Port of Long Beach Pier T Berth T121 BP Cold Ironing Project For

advertisement
Port of Long Beach
Pier T Berth T121
BP Cold Ironing Project
For Alaska Class Tankers
Sean Gamette, PE
Program Manager
Port of Long Beach
Agenda
Background/project overview
Engineering
Testing & commissioning
Construction activities
Project Location – Berth T121
Berth T121
Terminal Is Important to Region
BP’s No. 1 asset in
this region
Feeds oil to SOCAL
refineries
BP
Conoco
Valero
Operates 24/7 to
maintain refinery
output
Project Background
Initiated to
Reduce air emissions
Support POLB Green
Port Program
Cooperative
agreement between
Port of Long Beach &
BP
POLB landside
BP shipside
Project Overview
Major Project Challenges
Maintain operations
during construction
“Bumpless” transfer of
power
Mooring/Berthing of
numerous ships types
General Electrical Requirements
Ship power requirements
7.78 MW @ .8 PF = 9.73 MVA
6600 V
Limit voltage drops
Grounding
Ship Power Requirements
Bumpless transfer achieved by
One diesel generator (SSDG) on line
Momentary paralleling of shore & SSDG
Match Phase
Transfer to Shore Power (Green Power)
Ship power demands
Hotels Loads
Shipside Oil Unloading Pumps
Crude Oil Washing (COW) Pumps
Ship Power Requirements
Voltage Drop Analysis
Assure voltage within allowable limits
Operating voltage range 6600 to 6800
Calculated voltage drop below 5800 v
due to COW pump start
Ship controlled LTC transformer
Composite Voltage Profile
Grounding
Ship grounded to earth
Hull & earth same potential
Ship & earth bonded
Ground within power cables
TOUCH POTENTIAL
Between cable and
ship
Arching during
ground fault
conditions
Touch potential
study
Cable Management Design
Cable reels on platform crane on ship
Power/control
SHIP’S TRAY & RECEPTACLE
CMS Platform Layout
CMS Positioning
Position clear of hazard area
Mooring line interference
Circulation
CMS/Ship Interface Considerations
Vertical requirements/tides/draft
Crane Reach
Shipside cable tray
Vessel Movement
Passing vessel
Currents
Winds
Mooring and Berthing
COMPREHENSIVE TANKER DATA BASE
Mooring line layouts
DISPLACEMENT
Nr.
Representative ships
Dynamic mooring analysis
TERMSIM II
Berthing energy
MOTEMS
2398
2399
2400
2401
2402
2403
2404
2405
2406
2407
2408
2409
2410
2411
2412
2413
2414
2415
2416
Vessel
Name
Nan Hai Xi Wang
Enalios Ethra
Nan Hai Fa Xian
Agip Marche
Arco Spirit
Arco Independence
Agios Nikolaos
Chevron Edinburgh
Alamoot
Tonbridge
Acquila Trader
Saudi Splendour
Myrtos Bay
World Champion
Africa
Lyria
Mare Discovery
Bridgeton
Acropolis
DWT
MOULDED
See Note
LOA
LBP
BEAM
*
LADEN
BALLAST
*
*
*
(TONS)
(TONS)
(TONS)
m
m
m
174,015
151,973
254,642
254,650
266,586
266,586
263,394
268,334
317,825
267,911
260,849
280,579
257,099
273,150
274,479
277,553
515,700
407,823
554,999
204,026
179,078
294,382
294,390
307,667
307,667
304,119
309,610
364,424
309,140
301,289
323,204
297,116
314,959
316,435
319,847
580,816
463,323
623,381
46.00
46.00
51.82
51.80
54.31
54.31
51.88
53.60
55.40
53.50
51.87
54.46
54.50
54.56
51.82
51.87
56.44
70.00
63.25
30,011
27,105
39,740
39,740
41,081
41,081
40,725
41,276
46,599
41,229
40,440
42,625
40,017
41,809
41,956
42,294
65,116
55,500
68,382
293.24
290.69
348.91
285.79
335.26
335.26
343.51
338.63
351.45
339.15
338.10
340.79
337.06
337.01
348.77
