TOWN AND COUNTRY PLANNING ACT 1990 PLANNING AND COMPULSORY PURCHASE ACT 2004 PLANNING ACT 2008 PLANNING APPLICATION ON BEHALF OF: St Modwen Developments Ltd and Travis Perkins PLC Full planning application for the erection of a building for storage and distribution (B8) with ancillary offices, areas of external storage, HGV parking and staff car parking Phase 1, Area 1000, Whitley Business Park, Whitley PLANNING STATEMENT Planning Prospects Ltd 4 Mill Pool Nash Lane Belbroughton Worcestershire DY9 9AF November 2014 Reference: PPL/102 CONTENTS 1. INTRODUCTION 2. THE SITE AND SURROUNDING AREA 3. THE DEVELOPMENT PROPOSALS 4. PLANNING POLICY CONTEXT 5. PLANNING BALANCE 6. CONCLUSIONS WHITLEY BUSINESS PARK – TRAVIS PERKINS 1 1. INTRODUCTION 1.1 This Planning Statement has been prepared in support of a planning application which is submitted on behalf of the joint applicants, St. Modwen Developments Ltd and Travis Perkins Plc seeking full planning permission for the erection of a building for storage and distribution (B8) purposes with ancillary offices, areas of external storage, parking, together with associated development and highway access infrastructure. A concurrent planning application is also being jointly submitted for matching highway access infrastructure which is intended to expedite delivery of the development. 1.2 The Whitley Business Park is included as an allocated employment site within the Coventry Unitary Development Plan and also has outline planning permission for B1, B2 and B8 employment development (amongst other mixed uses) granted by the Secretary of State in 2001 and subsequent Reserved Matters approved by the City Council in December 2006. That planning permission was part implemented in 2008 and remains extant. 1.3 This application concerns the south western part of the overall site business park, known as Area 1000 or the “Riverside” phase and effective seeks permission for an alternative layout and design of building for this part of the site compared to what has already been approved for the site under the previous permissions. 1.4 The submission includes the following documentation: • The planning application form including the appropriate Certificate of Ownership; Application drawings for approval as follows: • Site Location Plan (drawing reference 3341 AL(0) 001 Rev J) • General Arrangement Plan – drawing reference 3341 AL (0) 003 Rev H • General Arrangement Elevations – drawing reference 3341 AL (0) 004 Rev E x 2 drawings • General Arrangement Sections – drawing reference 3341 AL (0) 005 Rev A • General Arrangement Part Elevations – drawing reference 3341 AL (0) 006 Rev F x 2 drawings • Existing Topography – drawing reference 3341 AL (0) 023 Rev A • Location Plan as Existing – drawing reference 3341 AL (0) 024 Rev A WHITLEY BUSINESS PARK – TRAVIS PERKINS • Typical Detail Sections Sheet 1 - drawing reference 3341 AL (21) 001 Rev A • Typical Detail Sections Sheet 2 Dock Access Doors - drawing reference 3341 AL 2 (21) 002 Rev A • Typical Detail Sections Sheet 3 Vehicular Doors - drawing reference 3341 AL (21) 003 Rev A • Typical Detail Sections Sheet 4 Offices - drawing reference 3341 AL (21) 004 Rev A • Overall Drainage Strategy – drawing reference D12-017 301 Rev B • Drainage Strategy Sheet 1 – drawing reference D12-017 302 Rev A • Drainage Strategy Sheet 2 – drawing reference D12-017 303 Rev A • Drainage Strategy Sheet 3 – drawing reference D12-017 304 Rev A • Drainage Strategy Sheet 4 – drawing reference D12-017 305 Rev A • Drainage Strategy Sheet 5 – drawing reference D12-017 306 Rev A • Overall Road Layout - drawing reference D12-017 40 Rev C • Road Layout Sheet 1- drawing reference D12-017 401 Rev C • Road Layout Sheet 2 - drawing reference D12-017 402 Rev C • Road Layout Sheet 3 - drawing reference D12-017 403 Rev C • Road Layout Sheet 4 - drawing reference D12-017 404 Rev C • Road Layout Sheet 5- drawing reference D12-017 405 Rev C • Longitudinal Road Section Sheet 1 – drawing reference D12-017 901 Rev A • Longitudinal Road Section Sheet 2 – drawing reference D12-017 902 Rev A • Longitudinal Road Section Sheet 3 – drawing reference D12-017 903 Rev A • Longitudinal Road Section Sheet 4 – drawing reference D12-017 904 Rev A • Road Cross Sections Sheet 1 – drawing reference D12-017 907 Rev B • Road Cross Sections Sheet 2 – drawing reference D12-017 908 • Storm Drainage Strategy – drawing reference P12-017 602 Rev C WHITLEY BUSINESS PARK – TRAVIS PERKINS 3 Supporting Reports: • Design and Access Statement prepared by Associated Architects Planning Statement prepared by Planning Prospects • Transport Statement prepared by Phil Jones Associates • Travel Plan prepared by Phil Jones Associates • Flood Risk Assessment prepared by Hydroland Consulting Engineers • Drainage Strategy prepared by Rogers Leask • Phase 1 Desk Study prepared by Roger Leask • 2014 Ecological Survey Report prepared by Cotswold Wildlife Surveys • Tree Survey prepared by Cotswold Ecology • Archaeological Desk Based Assessment prepared by Cgms • Sustainability Statement comprising a Feasibility Report for BREEAM prepared by Crouch Perry Wilkes 1.5 This supporting Planning Statement sets out the relevant background to the determination of the application by describing the site and general locality and details of the proposed