This sample chapter is for review purposes only. Copyright © The Goodheart-Willcox Co., Inc. All rights reserved. Project 2.2 Faced Bar—Drilled and Hand Tapped Project 2.2 Machining Projects Machining Projects Project 2.2 Faced Bar—Drilled and Hand Tapped Name ___________________________ Date __________ Instructor ________________________ Faced Bar— Drilled and Hand Tapped Period ________ NIMS Duties The tasks in this project develop skills related to the following NIMS duties: ❍ Duty 1.1 Job Process Planning ❍ Duty 2.7a Grinding Wheel Safety ❍ Duty 2.4 Turning Operations: Chucking Order of Operations 4.1, 13.7 13.7 13.2.3, 13.11 13.6 13.11 15.2 ❏ ❏ ❏ ❏ ❏ ❏ 1. 2. 3. 4. 5. 6. Select, measure, and cut stock to the specified length plus facing allowance. Calculate and set appropriate speed and feed. Set feed direction. Select, mount, and adjust appropriate lathe tool bit. Face the workpiece to the specified length. Mount drill chuck in the tailstock. Note The end of the bar must be faced correctly before performing Step 7. 7. Center drill one end of the workpiece. 13.9.1, 15.2 ❏ 6.10 ❏ 8. Select appropriate tap drill. 15.2 ❏ 9. Drill the workpiece as indicated on the drawing. 10.10 ❏ 10. Countersink to the major diameter of the thread. 10.13 ❏ 11. Tap the hole using a tap and tap wrench supported by the live center mounted in the tailstock. Notes _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ Performance Evaluation—Instructor’s Use Only Project completed on time? ❏ Yes ❏ No If No, which steps were not completed ___________________________________________________________ Overall performance on project: ❏ Excellent ❏ Good ❏ Satisfactory ❏ Unsatisfactory ❏ Poor Comments: _____________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ Instructor’s Signature_____________________________________________________ 44 Copyright by Goodheart-Willcox Co., Inc. Copyright by Goodheart-Willcox Co., Inc. 45