TRANSMITTAL 5995 Greenwood Plaza Blvd. Suite 100 Greenwood Village, CO 80111-4710 303-571-5377 303-629-7467 (fax) PROJECT: TO: DATE: 06-28-2014 Metro CareRing-Hunger Relief Center Barker Rinker Seacat & Architecture 3457 Ringsby Ct #200 Denver CO 80216 ATTN: Joel Hermann Ph/Fax: 303-455-1366 No. 13J2024-0079 RE: JOB: WE ARE SENDING: SUBMITTED FOR: 142010-Elevator 13J2024 ACTION TAKEN: Shop Drawings Approval Approved as Submitted Letter Your Use Approved as Noted Prints As Requested Returned After Loan Change Order Review and Comment Resubmit Submit Plans SENT VIA: Samples Returned Specifications / Product Data Attached Returned for Corrections Other: Separate Cover Via: Due Date: 05-19-2014 NOTES: Design team- Has DFD been contacted for code requirements as we do not have battery lowering or two way radio communication. Both need to be addressed now. I must say recently Phipps has found that Denver Fire requires two way radio communication as a code requirement. Item Package Code Submittal Submittal 142010 142010 142010-02 142817-01 1 1 06-28-2014 06-28-2014 Submittal 142010 142819-01 1 06-28-2014 Rev. Copies Date Description Status Passenger Elevator - Shop Drawings Passenger Elevator Control System Product Data Elevator Equipment - Product Data Architect Review Architect Review SEE REVIEW FORM NO EXCEPTIONS TAKEN EXCEPTIONS AS NOTED REVISE AND RESUBMIT REJECTED SUBMIT SPECIFIED ITEM CC: Checking is for only general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Contractor is responsible for dimensions to be confirmed and correlated at job site; quantities required; fabrication processes and techniques of construction; coordination of the work of all trades and satisfactory performance of the work. By: Andrea L. Cunningham Barker Rinker Seacat Architecture Date: 07/09/2014 Signed: Brady McQuinn Architect Review AEDG please verify that the two-way communication requirement has been met. Se spec section: 14 2010/2.03/E. and per the code. -BRS Install fire extinguisher within the elevator mechanical alcove if possible. -BRS Does the plate have to be continuous? Does there need to be a plate if the walls are reinforced CMU? Does the plate have to recessed into the wall? Otis' answer is: No tube steel needed. No plate is needed, but CMU cells at sides of elevator to be grouted solid to accommodate attachments. Reference RFI #8 for sump pit. -BRS Sump pit 24"x24", centered in elevator pit. OK. No change to shaft dims. Otis concurs. -BRS - Elevator to be 8'-4" Clear by 6'-0" - - Otis - please provide a sump pit location HW 9 DOOR 202, GHP: Please issue an RFI for these the new door and a change in the opening size for the elevator door itself. Access door to be Type H, Hollow metal frame, 45 minute rated, with hardware group 9. Group 9 has been updated at the right: Elevator door to be 3'-6" clear in lieu of 3'-0" as shown on drawings 4 & 8 on A501. -BRS 7'-10" min. rough opening at upper floor. 7'-0" clear opening. 7'-10" min. rough opening at lower floor. 7'-0" clear opening. 3 1 HINGE CLOSER 1 1 1 1 STOREROOM LOCK STOP KICKPLATE SMOKE SEAL BB5000 450 652 BO 8616 AF86 FC 689(mount onDO pull side) C848D LRC 626 DO 1270WV 630 TR K0050 10x34 630 TR 5050B 17’ NG Is a hatch better or a door? Otis' answer is: It must be a door. Cab Design Laminate Canadian Maple DL68 Brazilian Redwood DL93 Antique Walnut DL14SMA Moonstone* DT18SM Metallic Mist* L4SM Rustic Leather* DP4 Spiced Cherry DL91 Rosewood DL12 Coral Sands* DT21SM Glossy Nickel* F12PPS Cab shown in Brazilian Redwood with optional decorative trim * Longer lead time applies Behind laminate panels Stainless Steel Paint Cab shown in Safari with optional decorative trim Steel Panels Real White EW-0 Satin Stainless Steel Safari EN Rigidized Stainless Steel* 5WL Black Pearl EW-5 Cab shown in Satin Stainless Steel *Metal finishes vary slightly depending on product application. Additional costs and lead time apply. Contact your Otis representative for more information. Doors & entrances Painted Surfaces Door and Entrance shown in Safari Real White EW-0 Flax EN-1 Twilight EW-2 Safari* EN-2 Mushroom* EN-4 Charcoal * EW-4 * Additional lead time may apply Steel Surfaces Satin Stainless Steel* Gold Satin Door and Entrance shown in Stainless Steel http://www.otis.com APD-FIN28 (0812) AKS * Additional costs apply. Please contact your Otis Representative for more information. © Otis Elevator Company 2012. All rights reserved. Colors and patterns shown in this brochure are printed reproductions. For maximum fidelity, please request product samples from your Otis sales representative. Submittal Review Project: Project #: General Contractor: Contractor: Date: Reviewed by: Metro CareRing #2185.00 July 1, 2014 Anna-Lisa Conners Items Submitted: Submittal Number: Specification Section: No Exception Taken Rejected Make Corrections Noted Revise and Resubmit Submit Specified Item Architect to Comment Passenger Elevator Equipment #00184 142010 This review is only for the limited purpose of checking for general conformance with the design concept and the information shown in the Construction Documents. The review shall not include review of the accuracy or completeness of details, such as quantities, dimensions, weights or gauges, fabrication processes, construction means or methods, coordination of the work with other trades or construction safety precautions, all of which are the sole responsibility of the Contractor. General Notes: 1. None. Type Elevator Comments Revise and Resubmit • Please submit power confirmation sheet, indicating horsepower rating and overcurrent protection size requirements, as listed on item #26 under the Electrical Requirements • Verify if Battery Powered Emergency Return Unit (ERU) is to be provided with this unit • Verify if intra building intercom is to be provided with this unit • No standby power is provided for this elevator Kindly inform our office if any portion of this document is missing or unreadable. Page 1 of 1 Action RR NE R MC RR S AC