development. The statement goes on to assess the appropriate planning considerations relevant to the proposal; firstly having regard to the provisions of Development Plan policy, and secondly all other material considerations including national planning policy. Environmental Assessment 1.6 The planning application does not include an Environmental Impact Assessment (EIA). In accordance with the Town and Country Planning, England (Environmental Impact Assessment) (Amendment) (England) Regulations 2011, specifically Part III, 7 (1) for Procedures Concerning Applications for Planning Permission, it is for the Local Planning Authority upon receipt of this application to treat the submission as if it were a request for the Local Planning Authority to adopt a Screening Opinion under Regulation 5 (1). 1.7 The proposed development is listed under Schedule 2, as an urban development project (10b) and exceeds the 0.5ha site size threshold. However the site is not within the defined Sensitive Areas, nor in our view is it likely to have significant effects on the environment in terms of the characteristics of the development; its location; or the characteristics of potential impact. In such circumstances, Environmental Impact Assessment is not WHITLEY BUSINESS PARK – TRAVIS PERKINS 4 required and the Local Planning Authority have issued a Screening decision indicating the same Opinion. 1.8 Whilst not EIA development however, the application is nevertheless still supported by a comprehensive range of supporting technical documentation which still assesses a range of environmental implications associated with the development to ensure that the scheme can be accommodated on the site without any undue environmental harm. The Applicant 1.9 The planning application is submitted on behalf of St Modwen Developments Ltd and Travis Perkins Plc. 1.10 St Modwen is one of the UK’s leading developers. The Company works in partnership with private and public sector organisations, continually mindful of the impact of the developments on the communities in which they operate. The company has huge experience in the delivery of new development with a large portfolio of land and property. St Modwen purchased the Whitley Business Park from Jaguar with planning permission. To date, initial highway access infrastructure has been constructed together with the first phase of office buildings within Area 3000. 1.11 Travis Perkins plc have been supplying the building and construction trades for more than 200 years. They are one of their biggest such suppliers – a FTSE100 company with 17 industry leading brands and 1,900 outlets. The company employs more than 24,000 employees in the UK and Ireland. 1.12 Both companies have a keen desire and commitment to progress the development and its delivery upon planning permission being granted, such that it will make a positive contribution to the continued development at Whitley Business Park and a positive contribution to the Coventry economy with investment and jobs. WHITLEY BUSINESS PARK – TRAVIS PERKINS 5 2. THE SITE AND SURROUNDING AREA 2.1 The application site is located at Whitley on the southern edge of the built-up area of Coventry. It is located immediately to the south west of the existing Jaguar Engineering Centre and forms part of a wider triangle of generally open land defined by the A45/A46 Stonebridge Highway, the A444 and the residential areas of Whitley and Willenhall which defines the full extent of the larger Whitley Business Park area for which outline and reserved matters planning has already been granted. 2.2 The site to which this application relates extends to just over 18 ha of land including its full access roadway and is located within the Area 1000 / Riverside phase with the whole of the Business Park extending to a total of some 37 ha of land. The site currently comprises undeveloped land. 2.3 The River Sowe forms the eastern and southern boundary of the site with open land beyond including the Stonebridge Meadows Nature Reserve. To the north of the site is the fenced secured site of the Jaguar Engineering Centre. To the north west and beyond Jaguar are Areas 3000 / Lakeside and 2000 / Woodside phases of the Whitley Business Park respectively. To the east is the River Sherbourne, beyond which is the A444. 2.4 The site is characterised by its riverside location with extensive and deep tree and general landscaping separating and screening the site from the surrounding road network. There are limited views of the site from public vantage points. The site has a strong relationship to the Jaguar Engineering Centre with which its shares its northern boundary and which the Whitley Business Park generally surrounds. WHITLEY BUSINESS PARK – TRAVIS PERKINS 6 3. THE DEVELOPMENT PROPOSAL 3.1 The planning application relates to a proposed B8 storage and distribution unit which would have a gross external floor area of 20,177 sq m. The building comprises a large double height storage and distribution warehouse with ancillary office space at ground and first floor level. The premises would operate as a Regional Distributor Centre for Travis Perkins and would not be open for trade supplies to the public. The premises would be open 24 hours a day, seven days a week and would create jobs ranging initially from 199 up to 300, based over three working shifts when in full operation. 