Spanner Biomass CHP Electricity and heat generated from wood 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 1 Spanner Gasifier Woodgas filter Wood-Chip Lock Reformer Residual auger 12.05.2016 Woodgas cooling Proven and solid technolgy, engineered and manufactured in Germany 2 Spanner CHP Exhausegas heat exchanger Silencer Engine V8 Generator 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 3 Technical Data HK 30 HK 45 Electrical power 30 kW 45 kW Thermal power 73 kW 108 kW Consumption of wood-chips 30 kg/h 45 kg/h Consumption of wood-chips in 7.000 operating hours min 700 max 1.100 m³ min 1.000 max 1.700 m³ Space requirement min 8 x 4 m Min. height of the room min 3 m 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 4 Subsidies in UK Spanner Biomass CHP is classified as Advanced Gasification: 1. Electricity: - 1.8 ROC´s per kWh (4.3 p/kWh) - Energy sell to the grid (3.5 – 5.0 p/kWh) 2. Heat: - RHI 6.94 p/kWh (Biogas CHP tariff) for the 95kW from CHP - RHI (TIER 1 at 5.5 p/kWh (first 1300 operating hours) + TIER 2 at 2 p/kWh (remaining operating hours) for the 15kW from Gasifier 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 5 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 6 Necessary quality of the wood-chips Fragment size: G30-G40 No impurities • Sand results slagging • Screws, Stones and Nails harm the whole unit max. 30 % fine parts • More fine parts cause more trouble and errors • More fine parts cause more slagging 12.05.2016 max. 12% moisture content Proven and solid technolgy, engineered and manufactured in Germany 7 Comparision of possible fuels Best quality wood-chips 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 8 Comparision of possible fuels Mid quality wood-chips 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 9 Comparision of possible fuels Bad quality wood-chips 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 10 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 11 Broiler Farm: Mr. Baird, Dundee Electrical power: 45 kW Thermal power: 108 kW Operating hours: appr. 7.800 h/year Electrical yield: 350.000 kWh Thermal yield: 840.000 kWh Operating since: 2015 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 12 Forestry-business: Sawmill Mr. Hofer, Germany Electrical power: 30 kW Thermal power: 73 kW Operating hours: appr. 8.400 h/year Electrical yield: 240.000 kWh Thermal yield: 613.000 kWh Operating since: 2009 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 13 Forestry business: Sawmill Mr. Christel, Germany Electrical power: 45 kW Thermal power: : 108 kW Operating hour: appr. 7.500 h/year Electrical yield : 338.000 kWh Thermal yield : 810.000 kWh Operating since: 2011 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 14 Municipal-Service Lang, Germany Electrical power : 45 kW Thermal power : 108 kW Operating hours: appr. 8.300 h/year Electrical yield : 383.000 kWh Thermal yield : 918.000 kWh Operating since: 2011 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 15 District heating: Engelsberg, Germany Electrical power : 30 kW Thermal power : 73 kW Operating hours: appr. 7.500 h/year Electrical yield : 225.000 kWh Thermal yield : 550.000 kWh Operating since: 2011 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 16 Forestry-business: Timber trade, Mr. Büchner, Germany Electrical power: 30 kW Thermal power: 73 kW Operating hours: appr. 7.400 h/year Electrical yield: 240.000 kWh Thermal yield: 613.000 kWh Operating since: 2009 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 17 Hotel & Spa Taljörgele, Mr. Haller, Italy Electrical power : 3 x 45 kW (135 kW) Thermal power : 324 kW Ooperating hours: appr. 8.400 h/year each unit Electrical yield : 1.100.000 kWh Themal yield : 2.700.000 kWh 85% of the energy demand of the hotel is covered by the 3 units 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 18 Powerplant in Jekabpils, Latvia 20 x HK45: Overall output electrical: 900 kW Overall output thermical: 2,4 MW 12.05.2016 Proven and solid technolgy, engineered and manufactured in Germany 19 Matthias v. Senfft matthias.vonsenfft@spanner.de Phone : 0049 8773 70798 - 162 www.holz-kraft.de Thank you for your attention ! Proven and solid technolgy, engineered and manufactured in Germany