Wood chips to heat and power

advertisement
Spanner Biomass CHP
Electricity and heat generated from wood
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
1
Spanner Gasifier
Woodgas filter
Wood-Chip Lock
Reformer
Residual auger
12.05.2016
Woodgas cooling
Proven and solid technolgy, engineered and manufactured in Germany
2
Spanner CHP
Exhausegas heat exchanger
Silencer
Engine V8
Generator
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
3
Technical Data
HK 30
HK 45
Electrical power
30 kW
45 kW
Thermal power
73 kW
108 kW
Consumption of wood-chips
30 kg/h
45 kg/h
Consumption of wood-chips in 7.000
operating hours
min 700
max 1.100 m³
min 1.000
max 1.700 m³
Space requirement
min 8 x 4 m
Min. height of the room
min 3 m
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
4
Subsidies in UK
Spanner Biomass CHP is classified as Advanced Gasification:
1. Electricity:
- 1.8 ROC´s per kWh (4.3 p/kWh)
- Energy sell to the grid (3.5 – 5.0 p/kWh)
2. Heat:
- RHI 6.94 p/kWh (Biogas CHP tariff) for the 95kW from CHP
- RHI (TIER 1 at 5.5 p/kWh (first 1300 operating hours) + TIER 2 at 2 p/kWh
(remaining operating hours) for the 15kW from Gasifier
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
5
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
6
Necessary quality of the wood-chips
Fragment size:
G30-G40
No
impurities
• Sand results
slagging
• Screws, Stones
and Nails harm the
whole unit
max. 30
% fine
parts
• More fine parts
cause more trouble
and errors
• More fine parts
cause more
slagging
12.05.2016
max. 12%
moisture
content
Proven and solid technolgy, engineered and manufactured in Germany
7
Comparision of possible fuels
Best quality wood-chips
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
8
Comparision of possible fuels
Mid quality wood-chips
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
9
Comparision of possible fuels
Bad quality wood-chips
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
10
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
11
Broiler Farm: Mr. Baird, Dundee
Electrical power:
45 kW
Thermal power:
108 kW
Operating hours:
appr. 7.800 h/year
Electrical yield:
350.000 kWh
Thermal yield:
840.000 kWh
Operating since:
2015
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
12
Forestry-business: Sawmill Mr. Hofer, Germany
Electrical power:
30 kW
Thermal power:
73 kW
Operating hours:
appr. 8.400 h/year
Electrical yield:
240.000 kWh
Thermal yield:
613.000 kWh
Operating since:
2009
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
13
Forestry business: Sawmill Mr. Christel, Germany
Electrical power:
45 kW
Thermal power: :
108 kW
Operating hour:
appr. 7.500 h/year
Electrical yield :
338.000 kWh
Thermal yield :
810.000 kWh
Operating since:
2011
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
14
Municipal-Service Lang, Germany
Electrical power :
45 kW
Thermal power :
108 kW
Operating hours:
appr. 8.300 h/year
Electrical yield :
383.000 kWh
Thermal yield :
918.000 kWh
Operating since:
2011
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
15
District heating: Engelsberg, Germany
Electrical power :
30 kW
Thermal power :
73 kW
Operating hours:
appr. 7.500 h/year
Electrical yield :
225.000 kWh
Thermal yield :
550.000 kWh
Operating since:
2011
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
16
Forestry-business: Timber trade, Mr. Büchner, Germany
Electrical power:
30 kW
Thermal power:
73 kW
Operating hours:
appr. 7.400 h/year
Electrical yield:
240.000 kWh
Thermal yield:
613.000 kWh
Operating since:
2009
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
17
Hotel & Spa Taljörgele, Mr. Haller, Italy
Electrical power :
3 x 45 kW (135 kW)
Thermal power :
324 kW
Ooperating hours:
appr. 8.400 h/year each unit
Electrical yield :
1.100.000 kWh
Themal yield :
2.700.000 kWh
85% of the energy demand of the hotel is covered by
the 3 units
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
18
Powerplant in Jekabpils, Latvia
20 x HK45:
Overall output electrical: 900 kW
Overall output thermical: 2,4 MW
12.05.2016
Proven and solid technolgy, engineered and manufactured in Germany
19
Matthias v. Senfft
matthias.vonsenfft@spanner.de
Phone : 0049 8773 70798 - 162
www.holz-kraft.de
Thank you for your attention !