3.2 Access into Area 1000 Riverside is direct from the Business Park spine road which already encircles the northern part Area 3000 Lakeside of the Business Park. The spine road will be extended towards this area of the site, through Area 2000 Woodside and provide suitable access into the site itself and the wider 1000 Riverside phase. The extension of the spine road is included in this application but also forms a concurrent identical separate application which has been submitted to expedite delivery of this element of the development to required timeframes. The access into the site has been appropriately designed to accommodate HGV’s and the internal layout enables vehicles to manoeuvre, whilst retaining sufficient on site car parking. 180 car parking spaces are proposed for staff members and visitors, based upon anticipated staff needs to be on site at any given time. In addition, 15 secure and sheltered cycle parking spaces are proposed for employees and visitors. 3.3 The proposed building would be clad to an external coloured finish set out within the submitted Design and Access Statement and shown on coloured elevation plans. The overall height of the building is comparable to other buildings previously approved in this location and its design would not appear out of keeping in this locality, benefitting from established extensive buffer landscaping surrounding the Park. External storage is proposed as part of this application which is important to the overall operation and the nature of goods stored and is common in other Regional Distribution Centres of this kind for this operator. The height of external storage does not exceed the height of the building and its extent is fully defined on the submitted site layout plan. 3.4 In addition to the above, the proposals also include site enabling and reprofiling works to adjacent land setting it out a developable plateaux having regard to flood risk, landscape and ecology constraints. The proposals also extend to include necessary drainage infrastructure designed in line with sustainable drainage principles and serving both the new Travis Perkins building but also in readiness for a future building on the proposed development plateaux. WHITLEY BUSINESS PARK – TRAVIS PERKINS 3.5 7 Further details of the approach to the design and layout of the site are set out in the Design and Access Statement which has been submitted with the application. The Design and Access Statement also covers matters associated with sustainable building, albeit a separate sustainability statement has also been prepared and submitted principally dealing with sustainable energy use. Context of the application 3.6 The site benefits from outline planning permission granted by the Secretary of State on the 14th of November 2001 (Application Reference 47334). That outline planning permission granted permission for a mixed-use Business Park development comprising primarily offices, research and development and light industrial (Class B1), general industrial (Class B2) but excluding former special industrial use classes and storage and distribution (to a maximum of 10% of net developable area), local retail to a maximum size of 300 square metres, conference, leisure and training, children's day nursery/crèche, associated landscaping and highway infrastructure including modification to the existing road junctions. 3.7 Condition 6 pursuant to the outline planning permission defined the development to comprise buildings for industrial, office, research and development or warehousing uses totalling no more than 102,109 sq m gross internal floor space in aggregate; a local retail facility providing no more than 300 sq m gross internal floorspace; a day nursery; and pumping station. It also confirmed that the aggregate gross internal floorspace to be used for warehousing shall not exceed 10,211 sq m. Various matters are also covered by way of a S106 legal agreement for the site including improvements to nature conservation management, green travel initiatives and training amongst others. 3.8 The Outline planning permission was granted at a “Call In” Inquiry as the proposals were, at the time, contrary to the provision of the Development Plan and the site formed part of the Green Belt. However, since the granting of planning permission, the current adopted Development Plan now specifically identifies the site as a Principal Employment Site. Its delivery is fundamental to achieving the aims and aspirations of the plan and will contribute significantly to the economic development objectives of the City Council. 3.9 Reserved Matters pursuant to that original outline planning permission were approved for the entire site by Coventry City Council on the 12th December 2006. These reserved matters specifically included and approved the development of a range of buildings on all parts of the Business Park site, Areas 1000, 2000 and 3000. Pre-commencement conditions pursuant to the development were discharged and the development commenced by way of works to the site highway infrastructure in November 2008. The planning permission implementable. remains extant and the remainder of the development WHITLEY BUSINESS PARK – TRAVIS PERKINS 3.10 8 A full planning permission for the first phase of the northern part of the site, known as Area 3000, has also been approved by the City Council. It allows for the erection of 8,192 sq m of new business office space within 8 buildings, set out within a spacious, landscaped business park, with associated access infrastructure and parking areas. This permission has been part implemented with the constructed six building which have now been occupied. Two further buildings still have planning permission and are yet to be built to compete this phase. 