IEA-EBC Korea Micro Energy Grid (K-MEG) & Global Pilot Projects Youngmin Kwon, Ph.D. November 11, 2015 Ⅰ K-MEG & MEG Biz Models 1. K-MEG Overview 2. K-MEG Concept 3. MEG Biz Area 4. MEG Biz Modeling Ⅰ K-MEG & MEG Biz Models 1 K-MEG Overview Overview MOTIE: Ministry of Trade, Industry & Energy KETEP: Korea Institute of Energy Technology Evaluation and Planning Objectives • Program Title : Korea Micro Energy Grid (K-MEG) • Administrators : MOTIE / KETEP • Principal Leader : Samsung C&T • Participants : 60 members • Program Budget : Approx. 80 mil. USD • Program Period : July 2011 ~ September 2014 To Develop ICT-based Active Energy Solutions & Business Cases Implementing BAS: Building Automation System EMS: Energy Management System BEMS: Building EMS DR: Demand Response DER: Distributed Energy Resources Adv. Monitoring Infrastructure (AMI) BAS Demand Side Management EMS / BEMS Automated DR & Peak Control DER / Renewables Energy Shifting & Sharing Cyber Security, etc. • Fitted for building(s), building groups, communities or off-sites • Up to 30% energy efficiency improvement (savings) | 3 Ⅰ K-MEG & MEG Biz Models 2 K-MEG Concept Custom Modeling w/ Micro Energy Blocks (MEB) Macro Grids • ICT-based energy management & operation • Optimizing energy supply & consumption [MEB Components of Energy Supply/Management] | 4 Ⅰ K-MEG & MEG Biz Models 2 K-MEG Concept - Example F A Cities A B C Communities E D E Complexes (Building Groups) F · · · · Buildings Cells (Unitary Spaces / Zones) D B C | 5 Ⅰ K-MEG & MEG Biz Models 3 MEG Biz Area Customer Oriented Micro Energy Grid (MEG) Optimizing Supply & Consumption of Electricity/ Heat/ Gas Macro Grid Market Smart Grid Elec. Gener ation Transmission Micro Grid Market Distribution Customer Solution Renew -ables Heat Grid Heat Gener ation Solution Transit Customer Solution Wasted Heat Gas Grid Off Grid Storage Solution Storage/ Depressurization Transit Bio Solution Area of New Biz Opportunities Coal (Low Grade) | 6 Ⅰ K-MEG & MEG Biz Models 4 MEG Biz Modeling 9 MEG Business Models Developed | 7 Ⅰ K-MEG & MEG Biz Models 4 MEG Biz Modeling 12 Initiative Projects - 7 Domestic - 5 Overseas | 8 Ⅱ K-MEG Global Pilot Projects 1. Projects Configuration 2. Advanced Monitoring Platform 3. Domestic Projects 4. Overseas Projects Ⅱ K-MEG Global Pilot Projects 1 Projects Configuration Initiative Applicable Scale Applicable Sector Existing/Developed City Community Scope Pilot Projects Infra Improvement - Infra Construction - New/Undeveloped Off-Grid Independent Infra Off-Grid PV (Myanmar) Regenerative Heat Shihwa Industrial Complex Industrial Complex Waste to Energy (WTE) Commercial Central Cooling/Heating - Group Management (Gwanggyo Techno-Valley), COEX Central Control by Operator GSBC, Guardian / Montgomery (USA) Unitary Control by User G-Valley Remote (Cloud) Control/Management SejongCity First Town,VTT-Aalto (Finland) Building Dedicated Cooling/Heating Operation Central Energy Command Ctr. Innovative Applicable Scale Applicable Sector Generation DER Transmission Renewable Operation DSM Scope Pilot Projects Plasma Enhanced Energy Gen. Hwasung PE-IGG DC Distribution Seoul National Univ. Sensor Network & AutoDR CITRIS HQ (USA) | 10 Ⅱ K-MEG Global Pilot Projects 2 Advanced Monitoring Platform Advanced Energy Monitoring & Demand Side Management Advanced Monitoring & Real-time Analytics Building Level Zone/Floor Level Unit/Space Level K-MEG E-TOC | 11 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects Seoul Metro GSBC & Gwanggyo Techno-Valley Sejong City First Town G-Valley Seoul National Univ. COEX PE-IGG Shihwa Industrial Complex | 12 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 1) G-Valley Overview Primary Scope • Advanced monitoring: smart meters & AMI, smart sensors • Cell-BEMS: compact BEMS platform for unitary space (1 bldg) • Peak load management in use of emergency gen. and DR • TOU (Time of Use) simulations in connection with elec. market • Other ECMs: LED, user feedback service Results Period Site Overview Buildings Energy Saving 13 bldgs (AMI headend installed) 10.4% on average 1 bldg (Cell-BEMS applied) 17% 13 bldgs (AMI headend installed) 13.9% on average 7/2013 ~ 6/2014 • Location : Guro Digital Industrial Complex, Seoul, Korea • Built : 2000s • Use : office, factory, retail, etc. • PJT Size : 17 buildings in Complex 1 7/2014 ~ 6/2015 Next Step Biz Case • Unitary Space energy management tool/service Goal • Continuous gathering and analysis of energy data • Monitoring of emergency generators operated to control peak load during winter season • 15% energy saving | 13 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 1) G-Valley Details Unitary Space Energy Management Tool: Cell-BEMS • Implemented at 120 units of Ace Techno Tower 8 • Control of dedicated air conditioning systems & lights • Integrated control of individual units for peak load management Peak Load Management w/ Emergency Generators • Implemented at Ace High-end Tower 2 • Expected savings to be approx. 