Basic USACE-NAVFAC Quality Control Plan Sample Recommended for projects under $5 mil and bid qualifications Has All the Essential Elements required by USACE / NAVFAC /AFCEC /NASA UFGS-01 45 00.00 20 Contact: First Time Quality 410-451-8006 Pat [Pick the date] Questions? Call First Time Quality 410-451-8006 [CompanyName][CompanySuffix] Quality Assurance/Quality Control Plan PROJECT-SPECIFIC QUALITY PLAN TABLE OF CONTENTS The Project Quality Control Plan contents correspond with USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.00 20 (November 2011) Construction Quality Control (QC) Plan requirements. Background Information .......................................................................................................................... 4 Project Name .............................................................................................................................................. 4 Project Number .......................................................................................................................................... 4 Project Location .......................................................................................................................................... 4 Project Description ..................................................................................................................................... 4 Project Scope .............................................................................................................................................. 4 A. QC Organization................................................................................................................................... 5 B. Names and Qualifications .................................................................................................................... 6 C. Duties, Responsibilities, and Authority of QC Personnel ...................................................................... 8 Quality Responsibilities .............................................................................................................................. 8 D. Outside Organizations ....................................................................................................................... 11 Qualification of Subcontractors and Suppliers ......................................................................................... 11 Purchase Order Approval ......................................................................................................................... 11 E. Appointment Letters .......................................................................................................................... 13 F. Submittals Procedures and Submittal Register ................................................................................... 18 G. Testing Laboratory Information ......................................................................................................... 19 Qualification of Testing Laboratories ....................................................................................................... 19 H. Quality Testing Plan and Log .............................................................................................................. 21 Preparation of Inspection and Test Plan .................................................................................................. 21 I. Procedures Completion of Rework Items ............................................................................................ 23 Nonconformance Controls ....................................................................................................................... 23 Nonconformance Corrective Actions ....................................................................................................... 24 Nonconformance Preventive Actions ....................................................................................................... 24 J. Documentation Procedures ................................................................................................................ 27 K. List of Definable Features................................................................................................................... 29 L. Procedures for Performing the Three Phases of Control ..................................................................... 31 Phase 1: Preparatory Phase ...................................................................................................................... 31 Phase 2: Initial Phase ................................................................................................................................ 32 Phase 3: Follow-up Phase ......................................................................................................................... 33 M. Personnel Matrix .............................................................................................................................. 40 N. Procedures for Completion Inspection............................................................................................... 41 Punch-Out QC Inspection ......................................................................................................................... 41 Page 2 [ProjectName] - [ProjectNumber] Copyright Questions? Call First Time Quality 410-451-8006 [CompanyName][CompanySuffix] Quality Assurance/Quality Control Plan Pre-Final Customer Inspection ................................................................................................................. 