1 WHALE TANKERS SPECIFICATION 2 3 4 Type: STAINLESS STEEL VACUUM TANKER TO COMPLY WITH ADR CLASSIFICATION AND TO SUIT WHALE PRODUCT LIST 3A : 4 bar test pressure & hermetically sealed. Warning: In certain operational circumstances it is possible that the GVW or individual axle loading of this vehicle could be exceeded, the operator should be made aware of this possibility. Chassis: Free-issue DAF CF 85 32tonne GVW converted to full ADR to comply with the requirements of chapter 9.2 and to include Safe Loading Pass requirements and all speed governor Drive: RIGHT HAND DRIVE Chassis Dealer: HTC Croydon Contact: David Hatton Telephone: 020 8683 6200 Chassis Exhaust: Chassis OEM / Dealer supplied and fitted, as per ADR chapter 9.2, 4 5. requirements Height Limit: NONE ADVISED. PTO: 1 Outlet required SYSTEM CONTROL TANK Material: Shape/Thickness: Internal Finish: Specific Gravity: Contents: Nominal Capacity: ADVANCED WHALE PLC CONTROLLER Grade 316 Stainless Steel - Wetted parts. Cylindrical/5.00 mm (6mm D&F Ends ) - Carbon steel external stiffening rings Natural finish 1.00 Hazardous wastes included on the product list for ADR 4200 gallons (4000 gallons dirty / 200 gallons clean) - Unit may exceed the GVW if fully loaded Tipping: Single front mounted multi-stage ram, tipping hinge to rear Safety: Integral body-prop, operated from nearside using hydrant key Height indicator: Visual warning in cab to alert driver if overhead equipment or tipping body not stowed correctly. To comply with regulations Construction & Use 1986 Amendment SI 1997 No 530 Parallel to chassis Ram cradle at front and tipping hinges at rear Ram Cradle at front - Tipping Hinges at the rear 2-off anti-surge bolt-in type with access. 2 off 500mm Stainless steel 6-clamp manholes, with seal breaking interlock - catwalk and ladder - 1 fitted between front dish and first baffle and 1 between the baffles Access: Whale full length low level folding catwalk and handrail, complete assembly folds against the tank barrel by means of manually pumped hydraulics controlled at ground level. Front End: Torispherical dish and flange to BS EN 13445-3:2002 Type of Door: Hydraulically operated fully opening top hinged rear door with 4 bar test. Earthing strap. Fall over length: Subframe: Mountings: Baffles: Manholes: Door clamps: Heavy duty hydraulic clamps to ADR requirements. : Large Rear debris chute to protect equipment at rear when discharging the load Page 1 of 4 WHALE TANKERS SPECIFICATION PRV: Tank-top Whale Type Approved PRV locked, sealed & set, piped to ground mounted above bursting disc with failure indication to comply with ADR requirements. PRV: In-line Whale Type Approved PRV, PTFE components locked, sealed & set - piped to ground 5 6 Gauges: Combined vacuum pressure calibrated in working pressure & vacuum and fitted on the nearside CONTENTS INDICATOR: Sight Glass: 3" diameter full length GLASS sight glass with ullage mark cleaning & rodding access and linked manual stainless steel shut off valves, stainless steel ball & viton seals. Glass to be marked at legal GVW at an SG of 1.0 VALVES: STAINLESS STEEL Inlet/outlet Valve: 4" lever operated stainless ball valve, lockable with stainless steel ball & viton seals Valve connections: Bauer in stainless steel incorporating a shear section for protection with stainless steel blank cap Valve position: Through the Knuckle in the base of rear door Inlet valve: 6" lever operated stainless ball valve, lockable, with stainless steel ball & viton seals Valve connection: Bauer stainless steel with Stainless Steel blank cap and Viton seal Valve position: Base of rear door with stack pipe and wear plate, clearly labelled "for use with nonflammable loads only" Inlet valve: 4" lever operated stainless ball valve, lockable, with stainless steel ball & viton seals Valve connection: Bauer stainless steel with Stainless Steel blank cap and Viton seal Valve position: Base of rear door with stack pipe and wear plate, clearly labelled "for use with nonflammable loads only" Outlet Valve: 6" lever operated stainless ball valve, lockable, with stainless steel ball & viton seals Valve connections: Bauer stainless steel with Stainless Steel blank cap and Viton seal Valve position: Base of rear door , clearly labelled "for use with non-flammable loads only" Tank Top: Valve connections: Valve position: : 6" lever operated stainless ball valve, lockable, with stainless steel ball & viton seals Bauer stainless steel with Stainless Steel blank cap and Viton seal Positioned on the top at the front to connect to Megatron Clearly labelled "for use with non-flammable loads only" Breaker Valve: 25mm diameter stainless steel valve fitted in pipework between valve and hose connection on inlet and outlet valves - Lockable Overspill Valve: Air actuated sliding knife gate valve interlinked to vacuum pump engagement. Valve Material: Stainless body, stainless steel blade with viton seals Valve position: Fitted on tank top Vent Valve: 65mm diameter air actuated sliding knife gate valve operated from ground level and interlocked to park brake. Valve Material: Stainless body, stainless steel blade with viton seals Valve position: Fitted on tank top & operated from ground level Page 2 of 4 WHALE TANKERS SPECIFICATION 7 8 9 10 VACUUM SYSTEM: Exhauster: Jurop PR 