ARCHITECTURE
CONSTRUCTION MANAGEMENT
DEVELOPMENT
ELECTRICAL IDENTIFICATION
DUPLEX RECEPTACLE
PLATE
STANDARD TOGGLE
SWITCH PLATE
FRONT
SYMBOL
FRONT
REAR SIDE
OF PLATE
REAR SIDE
OF PLATE
N-2
N-5
LABEL CKT. NO. OF EACH
DEVICE ON REAR SIDE OF COVER
PLATE. USE PERMANANT MARKER PEN,
BRADY MARKING SYSTEM OR OTHER
METHOD APPROVED BY THE ENGINEER
LABEL COVERS WITH CKT.'S
CONTAINED WITHIN. USE
PERMANANT MARKER PEN OR
OTHER APPROVED METHOD.
JUNCTION BOXES (EXPOSED
OR CONCEALED ABOVE
ACCESSIBLE CEILING)
CKT.S
LP4-13,15,17
ELECTRICAL SYMBOL LEGEND
DESCRIPTION
NOTES
DESCRIPTION
NOTES
S
S3
S4
SD
SINGLE POLE SWITCH, (LEVITON #CSBI-20-W)
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON
DUPLEX OUTLET - 20 AMP (LEVITON #BR20-W)
MOUNT @ 16" A.F.F. TO BOTTOM OF BOX, UON
THREE-WAY SWITCH, (LEVITON #CSB3-20-W)
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON
GFCI WEATHER-RESISTANT DUPLEX OUTLET - (LEVITON
#7899-T-W) w/ WHILE-IN-USE COVER (LEVITON #5977-DGY)
MOUNT @ 24" A.F.F. TO BOTTOM OF BOX, UON
FOUR-WAY SWITCH, (LEVITON #CSB4-20-W)
DIMMER SWITCH (FIELD VERIFY w/ LOAD)
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON
DUPLEX OUTLET - GROUND FAULT (LEVITON #8899-W)
MOUNT @ 16" A.F.F. TO BOTTOM OF BOX, UON
S 3D
SS
S SF
THREE-WAY DIMMER SWITCH (FIELD VERIFY w/ LOAD)
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON
GFCI DEAD-FRONT DUPLEX OUTLET - (P&S #2085W)
MOUNT @ 42" A.F.F. TO BOTTOM OF BOX, UON
PASSIVE INFRARED OCCUPANCY SENSOR SWITCH,
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON
DUAL-RELAY MULTI-TECHNOLOGY OCCUPANCY SENSOR
WALL SWITCH, (LEVITON #OSSMD-FT*)
MOUNT @ 44" A.F.F. TO BOTTOM OF BOX, UON - CONNECT
EXHAUST FANS TO DELAYED-OFF ON SECOND RELAY.
250V OUTLET, VERIFY WITH EQUIPMENT SPECIFICATIONS
MOUNT @ 48" A.F.F. TO BOTTOM OF BOX, UON
SINGLE-PHASE SPECIAL PURPOSE OUTLET, AS NOTED
REFER TO SHOP DRAWINGS FOR CONNECTION REQUIRE.
ROUND FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
2'x4' FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
2'x2' FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
1'x4' FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
WALL MOUNTED FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
4' LINEAR FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
JUNCTION BOX WITH BLANK COVER
UNIVERSAL EXIT SIGN w/ DIRECTIONAL ARROWS
AS REQUIRED.
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
LIGHTING/BRANCH CIRCUIT PANELS
REFER TO SPEC'S, AND ONE-LINE DIAGRAM.
DOUBLE HEADED EMERGENCY LIGHT FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
LOW VOLTAGE DATA OUTLET
REMOTE EMERGENCY LIGHT FIXTURE
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
E.C. TO PROVIDE AND INSTALL 4" SQ. x 2-1/8" DEEP BOX
WITH 2" DEEP PLASTER RING AND 1" CONDUIT STUBBED
ABOVE NEAREST ACCESSIBLE CEILING.