343.01
354.55
365.99
381.92
275.00
275.01
330.71
267.34
323.07
323.07
330.71
320.00
336.00
324.00
319.99
324.03
320.00
320.00
330.56
330.72
353.30
351.15
368.80
DEPTH
DRAUGHT
*
FREEBOARD Manifold
TPC
from
LADEN
LADEN
m
m
m
24.00
24.01
25.58
25.60
26.20
26.20
26.22
26.41
26.47
26.60
26.70
26.99
27.00
27.00
27.33
27.34
28.42
29.10
35.00
18.60
16.80
20.00
20.00
20.47
20.47
20.48
20.56
20.44
20.73
20.90
21.07
19.93
20.02
21.39
21.36
22.30
22.60
23.41
105.00
117.35
157.60
157.80
167.30
164.70
158.03
157.48
138.78
157.50
200.00
162.00
160.10
161.20
159.00
160.00
172.00
228.00
228.80
5.40
7.21
5.58
5.60
5.73
5.73
5.74
5.85
6.03
5.87
5.80
5.92
7.07
6.98
5.94
5.98
6.12
6.50
11.59
Bow
m
136.86
173.74
173.74
160.93
160.93
170.69
161.54
159.40
168.86
153.01
165.20
171.25
181.66
180.42
181.36
CMS Platform Mooring - Smallest
Ship 370’ CL Manifold to Stern
CMS Platform - Berthing
CMS Platform - Circulation
CMS Platform - Final Layout
CMS PLATFORM
Marine Structures
CMS platform
Access Trestle
Catwalk
Construction Constraints
Limited site access
Identified anticipated work
windows
Specified Multiple Mobs &
Demobs
Construction Bid Packaging
Two construction contracts
Offshore structural
Onshore/electrical
Provided offsite fab area
Fabricate and assemble
Piles, platform
Access trestle, catwalk
TESTING & COMMISSIONING
Step 1 - Procedures
Testing
Commissioning
Operational
Lock out/Tag out
Incorporated into BP terminal operational
procedures
CABLE LIFT TESTING
Two lifting methods
Cable bun lifting devise
Cable lifting tray
CABLE BUN LIFTING DEVISE
CABLE BUN LIFTING TESTING
CABLE BUN LIFTING TESTING
CABLE LIFTING TRAY
CABLE LIFTING TRAY
CABLE LIFTING TRAY TESTING
CABLE LIFTING TRAY TESTING
ELECTRICAL
TESTING & COMMISSIONING
Landside equipment testing program
Electrical contractor
Black box – simulated ship system
Commissioning plan validation
Ship controlled
Breaker function
Ground check safety
Phase sequence & rotation
Power transfer
Project Status
Offshore Structural
Construction complete
Onshore/Electrical
Construction complete
Cable Lift/Electrical Testing
Testing complete
Commissioning
On-going
Construction
Construction overview
Steel Pile Fab. – XKT Mare Island, CA
54” A572 Gr50, 36” API-FLX Gr 52,
Procurement Time, 5 Months
Steel Pile Fabrication
Full Pen V Groove Long & Circum Welds
Steel Coating – S W AR425
Envirolastic Polyurea Spray On
Steel Shop Fabrication - Brooklyn
Iron Works Spokane, WA
Pile Delivered By Barge
Steel Piles In Laydown Area
Concrete Piles On Barge
Abutment Pile Driving
Abutment Pile Driving
Abutment Pile Driving
Steel Pile Driving
Steel Pile Driving
APE Double King Kong Vibrating
Hammer
Steel Pile Driving
Steel Pile Driving
Steel Pile Driving
Steel Pile Driving
Steel Pile Cut Off
Steel Pile Cut Off
Steel Pile Cut Off
Trestle Pile Cap Placement
Abutment Forming & Placement
Revetment Apron Placement
Trestle Assemble
Trestle Assemble
Trestle Assemble
Trestle Erection
Catwalk Assemble
Electrical Duct Bank
CMS Platform Assemble
CMS Platform Assemble
CMS Platform Deck Reinforcement
Lifting Pad Eye
CMS Platform Deck Reinforcement
Cable Penetrations
CMS Platform Deck Reinforcement
Concrete Formwork
CMS Platform Erection
ACCESS TRESTLE ERECTION
CATWALK ERECTION
PLATFORM STRUCTURES
CABLE REELS PLACED
CMS PLATFORM