3.11 A further full planning permission has been granted by the Council for the construction of a new access, roundabout and consequential car park alterations at the Jaguar site entrance. This permission has been implemented and completed and provides the northern access into the Whitley Business Park. 3.12 In the context of the above it can be noted that: • The site has an extant planning permission for B1, B2 and B8 development as set out in the original outline planning permission for the site and subsequent reserved matters • Part of the extant planning permission included large scale buildings for B8 use and reserved matters specifically proposed and gained approval for such buildings within the Business Park. • The site is now specifically allocated within the UDP as a Principal Employment Site; it is no longer in the Green Belt 3.13 The outline planning already grants permission for this type of development in principle. It sets out the range of development which can be built on this and the wider site and the reserved matters, as approved, provide detailed proposals for the development layout and design of the Business Park. The principle of the development has therefore been agreed and approved. 3.14 The existence of the outline planning permission and reserved matters approval is a significant material consideration in the determination of this application and effectively, although a full planning application, this submission merely seeks to provide for an alternative design and layout of building for this part of the site to that which was previously granted planning permission. Other Aspects of the Proposed Development 3.15 In addition to the above, the following are taken into account in the application submission, are referred to in other supporting reports and information submitted with the application, and are also referred to in suggested conditions later in this Statement; WHITLEY BUSINESS PARK – TRAVIS PERKINS • 9 Site drainage and issues relating to the management of surface water are considered in detail in the Flood Risk Assessment and Drainage Strategy submitted as part of this application. The proposed development will incorporate sustainable drainage in the form of attenuation ponds and infiltration drainage where site conditions allow. Foul sewage will be disposed by a foul pumping station which is a similar arrangement to the Jaguar facility. • A specific report sets out issues relating to site and ground conditions. The report makes recommendations to minimise risks and confirms there are no geoenvironmental issues which would impede development which cannot be mitigated against. General items are listed for further investigation as would be expected for a site of this nature. • Access to the development has previously been approved and implemented. The northern access to the business park has already been constructed under separate planning permission. The accompanying Transport Statement sets out justification for this scale of development to be approved as a stand-alone permission with access direct from the north, via an extension to the new business park spine road. • The Transport Statement is also fundamentally linked to the provision of a Travel Plan for the site which is also included in the submission. The Travel Plan encourages alternative modes of travel, rather than relying on the private car. Showers and secure cycle parking will be provided on site to encourage staff to walk or cycle to work. Wider sustainable transport improvements are proposed including provision for future Bus Rapid Transport. • The Whitey Business Park has previously approved a Habitat and Protected Species Strategy. Linked to this there is also a specific River Corridors Strategy which provides specific proposals for the management and protection of the river corridors. This application includes and updated ecology report with the latest survey information on matters associated with the ecology of the area. It sets out the relevant linkages to the already approved strategies and confirms there are no ecological impediments to the site’s development. • A Tree Survey has been undertaken and whilst the proposal requires some tree removal, an appropriate landscaping scheme and re-planting is proposed to enhance the development and to mitigate against any loss. Tree protection measures are recommended to ensure that trees are protected during any development works. WHITLEY BUSINESS PARK – TRAVIS PERKINS • 10 An Archaeological Desk Based Assessment is submitted with the application, which considers the archaeological constraints with the site. There are no designated heritage assets within the site. Further field evaluations of the site is being proactively undertaken in addition to