41 Final Acceptance Customer Inspection .................................................................................................... 41 O. Training Procedures and Training Log ................................................................................................ 45 Project Quality Training ............................................................................................................................ 45 P. Organization and Personnel Certifications ......................................................................................... 48 Company Qualifications............................................................................................................................ 48 Personnel Certifications ........................................................................................................................... 48 Q. Design Control ................................................................................................................................... 51 R. Quality Assurance Surveillance .......................................................................................................... 52 S. Additional Quality Control Requirements .......................................................................................... 53 Page 3 [ProjectName] - [ProjectNumber] Copyright Questions? Call First Time Quality 410-451-8006 [CompanyName][CompanySuffix] Quality Assurance/Quality Control Plan A. QC ORGANIZATION The Project QC Organization Chart shows the QC organizational structure. The chart includes job positions along with the name of each person appointed to that position. Figure A-1 shows the QC Organization Chart for this project. The President defines the organization chart for the project. The organizational chart includes job titles, names of assigned personnel, and organizational and administrative interfaces with the customer. The organization chart defines lines of authority as indicated by solid connection; dotted lines indicate lines of communication. The lines of authority preserve independence of quality control personnel from the pressures of production. The President assesses the qualification requirements for each position on the project organization chart, qualifications of each person, and then appoints only qualified persons to the project organization. Figure A-1 President [PresidentName] Alternate QC Manager [AltQCManagerName] QC Manager [QCManagerName] Project Manager [ProjectManagerName] Third Party Inspection and Testing Agencies Superintendent [SuperintendentName] Crew Foremen Subcontractors and Suppliers Page 5 [ProjectName] - [ProjectNumber] Copyright Site Safety and Health Officer [SafetyManagerName] Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan I. PROCEDURES COMPLETION OF REWORK ITEMS Should a nonconformance be identified by an inspection, a systematic method will be used to control the item, correct it, and ensure that project quality is not adversely impacted by the event. Nonconformances and their resolution are recorded on a Nonconformance Report form. A Nonconformance Report form exhibit is included in this subsection. NONCONFORMANCE CONTROLS Should a nonconformance be identified by an inspection there is a systematic method to control the item, correct it, and ensure that project quality is not adversely impacted by the event. MARKING OF NONCONFORMANCES AND OBSERVATIONS es A nonconformance is any item that does not meet project specifications or [CompanyName] Quality System requirements. CONTROL THE CONTINUATION OF WORK Pa g When the QC Manager, Superintendent, inspector, or customer identifies a nonconformance or an observation, the item is quickly and clearly marked by tape, tag, or other easily observable signal to prevent inadvertent cover-up. After the item is marked, the Superintendent determines if work can continue in the affected area: ct ed CONTINUE WORK: When continuing work does not adversely affect quality or hide the defect, work may continue in the affected area while the disposition of the item is resolved. The Superintendent may place limitations on the continuation of work. Se le STOP WORK ORDER: When continuing work can adversely affect quality or hide the defect, work must stop in the affected area until the disposition of the item resolved. The Superintendent identifies the limits of the affected area. The Superintendent quickly and clearly identifies the boundaries of the stop work area. RECORDING OF NONCONFORMANCES If nonconformances or observed items exist by the feature of work completion inspection, the Superintendent or inspector records the nonconformances on a nonconformance report. The Superintendent sends the nonconformance report to the QC Manager. QC MANAGER DISPOSITION OF NONCONFORMANCE REPORTS When the QC Manager receives a Nonconformance Report, he or she makes an assessment of the affect the reported nonconformance has on form, fit, and function. The QC Manager may assign a disposition of either: REPLACE: The nonconformance can be brought into conformance with the original specification requirements by replacing the nonconforming item with a conforming item. REPAIR: The nonconformance can be brought into conformance with the original requirements through completion of required repair operations. Page 26 [ProjectName] - [ProjectNumber] Copyright Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan REWORK: The nonconformance can be made acceptable for its intended use, even though it is not restored to a condition that meets all specification requirements. The QC Manager may specify standards that apply to the completion of rework. Rework nonconformances must be approved by the customer. USE