250 water cooled rotary vane exhauster/compressor. Output 910 cfm (free air) with flame traps : System deoiler Drive: Hydraulic : Piped and set up to pressure off when tipping Cut-off: Primary & secondary cyclone with cut out, stainless steel floats & lockable 1.5" stainless steel drain valve Protection: Suction side grit strainer & check valve Control: PTO engagement and vacuum / pressure selection on nearside at rear. Atmosphere Line: 4" URT stainless steel coupling to facilitate piping away vapour. LOW VOLUME JETTING Divisions: Wash Out: Drain Valve: Sight Glass: Water Intake: Jetting Pump: Pressure Control: Drive: Hose reel: Equipment: Protection: : : One to give 200 galls water compartment 4" URT Wash out access in tank Air operated Drain Valve in base of tank 2" diameter full depth acrylic sight glass in front compartment. 3" approved no back syphon hydrant filler - std 2.1/2" quick coupling High pressure pump (up to 12gpm @ 4000psi) Manual Variable Pressure Control at the Rear near Hose reel Hydraulic Hydraulic on nearside at the rear and rear facing with 60m x 1/2" high pressure hose Forward facing & retro nozzles, Handlance with fan and needle nozzles Low water warning device with automatic water-dumping circuit Fit Bulkhead fitting to stow jetting hose Emergency stop fitted at the workstation STORAGE Hose storage: Full length sealed Hose trays on both sides, extra deep with filled in backs and removable stanchions with wire tethers. - Fit drain valves front and rear Other storage: Stainless steel tool locker with drain holes : 6" up stand above Front Nearside second steer mudguard/ wing See 33271 and Photos : Cone Spike fitted inside the storage above wing : Fit Mesh Storage basket under closure plate at rear between chassis rails, with hinged lid with support stay. Mudguards: Steel with full spray suppression. LIGHTING All lights to be switched from the cab : All Electrics to ADR Requirements : End outline marker lights & side marker lights and reflectors Warning lights: 13 off Amber flashing LED beacons fitted, 3 fitted each side, 4 at the rear and 3 at the front Part No 141569 Worklights - Fixed: : 13 off LED worklights fitted - 5 off fitted each side on the tank equally spaced at mid level, 2 off fitted at rear, 1off fitted on the hose reel Rear Beacon Bar: 1 off Onus Amber Flashing Beacon Bar at rear to be half metre long Cab Beacon Bar: 1 off Onus Amber Flashing Beacon Bar on front of cab to be 1.2 metre long : Kelsa top roof bar f/w 4 x oblong spot lights also mounted on cab Onus 1.2 metre Amber flashing light bar : Kelsa bottom bar f/w 3 x oblong spot lights : Remove factory fitted Cab Roof Beacons : Conspicuity Markings to UN ECE Reg 48 SI 2009 No 3220 Page 3 of 4 WHALE TANKERS SPECIFICATION 11 GENERAL: Regulations: : Insurance: Quality Ass: Testing: Construction and Use. ADR Fully labelled to ADR requirements £10M Products Liability cover Witness by Approved Authority Hydraulic test to 4 bar/full vacuum, 4.0 bar design pressure, operating press/vac +/-1 bar : The design & build is approved by an accredited competent body. TC1 & TC2 approval certificates will be issued on delivery of the unit. : Before delivery to the customer the VOSA initial ADR test will be arranged and completed. The ADR1 VOSA certificate will be issued on delivery of the unit Commissioning: 1 day commissioning instruction Weight ticket: Weight ticket supplied Labels: Safety labels and operator handbook Delivery: Delivered to your specified depot 12 13 PAINTWORK Internal Finish: External Finish: : : Cab Finish: Chassis Finish: : Paint Inspection: Wheel finish: Signwriting: Self-colour Shotblast - Swedish standard SA 2.5 Primed - two coats, two pack epoxy Finish - one colour RAL 2004 , in two pack high build acrylic coating Finish - one colour RAL 2004 , in two pack high build acrylic coating Preparation - degrease, Steamclean and flat existing paint Paint - two coats, two pack polyurethane chassis BLACK 100 microns dry film build (elcometer gauge) OEM Factory Finish Signwriting not included - Separate quote provided on request HOSES: None 14 Other features: Cyclist Protection: : : : : : : : : 15 ADR FEATURES : : : : : : : : : : : : : : : Audible reversing bleeper London Cyclist Protection system Cab wind deflectors to be fitted each side of the cab at rear Overall height displayed in cab Electrically heated handwash unit Automatic PTO disengagement linked to handbrake Rear under-run protection (Not Required on Tipping Tanker) Sideguards fitted each side Spray suppression Sign boards fitted both sides ADR X Rays and Welding Certification to comply with Regulations BS 14025 1-off 9kg dry powder fire extinguisher in a box - fitted in a suitable position Chassis must have a 3kg fire extinguisher fitted in the cab Spill Kit Digits and numbers with storage box Earthing straps to give complete earthing continuity 1/2" and 3/4" earthing points to rear and on manhole(s) if fitted. 10m earthing reel Set of 3 electro-polished stainless steel combination hazchem frames with 3 off Diamonds and fold up orange panel on front of the cab. Heavy Duty valve protection Ullage Indicator on sight glass Tank door ring to ADR regulations Rollover protection to top of barrel, sight glass and fittings. Two plastic wheel chocks SPECIFICATION ENDS Page 4 of 4