SOFC stack modules for decentralized power generation Contents 1. 2. 3. 4. 5. 2 staxera company presentation staxera GmbH Integrated Stack Module (ISM) Performance 3 kW system demonstrator Summary Jeremy Lawrence staxera GmbH 3 staxera company presentation Jeremy Lawrence World‘s leading SOFC stack supplier Defined product Clear interfaces Performance guarantee 5.000 hours and 20 thermal cycles Continuous improvement Roadmap to higher power SOFC stacks are ready for system development 4 staxera company presentation Jeremy Lawrence Security of supply Active in more than 58 countries Automobile component supplier 1.6 billion € turnover in 2008 7.5% investment of turnover in R&D More than 7000 employees SOFC stacks 100% owned by Webasto AG 5 staxera company presentation Jeremy Lawrence Core technology - Mk200 stack 75% fuel utilization High efficiency Low pressure drop Low system parasitic losses Redox stability Electrolyte supported cells Mk200 stacks are the heart of each staxera ISM 6 staxera company presentation Jeremy Lawrence Continuous improvement Clear roadmap to increased power 7 staxera company presentation Jeremy Lawrence Industrial customers www.callux.net 1 kW microCHP 8 staxera company presentation Jeremy Lawrence 3 kW system demonstrator Research and development customers Biogas operation 9 staxera company presentation Propane system Jeremy Lawrence SOFC research staxera R&D + production site Future expansion with an additional 2000m2 factory 10 staxera company presentation Jeremy Lawrence Manufacturing 11 capacity today: 500 ISMs per year future capacity with 2000m2 hall: 50.000 ISMs per year staxera company presentation Jeremy Lawrence Testing Four 30-cell stack test stations and six ISM test stations 12 staxera company presentation Jeremy Lawrence Organization Dr. Christian Wunderlich Chief Executive Officer Susanna Bastian Corporate Planning Susanne Kirst Accounting Jens Baade Björn Erik Mai Mario Heinrich Jeremy Lawrence Mario Heinrich Infrastructure Testing R&D (provisional) Business Development Production 1x technician 3x engineers 3x scientists 2x engineers 2x technicians 2x engineers 5x technicians Experienced & established management team 13 staxera company presentation Jeremy Lawrence Key partners and suppliers 14 staxera company presentation Jeremy Lawrence Products 15 staxera company presentation Jeremy Lawrence Products and services Standardized ISMs (1.1 & 1.4 kW) Ready for delivery in 8 weeks Customized ISMs Tighter system integration On-site support Assistance with installation and testing Fastest path to a SOFC system 16 staxera company presentation Jeremy Lawrence Systems available from EBZ 3 kW system demonstrator Available now Steam reforming, natural gas High efficiency Clear path to 20 kW systems staxera will develop 3 kW and 5 kW ISMs staxera and EBZ are your partners for SOFC systems 17 staxera company presentation Jeremy Lawrence ISM and stack performance 18 staxera company presentation Jeremy Lawrence ISM power 19 staxera company presentation Jeremy Lawrence Mk200 stack endurance 6.0 5.0 Degradation [%] 4.0 3.0 2.0 Current Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 Block 7 Block 8 Block 9 Block 10 0.0 -1.0 -2.0 2.4 Block voltage [V] 2.3 26 2.2 24 2.1 22 2.0 20 1.9 18 1.8 16 1.7 14 1.6 0 1000 2000 3000 4000 5000 6000 7000 Operating time [h] 20 28 staxera company presentation Jeremy Lawrence 8000 9000 10000 11000 12 12000 Current [A] 1.0 Mk200 stack thermal cycling TC5 TC10 TC160 550 800 500 700 450 600 400 500 Stack power Stack voltage Core temperature Current 350 300 Current [A] 400 300 250 200 200 100 ... 