AC
ABOVE COUNTER
CEILING MNTD. OCCUPANCY SENSOR
SEE LIGHTING FIXTURE SCHEDULE FOR TYPES
AFF
ABOVE FINISHED FLOOR
SWITCHPACK LIGHTING CONTROL (COOPER #SP20-MV)
CONNECT TO OCC. SENSORS (PER MANUFACTURER)
EC
ELECTRICAL CONTRACTOR
120V PHOTOCELL
CONNECT IN SERIES WITH TIMER AS REQ'D.
EGC
EQUIPMENT GROUNDING CONDUCTOR
EXT'G DOOR BELL
EXT'G
EXISTING
FIELD VERIFY
GEC
GROUNDING ELECTRODE CONDUCTOR
EXT'G SURFACE MNTD RACEWAY OR PLUGSTRIP
FIELD VERIFY
SM
SURFACE MOUNTED
EXT'G PLYWOOD BACKWOOD
FIELD VERIFY
UON
UNLESS OTHERWISE NOTED
VIF
VERIFY IN THE FIELD
xR
EXISTING TO BE RELOCATED
1-21
CIRCUIT FROM PANEL 1, CIRCUIT 21
LABEL EXAMPLES:
----------"FIRE ALARM-ZONES 2&3"
"P.A. ZONES 4,5,&6"
"DATA CIRCUITS A&B"
"EXIT SIGNS-EMI&2"
"EMERG. CKTS. BPEM-3,4"
FOR J.B.'S CONTAINING
OTHER THAN POWER OR
LIGHTING CKT.'S LABEL
COVERS INDICATING
SYSTEM TYPE AND ZONES.
SYMBOL
LOW VOLTAGE
DATA OUTLET DETAIL
THE
DESIGN GROUP
SINGLE-PHASE MOTOR, AS SPECIFIED
SINGLE-PHASE FUSED OR NON-FUSED DISCONNECT
SINGLE-PHASE MANUAL STARTER OR COMB. DISC./STR.
SM
MOTOR TOGGLE SWITCH WITH THERMAL OVERLOAD
AND LOCKOUT
SQUARE D #CLASS 2510 FGJ5P (SINGLE POLE)
1104 S. MITCHELL ST.
CADILLAC, MICHIGAN 49601
(231) 779-4002
(231) 779-4022 FAX
GENERAL ELECTRICAL SPECIFICATIONS
NO SCALE
1.
2. ELECTRICAL WORK SHALL COMPLY WITH THE LATEST ENFORCEABLE EDITION OF THE N.E.C., LOCAL AND
STATE CODES, ORDINANCES, REGULATIONS, INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT
(OSHA), AND ADA GUIDELINES WITH THE LOCAL CODE AUTHORITIES HAVING JURISDICTION.
15. WITHIN THIRTY (30) DAYS AFTER THE ELECTRICAL CONTRACTOR HAS BEEN NOTIFIED TO PROCEED WITH THE
WORK, HE SHALL SUBMIT TO THE ARCHITECT/ENGINEER EIGHT (8) PRINTED HARD COPIES OR ONE (1)
ELECTRONIC COPY IN PDF FORMAT OF EACH OF THE FOLLOWING DRAWINGS AND DATA SHEETS FOR
REVIEW. ALL EQUIPMENT FOR WHICH SHOP DRAWINGS ARE BEING SUBMITTED SHALL NOT BE ORDERED
UNTIL APPROVED DRAWINGS HAVE BEEN RETURNED. SUCH SUBMITTALS SHALL INCLUDE:
* ELECTRICAL DISTRIBUTION EQUIPMENT, INCLUDING CIRCUIT BREAKERS AND DISCONNECTS.
