SALAMANDER DESIGNS.COM Date D E F I N I N G O R I G I N A L™ Salamander Seating Customer Owned Material Reference ID / Purchase Order #: Salamander Designs offers the ultimate in chair customization with Customer Owned Material (COM). WHAT YOU WILL NEED Contact 1. One 12 x 12 non-returnable sample of each material for testing. Upon approval, Salamander will provide the required yardage/square footage of material to be supplied based on model requirements. Address City STZip 2. Complete C.O.M. and Request for Quote forms. 3. Send forms and samples to: Emai Tel. Special Instructions Salamander Designs Attn: Salamander Seating C.O.M. 811 Blue Hills Avenue Bloomfield CT, 06002 JumpSeat, Storage Ottoman, Pillows 1 & 2 - Specify Stitch Detail Standard Matching Piping Stitch (Alex & Talia Detail) Standard Matching Stitch (Olivia & Matteo Detail) Olivia & Jumpseat - Two Cover Options List Material below and specify A or B application on diagram. Ottoman Interior Seat material MUST be a fabric. Olivia Seat A. Ottoman Interior Seat B. Olivia Outer Ottoman Outer DISCLAIMERS, POLICIES & WARRANTY • Customer is responsible for all the supplied cover material. Fabrics must be supplied in continuous roles 54” wide and leather is to be supplied in full hides. Cut yardage and partical pieces will not be used. Defective materials will be rejected and returned. • Salamander Designs will not be responsible for transportation of material to factory. • Material will be applied using standard manufacturing practices, and appropriate care will be exercised to assure efficient utilization of the supplied material. If additional material is required, the customer will be responsible to provide it. • Materials will be applied in a random fashion. • Standard Salamander Designs Freight Program applies. See your Salamander representative for details. • All chair orders are NON-REFUNDABLE AND NON-RETURNABLE, no exceptions. • Salamander DOES NOT WARRANTY the customer owned cover material, but ALL other Salamander Designs warranty policies apply. • Lead time is 6 weeks after material has been received by factory. Effective July 1, 2012 / v7.12 1 of 1