Use it or Lose it! – Monthly Limits Require Careful Planning Contents Introduction to Tradebe Fawley Thermal Treatment Centre The Current Framework and Looking Ahead Fawley’s RSR EPR10 Limits Waste Types and Packages Taking the hazard out of waste management Tradebe Worldwide USA UK SPAIN 16 Locations 16 Locations 20 Locations 650 employees 530 employees 550 employees SALES: €90Million SALES: €110Million SALES: €150 Million Business Lines: Business Lines: Business Lines: Waste Management Waste Management Waste Management Solvent Recovery/Sales Metal Recovery Consulting Directly Manages: Turkey Directly Manages: Thailand France Tradebe History in the UK 2002 We set up Tradebe Ltd to explore opportunities in the UK market. 2003 We acquired Willacy Oil Services, specialized in waste management services to oil refineries 2010 2011 We acquired, Britcare Ltd, specialized in clinical waste We acquired SRM from Hanson Cement 2007 We acquired the Gwent and Ellesmere Port sites from United Utilities 2012 2007 1st qtr 2007 we acquired the Dinnington site from Safety Kleen Europe 2009 We acquired the assets and the activities of Pyros Environmental. United Kingdom Heysham North Shields Kirkby Sunderland Ellesmere Port Ocean Terminal Knottingley Queensferry Doncaster Sandycroft Dinnington Kingsnorth Hereford Bridgend Rye Harbour Fawley Birmingham Gwent OIL SERVICES HAZARDOUS WASTE Tradebe Fawley HTI Taking the hazard out of waste management Waste to Energy Fawley Site Information Situated within a large petrochemical complex on an old gravel pit 11 acres total size of site Top Tier COMAH site EPR Permits Incineration RSR EPR10 Other permits include Chemical Weapons, Firearms, GMO, Controlled Substances 1974 Site established 1990 Rotary kiln, ABC and Gas Cleaning Plant installed 2009 Solids handling systems upgraded 70 people dedicated to site Operations Taking the hazard out of waste management HTI Process Information Permitted Capacity - 45,000Tes Thermal Capacity - 24 MW Co incineration of solids, liquids and gases Average 85% volume reduction Operates under Industrial Emissions Directive Minimum operating temperature 1100oC, typically 1200oC Taking the hazard out of waste management HTI Process - Feed Systems HTI Process – Gas Cleaning Taking the hazard out of waste management HTI Process – Effluent Treatment Taking the hazard out of waste management HTI Process Residues to Landfill Solid Vitrified Ash High melting point metals are bound to each other to form an inert solid Each skip is internally analysed for leaching metals, TOC and LoI and a composite sample externally analysed. Never had a failure on metals, any on TOC are reprocessed Disposed of at a local non hazardous landfill as either VLLW or NORM Exempt Stabilised Filter Cake Metals are in a stabilised, insoluble form Each skip is internally analysed for leaching metals and a composite externally tested. Never had a failure. Disposed of at a local non hazardous landfill as either VLLW or NORM Exempt Taking the hazard out of waste management HTI Process Residues Aqueous Effluent Batch process with certificates of analysis 24hr flow proportional samples retained, monthly composite externally analysed Random external inspection and sampling regime by EA All metals in ppb levels Discharge to estuary Air Emissions Continuous emission monitors (CEMs) generating instant, 10min, 30min, 1hr and 24hr data CEMS controls input to the incinerator Monthly internal sampling Bi-annual external sampling by EA Taking the hazard out of waste management LLWR Volume 2011 Beta/Gamma 2012 Beta/Gamma Volume Processed C-14 Processed Tritium Processed Alpha Processed Beta / Gamma Processed Future Developments Fawley to increase storage and disposal limits Wheelie bin lift offering more flexibility for clients Mercury abatement plant (NORM) Work with LLWR and producers to schedule deliveries and smooth the flow of waste LLWR to buy monthly capacity and activity? Eliminate “phantom activity” Volumes are increasing – we can still do more! Taking the hazard out of waste management HTI EPR10 Accumulation Limits Volume: 200m3 Time: 90 Days – – – – – Activity: Carbon-14 Tritium Iodine-125, iodine-131, Phosphorus-32 & Sulphur-35 Other beta/gamma wastes Alpha emitters } } 500 1.6 TBq 4 TBq 2 GBq 2 1 GBq 40 MBq 5 HTI EPR10 Disposal Limits Volume: Activity: – Carbon-14 – Tritium – Iodine-125, iodine-131, Phosphorus-32 & Sulphur-35 – Other beta/gamma wastes – Alpha emitters No Limit 1000 GBq/Month 2000 GBq/Month } 1 GBq/Month } 500 MBq/Month 40 MBq/Month 2000 5000 Future Developments Fawley to increase storage and disposal limits Wheelie bin lift offering more flexibility for clients Mercury abatement plant (NORM) Work with LLWR and producers to schedule deliveries and smooth the flow of waste LLWR to buy monthly capacity and activity? Eliminate “phantom activity” Volumes are increasing – we can still do more! Taking the hazard out of waste management Example Wastes Sludges, silts, sands etc Solvents, oils, scintillants, zinc bromide solution Filters, filter cloths, ion-exchange resin Contaminated PPE, absorbents, rags & wipes Plastics (PVC), wood, paints, greases Taking the hazard out of waste management Waste Packages Drums Solids/Liquids/Sludges Up to 200L Metal/Plastic/Fibre IBCs Solids/Liquids/Sludges Up to 1.2te IBBs – Big Bags Solids / Sludges 1m3 and 1.2te Wheelie Bins Solids 300Kg Re-useable Future Developments Fawley to increase storage and disposal limits Wheelie bin lift offering more flexibility for clients Mercury abatement plant (NORM) Work with LLWR and producers to schedule deliveries and smooth the flow of waste LLWR to buy monthly capacity and activity? Eliminate “phantom activity” Volumes are increasing – we can still do more! LLWR Volume