* LIGHT FIXTURES, LIGHTING CONTROLS, AND LAMPS
* WIRING DEVICES, INCLUDING SWITCHES, RECEPTACLES, ETC.
3.
16. ELECTRICAL MATERIALS SHALL BE NEW, AND BEAR THE "UL" LABEL OR LISTING.
1" CONN. & BUSHING
ON STUB-OUTS
CEILING
PRIOR TO SUBMITTING A PROPOSAL, BIDDER SHALL HAVE VISITED THE CONSTRUCTION SITE. HE SHALL BE
FAMILIAR WITH THE EXISTING CONDITIONS UNDER WHICH HE WILL HAVE TO OPERATE AND WHICH WILL IN
ANY WAY AFFECT THE WORK UNDER THIS CONTRACT. NO SUBSEQUENT ALLOWANCE WILL BE MADE IN THIS
CONNECTION ON BEHALF OF THE CONTRACTOR FOR ANY ERROR OR NEGLIGENCE ON HIS PART.
1" EMT
4" SQ. x 2 1/2" DEEP BOX W/
1-GANG 2" DEEP PLASTER RING
WITH BLANK S.G. WALL PLATES
(TYPICAL OF EACH)
4.
THE CONTRACTOR SHALL EMPLOY QUALIFIED AND EXPERIENCED WORKMEN FOR THIS WORK.
5.
ELECTRICAL CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED UNDER HIS CONTRACT TO BE FREE
FROM DEFECTIVE WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER THE ACCEPTANCE
OF THE BUILDING BY THE OWNER. SHOULD DEFECTS OCCUR WITHIN THIS PERIOD, REPAIR AND/OR
REPLACE DEFECTIVE ITEMS AT NO EXPENSE TO THE OWNER.
18" AFF
FLOOR
ELECTRICAL CONTRACTOR SHALL OBTAIN ALL PERMITS, PAY ALL FEES, AND ARRANGE FOR ALL
INSPECTIONS FOR HIS WORK. AT THE COMPLETION OF ELECTRICAL WORK, THE ELECTRICAL CONTRACTOR
SHALL FURNISH THE OWNER WITH ALL CERTIFICATES OF FINAL INSPECTION AND APPROVALS.
6.
THE ELECTRICAL CONTRACTOR SHALL PROVIDE A MINIMUM OF TWO (2) HOURS OF TRAINING AS NECESSARY
TO THE OWNER ON THE LIGHTING CONTROLS, AND ALL OTHER ELECTRICAL EQUIPMENT AND/OR DEVICES.
7.
THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL OPERATING AND MAINTENANCE INSTRUCTION
MANUALS, CERTIFICATES OF INSPECTION, TEST REPORTS, SPARE PARTS, AND RECORD DRAWINGS
(AS-BUILTS) TO THE OWNER PRIOR TO CLOSEOUT. FINAL PAYMENT WILL ONLY BE MADE AFTER THE FINAL
PUNCH LIST COMPLETION AND RECEIPT OF THE ABOVE CLOSEOUT DOCUMENTATION.
8.
9.
ELECTRICAL CONTRACTOR SHALL COORDINATE LOCATIONS OF HIS EQUIPMENT AND WORK WITH OTHER
BUILDING TRADES TO AVOID ANY INTERFERENCES BETWEEN HIS WORK AND THE WORK OF OTHER BUILDING
TRADES. IF ANY DISCREPANCIES OCCUR, CONSULT WITH THE ARCHITECT, ENGINEER AND/OR OWNER
BEFORE CONTINUING.
THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE PROPER RESTORATION OF ALL EXISTING
SURFACES REQUIRING PATCHING, PLASTERING, PAINTING AND/OR REPAIR DUE TO THE INSTALLATION OF
ELECTRICAL WORK UNDER THE TERMS OF THIS SPECIFICATION. CLOSE ALL OPENINGS, REPAIR ALL
SURFACES, ETC. AS REQUIRED.
