TRANSMITTAL SEE REVIEW FORM NO EXCEPTIONS TAKEN

TRANSMITTAL
5995 Greenwood Plaza Blvd.
Suite 100
Greenwood Village, CO 80111-4710
303-571-5377
303-629-7467 (fax)
PROJECT:
TO:
DATE: 06-28-2014
Metro CareRing-Hunger Relief Center
Barker Rinker Seacat & Architecture
3457 Ringsby Ct #200
Denver CO 80216
ATTN:
Joel Hermann
Ph/Fax:
303-455-1366
No. 13J2024-0079
RE:
JOB:
WE ARE SENDING:
SUBMITTED FOR:
142010-Elevator
13J2024
ACTION TAKEN:
Shop Drawings
Approval
Approved as Submitted
Letter
Your Use
Approved as Noted
Prints
As Requested
Returned After Loan
Change Order
Review and Comment
Resubmit
Submit
Plans
SENT VIA:
Samples
Returned
Specifications / Product Data
Attached
Returned for Corrections
Other:
Separate Cover Via:
Due Date: 05-19-2014
NOTES: Design
team- Has DFD been contacted for code requirements as we do not have battery lowering or two way radio
communication. Both need to be addressed now. I must say recently Phipps has found that Denver Fire requires two
way radio communication as a code requirement.
Item
Package
Code
Submittal
Submittal
142010
142010
142010-02
142817-01
1
1
06-28-2014
06-28-2014
Submittal
142010
142819-01
1
06-28-2014
Rev. Copies Date
Description
Status
Passenger Elevator - Shop Drawings
Passenger Elevator Control System Product Data
Elevator Equipment - Product Data
Architect Review
Architect Review
SEE REVIEW FORM
NO EXCEPTIONS TAKEN
EXCEPTIONS AS NOTED
REVISE AND RESUBMIT
REJECTED
SUBMIT SPECIFIED ITEM
CC:
Checking is for only general conformance with the
design concept of the project and general compliance
with the information given in the Contract Documents.
Contractor is responsible for dimensions to be confirmed
and correlated at job site; quantities required; fabrication
processes and techniques of construction; coordination
of the work of all trades and satisfactory performance of
the work.
By:
Andrea L. Cunningham
Barker Rinker Seacat Architecture
Date: 07/09/2014
Signed:
Brady McQuinn
Architect Review
AEDG please
verify that the
two-way
communication
requirement
has been met.
Se spec
section: 14
2010/2.03/E.
and per the
code.
-BRS
Install fire extinguisher within the elevator
mechanical alcove if possible.
-BRS
Does the plate have to be
continuous?
Does there need to be a
plate if the walls are
reinforced CMU?
Does the plate have to
recessed into the wall?
Otis' answer is: No tube
steel needed.
No plate is needed, but
CMU cells at sides of
elevator to be grouted
solid to accommodate
attachments.
Reference RFI #8 for sump pit.
-BRS
Sump pit 24"x24",
centered in
elevator pit.
OK. No change to shaft
dims. Otis concurs.
-BRS
- Elevator to be 8'-4" Clear
by 6'-0"
-
- Otis - please provide a
sump pit location
HW 9
DOOR 202,
GHP: Please issue an RFI for these
the new door and a change in the
opening size for the elevator door
itself.
Access door to be Type H, Hollow
metal frame, 45 minute rated, with
hardware group 9. Group 9 has
been updated at the right:
Elevator door to be 3'-6" clear in lieu
of 3'-0" as shown on drawings 4 & 8
on A501.
-BRS
7'-10" min. rough
opening at upper
floor. 7'-0" clear
opening.
7'-10" min. rough
opening at lower
floor. 7'-0" clear
opening.
3
1
HINGE
CLOSER
1
1
1
1
STOREROOM LOCK
STOP
KICKPLATE
SMOKE SEAL
BB5000 450 652
BO
8616 AF86 FC 689(mount onDO
pull side)
C848D LRC 626
DO
1270WV 630
TR
K0050 10x34 630
TR
5050B 17’
NG
Is a hatch better or a door?
Otis' answer is: It must be a door.
Cab Design
Laminate
Canadian Maple
DL68
Brazilian Redwood
DL93
Antique Walnut
DL14SMA
Moonstone*
DT18SM
Metallic Mist*
L4SM
Rustic Leather*
DP4
Spiced Cherry
DL91
Rosewood
DL12
Coral Sands*
DT21SM
Glossy Nickel*
F12PPS
Cab shown in Brazilian Redwood with
optional decorative trim
* Longer lead time applies
Behind laminate panels
Stainless Steel
Paint
Cab shown in Safari with optional
decorative trim
Steel Panels
Real White
EW-0
Satin Stainless Steel
Safari
EN
Rigidized Stainless Steel*
5WL
Black Pearl
EW-5
Cab shown in Satin Stainless Steel
*Metal finishes vary slightly
depending on product
application. Additional costs
and lead time apply. Contact
your Otis representative for
more information.
Doors & entrances
Painted Surfaces
Door and Entrance shown in Safari
Real White
EW-0
Flax
EN-1
Twilight
EW-2
Safari*
EN-2
Mushroom*
EN-4
Charcoal *
EW-4
* Additional lead time may apply
Steel Surfaces
Satin Stainless Steel*
Gold Satin
Door and Entrance shown in Stainless Steel
http://www.otis.com
APD-FIN28 (0812) AKS
* Additional costs apply.
Please contact your Otis Representative for more information.
© Otis Elevator Company 2012.
All rights reserved.
Colors and patterns shown in this brochure are printed
reproductions. For maximum fidelity, please request
product samples from your Otis sales representative.
Submittal Review
Project:
Project #:
General Contractor:
Contractor:
Date:
Reviewed by:
Metro CareRing
#2185.00
July 1, 2014
Anna-Lisa Conners
Items Submitted:
Submittal Number:
Specification Section:
No Exception Taken
Rejected
Make Corrections Noted
Revise and Resubmit
Submit Specified Item
Architect to Comment
Passenger Elevator Equipment
#00184
142010
This review is only for the limited purpose of checking for general conformance with the design concept and the information
shown in the Construction Documents. The review shall not include review of the accuracy or completeness of details, such as
quantities, dimensions, weights or gauges, fabrication processes, construction means or methods, coordination of the work with
other trades or construction safety precautions, all of which are the sole responsibility of the Contractor.
General Notes:
1. None.
Type
Elevator
Comments
Revise and Resubmit
• Please submit power confirmation sheet, indicating horsepower rating
and overcurrent protection size requirements, as listed on item #26 under
the Electrical Requirements
• Verify if Battery Powered Emergency Return Unit (ERU) is to be
provided with this unit
• Verify if intra building intercom is to be provided with this unit
• No standby power is provided for this elevator
Kindly inform our office if any portion of this document is missing or unreadable.
Page 1 of 1
Action
RR
NE
R
MC
RR
S
AC