PERMIT #__________________ DEPARTMENT OF DEVELOPMENT & PERMITS Code Compliance Division P. O. Box 15225 Chesapeake, VA 23328 Date:___________________ Tel. (757) 382-6018 Fax (757) 382-8448 Inspection Request: (757) 382-2489 Email: develop-permits@cityofchesapeake.net APPLICATION FOR ELECTRICAL PERMIT A permit is hereby requested to install electrical work at: Address__________________________________________________________________ Suite/Lot #__________ Subdivision_____________________________________ Builder/Owner/Occupant__________________________ Electrical Co. Name_____________________________________ State Reg. #_____________________ A B C Master /Owner Signature_____________________________________________ Phone #__________________ PRINT Signature Name_________________________________________ Ches. Bus. License #____________ Business Address____________________________________________________________________________ Structure is: Code Used: _____New _____Foundation _____Existing _____Addition ____Moved _____Residential _____Commercial _____Industrial ______Mobile Home/Trailer _____NEC _____International Residential Code ELECTRICAL SERVICE INFORMATION (Complete this information if applicable) Work Request # Work Request No. is required for all new and/or service changes and relocations New Service Size: ________Amps ______Phase ______Volts _________Number of Meters Existing Service Size:_______Amps (Required Information for Service Change/Upgrades) Service will be: _____Temporary Power Pole New Service Fee ____________ _____Overhead Existing Service Fee INSTALLATION _____Outlets (Swit, Ltg. Recp) _____Motors _______HP _____Range ______KW _____Water Heater ______KW _____Dryer ______KW _____Heat (Gas or Oil) _______HP _____A/C & Heat Pump _______Ton _____Hydro-massage tub ____ ___HP _____Kitchen/Bath Fans ____ __CFM Other_____________________________ Fee $________________________ Minimum Permit Fee - $40.00 _____Underground ___________ Temporary Pole Fee __________ ADDITIONS OR REPAIRS Indicate number of circuits plus feeders worked on according to the size. _____ 0 – 30 amps $ 3.00 _____ 31 – 60 amps 4.00 _____ 61 – 100 amps 5.00 _____ 101 – 200 amps 10.00 _____ Over 200 amps 15.00 _____ Pool Bonding & Equip – Inground 30.00 _____ Pool Bonding & Equip – Above Ground 15.00 _____ Meter Base Replacement Size ________ amps 5.00 Other_____________________________________________________ Technology Fee $5.00 Contract Value $____________________ If application is not complete, it may be returned resulting in a delay of inspection. SEE BACK FOR MORE DETAILED INFORMATION. Revised 8/19/13 CG-7075/R-09 For issuing each permit, the fee shall be $40.00. In addition to the $40.00 fee for issuing each permit are the following fees: Technology Fee – 5.00 Temporary Pole – 60 Amps and Over - $15.00 New Services: Fees for new services, whether single or three phase includes all circuits, motors, generators and other derivations of an electrical system. Single Phase – Figured at $15.00 per 50 amps. 60 amps 100 amps 150 amps 200 amps 300 amps 400 amps 500 amps 600 amps - Three Phase $ 15.00 30.00 45.00 60.00 90.00 120.00 150.00 180.00 50 amps 100 amps 150 amps 200 amps 300 amps 400 amps 500 amps 600 amps - $ 20.00 40.00 60.00 80.00 120.00 160.00 200.00 240.00 Three Phase – Figured at $20.00 per 50 amps for first 1,000 amps, $10.00 per 50 amps for remaining amps after 1,000. Change of Service: Fees for changes of service (pay for change of services and any additional circuits added, worked on, extended or relocated. For circuit fee, see additions or repairs schedule below: Single Phase – Figured at $7.50 per 50 amps. To 100 amps To 150 amps To 200 amps To 300 amps To 400 amps To 500 amps To 600 amps - Three Phase $ 15.00 22.50 30.00 45.00 60.00 75.00 90.00 To 100 amps To 150 amps To 200 amps To 300 amps To 400 amps To 500 amps T0 600 amps - $ 20.00 30.00 40.00 60.00 80.00 100.00 120.00 Three Phase – Figured at $10.00 per 50 amps for first 1,000 amps, $5.00 per 50 amps for remaining amps after 1,000. Addition or Repairs: For each piece of equipment connected and each circuit or feeder installed, extended relocated or repaired, the fee shall be: Amperes 0 – 30 amps 31 – 60 amps 61 – 100 amps 101-200 amps Over 200 amps Conductor Size #14, 12, 10 #8, 4 #4, 3, 2 #1, 0, 00, 000 Over 000 Fee $ 3.00 per circuit 4.00 per circuit 5.00 per circuit 10.00 per circuit 15.00 per circuit $5.00 per meter base Temporary Release for residential - $25.00, commercial - $50.00 Late Fee for beginning work without a permit - $75.00 NOTE: 2% of the total fee must be added for state levy. I understand that the permit is granted for the work shown and described in this application. Any falsification, misrepresentation or misleading information given VOIDS the permit. CG-7-075/R-09