2.9%/yr ($24k USD/yr) • Possible resource for Demand Response TOC Demand Response Signal 1 3 Input of DR Participation & Generation Info 5 Delivery of Output from Em. Control Operational Modes n : Demand Response Mode n : Peak Cut Mode n : Emergency Mode 1 Operation 4 3 6 5 Real-time 1 2 Control Emergency Control 4 2 Peak Control Scenario Selection 3 Emergency Control Scenario Selection Local Agent eCodi Generator 5 4 2 Info Acquisition about Emergency Situation Data Acquisition | 14 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 1) G-Valley Data Analysis • Energy data cluster analysis performed on 1552 cell units of 8 buildings - Analysis of annual energy consumption by unitary cell - Analysis of average daily energy consumption over weekdays and seasons - Analysis of correlation btw seasonal energy consumption and outdoor air temperature [Average Daily Electricity Consumption by Season - Cell Units of Ace Twin-tech Tower 2] [Correlation btw Seasonal Elec. Consumption & Outdoor Air Temp. - Cell Units of Ace Twin-tech Tower 2] | 15 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 1) G-Valley Data Analysis • Predictive analytics w/ potential demand resources - Analysis of amount of energy consumption varied per temperature change by season - Whole building control vs cluster control of cell units Analysis on Cell Units of Ace Twin-tech Tower 2 - Control in energy consumption of 67% (during summer) and 48% (during winter) of cell units resulted corresponding to that of whole bldg | 16 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 2) Shihwa Industrial Complex Overview Primary Scope • Heat Grid supplying/trading processed steam • SPC joint venture investment - Total budget: 8M USD - ESCO financing: 7M USD (6 year repayment) • Design Steam Supply - 59,000 ton/yr (average 9 ton/h) Operation • Actual Steam Supply: average 7 ton/h Site Overview Note • Location : Ansan City / Siheung City, Gyeonggi, Korea • Built : 2006 • Use : Steel/petro-chemistry/paper manufacturing, etc. • PJT Size : 1 heat/steam provider, 3 consumers • ESCO finance repayment period increased • Business Swing Factor: variation in energy price - Price of LNG decreased recently → Local steam generation becomes an option Biz Case • Heat energy based MEG in use of wasted process heat Goal • Recycle wasted heat generated from manufacturing process | 17 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 2) Shihwa Industrial Complex Expansion Plan: Shihwa Industrial Complex & MTV Complex Phase 2 – Expansion across Shihwa Industrial Complex • Heat Grid expanded across Shihwa Industrial Complex Phase 1 – K-MEG Project • Heat Grid on partial Shihwa Industrial Complex 도스 템 풍년 한영 450m Piping Work completed Expansion to MTV New Industrial Complex 성림 유화 Providers • Biz modeling integrating PV, heat recovery, fuel cell | 18 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 3) GSBC & Gwanggyo Techno-Valley Overall Project Plan Phase 1 GSBC Phase 3 Integration Cooling Tower Phase 2 Gwanggyo Techno-Valley GSBC R&DB Center Bio-Center KANC Sub-station Sub-station Sub-station Sub-station MEG Plant Cooling/Heating Energy from MEG Plant Energy Sharing (FAB Wasted Heat Recovery) Phase 1: Electricity/Gas oriented MEG Phase 2: Heat oriented MEG Phase 3: Integrated MEG * Phases 2 & 3 currently suspended | 19 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 3) Phase 1: GSBC Overview Primary Scope • Building energy management platform - Integrated w/ BAS/BEMS, smart meters & smart sensors - Building energy analytics & prediction - Peak control • MEG Plant: fuel cell-heat pump hybrid heat/elec. generation • Other ECMs: LED, wasted heat recovery Results Period Condition Energy Saving 7/2013 ~ 6/2014 w/o MEG Plant 18.3% 7/2014 ~ 6/2015 w/o MEG Plant 17.7% Site Overview • Location : Gwanggyo Techno-Valley, Suwon, Korea • Built : 2001 • Use : office/convention/auditorium • PJT Size : office bldg + exhibition ctr. (GFA: 48,650 m2) Biz Case • DER integrated building energy grid Goal • 20% energy saving (30% w/ MEG Plant contribution) • MEG Plant Contribution: approx. 