I VIA HAND DELIVERY Sandra Squire Executive Secretary Public Service Commission of West Virginia 201 Brooks St. P.0; BOX 812 Charleston, West Virginia 25323 3Q4(’348-43.45 Janey KeyZon v. Appalachian Power Company P.S.C. Case No. 12-0082-E-C Re: Gina E . Mazzei-Smkth AtZisrney - Litigation (P) 304/348-4350( F f ~ ~ ~ ~ % ~ ~ ~ ~ ~ e ~ . ~ o ~ Dear Mrs. Squire: Please find enclosed for filing in the above-styled case an original and twelve (12) copies of the RESPONSE OF DEFENDANT, APPALACHIAN POWER COMPANY, TO STAFF% FIRST REQUEST FOR INFORMATION, REQUESTS 1.6 and 1.7. A copy was mailed to the Complainant on this date, and a copy was hand delivered to PSC staff attorney, Leslie Anderson, on this date. I Thank you for your attention to this matter. Power GEM: dp Enclosures cc: Janey Keylon Wayne Perdue Leslie Anderson PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CASE NO. 12-0082-E-C JANEY KEYLON, Complainant, V. APPALACHIAN POWER COMPANY, Defendant. RESPONSE OF DEFENDANT, APPALACHIAN POWER COMPANY, TO STAFF’S FIRST REQUEST FOR INFORMATION, REQUESTS 1.6 and 1.7. Appalachian Power Company (“APCo” or (‘the Company”), files the following as its Response to Staffs First Request for Information, requests 1.6 and 1.7 in the above Case. The Company filed responses on March 19, 2012 and advised it was currently gathering the information for requests 1.6 and 1.7 and would file them as soon as possible. STAFF’S FIRST REQUEST FOR INFORMATION FROM Appalachian Power Company Janey Keylon v. APCo Case No. 12-0082-E-C Reauest No. 1.6 Please provide a ten-year history recloser and station breaker counter operations in a n Excel spreadsheet format. Please include the following information. Identify the type and location of all reclosers. A. Identify the type and location of all reclosers Identify the type of station breaker and provide the monthly counter readings only. B. If possible, identify the number of fault operations as opposed to a breaker test. C. Installation and replacement dates for all reclosers and station breakers. Indicate whether a recloser failed in service or routinely replaced. If a recloser failed please state the reason for each failure. Please provide a ten-year maintenance history of inspections, battery checks, and/or D. repairs made while in service. Response No. 1.6 Please see Attachment 1.6. Reclosers are visually inspected on a yearly basis. Depending on the type of recloser and control, batteries are replaced if needed. Reclosers are maintained on either a six- or eightyear cycle depending on the type of interrupter, oil or vacuum. Counter readings are recorded when reclosers are installed and when they are inspected. Counter reading registers are located near the top of the recloser tank making them often difficult or impossible to read from the ground. Responder: Michael Scott, Engineer 1 Name of Person Who Could Testify: The Company has not determined who may testify. Date: April 25,2012 Attachment 1.6 ~ Recloser Devices Upstream of Premise # Keylon Residence at 209 Natural Bridge Road, Looneyville Clendenin I Walton 34.5kV Circuit (CktlD 2345901) - Answer 1.6 -A. Line Reclosers Location On Big Left Hand Road at Little Left Hand Road - pole 3981 1062C00082Lat 38.575199 & Lon. -81.261 76 On Amma Road near Osbome Mills Road - pole 3981 1085D00090at Lat. 38.551482& Lon. -81.296976 On Amma Road at Rt 119 - pole 3981 1084D20008-- prior to April of 2005 at Lat. 38.5458 & Lon. -81.34846 On Amma Road at Rt 119 - pole 3981 1084D21032-- since April of 2005 at Lat 38.545736 & Lon. -81.348746 , I Device Type - Answer 1.6 C. Replacemenl - Answer 1.6 D. Maintenance History Recloser - single phase Hydraulic - 70 amp 4H replaced Sept 2005 - routine replacement not available Recloser - 3 units Hydraulic - 100 amp DV Recloser - single phase Vacuum electronic control 280 amp setting replaced June 2005 with multiphasing not available removed April 2005 with multiphasing none Recloser - 3 units Hydraulic- 160 amp DV Installed April 2005 with multiphasing none STAFF’S FIRST REQUEST FOR INFORMATION FROM Appalachian Power Company Janey Keylon v. APCo Case No. 12-0082-E-C Request No. 1.7 Please provide list of all reliability improvement projects, for the past five years, that are in the planning stages, in progress, complete or on hold. Please include the following: A. Projected or actual starting and ending dates. B. Justification for each project including the type of additions or modifications performed. C. Location of each the project. D. The equipment added or modified. E. Whether company or contract labor was used. F. Other pertinent work details. Resnonse No. 1.7 Please see Attachment 1.7. Over the past five-year period, the following known reliability projects were completed. This list is not all inclusive since it only includes projects recalled by the APCo engineer assigned to this area. Responder: Michael Scott, Engineer 1 Name of Person Who Could Testify: The Company has not determined who may testify. Date: April 25, 2012 Attachment 1.7 Reliability Improvement Projects affecting Premise # Keylon Residence at 209 Natural Bridge Road, Looneyville Clendenin / Waiton 34.5kV Circuit (CktlD 2345901) - Section A. Start I Ending dates Section B. Justification March 2005 to March 2006 Single phase heavily loaded along Amma Roadfrom Rt 119 to Amma Post Office and potential for 3 phase customers 7.01 miles Apr-I 2 reduce amount of customers Rrt 119 past Thorofare Road Vacuum reclosers and electronic on circuit that would see a Lat. 38.502728 & Lon. sustained fault 81.350237 controls with great functionality contractor Expected May 2012 Improvefault locating and coordination Section C. Location Section D. Equipment added Section E. labor group Section F. details Three phase #2 AA conductors and neutral including nesessary new poles, swithces and regulators contractor replace hydraulic reclosers with Amma Road at Rt 119 - Lat vacuum reclosers and electronic 38.545736 & Lon. -81.348746 controls with great functionality contractor relocated portions of line route to be more accessible Respectfully submitted, APPALACHIAN POWER COMPANY Defendant Power Company VERIF’ICATION STATE OF WEST VIRGINIA, COUNTY OF KANAWHA, TO-WIT: 1 Charles W. Gary, P.E., Regulatory Consultant for Appalachian Power Company, after being duly sworn, states upon his information and belief that the facts and allegations contained in the foregoing Response are true. Taken, subscribed and sworn to before me on the 25th day of April, 2012. My commission expires: kktkih3,drllQ. .-.n (SEAL) CERTIFICATE OF SERVICE I, Gina E. Mazzei-Smith, Senior Counsel for Appalachian Power Company, do hereby certify that a true copy of the Defendant’s RESPONSE, was mailed to Complainant through the regular course of the United States Postal Service, postage prepaid, this 25‘hday of April, 2012 addressed as follows: Janey Keylon 209 Natural Bridge Rd. Looneyville, WV 25259 and a copy of APCO’S RESPONSE was hand delivered, addressed to: Leslie Anderson Public Service Commission of WV 201 Brooks St. Charleston, West Virginia 25323 VIA HAND DELIVERY