AS-IS: When the nonconforming item is satisfactory for its intended use. Any use as-is items that do not meet all specification requirements must be approved by the customer. NONCONFORMANCE CORRECTIVE ACTIONS The Superintendent verifies that corrective actions eliminate the nonconformance to the requirements of the original specifications or as instructed by the disposition of the nonconformance report, and then removes, obliterates, or covers the nonconformance marker. es Furthermore, the Superintendent ensures that previously completed work is reinspected for similar nonconformances and corrective actions are taken to avert future occurrences (see section 9.3 Corrective Actions). CONTROL OF CORRECTIVE ACTIONS • • Pa g When a nonconformance is found, the Superintendent ensures that: Previously completed work is reinspected for similar nonconformances Corrective actions are taken to avert future occurrences ed The QC Manager identifies requirements for corrective actions with respect to frequency, severity, and detectability of quality nonconformances items found during and after completion of work activities. When a solution requires changes to [CompanyName] quality standards, the QC Manager makes modifications as necessary by making changes to: le ct Material specifications Personnel qualifications Subcontractor and Supplier qualifications Company standards Inspection processes Se • • • • • CORRECTIVE ACTION TRAINING The Superintendent initiates corrective action training to address quality nonconformances. Personnel and subcontractors and suppliers performing or inspecting work participate in the training. Heightened awareness during quality inspections verifies and documents compliance with the corrective action improvement items. A qualified Superintendent inspects corrective actions during regular quality inspections and records observations on the quality inspection form. The Superintendent notifies affected subcontractors and suppliers of selected preventive action training requirements. The Superintendent evaluates the effectiveness of the improvements. The QC Manager reviews improvement results recorded on quality inspection records and monthly field reviews. When the QC Manager determines that the improvement actions are effective, the item is no longer treated as a preventive action. Additional detail on [CompanyName] policies and procedures for the controlling nonconformances appear in Quality Manual section 9 Nonconformances and Corrective Actions. Page 27 [ProjectName] - [ProjectNumber] Copyright Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan [CompanyName][CompanySuffix] Nonconformance Report Version 20131009 Nonconformance Report Control ID Project ID Project Name [ProjectNumber] [ProjectName] Preparer Signature/ Submit Date QC Manager Signature / Disposition Date Description of the requirement or specification Replace Repair Use As-is Pa g Disposition Rework es Description of the nonconformance, location, affected area, and marking Approval of disposition required by customer representative? Yes No ed Customer approval signature /date: ___________________________________ Corrective Actions ct Corrective actions completed Name/Date:_________________________ Customer acceptance of corrective actions required? Yes No Preventive Actions Se le Name/Date:_________________________ Preventive actions completed Name/Date:_________________________ Page 29 [ProjectName] - [ProjectNumber] Copyright Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan L. PROCEDURES FOR PERFORMING THE THREE PHASES OF CONTROL Three phases of control and a feature of work completion inspection will be performed for each defined feature of work. The controls and the forms that will be used to record control activities are included on table L-1. Table L-1 Control Form Preparatory Phase Checklist Phase 2: Initial Phase Initial Phase Checklist Pa g es Phase 1: Preparatory Phase Contractor Quality Control Report Phase 3: Follow-up Phase Feature of Work Inspection Form ed Feature of Work Completion Inspection ct Three Phases of Control and FOW Completion Inspection forms exhibits are included as an exhibit in this subsection. le PHASE 1: PREPARATORY PHASE Se Phase 1 is the Preparatory Phase that plans quality for an upcoming feature of work. It includes a requirements review, site inspection, and a preparatory meeting. Records of the preparatory phase of control are recorded on the Preparatory Phase Checklist included as exhibits in this subsection. Procedures that will be used on this project to conduct the Phase I preparatory phase of control are as follows. PREPARATORY FEATURE OF WORK QUALITY CONTROL PLANNING In preparation for the start of an upcoming feature of work, the Superintendent reviews an integrated and coordinated set of documents that collectively define quality requirements for the feature of work including: • • • • • • • Objectives and acceptance criteria of the feature of work Quality standards that apply to the feature of work Work instructions, process steps, and product installation instructions that apply to the feature of work Shop drawings Submittals Tools and equipment necessary to perform the work License, certification, or other qualification requirements of personnel assigned to work Page 34 [ProjectName] - [ProjectNumber] Copyright Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan Q. DESIGN CONTROL Design controls are in place to assure the quality of designs for this project. A design plan is used to document the design control process. A Design Plan form exhibit is included in this subsection. The first control point will be of the review of design