8% energy saving Next Step • Continuous gathering and analysis of energy data • Operational improvement by data analysis • Operational algorithm update & optimal control w/ BEMS | 20 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 4) Sejong City First Town Overview Primary Scope • City-wide energy operational platform - Development of city-wide energy command center - Gateway development for heterogeneous BAS integration, etc. • Operation strategies integrating multiple renewable sources - Optimal operation of geothermal energy w/ PV & ESS Results Site Overview • Location : Sejong City, Korea • Built : 2012~2013 • PJT Size : 5 buildings (4 public, 1 educational) - Community Service, Post Office, Police Office, Fire Stn., School Period Buildings Energy Saving 7/2014 ~ 6/2015 5 bldgs 17.1% on average Next Step • Continuous gathering and analysis of energy data • Upgrade of remote energy services and operation Biz Case • Centralized remote energy monitoring & operation Goal • 15% energy saving | 21 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 5) Seoul Nat’l Univ. Overview Primary Scope • DC power resources & distribution system - Renewables: rooftop PV 35kW, BIPV 20kW - AC/DC hybrid switchgear (500kW), ESS (40kW) • Development & application of DC appliances - DC LED, DC office appliances (PC, TV), etc. • Development of DC power operational system Results • 4.3% energy saving (3/2015~5/2015) Site Overview Next Step • Location : Seoul Nat’l Univ., Seoul, Korea • Built : 1970 (renovated: 2013) • Continuous gathering and analysis of energy data • Use : classroom, lab, office • Improvement & optimization in DC operation • PJT Size : Eng. Bldg. #33 (GFA: 2,300 m2) Biz Case • DC power distribution technology Goal • 10% energy saving | 22 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 5) Seoul Nat’l Univ. Conceptual Diagram • AC/DC Hybrid Switchgear • AC/DC Cabling • ESS, etc. • DC LED (1,500 sets), etc. • Rooftop PV • BIPV • Operation Center • DC Appliances [DC Monitoring & Analytics] | 23 Ⅱ K-MEG Global Pilot Projects 3 Domestic Projects – 6) PE-IGG (Plasma Enhanced Integrated Gasification & Generation) Overview Site Overview • Location : Hwasung, Korea • PJT Size : Test bed w/ 500kW PE gasification system Biz Case • PE-IGG plant based independent energy supply microgrid Goal • Development of PE-IGG technologies and plant using low grade coal or biomass Primary Scope • Steam plasma gasification w/ low grade coal • Development of 75kW steam plasma torch • Development of synthetic gas purification system Results • 75kW steam plasma torch developed • 500kW PE gasification system developed and demonstrated Note • Power conversion technology development & capacity increase in progress w/ another national R&D program | 24 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects VTT-Aalto Univ. - Finland Off-Grid - Myanmar CITRIS HQ - Berkeley, USA Montgomery Bldg. - Chicago, USA Guardian Bldg. - Detroit, USA | 25 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 1) VTT-Aalto Campus Overview Primary Scope • Electricity & district heat combined energy efficiency • Building energy control - BEMS, NIALM smart meters, smart sensors - Energy saving web applications, user feedback - Occupancy sensor linked cooling/heating • Campus building group management - BAS integration, central energy operation center Results Site Overview • 10% energy savings on average (8 buildings) • Location : Espoo, Finland • Built : 1970s • Use : national lab (VTT), college campus (Aalto), hotel • Continuous gathering and analysis of energy data • PJT Size : 8 bldgs (full scope), 80 bldgs (monitoring only) • Operational improvement by data analysis Next Step Biz Case • Centralized remote monitoring & building group management Goal • 15% energy saving | 26 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 1) VTT-Aalto Campus Conceptual Diagram Advanced Monitoring BEMS User Feedback Mobile Applications | 27 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 1) VTT-Aalto Campus Campus Level Group Management Platform & Energy Operation Center (EOC) | 28 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 2) Guardian Building (Wayne County HQ) Overview Primary Scope • Establishment of a business reference in N. America • Development of a business case for global retrofit market • Building energy control: BAS/BEMS, smart meters/sensors • Advanced Building energy monitoring - Energy Operation Center (EOC) - Expandable system for multi-building remote monitoring • Peak management: AutoDR & DRMS (demo only) Results Site Overview • 9.6% energy savings (summer 2014) • Location : Detroit, Michigan, USA • Built : 1929 (renovated: 2008) • Use : office, retail • Continuous gathering and analysis of energy data • PJT Size : 40 storeys (GFA: 50,300 m2) • Operational improvement by data analysis Next Step Biz Case • BEMS integrated commercial building energy efficiency Goal • 10% energy saving | 29 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 2) Guardian Building (Wayne County HQ) Conceptual Diagram TOC EOC (Korea) DRMS Other Wayne County Buildings Guardian Building K-MEG BEMS System Interface BAS System K-MEG BAS System DDC DDC Additional Devices Local Controller Actuators AHU FCU Sensors AHU Actuators Sensors Cooling Tower Chiller Boiler VAV Existing Siemens Control System New K-MEG Control System (Wayne County Floors) (Lease Floors) Sensors Inverters Actuators | 30 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 2) Guardian Building (Wayne County HQ) Energy Operation Center (EOC) & BEMS Analytics EOC BEMS Demo EOC Screen Energy Use Analysis | 31 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 3) Montgomery Building Overview Primary Scope • Establishment of a business reference in N. America • Development of a business case for global retrofit market • Building energy control - BAS upgrade & integration, BEMS - Smart meters/sensors Results • 9.5% energy savings (summer 2015) Next Step Site Overview • Location : Chicago, Illinois, USA • Continuous gathering and analysis of energy data • Built : 1974 (renovated: 2005) • Operational improvement by data analysis • Use : mixed (residential/retail) • PJT Size : 28 storeys + enclosed parking lot (GFA: 50,600 m2) Biz Case • BEMS integrated mixed-use building energy efficiency Goal • 10% energy saving | 32 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 3) Montgomery Building Conceptual Diagram | 33 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 4) CITRIS HQ Overview Primary Scope • Smart sensor network & operational system • Operational technologies for peak load management - Smart sensor based real-time monitoring - AutoDR (Deep DR/Fast DR) applied facility control • Development of big energy DB technology • Thermal comfort based building energy control Results • 30% peak control demonstrated Site Overview Next Step • Location : UC Berkeley, Berkeley, California, USA • Built : 2010 • Continuous gathering and analysis of energy data • Use : office, lab, lecture rooms, etc. • Grid-tied building energy management • PJT Size : 7 storeys (GFA: 13,100 m2) Biz Case • Smart sensor network integrated building energy efficiency Goal • 30% peak energy saving | 34 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 5) Myanmar Off-Grid Overview Primary Scope • PV Power Plant (50kW) - Fixed PV system (30kW) - Modular home PV system (20kW) - Others: solar pump, LEG street lights • Technology for simultaneous battery recharging w/ multi-ports • Operation system for DC distribution & DC appliances Site Overview • Location : Khaloke Village, Yangon, Myanmar • PJT Size : 550 homes (3,413 residents) Biz Case • PV based Off-Grid independent energy supply Goal • Off-Grid biz case development for underdeveloped countries | 35 Ⅱ K-MEG Global Pilot Projects 4 Overseas Projects – 5) Myanmar Off-Grid Project Details Village Off-Grid 30kW Village Power Supply Model • • • • Fixed ground/rooftop systems PV panels, batteries, inverters, auxiliary Systems Public Load: LED street lights, battery recharging system Acquisition of power generation data Battery Recharging System • Recharging of batteries used at homes • Constructed at village public center and temple • Unitary recharging system w/ individual BMS module Home Off-Grid 20kW Home Power Supply Model • PV power generation w/ single PV module • PV plant, MPPT control, charger/discharger unified BMS system • System Composition (80 sets): 250W PV module, 250W ESS, controller, inverter, battery • AC Feeding: 220V 50Hz AC power feeding using inverter • DC feeding: DC power feeding using battery joint clip • 4 hrs lasted at 150W load | 36 Korea Micro Energy Grid (K-MEG) & Global Pilot Projects Youngmin Kwon, Ph.D.