150 0 40 40 35 35 30 30 25 25 20 20 15 15 10 10 5 0 160 180 200 220 240 260 280 300 320 340 360 380 400 Operating time [h] 21 900 staxera company presentation Jeremy Lawrence 420 440 ... Temperature [°C] TC 1 5 3740 3780 3820 0 3860 Stack voltage [V] Stack power [W] 600 Mk200 stack – no leakage after 150 cycles DP 1 28.05.2009 3.8 3.7 3.7 3.6 3.6 Spannung [V] Spannung [V] 3.8 3.5 3.4 3.3 3.2 DP 94 16.08.2009 3.5 3.4 3.3 3.2 3.1 3.1 Beginn DP 3.0 186.2 Ende DP 186.3 186.4 186.5 186.6 Beginn DP 3.0 2112.1 186.7 Ende DP 2112.2 Betriebsdauer [h] DP 120 21.09.2009 3.8 3.7 3.7 3.6 3.6 3.5 3.4 3.3 3.2 2112.6 DP 160 Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 Block 7 Block 8 Block 9 Block 10 24.10.2009 3.5 3.4 3.3 3.1 Beginn DP 2960.8 Ende DP 2960.9 2961.0 2961.1 2961.2 Betriebsdauer [h] 22 2112.5 3.2 3.1 3.0 2960.7 2112.4 Betriebsdauer [h] Spannung [V] Spannung [V] 3.8 2112.3 staxera company presentation Jeremy Lawrence Beginn DP 2961.3 3.0 3767.4 3767.5 Ende DP 3767.6 3767.7 3767.8 Betriebsdauer [h] 3767.9 3768.0 ISM start time 1,5 h 585 900 800 45 Core temperature (MEA_1/2) Temperature Cathode Inlet Current Air flow rate 520 40 455 preheater heat up temperature control with air flow 500 25 400 20 time to full load 325 260 300 15 195 200 10 130 100 5 65 0 0 0.5 1 1.5 Heating time [h] 23 390 30 staxera company presentation Jeremy Lawrence 2 0 2.5 0 Air flow rate [Nl/ l/min] Temperature [° °C] 600 35 Current [A] 700 Thermal management 798.7 781.0 770.7 759.1 746.0 808.6 794.1 785.7 776.0 765.6 817.9 807.5 801.8 795.0 788.7 829.1 822.6 819.3 815.2 813.0 833.7 829.4 827.5 825.0 Plane 60 14 I [A] 13 12 826.3 811.2 802.1 791.1 779.8 843.5 834.7 829.4 822.7 817.0 860.8 858.1 856.8 854.2 854.1 848.9 846.9 845.8 844.0 844.9 Plane 45 11 10 9 801.8 785.4 775.8 764.5 751.3 818.8 806.9 799.9 791.3 781.7 834.6 827.0 822.6 816.9 811.0 846.0 842.3 840.3 837.3 835.8 846.1 844.1 843.1 841.2 841.3 20-30 A Air Air Cell group Plane 31 8 7 6 5 4 840.8 832.2 826.8 819.2 808.5 858.0 855.0 852.9 849.0 844.0 860.0 860.3 860.5 859.5 857.8 860.0 861.6 862.2 865.3 Plane 15 3 2 789.3 780.1 775.2 768.1 760.9 806.8 800.5 797.1 792.6 786.8 822.6 818.9 816.9 813.8 810.2 822.0 820.0 819.0 817.0 815.8 822.1 820.9 820.4 818.8 818.5 1 Plane 1 0.5 0.6 0.7 Voltage [V] 24 staxera company presentation Jeremy Lawrence 0.8 Challenge of thermomechanics 53.7 MPa Single plane from stack measured temperature distribution FEA model free floating cell σ1 principal stress free floating cell Temperature gradients can lead to cell fracture 25 staxera company presentation Jeremy Lawrence 3 kW system demonstrator 26 staxera company presentation Jeremy Lawrence 3 kW system demonstrator Cooperation with EBZ www.ebz-dresden.de Steam reforming, natural gas High efficiency (target > 50% at 20 kW) Stationary electricity generation (or CHP) Multiple ISMs in one system Modularity, quality, costs First step on the path to 20 kW sysems 27 staxera company presentation Jeremy Lawrence Typical operating point Total stack power 1900 Wel (two ISMs) U 40,4 V Fuel -> Reformer 6,6 l/min I 23,5 A Air flow 254 l/min Fuel -> Afterburner 0,5 l/min S/C 2,7 Fuel utiliz. 74 % T Reformer 657 °C Air utiliz. 18 % Tmax stack 856 °C Umin ISM 1 3,20 V (Block 1) Tmin stack 720 °C Umin ISM 2 3,28 V (Block 1) T exhaust 124 °C Very similar performance from both ISMs 28 staxera company presentation Jeremy Lawrence Test summary > 3.000 hours operation Stable performance 15 thermal cycles Robust and durable SOFC stacks Multiple ISMs in one system Each ISM can be stably controlled Further information available from www.ebz-dresden.de 29 staxera company presentation Jeremy Lawrence Product quality, manufacturing cost 30 staxera company presentation Jeremy Lawrence Stack manufacturing High yield rate > 90% even with manual assembly processes 31 staxera company presentation Jeremy Lawrence Cost challenge 500 €/kW can be achieved 32 staxera company presentation Jeremy Lawrence Summary staxera is a supplier of SOFC integrated stack modules Products are focused on industrial customers Demonstrated continuous improvement since market entry in 2006 Complete 3 kW systems are available from our partner EBZ Robustness and endurance are key performance differentiators Thermomechanics is the key design challenge for lightweight stacks 10.000 hours endurance life and 150 cycles demonstrated 33 staxera company presentation Jeremy Lawrence Thank you for your attention