inputs. The Design Manager will assure that all necessary information is available to perform the required design work. The Design Manager will also assure that expectations for design outputs are well defined. Intermediate reviews will be carried out as indicated on the design control plan. The last review is the design output review. A record of all reviews will be recorded on the Design Review form. A Design Review form exhibit is included in this subsection. Pa g es The President has appointed [DesignManagerName] as the Design Manager. [DesignManagerName] will control the design process with specific quality responsibilities, duties, and the authority to carry them out. A record of the Design Manager’s appointment appears as in this plan as an exhibit in subsection E Appointment Letters. DESIGN PLAN The QC Manager prepares a project-specific design review plan that includes: ed Se • ct • • A listing of company and customer stakeholders, reviews they will participate in, and how their input will be used to amended design requirements. The project organization chart Includes interfaces between various groups and personnel for producing and reviewing the design. Design output deliverables, including required drawings, and engineering calculations Identification of who will perform design output verification activities and the criteria they will use. The QC Manager reviews the design process project plan with the customer and other interested parties. The customer approves the plan after any discrepancies are resolved and the plan is agreed upon. Design work may begin only after the customer approves the plan. le • DESIGN REVIEWS DESIGN INPUT REQUIREMENTS REVIEW The QC Manager ensures that the information in design inputs clearly defines customer expectations and that the necessary details are provided to set requirements for design. The QC Manager obtains design specifications from the customer and conducts a customer design input review to ensure that: • • • • • Customer design input requirements and specifications are complete Design process review milestones are specified when necessary Customer design output requirements and specifications are complete for review milestones as well as the completed design Customer design requirements and specifications are compatible with the relevant regulations, [CompanyName] quality standards, and Quality System requirements [CompanyName] has the capability to deliver the completed design in the time allotted Page 54 [ProjectName] - [ProjectNumber] Copyright Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan [CompanyName][CompanySuffix] Project Design Review Plan Version 20131009 Project ID Project Name Date [ProjectName] Design Appointments Pa ge Design Manager s [ProjectNumber] Preparer Designer(s) Design QC Reviewer Design Review Milestones Output required for review ed Ref# Feature of Work Final Design Review: le Work in Process Review: Se Work in Process Review: ct Design Input Review Page 56 [ProjectName] - [ProjectNumber] Copyright Scheduled date/milestone Review participants Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 List of Included Forms Military Forms: • • • • • Preparatory Phase Checklist Initial Phase Checklist Form Contractor Production Report Contractor Quality Control Report Testing Plan and Log le ct ed Pa g Project Subcontractor and Supplier List QC Manager Appointment Letter Alternate QC Manager Appointment Letter Project Manager Appointment Letter Superintendent Appointment Letter Design Manager Appointment Letter Laboratory Qualification Form Quality Inspection and Test Plan Form Nonconformance Report Form Quality Controlled Feature of Work List Form Feature of Work Inspection Form Punch List Form Project Completion Inspection Form Training Plan Form Training Log Form Project License and Qualifications Form Se • • • • • • • • • • • • • • • • es Standard Forms: Questions? Questions? Call Call First First Time TimeQuality Quality410-451-8006 410-451-8006 Construction Quality Control Plan SPEC SECTION DATE SCHEDULE ACT NO. INDEX # PREPARATORY PHASE CHECKLIST (CONTINUED ON SECOND PAGE) CONTRACT NO DEFINABLE FEATURE OF WORK PERSONNEL PRESENT GOVERNMENT REP NOTIFIED ____ _ HOURS IN ADVANCE: NAME YES POSITION NO COMPANY/GOVERNMENT REVIEW SUBMITTALS AND/OR SUBMITTAL REGISTER. HAVE ALL SUBMITTALS BEEN APPROVED? YES IF NO, WHAT ITEMS ARE MISSING? NO es ARE ALL MATERIALS ON HAND? Pa g SUBMITTALS IF NO, WHAT ITEMS HAVE NOT BEEN SUBMITTED? CHECK APPROVED SUBMITTALS AGAINST DELIVERED MATERIAL. (THIS SHOULD BE DONE AS MATERIAL ARRIVES.) ct NO Se SPECIFICATIONS YES IF NO, WHAT ACTION IS TAKEN? REVIEW EACH PARAGRAPH OF SPECIFICATIONS. PRELIMINARY WORK & PERMITS ed ARE MATERIALS STORED PROPERLY? le MATERIAL STORAGE COMMENTS : DISCUSS PROCEDURE FOR ACCOMPLISHING THE WORK. CLARIFY ANY DIFFERENCES. ENSURE PRELIMINARY WORK IS CORRECT and PERMITS ARE ON FILE. IF NOT, WHAT ACTION IS TAKEN? Page 37 [ProjectName] - [ProjectNumber] Copyright YES NO Instant Download You’ll be taken to a page with a download link. You can then download your fully written document. Reusable on multiple projects Your plan will be in MS Word, so you can easily edit or modify it and use on future projects. Compliance and Money-Back Guarantees This plan complies with USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.00 20 (November 2011) QC Requirements. If you’re not completely satisfied, contact us and we’ll refund your money. Phone and Email Support Included Any questions, email edc@firsttimequality.com or call us at 410-451-8006. For More Information: Contact: First Time Quality 410‐451‐8006 www.firsttimequality.com edc@firsttimequality.com