Port of Long Beach Pier T Berth T121 BP Cold Ironing Project For Alaska Class Tankers Sean Gamette, PE Program Manager Port of Long Beach Agenda Background/project overview Engineering Testing & commissioning Construction activities Project Location – Berth T121 Berth T121 Terminal Is Important to Region BP’s No. 1 asset in this region Feeds oil to SOCAL refineries BP Conoco Valero Operates 24/7 to maintain refinery output Project Background Initiated to Reduce air emissions Support POLB Green Port Program Cooperative agreement between Port of Long Beach & BP POLB landside BP shipside Project Overview Major Project Challenges Maintain operations during construction “Bumpless” transfer of power Mooring/Berthing of numerous ships types General Electrical Requirements Ship power requirements 7.78 MW @ .8 PF = 9.73 MVA 6600 V Limit voltage drops Grounding Ship Power Requirements Bumpless transfer achieved by One diesel generator (SSDG) on line Momentary paralleling of shore & SSDG Match Phase Transfer to Shore Power (Green Power) Ship power demands Hotels Loads Shipside Oil Unloading Pumps Crude Oil Washing (COW) Pumps Ship Power Requirements Voltage Drop Analysis Assure voltage within allowable limits Operating voltage range 6600 to 6800 Calculated voltage drop below 5800 v due to COW pump start Ship controlled LTC transformer Composite Voltage Profile Grounding Ship grounded to earth Hull & earth same potential Ship & earth bonded Ground within power cables TOUCH POTENTIAL Between cable and ship Arching during ground fault conditions Touch potential study Cable Management Design Cable reels on platform crane on ship Power/control SHIP’S TRAY & RECEPTACLE CMS Platform Layout CMS Positioning Position clear of hazard area Mooring line interference Circulation CMS/Ship Interface Considerations Vertical requirements/tides/draft Crane Reach Shipside cable tray Vessel Movement Passing vessel Currents Winds Mooring and Berthing COMPREHENSIVE TANKER DATA BASE Mooring line layouts DISPLACEMENT Nr. Representative ships Dynamic mooring analysis TERMSIM II Berthing energy MOTEMS 2398 2399 2400 2401 2402 2403 2404 2405 2406 2407 2408 2409 2410 2411 2412 2413 2414 2415 2416 Vessel Name Nan Hai Xi Wang Enalios Ethra Nan Hai Fa Xian Agip Marche Arco Spirit Arco Independence Agios Nikolaos Chevron Edinburgh Alamoot Tonbridge Acquila Trader Saudi Splendour Myrtos Bay World Champion Africa Lyria Mare Discovery Bridgeton Acropolis DWT MOULDED See Note LOA LBP BEAM * LADEN BALLAST * * * (TONS) (TONS) (TONS) m m m 174,015 151,973 254,642 254,650 266,586 266,586 263,394 268,334 317,825 267,911 260,849 280,579 257,099 273,150 274,479 277,553 515,700 407,823 554,999 204,026 179,078 294,382 294,390 307,667 307,667 304,119 309,610 364,424 309,140 301,289 323,204 297,116 314,959 316,435 319,847 580,816 463,323 623,381 46.00 46.00 51.82 51.80 54.31 54.31 51.88 53.60 55.40 53.50 51.87 54.46 54.50 54.56 51.82 51.87 56.44 70.00 63.25 30,011 27,105 39,740 39,740 41,081 41,081 40,725 41,276 46,599 41,229 40,440 42,625 40,017 41,809 41,956 42,294 65,116 55,500 68,382 293.24 290.69 348.91 285.79 335.26 335.26 343.51 338.63 351.45 339.15 338.10 340.79 337.06 337.01 348.77 343.01 354.55 365.99 381.92 275.00 275.01 330.71 