the extensive research to date in order to allow a full understanding of archaeology in advance of determination. • A Sustainability Statement comprising a Feasibility Report for BREEAM is submitted, which demonstrates how the proposal has been designed to target a ‘Very Good’ BREEAM score. Renewable and Low Carbon Technologies are proposed including Solar Photovoltaic and an Air Source Heat Pump. 3.16 The various submitted reports with the application should be read together in order to fully understand the interrelated nature of the proposals. WHITLEY BUSINESS PARK – TRAVIS PERKINS 11 4. PLANNING POLICY CONTEXT 4.1 Section 38(6) of the Planning and Compulsory Purchase Act 2004 requires that applications for planning permission are determined in accordance Development Plan unless material considerations indicate otherwise. with the In addition government policy, principally the National Planning Policy Framework published in March 2012 (NPPF or generally referred to here as the Framework) is material to the determination of planning applications. Development Plan Policy 4.2 In this instance the Development Plan comprises the Coventry Unitary Development Plan (adopted 2001). 4.3 Although the Plan was only intended to cover the period until 2011, many of its policies have been ‘saved’ and remain part of the Development Plan. 4.4 The NPPF confirms (paragraph 12) that its publication “does not change the statutory status of the Development Plan as the starting point for decision making.” Proposals must be determined in accordance with the Development Plan unless material considerations indicate otherwise. However the NPPF includes transitional arrangements in respect of Development Plan policy and the weight which should be attributed to it, stating (Annex 1, paragraphs 214 – 215) that “For 12 months from the day of publication, decision-takers may continue to give full weight to relevant policies adopted since 2004 even if there is a limited degree of conflict with this Framework…. In other cases and following this 12month period, due weight should be given to relevant policies in existing plans according to their degree of consistency with this framework (the closer the policies in the plan to the policies in the Framework, the greater the weight that may be given).” 4.5 In this case, the proposals here are consistent with the Development Plan which is itself consistent with the Framework and its approach to support economic development and growth. 4.6 The following policies relate to the issues raised by the proposal within the Development Plan; 4.7 Policy E1 of the UDP concerns the overall economy and employment strategy. It allocates and seeks to retain a portfolio of sufficient employment land of appropriate size and quality and provides a framework to investment and regenerate the city's economy. 4.8 Policy E2 seeks to encourage consolidation and strengthening of the city's existing economic base. It encourages the retention of sufficient employment land to assist manufacturers and to encourage the growth and modernisation of existing companies. WHITLEY BUSINESS PARK – TRAVIS PERKINS 4.9 12 Policy E3 encourages diversification of the local economy to establish new economic activities in sectors which further help to strengthen and diversify the city’s economic base bringing in new business. 4.10 The application site is specifically identified as part of a Principal Employment Site (Site 15) under Policy E6 within the UDP. It is identified as being in the International/National Sector, a sector for sites with a prestigious location, large size with good accessibility to road and rail readily available. Its delivery is fundamental to achieving the aims and aspirations of the plan and will contribute significantly to the economic development objectives of the city council. 4.11 Paragraph 5.33 of the UDP specifically concerns this site and describes it as land adjacent to Jaguar's plant at Whitley. It states: “The new site will wrap around the existing Jaguar employment site and will provide a high-quality Business Park building upon research and development elements. The site, which lies only 2 - 3 km from the city's highest unemployment area, will create the opportunity for high quality flagship development and help attract continued inward investment into the city”. 4.12 All of the above points to the importance of the delivery of this site to the City’s economy. Outline planning permission has been granted and this clearly establishes the principle of the acceptability of the proposed development. Its allocation in the UDP further confirms its development status in addition to the outline planning permission and delivery of the site is essential to realise the economic benefits anticipated from the proposed Business Park. The proposed development in this planning application is entirely and completely in accordance with the provisions of the Development Plan. Emerging Core Strategy 4.13 In 2012 the Council formally submitted a new Core Strategy to the Planning Inspectorate. The Core Strategy continued to allocate the Whitley Business Park site for employment development. At Examination however the plan was not found to be sound mainly to do with unrelated issues to this site concerning the Duty to Co-operate and the