MTEP14 Central SPM #2 MISO Missouri Project Information March 27, 2014 MISO Central Region AMEREN MISSOURI 2 Ameren Missouri • • Ameren Missouri has a total of 28 project proposals in the MTEP14 database Of those 28 projects: – 7 project proposals have a target appendix of Appendix A in MTEP14. • Costs for these projects: – 4 projects have a cost >$5M – 2 projects have a cost between $1M and $5M – 1 project has a cost <$1M • Drivers for these projects: – Four are driven by Age and Condition of existing facilities – One is a Baseline Reliability Project – Two are driven by Local Reliability needs – 2 project proposals have a target appendix of Appendix B in MTEP14. • Both of these projects have a cost >$5M. – 16 project proposals already in Appendix B. 3 Ameren Missouri Appendix A Projects 4 Projects Driven by Age and Condition of Facilities Target Appendix Prj. ID Project Name Project Description A in MTEP14 2996 Montgomery-Hills- Increase Replace approximately 600 transmission line structures on Ground Clearance the Montgomery - Hills 345 kV line A in MTEP14 A in MTEP14 4495 Osage – Clark DoubleRebuild 95 miles of double-circuit 138 kV line from the Osage Circuit 138 kV Line Rebuild 138/161 kV Substation to the Clark 138/161 kV Substation 2993 Dupo Ferry-Buck Knob Rebuild 23.34 miles of double-circuit tower 138 kV line from Reconductoring Dupo Ferry Substation to the Buck Knob switching station A in MTEP14 4723 Kelso-Lutesville-1 345 kV Replace approximately 50% of structures on this 17.6 mile Replace Structures transmission line to permit operation at a temperature of at least 100 degrees C 5 Expected ISD Estimated Cost 12/31/2014 $66,400,000 12/1/2016 $46,900,000 6/1/2016 $25,980,000 6/1/2015 $8,800,000 Projects driven by local reliability needs for Ameren Missouri 6 Maurer Lake 161 kV Capacitor Bank P4064 161 kV Capacitor Bank: Expected In Service Date: 6/1/2015 Estimated Cost: $1,500,000 Target Appendix: A in MTEP14 Project Type: Baseline Reliability TPL Category: B2 (Fault Transmission Circuit) 7 Lakeshire Substation 3rd 138-34.5 kV Transformer P4497 Lakeshire 3rd Distribution Transformer: Expected In Service Date: 6/1/2014 Estimated Cost: $4,066,000 Target Appendix: A in MTEP14 Project Type: Other – Distribution TPL Category: N/A 8 Appendix A Projects below $1M Target Appendix Prj. ID Project Name A in MTEP14 9 Project Description 4490 Mason-Labadie-3 345 kV Replace two 2000A disconnect switches and Terminal Equipment one 2000A wave trap on the Mason – Upgrade Labadie-3 345kV line position. Replace one 2000A wave trap on the Mason-Labadie-4 345kV line position. Expected Estimated ISD Cost 6/1/2014 System Need $286,000 Terminal equipment limiting circuit rating Ameren Missouri Appendix B Projects 10 Hannibal W – Palmyra 161 kV Line Clearance Increase P4484 Hannibal W – Palmyra Line Clearance Expected In Service Date: 11/15/2018 Estimated Cost: $8,547,000 Target Appendix: B in MTEP14 Project Type: Other – Reliability TPL Category: N/A 11 Berntie – Jim Hill 161 kV Line P4498 Berntie – Jim Hill Line Expected In Service Date: 6/1/2020 Estimated Cost: $30,500,000 Target Appendix: B in MTEP14 Project Type: Other – Reliability TPL Category: N/A 12 MISO Central Region CITY OF COLUMBIA, MO (CWLD) 13 City of Columbia, MO (CWLD) • No projects currently in the planning database for CWLD 14 Contact Information • Laura Rauch – Manager Expansion Planning, Central Region – lrauch@misoenergy.org • Mike Nygaard – Expansion Planning Engineer, Central Region – mnygaard@misoenergy.org 15