Hanging Strap Kit - Peerless Boilers

advertisement
ISOLATING HANGING STRAP KIT
BOLT
Designed to suspend a horizontal or vertical fancoil. Nylon
reinforced rubber gives the Strap Kit the strength to hold
the Fancoil unit and the PRM with connected lines sets.
The nylon straps will absorb most of the vibration
generated by the fancoil system.
5/16
WASHER
1/4” LOCK
NUT
x8
x8
24” NYLON STRAP
1/2” SELF
TAPPING
SCREW
METAL
FLANGE
x16
x8
x8
x4
Figure 1
INSTALLATION INSTRUCTIONS
Fancoil Unit Only:
1. Attach the metal flanges to the four facing corners of
the fancoil unit. . (see Figure 2)
2. Measure the distance apart from the metal flanges and
mark the joists. If the joists are too far apart a cross 2"x4"
can be used.
3. Cut a ¼" hole 1" from the end of the nylon straps, slide
the 1¼" bolt into the hole of the metal flange then into the
nylon strap, finish with the washer and nut. Complete this
at one end of each of the nylon straps. (see Figure 3)
4. At the other end of the nylon strap, measure and mark
the desired height for the fancoil (4" or more). Cut a ¼"
hole 1" from the end of the nylon straps, install the nylon
straps to the joist using the end with the metal flanges.
Figure 2
1”
5. Lift the fancoil unit and slide the bolt into the metal
flange located on the unit through the nylon strap, finish
with the washer and nut.
Figure 3
Fancoil Unit with Cooling Coil:
1. Attach the cooling coil to fancoil unit. Attach the
metal flanges to the four facing corners of the fancoil
and cooling coil assembly. (see Figure 5)
2. Follow steps 2 - 5 as above.
OR
Connect Cooling Coil
and Fancoil together first
(see drawing FAC-101)
www.pavilionair.com
Figure 5
Figure 4
Drawing: IHS-301(P)
Date: 01/04
Download