Ref. STG-01-N-N-0-N-N-120-24-120-ND-000 CENTRAL PROCESSING UNIT CPU 1000 HBX 10 A 10 A 20-240 v 20-240 v 20-240 v 10 A DO NOT CONNECT POWER HERE 10 A 10 A DO NOT CONNECT POWER HERE 1 2 3 4 5 6 7 8 9 10 12 13 14 DS DS DS DS DS DS TM TM TM TM TM TM RL RL RL RL 1 1 2 2 3 3 1 1 2 2 3 3 1 1 2 2 11 15 16 17 18 19 20 120 L 21 22 23 120 N GR L 24 25 26 N GR L 27 28 120 120 N GR L N EXP-0300 HBX GR 10 A 1 2 3 4 DS DS 1 10 A 1 1 5 6 7 8 120 L N 9 10 11 12 13 120 GR L N 120 GR HBX EXP-0100 DO NOT CONNECT POWER HERE 20-240 v TM TM 1 EXPANSION MODULE L N GR EXPANSION MODULE EXP-0300 HBX DO NOT CONNECT POWER HERE 20-240 v 10 A 10 A 1 2 3 4 5 6 7 8 1 2 3 4 TM TM DS DS RL RL RL RL TM TM DS DS 1 1 1 1 1 1 2 2 1 1 EXPANSION MODULE 10 A 10 A 20-240 v 1 1 5 6 7 8 120 L N 9 10 11 12 13 120 GR L N 120 GR L Setpoint2 Setpoint2 Contact 1 Contact 2 SETP SEN 2 SETP SEN 1 BOIL SEN OUT SEN Apply Control Signal or Program for Permanent Heat Demand TH SETP SEN 3 Setpoint 3 Setpoint 3 Pump 1 Pump 2 Setpoint 1 Setpoint 1 Pump 1 Pump 2 BOILER Hi Temp System Pump 1 24 V AC C R 120 V AC L N Title Notes: This is not an engineered drawing and does not necessarily include all the components for an entire system. It is intended as a representative sample of how the control may be wired for a sample application. It is the responsibility of the installer to seek professional advice and/or install the the system to meet all necessary codes for the jurisdiction of the actual installation. HBX Control Systems Inc. Staging Control, Single Stage Boiler, 1 Main HT System Pump, Setpoints 1&3 are 120VAc and setpoint 2 dry contact No DHW options - Elec Date: 08/11/05 File No: N GR