10. CUTTING AND/OR PATCHING THAT MAY BE REQUIRED FOR THE INSTALLATION OF THE ELECTRICAL
SYSTEM(S) SHALL BE DONE AND/OR REPAIRED BY THE ELECTRICAL CONTRACTOR. NO CUTTING OF THE
BUILDING STRUCTURAL SYSTEM SHALL BE DONE WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT.
11. THE ELECTRICAL CONTRACTOR SHALL PERIODICALLY REMOVE FROM THE SITE ALL DEBRIS AND RUBBISH
ACCUMULATING AS A RESULT OF THE ELECTRICAL INSTALLATION. UPON COMPLETION OF THE PROJECT, HE
SHALL DISPOSE OF ALL DEBRIS AND RUBBISH AND SHALL LEAVE ALL AREAS CLEAN. THE INTERIORS OF ALL
CABINETS, PULL BOXES, AND EQUIPMENT ENCLOSURES SHALL BE FREE OF ANY DEBRIS.
12. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND SHALL WORK WITH EXISTING SYSTEMS IN
AN "AS FOUND" CONDITION.
13. DRAWINGS ARE DIAGRAMMATIC ONLY AND SHOW OBSERVATIONS FROM CASUAL FIELD INVESTIGATIONS AND
EXISTING DRAWINGS. FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MOUNTING LOCATIONS.
NOTIFY ENGINEER IF ANY DISCREPANCIES ARE FOUND THAT AFFECT THE WORK TO BE PERFORMED, PRIOR
TO PROCEEDING.
14. ELECTRICAL JOINTS WILL BE PERMITTED ONLY IN JUNCTION AND OUTLET BOXES. ALL JOINTS SHALL BE
FIRMLY BONDED TOGETHER AND TAPED OR SHALL BE MADE WITH MECHANICAL CONNECTORS.
17.
OR "THWN-2" AND INSTALLED IN EMT, FOR INDOOR USE, AND SCHEDULE 40 PVC OR RMC FOR OUTDOOR
USE, MINIMUM SIZE 1/2", OR "MC" OR "AC" CABLE (10 FT. MAXIMUM UNLESS OTHERWISE APPROVED BY THE
ARCHITECT,/ENGINEER/OWNER), UNLESS OTHERWISE NOTED OR REQUIRED BY CODE. INTERIOR MOTOR
CONNECTIONS SHALL BE TYPE "MC" OR "AC" CABLE OR LIQUID TITE FLEXIBLE CONDUIT (BOTH WITH A 6FT.
MAXIMUM LENGTH). ALL WIRE AND CABLE SHALL BE NEW AND SHALL BE DELIVERED TO PROJECT IN
UNBROKEN AND UNDAMAGED CARTONS AND/OR REELS.
18. FUSES SHALL BE "UL" LISTED, DUAL-ELEMENT AS MANUFACTURED BY BUSSMAN CO., OR APPROVED EQUAL
(200,000 AIC).
19. SWITCHES SHALL BE RATED 20A, 120/277V, COMMERCIAL SPECIFICATION GRADE, SINGLE, DOUBLE-POLE,
THREE-WAY, ETC. AS INDICATED, AND EQUAL TO HUBBELL, GE, LEVITON, COOPER, ARROW-HART OR P&S.
20. RECEPTACLES SHALL BE RATED 20A, 125AMP, COMMERCIAL GRADE GROUNDED TYPE (NEMA 5-20R), EQUAL
TO HUBBELL, GE, LEVITON, COOPER, ARROW-HART OR P&S.
21. PLATES FOR SWITCHES AND RECEPTACLES SHALL BE PLASTIC OR SIMILAR. COORDINATE ALL FINISH
COLORS WITH OWNER/ARCHITECT TO MATCH ASSOCIATED DEVICES.
