Creative Science portland public schools |Facility Plan FACILITY PROFILES | JANUARY 2009 5 3 2 1 Laurelhurst K-8 HA LS EY ST Grant HS Madison HS 2 1 T BLVD Creston Annex K-8 2 3 69TH AVE 2 2 1 STE EL E ST 5 2ND AVE 1 1 WOOD ST OCK BL VD 3 5 2 3 5 4 1 3 5 11 Harrison Park K-8 15 4 14 Arleta K-8 3 2 FO 1 ST 1 ER RD 3 Middle School K-5/K-8 Special Programs Boundaries K-5/K-8 High School 5 1 High School Area Population: 444 8 PO W E LL BL VD 3 1 ( ! 1 9 Marysville K-8 1 Creative Science K-8 ! ( Planning Area with CSS K-8 2014 Population 0 3 o Miles 0.75 CSS distribution 1 HO L GA TE BL VD 6 20 g g ¯ ­ g ¯ ­ ­ ¯ DIVISION ST 10 g ¯ ­ STA RK ST ST Bridger K-8 3 PPS School Sites ! ( 6 ! ( 3 2 6 ! (!( Lent K-8 ! ( ! ( ! ( ! ( ! ( 1 ! ( ! ( ( !! ( ! ( ! ( ! ! ( !( ! ! ( ( ( ( !! ! (( ! ( (! ( (! ! ! ( ( ! ( (! ( ! ! ! (! ! (! ! ( (! ! ( ( ! ( ! ! ( ! (( ! ! ( ! (! ( (! ! (! ( ! ( (! ! ( ( ( ! ( ! ( ! ( ! ( ! ! ( ( ! ! ( ( ! ! ( ( ! ! ( !( ! ( ! ! ( ( ! ! ( ( !( ! ( ! (( ! (! (! ! (! (( (! ( ! ( ! ! ( ! ( ! ! ( ( ! ( ( ! ! (! ( ! ( Fran n HS kli Woodstock K-5 1 4 Creston K-8 Franklin HS Cleveland HS 3 Legend ( ! 18 Madison HS WA S H IN G TO N Franklin HS 3 Atkinson K-5 Franklin 9-12 1 4 5 66TH AVE POW EL L CE SAR E C H AVE Z BLVD 35TH AVE WO O DW AR D ST 2 2 62ND AVE 5 5 0 TH A V E DIVISION ST 1 2 1 7 4 76TH A VE H A WT H O R N E BLVD 3 ST 1 60TH A VE 41ST AVE 1 Richmond K-5 R B U RN HO STA RK ST 1 ( ! Vestal K-8 3 55 TH AV E Sunnyside K-8 6 4 82ND AVE BEL MON T ST Glencoe K-5 42N D A VE 1 STA RK ST 2014-15 Attendance Area with CSS K-8 Population CSS 4 14 GLI SA N ST Mt Tabor 6-8 PIN E ST 3 DRAFT 1 1 DAVIS ST B U R N S ID E S T CE SAR E CH A VE Z BL VD Grant HS F rankli n HS 1 1 2 2 1 2 Lee K-8 Date: 11/18/2014 Fernwood 2-8 2 Path: M:\PROJECTS\Projects_2014-15\Map Requests\DBRAC\PPS DBRAC 8x11_2014-15 FocusOption Areas.mxd Rose City Park 1-8 on H S VD 92ND AVE BL 92ND AVE Y 86TH CT D 82ND AVE S AN Madison 9-12 76TH AVE 2 Grant 9-12 Portland Public Schools 2 M adis 1 Hollyrood K-1 Roseway Heights K-8 72N D AVE 33RD A VE 5 ! ( Reference ! ( ! ( ! ( ! ( ! ( ! ! ( ( ENROLLMENT/PROGRAM ISSUE WORKSHEET School: Creative Science/Head Start Draft Date: 11/14/2014 Principals: Kristie Cunin/Deborah Berry & Eileen Isham Senior Directors: Lisa McCall/Harriet Adair PART ONE: Current configuration Students by grade Instructional Spaces Creative Science Teachers Classroom 24 Teachers K Classrooms (full 88 access) Classrooms 50 (grade limited) 1 53 Total Classrooms 2 57 3 Instr support 55 rooms(a) 4 57 24 Special Ed ESL (.5 wt for utilization) Creative Science 2 Total Head Start Teachers 5 58 PK 6 7 8 CSS Total CSS + HS Total Electives Total All Teachers 54 2013 Demographics‐Creative Science 38 Students of color Students who 22 qualify for F/RM Students who 444 qualify for ESL Students who 532 qualify for SPED Comparisons 16.00 Utilization (c) Utilization rank (d) 1.50 Enroll change 1.50 '13 to '14 (CSS) Student: 0.50 teacher ratio 19.25 Ratio rank(e) Est 15‐16 3 utilization(f) 93% 14 of 15 19 23.9 2 of 15 97% 22.25 2013 Demographics‐Head Start (all locations) 20% Students of color Students who 35% qualify for F/RM Students who 5% qualify for ESL Students referred 13% for SPED CSS Inst support 81% (b) 1 100% 53% 9% Sources: preliminary 2014 enrollment, staffing and classroom counts; demographic data from 2013 enrollment profiles (a) Instructional support rooms are spaces that do not qualify as classrooms but can be used for small group student support and instruction. (b) Instructional support staff includes counselors, instructional specialists and coaches, student management specialists and other staff who may meet with small groups of students to provide support and instruction (c) Utilization is the number of teachers who would normally be assigned a full classroom (ESL 1/2 wt, no PE) compared to the number of classrooms on a campus (d) Utilization rank among 15 schools monitored for overcrowding. The average utilization in this group is 101.4% (e) Student: teacher ratio rank among 15 schools monitored for overcrowding. The average ratio in this group is 20.4 (f) 2015‐16 utilization assumes same K enrollment next year as this year, and that current class sizes below 25 at grades 1‐5 could be compressed to fewer sections (does not assume creating additional multi‐grade blended classrooms) ENROLLMENT/PROGRAM ISSUE WORKSHEET School: Creative Science/Head Start Principals: Kristie Cunin/Deborah Berry & Eileen Isham PART TWO: Issue summary Creative Science School was directed in 2009 to grow to 2 sections per grade level. Each year the school has needed one additional classroom, causing co‐located support programs to move out or downsize. Head Start currently uses 3 classrooms as well as additional support and administration spaces. CSS needs one more classroom next year. Cause of the enrollment change Neighborhood enrollment growth Is this issue new this year? YES NO Potential implications if no change next year Possible reduction of programming PART THREE: Options to address issue Change type Cost Interior changes Add modulars Relocate Head Start Timeline for decision yes‐‐$$ TBD Winter 2014‐15 $400,000+ Likely Winter 2014‐15 Winter 2014‐15 Decision‐making process Related impacts Benefits Facilities/OSP Gain 1 classroom; keep current May not be structure possible Facilities/OSP Gain 2 classrooms; keep current structure OSP/OSS Space at another Gain 3 rooms building for CSS Risks #1 Major change for HS #2 Destabilizes program #3 Winter 2014‐15 Relocate CSS Likely Grade reconfigur‐ ation Likely Greater distance for some District‐wide boundary review, implement in 2016 or Adequate space families later Significant program/staff Focus Option Review and/or District‐wide boundary Reduced population changes review, implement in 2016 or later OSP ? High cost; permanent addition Limit K enrollment n/a Gain one classroom Feasibility rank #4 #5