Items
Beginning (1-49 pts.)
Developing (50-69 pts.)
Accomplished (70-100 pts.)
Mounting and Bonding of Device Boxes
More than half the boxes incorrect with regard to
height, # of screws, level, or depth.
More than half the boxes(including the panel) without
proper bonding.
Less than half the boxes incorrect with regard to
height, # of screws, level, or depth.
Less than half the boxes(including the panel) without
proper bonding.
All boxes mounted correctly with regard to height, # of
screws, level, or depth.
All of the boxes(including the panel) with proper
bonding methods.
Cable Installation
Minimal # of the supports are correctly sized, placed
and installed(straight and not too deep). Very few of
the installed conductors are at correct depth from stud
edge.
Majority of the supports are correctly sized, placed
and installed(straight and not too deep). Majority of
the conductors installed are at correct depth from stud
edge.
All of the supports are correctly sized, placed and
installed(straight and not too deep). All of the
conductors are installed at the correct depth from stud
edge.
Wiring Terminations and Practices
Very few wires are installed in the boxes with 1/4" or
outer sheath, minimum of 6" internally, bond wire
connected to device, no bare conductor showing
around the wire nut, minimal bare conductor visible at
terminal screws and wraps are clockwise. Minimal # of
box clamps and connectors are tightened properly
avoiding short circuits. Some splices contain minimum
of three equal wraps.
Majority of wires are installed in the boxes with 1/4" or
outer sheath, minimum of 6" internally, bond wire
connected to device, no bare conductor showing
around the wire nut, minimal bare conductor visible at
terminal screws and wraps are clockwise. Majority of
box clamps and connectors are tightened properly
avoiding short circuits. Majority of splices contain
minimum of three equal wraps.
All wires are installed in the boxes with 1/4" or outer
sheath, minimum of 6" internally, bond wire connected
to device, no bare conductor showing around the wire
nut, minimal bare conductor visible at terminal screws
and wraps are clockwise. All box clamps and
connectors are tightened properly avoiding short
circuits. All splices contain minimum of three equal
wraps.
Workmanship
Minimal amount of conductor is installed without twists
and at right angles with supports in places other than
those required. Very few wires within the distribution
panel are bent at right angles, spaced properly and
without splices. Less than half of the devices and
associated covers are properly attached, consistent in
direction and level.
A majority of conductor is installed without twists and
at right angles with supports in places other than
those required. Almost all wires within the distribution
panel are bent at right angles, spaced properly and
without splices. More than half of the devices and
associated covers are properly attached, consistent in
direction and level.
All of the conductor is installed without twists and at
right angles with supports in places other than those
required. All wires within the distribution panel are
bent at right angles, spaced properly and without
splices. All devices and associated covers are
properly attached, consistent in direction and level.
Circuit Functionality
Circuit(s) work initially but a short circuit occurs.
Some of the circuit(s) work, but not entirely.
Every circuit(s) work properly in their entirety.
Comment: Front Entrance
Created With ForAllRubrics | www.forallrubrics.com | Page 1
Download