22. THE AUTOMATIC OCCUPANCY SENSORS SHALL BE FIELD ORIENTATED TO MAXIMIZE SENSING COVERAGE.
E.C. SHALL ADJUST AUTOMATIC OFF DELAY SETTINGS PER THE OWNERS SPECIFICATIONS. E.C. SHALL
TRAIN THE OWNER ON HOW TO ADJUST THE DELAY SETTINGS. OCCUPANCY SENSORS SHALL BE AS
SPECIFIED BY COOPER OR EQUAL BY LEVITON, HBA, SENSOR SWITCH, OR WATTSTOPPER
23. FLUORESCENT FIXTURE BALLAST VOLTAGE RATING SHALL BE AS NOTED, NON-PCB, HIGH POWER FACTOR,
ENERGY SAVING, CLASS P, "A" SOUND RATED, PROGRAM RAPID START MINIMUM 100,000 CYCLES.
24. LAMPS - ALL LAMPS SHALL BE CLASSIFIED "ENERGY SAVING". PROVIDE A MINIMUM OF 3% OR TWO (2),
WHICHEVER IS GREATER, SPARE OF EACH TYPE OF LAMP TO THE OWNER AT PROJECT CLOSEOUT. LAMPS
25. INTEGRAL EMERGENCY BATTERIES AND REMOTE EMERGENCY MINI-INVERTERS SHALL PROVIDE A MINIMUM
OF 90 MINUTES OF RUN-TIME FOR LAMPS AS SHOWN. BY COOPER, LVS, IOTA, BODINE, OR SIMILAR.
26. ALL LIGHT FIXTURES HAVE BEEN SELECTED BY THE ARCHITECT/ENGINEER FOR THE BASIS OF DESIGN AND
APPEARANCE. SUBMIT ALL PROPOSED VOLUNTARY ALTERNATE LIGHT FIXTURES A MINIMUM OF TEN (10)
WORKING DAYS PRIOR TO BIDS BEING DUE.
27. PROJECT HAS BEEN DESIGNED TO COMPLY WITH AUTOMATIC LIGHTING SHUTOFF REQUIREMENTS OF
ADOPTED ENERGY CODE (ASHRAE 90.1-2007). INTERIOR AND EXTERIOR LIGHTING COMPLIANCE
DOCUMENTATION CAN BE PROVIDED BY THE ENGINEER UPON REQUEST.
30. FEEDER AND BRANCH CIRCUIT BREAKERS SHALL BE COMPATIBLE (VOLTAGE, AIC RATING, MANUFACTURER,
ETC.) WITH THE EXISTING PANELBOARDS THAT THEY ARE MOUNTED IN.
31. FIRE CAULKING REQUIRED WHERE ANY PENETRATIONS ARE MADE THROUGH FIRE RATED WALLS, BY. E.C.
32. PROVIDE AN UPDATED, ACCURATE AND TYPED PANEL SCHEDULE FOR ALL NEW AND EXISTING ELECTRICAL
PANELS THAT ARE AFFECTED BY THE WORK IN THIS PROJECT. DOCUMENT ALL CHANGES ON FINAL
AS-BUILT DRAWINGS AS REQUIRED. VERIFY ALL EXISTING LOADS AND WIRING - NOTIFY THE
ARCHTIECT/ENGINEER IF EXISTING CONDITIONS ARE FOUND THAT VIOLATE INSTALLATION OR SAFETY
CODES.
33. ALL NEW EQUIPMENT (DISCONNECTS, VARIABLE FREQUENCY DRIVES (VFD), ETC.) SHALL BE IDENTIFIED WITH
TYPED LABELS.
34. UNDERGROUND CONDUIT TO BE SCHEDULE 40 PVC, UNLESS OTHERWISE REQUIRED BY CODE.
35. ELECTRICAL CONTRACTOR SHALL VERIFY EXACT ELECTRIC UTILITY COMPANIES SERVICE POINTS AND
PRIMARY SERVICE CONDUIT, ROUTING, AND SIZE WITH UTILITY COMPANY SERVICE PANNERS/ENGINEERS
PRIOR TO BEGINNING WORK.
36. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A BOX AND RACEWAY SYSTEM FOR THE
LOW-VOLTAGE CABLING SYSTEMS (TELEPHONE, DATA, TELEVISION, SOUND, ETC.) THAT ARE BEING
PROVIDED BY THE OWNER. THESE DRAWINGS ARE DIAGRAMMATICAL AND THE LOCATIONS AND
REQUIREMENTS SHALL BE COORDINATED WITH THE OWNER/OWNER'S CONTRACTORS IN THE FIELD.
PROVIDE AND INSTALL RACEWAY SLEEVES THRU FLOORS, FIRE WALLS, AND NON-ACCESSIBLE CEILINGS AS
REQUIRED.
37. ALL NEW BRANCH WIRING SHALL BE COLOR CODED BY THE FOLLOWING VOLTAGE SYSTEMS AND LABELED
AT THEIR SOURCE PER 2011 NEC SECTION #210.5:
NEUTRAL - WHITE
E.G.C. - GREEN
38. EXISTING ELECTRICAL WIRING WHICH WILL NOT BE MADE OBSOLETE AND WHICH WILL BE DISTURBED DUE
TO CONSTRUCTION CHANGES REQUIRED BY THIS CONTRACT SHALL BE RESTORED TO OPERATING
CONDITION AS REQUIRED AND/OR DIRECTED. WHERE REQUIRED, SHOWN, AND/OR DIRECTED, OUTLETS
AND CONDUIT RUNS SHALL BE RELOCATED. IN SOME CASES IT MAY BE NECESSARY TO EXTEND CONDUITS
AND PULL IN NEW WIRING, INSTALL JUNCTION BOXES, AND SPLICE IN NEW WIRING, OR REPLACE OLD
WIRING WITH NEW.
39. WHERE EXISTING WIRE, CONDUIT, AND OUTLET BOXES ARE NO LONGER USED, REMOVE EXISTING WIRE
BACK THE POWER SOURCE AND PROVIDE BLANK COVER PLATES ON EMPTY GANG BOXES. ALL EXPOSED
CONDUIT AND SURFACE MOUNTED RACEWAY THAT HAS BEEN ABANDONED SHALL BE REMOVED. WHERE IT
IS IMPOSSIBLE TO REMOVE, THE CONDUIT SHALL SHALL BE CUT OFF AND CAPPED/PLUGGED.
40. COORDINATE WITH THE OWNER AND THE UTILITY COMPANY TO APPLY FOR AVAILABLE ENERGY INCENTIVES
OFFERED BY THE UTILITY.
41. ELECTRICAL CONTRACTOR SHALL SUBMIT SEPARATE LINE ITEM PRICING ON ALL BID ALTERNATES AS
DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. REFERENCE THE ARCHITECTURAL
DRAWINGS AND SPECIFICATIONS FOR MORE DETAILS AND LIST OF ADD ALTERNATES.
ARCHITECT OF RECORD:
D. DeKryger
DRAWN BY:
B. Reinhardt
DATE ISSUED:
July 31, 2015
Construction Drawings
28. DISCONNECT SWITCHES SHALL BE RATED 250V, OR 600V, FUSED OR NON-FUSED AS NOTED, HEAVY-DUTY,
NEMA-1, FOR INDOOR USE, AND NEMA-3R FOR OUTDOOR USE BY SQUARE D OR SIMILAR.
29. SINGLE PHASE MOTOR STARTERS SHALL HAVE MANUAL TOGGLE SWITCH WITH THERMAL OVERLOADS AND
PILOT LIGHT, SURFACE OR FLUSH MOUNTED AS NOTED BY SQUARE D CLASS 2510 OR SIMILAR.
SHEET NUMBER:
E2.0
PROJECT NUMBER:
15121