scale of new homes proposed given the populations projections for the City. In April 2013, the Council’s cabinet formally resolved to withdraw the Coventry Core Strategy. The emerging Coventry Local Plan therefore remains subject to further consultation and is not likely to be submitted to the Secretary of State for Examination until much later in 2015/16. National Planning Policy Framework 4.46 The National Planning Policy Framework (NPPF) was published in March 2012 and supersedes all the previous Planning Policy Guidance Notes and Statements. WHITLEY BUSINESS PARK – TRAVIS PERKINS 4.47 13 As noted above, the NPPF confirms (paragraph 12) that its publication, “…does not change the statutory status of the Development Plan as the starting point for decision making.” Proposals must be determined in accordance with the Development Plan unless material considerations indicate otherwise. The NPPF represents a material consideration which should be taken into account in determining applications. 4.48 The NPPF states (paragraph 197) that in determining proposals, “…Local Planning Authorities should apply the presumption in favour of sustainable development”. This lies at the heart of the NPPF and for decision making this means (paragraph 14) “…approving development proposals that accord with the Development Plan without delay; and where the Development Plan is absent, silent or relevant policies are out-ofdate, granting permission unless: any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole; or specific policies in this Framework indicate development should be restricted.” 4.49 The NPPF is framed as a positive and enabling document, seeking to facilitate sustainable development and growth. There is a clear commitment (paragraphs 18 – 19) to supporting and securing, rather than impeding, sustainable economic growth. The golden thread running through the NPPF is a ‘presumption in favour of sustainable development’. 4.50 Applications for sustainable development should be approved wherever possible (paragraph 187), consistent with an overarching approach that demands a “presumption in favour” of sustainable development (paragraph 14). It advocates a proactive, creative and solution seeking approach to planning (paragraphs 17 and 187). 4.51 The overarching role of the planning system is contained within 12 principles which include; • Planning should be plan-led. They should be up to date and provide a practical framework within which decisions can be made predictably and efficiently. • Should be more than just scrutiny, should be a creative exercise in finding ways that enhance and improve the places in which people live their lives. • Proactively drive sustainable economic development to deliver homes, business, infrastructure and places that the country needs. The housing and other development needs of an area should be objectively identified and met and respond to wider opportunities for growth. • Seek to ensure high quality design and good standard of amenity • Take account of the roles and character of different areas WHITLEY BUSINESS PARK – TRAVIS PERKINS 14 • Support and encourage the use of renewable energy and reuse of existing resources. • Contribute to conserving and enhancing the natural environment • Encourage the effective use of land • Promote mixed use developments, encourage multiple benefits from the use of land in urban and rural areas • Conserve heritage assets • Actively manage patterns of growth to make fullest possible use of public transport, walking and cycling, and focus significant development in locations which are or can be made sustainable. • Take account of and support local strategies to improve health, social and cultural wellbeing for all. 4.52 Section 1 of the NPPF sets out policy to build a strong and competitive economy. Paragraph 18 states “the Government is committed to securing economic growth in order to create jobs and prosperity, building on the country’s inherent strengths, and to meeting the twin challenges of global competition and of a low carbon future”. 4.53 Paragraph 19 of the NPPF is particularly relevant as it states “the Government is committed to ensuring that the planning system does everything it can to support economic growth. Planning should operate to encourage and not act as an impediment to sustainable growth. Therefore, significant weight should be placed on the need to support economic growth through the planning system”. Paragraph 20 goes onto state that “to help achieve economic growth, local planning authorities should plan proactively to meet the development needs of business and support an economy fit for the 21st Century”. 