267.34 323.07 323.07 330.71 320.00 336.00 324.00 319.99 324.03 320.00 320.00 330.56 330.72 353.30 351.15 368.80 DEPTH DRAUGHT * FREEBOARD Manifold TPC from LADEN LADEN m m m 24.00 24.01 25.58 25.60 26.20 26.20 26.22 26.41 26.47 26.60 26.70 26.99 27.00 27.00 27.33 27.34 28.42 29.10 35.00 18.60 16.80 20.00 20.00 20.47 20.47 20.48 20.56 20.44 20.73 20.90 21.07 19.93 20.02 21.39 21.36 22.30 22.60 23.41 105.00 117.35 157.60 157.80 167.30 164.70 158.03 157.48 138.78 157.50 200.00 162.00 160.10 161.20 159.00 160.00 172.00 228.00 228.80 5.40 7.21 5.58 5.60 5.73 5.73 5.74 5.85 6.03 5.87 5.80 5.92 7.07 6.98 5.94 5.98 6.12 6.50 11.59 Bow m 136.86 173.74 173.74 160.93 160.93 170.69 161.54 159.40 168.86 153.01 165.20 171.25 181.66 180.42 181.36 CMS Platform Mooring - Smallest Ship 370’ CL Manifold to Stern CMS Platform - Berthing CMS Platform - Circulation CMS Platform - Final Layout CMS PLATFORM Marine Structures CMS platform Access Trestle Catwalk Construction Constraints Limited site access Identified anticipated work windows Specified Multiple Mobs & Demobs Construction Bid Packaging Two construction contracts Offshore structural Onshore/electrical Provided offsite fab area Fabricate and assemble Piles, platform Access trestle, catwalk TESTING & COMMISSIONING Step 1 - Procedures Testing Commissioning Operational Lock out/Tag out Incorporated into BP terminal operational procedures CABLE LIFT TESTING Two lifting methods Cable bun lifting devise Cable lifting tray CABLE BUN LIFTING DEVISE CABLE BUN LIFTING TESTING CABLE BUN LIFTING TESTING CABLE LIFTING TRAY CABLE LIFTING TRAY CABLE LIFTING TRAY TESTING CABLE LIFTING TRAY TESTING ELECTRICAL TESTING & COMMISSIONING Landside equipment testing program Electrical contractor Black box – simulated ship system Commissioning plan validation Ship controlled Breaker function Ground check safety Phase sequence & rotation Power transfer Project Status Offshore Structural Construction complete Onshore/Electrical Construction complete Cable Lift/Electrical Testing Testing complete Commissioning On-going Construction Construction overview Steel Pile Fab. – XKT Mare Island, CA 54” A572 Gr50, 36” API-FLX Gr 52, Procurement Time, 5 Months Steel Pile Fabrication Full Pen V Groove Long & Circum Welds Steel Coating – S W AR425 Envirolastic Polyurea Spray On Steel Shop Fabrication - Brooklyn Iron Works Spokane, WA Pile Delivered By Barge Steel Piles In Laydown Area Concrete Piles On Barge Abutment Pile Driving Abutment Pile Driving Abutment Pile Driving Steel Pile Driving Steel Pile Driving APE Double King Kong Vibrating Hammer Steel Pile Driving Steel Pile Driving Steel Pile Driving Steel Pile Driving Steel Pile Cut Off Steel Pile Cut Off Steel Pile Cut Off Trestle Pile Cap Placement Abutment Forming & Placement Revetment Apron Placement Trestle Assemble Trestle Assemble Trestle Assemble Trestle Erection Catwalk Assemble Electrical Duct Bank CMS Platform Assemble CMS Platform Assemble CMS Platform Deck Reinforcement Lifting Pad Eye CMS Platform Deck Reinforcement Cable Penetrations CMS Platform Deck Reinforcement Concrete Formwork CMS Platform Erection ACCESS TRESTLE ERECTION CATWALK ERECTION PLATFORM STRUCTURES CABLE REELS PLACED CMS PLATFORM Questions & Answers