NBC
Parking requirement as per
GDR
Parking area provided (sq m)
and number of CPS
Water requirement (KL/day)
Waste water generation
(KL/day)
Municipal Solid waste
generation (kg/day)
Total green belt area (sq.m.)
858.09
NIL
816 CPS
858.09 + NIL = 858.09
NIL
816+30= 846 CPS
16,699.55 Sq. m.
17,640.25 Sq. m.
835 CPS
19,207.43 Sq. m.
526.0
30 .0
846 CPS
19,438.15 Sq. m.
526.35
30.35
128.0
134.0
68,017.07
65,616.3
Tree covered area (sq. m.)
Lawn covered area(sq. m.)
27,669.25
40,347.82
25,268.48
40,347.82
During the meeting, it was found that there will be additional buildings for Neutronics Laboratory with built up
area of 2,800.40 m2 after the proposed expansion. It was presented that they have obtained site approval &
NOC from the Atomic Energy Regulatory Board (AERB) for the proposed Neutronics Laboratory buildings. It
was presented that 18 nos. of existing trees need to be cut for the proposed construction and they have
already applied to Forest Department for obtaining permission for cutting the trees. Domestic waste water to
be generated will be treated in the onsite STP and treated sewage will be discharged into the drainage line of
AUDA. After discussing various aspects of the project it was decided to recommend the project to SEIAA
Gujarat for grant of amendment in the Environmental Clearance order dated 30/09/2014.