4.54 The NPPF also seeks to ensure that business is given every advantage to grow and in paragraph 21 it states that “investment in business should not be over-burdened by the combined requirements of planning policy expectations. Planning policies should recognise and seek to address potential barriers to investment, including a poor environment or any lack of infrastructure, services or housing”. It further adds that local planning authorities should set out a clear economic vision and strategy for their area which positively and proactively encourages sustainable economic growth; further it should support existing business sectors, taking account of whether they are expanding or contracting and, where possible, identify and plan for new or emerging sectors likely to locate in their area. Policies should be flexible enough to accommodate needs and to allow rapid response to changes in economic circumstances. WHITLEY BUSINESS PARK – TRAVIS PERKINS 15 Summary 4.53 It is clear from national planning policy that the Government is committed to encourage, moreover do everything it can to support sustainable economic growth which will generate jobs and provide benefits to local communities. These factors are an important material consideration which should be carefully balanced during the decision making process. WHITLEY BUSINESS PARK – TRAVIS PERKINS 16 5. PLANNING BALANCE 5.1 There is a clear direction within the NPPF that Local Planning Authorities should approach decision-taking in a positive way to foster the delivery of sustainable development. Local Planning Authorities should look for solutions rather than problems, and decision-takers at every level should seek to approve applications for sustainable development wherever possible. Local Planning Authorities should work proactively with applicants to secure developments that improve the economic, social and environmental conditions of the area. As explained, in respect of sustainable economic growth, the Government is committed to ensuring the planning system offers everything it can to support it. This should be the planning application determination context to these proposals. 5.2 The previous sections of this statement have set out details about the site, the proposed development and its planning policy context within the Development Plan and national Framework. 5.3 The Development Plan in this case allocates the site for employment development and the proposals can be seen to be generally consistent with the Framework. 5.4 Paragraph 14 of the Framework states that where development is in line with the Development Plan, then planning permission should be granted without delay. This is the case here. 5.5 Beyond the Development Plan position, it can also be noted that the benefits of granting planning permission here are considerable and there are no adverse impacts which would significantly or demonstrably outweigh these benefits. 5.6 Equally the proposals adhere closely to the definition of sustainable development within the Framework. The NPPF has at its heart a "presumption in favour of sustainable development". Paragraph 7 of the Framework states that "there are three dimensions to sustainable development: economic, social and environmental. These dimensions give rise to the need for the planning system to perform a number of roles". These are, firstly, an economic role whereby it supports growth and innovation and contributes to a strong, responsive and competitive economy. The second role is a social one where it supports "strong, vibrant and healthy communities, by providing the supply of housing required to meet the needs of present and future generations". The third role is an environmental one where it contributes to protecting and enhancing the natural, built and historic environment. 5.7 Paragraph 8 of the NPPF states that the three "roles should not be undertaken in isolation, because they are mutually dependent". lt goes on to state that the "planning system should play an active role in guiding development to sustainable locations". WHITLEY BUSINESS PARK – TRAVIS PERKINS 17 Economic Benefits - Delivery of Employment Opportunities 5.8 The economic benefits of the proposed development are considerable. They include jobs created during both the construction and operational phases of the development. investment in construction will create jobs over the construction build period. Expenditure from employees during construction will benefit the local economy. 5.9 The proposed development will make a positive contribution to employment in the long term when operational. The proposal will generate up to 300 jobs. These jobs will directly benefit local employment opportunity and the local economy. generate a varied work force. This proposals will Such employment opportunities are promoted and encouraged through the NPPF. 5.10 The economic benefits of the proposed development contribute to the economic role of sustainable development defined within the Framework, contributing to building a strong, responsive and competitive economy. These are a significant benefit to the proposed development. High Quality Sustainable Development 5.11 The proposals represent high quality sustainable employment development and design. Careful consideration has been given to the design of the proposed development and the layout of the site. This includes due consideration of the size and scale of the proposed building whilst of course meeting occupier needs. 5.12 Travis Perkins are seeking to achieve a BREEAM target of ‘Very Good’. In order to achieve this target, the proposal seeks to achieve a reduction in Carbon Dioxide emissions through on-site renewable energy generation. 5.13 A full explanation of the design of the proposed development, including its evolution, site constraints and opportunities is provided within the submitted Design and Access Statement. The proposed design of the building is suitable for this location retaining the best of the site landscape context which screens and contains the development but also preserves ecological interest and protects the nearby floodplain. New landscape planting is proposed. 5.14 The site is sustainably located with safe and convenient access to the development included in the proposals. Opportunities are available for use of public transport and other sustainable transport choices. Where accessed by car, suitable and sufficient car parking spaces are provided. WHITLEY BUSINESS PARK – TRAVIS PERKINS 5.15 18 The creation of a high quality sustainable development proposal contributes to the environmental role of sustainable development set out within the Framework, protecting and enhancing the natural, built and historic environment and is a further significant benefit of the proposals. Climate Change, Flooding Risk and Drainage 5.16 The NPPF recognises that planning plays a key role in helping shape places to secure radical reductions in greenhouse gas emissions, minimizing vulnerability and providing resilience to the impacts of climate change, and supporting the delivery of renewable and low carbon energy and associated infrastructure. 5.17 A Flood Risk Assessment and Drainage Strategy has been submitted with the application demonstrating that foul and surface water drainage will be appropriately managed adopting sustainable drainage principles. This sustainable drainage links to environmental and ecological benefits. The approach has been developed in consultation with the Water Authority. Conserving natural environment 5.18 An assessment has been made of the ecological value of the site and its immediate environs. This identifies that there were limited habitats on site and that no designated sites will be affected by proposals. 5.19 An arboricultural report has also been prepared which includes a tree schedule, survey and suitable tree protection measures in accordance with British Standard 5837:2012. There will be some tree loss, but with further planting proposed within areas of informal space and general landscaping, opportunities here will provide some benefits. 5.20 The proposed development can therefore be seen to have limited impacts on the natural environment. S106 Planning Obligation 5.21 The site has previously been subject to a S106 Planning Obligation that set out various matters to protect and enhance the local environment. This includes matters relating to habitat protection, pond and lake strategies, green travel, Whitey Common and Leaf Lane enhancements, footpath and River Sowe bridge works etc amongst others matters. 5.22 The S106 obligations have primarily already been addressed by other developments on the site. This is mainly with the exception of Green Travel. In respect of Green Travel, this development includes its own discrete proposals to address Green Travel for this occupier with a separate submitted Travel Plan. WHITLEY BUSINESS PARK – TRAVIS PERKINS 19 Planning Conditions 5.23 Further discussions are expected with the Council in respect of conditions and the list will evolve during the determination of the planning application. However some of the principally relevant conditions and the basic structure of the planning permission is expected to include the following, amongst others: • Approval of the full planning application and application drawings • Sample materials to be used in the external treatment of each building; • Construction management plan to ensure appropriate measures are in place to include controls in relation to traffic management, hours of operation, dust, noise, vibration, waste, stockpiling, emissions, vehicle sheeting and wheel washing, road sweeping, machinery and plant including cranes. WHITLEY BUSINESS PARK – TRAVIS PERKINS 20 6. CONCLUSIONS 6.1 In making the planning application, it is our submission that the application proposes a high quality, sustainable development which will provide significant benefits particularly to the local economy. It falls in line with the Development Plan and there are compelling grounds to grant planning permission in this instance. 6.2 In summary: • The Development Plan allocates the site for employment development. • The proposed development is both high quality and sustainable and would deliver a B8 employment use on an allocated employment site. • The site is suitably located and is accessible to sustainable transport links and the wider strategic highway network. • The development accords with the NPPF. It also accords with the economic role of sustainable development in that it will contribute to a strong, responsive and competitive economy providing jobs including during the construction phase of the development. • The development accords with the environmental role of sustainable development protecting and enhancing the best of the local natural environment, with the prudent use of resources and mindful of climate change. • The development sensitively addresses site development issues including such matters as site access, flood risk and drainage as well as taking on board such matters as ecology and landscape setting. 6.3 The proposals are in line with the National Planning Policy Framework and represent sustainable development. In such circumstances planning permission should be granted.