Salient Features of Parbati - Kalisindh - Chambal Link Project 1.0 1.1 1.2 General Name of the Project Purpose 1.3 (a) (b) 2.0 River basin Name Location Head Works 2.1 (a) Location State (b) (c) (d) (e) (f) District Tehsil River Sub-basin Access to the project i) Air port ii) Railway station iii) Road 2.2 (a) (b) (c) (d) (e) Hydrology Catchment area (sqkm.) 75% dependable yield (Mm3) 50% dependable yield (Mm3) Surface water available for transfer at 75% dependability Design flood (cumec) Parbati - Kalisindh - Chambal Link Project Diversion of surplus water of Parbati river(tributary of Chambal), Newaj river(sub-tributary of Kalisindh) and Kalisindh river (tributary of Chambal) to Chambal river at Rana Pratap sagar or alternatively at Gandhi Sagar for extending irrigation enroute of the link and drought prone areas of Upper Chambal sub-basin. Chambal Madhya Pradesh and Rajasthan Mohanpura Patanpur dam dam Madhya Pradesh Rajgarh Biaora Parbati Parbati Patanpur dam Madhya Pradesh Rajgarh Biaora Newaj Kalisindh Mohanpura dam On MaksiOn MaksiGuna line, Guna line, Biaora Rly. Biaora Rly. Station 38 km Station 11 km from the from the Project site. Project site. NH-3 from NH-3 from Mumbai-Agra Mumbai-Agra road 38 km road 3.0 km from Project from Project site. site. Mohanpura Patanpur dam dam 5312 3594 1934 862 Kundaliya dam Madhya Pradesh Rajgarh Zeerapur Kalisindh Kalisindh Kundaliya dam On MaksiGuna line, Biaora Rly. Station 80 km from the Project site. JhalawarUjjain highway 7.0 km from Project site. Kundaliya dam 5953 1278 2370 1266 1827 948 444 610 10121 10637 11539 2.3 (a) (b) (c) (d) 2.4 (a) (b) (c) (d) 2.5 (a) (b) (c) (d) (e) 2.6 (a) (b) (c) (d) (e) (f) (g) Reservoir data Top level of the dam (m) Max. water level (m) Full reservoir level (m) Minimum draw down level (m) Storage details Gross storage at FRL (Mm3) Live storage capacity (Mm3) Dead storage capacity (Mm3) Submergence at FRL 1. Area (ha) i) Forest land ii) Irrigated land iii) Unirrigated land iv) Culturable waste land v) Area not available for Cultivation 2. Villages 3. Population Non overflow dam Type Length of left transition (m) Length of right transition Maximum height from average N.S.L. of river bed (m) Top width (m) Spillway Type Length of spillway (m) Crest level (m) Average N.S.L. of river bed (m) Type of gate No. of gates Size of gates 421.62 419.62 419.00 407.00 403.00 401.50 400.00 390.00 382.00 379.50 378.00 369.20 156.00 140.00 1234.00 87.50 959.00 46.00 52.50 275.00 2998.00 68.89 219.69 1869.16 418.08 2510.00 236.51 1073.26 827.80 11800.00 175.51 1699.08 5447.25 1668.90 422.17 372.11 2809.68 22 4255 8 2530 35 20270 60.00 60.00 Concrete gravity 60.00 40.00 Concrete gravity 60.00 60.00 19.62 24.50 45.00 6.00 6.00 8.00 Ogee spillway 197.00 409.29 402.00 Ogee spillway 176.00 389.50 378.50 Ogee spillway 228.50 369.00 337.00 Radial (18+1) 8.0m x 10.5 m Radial (16+1) 8.0m x 12.0 m Radial (20+2) 8.0m x 10.5 m 110.00 Concrete gravity ii 2.7 (a) (b) (c) (d) (e) 3.0 3.1 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) 3.2 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) Earthen dam Length of right 1190 667 240 earthen dam (m) Length of left earthen 2490 957 2911.5 dam (m) Top width (m) 8.0 8.0 8.0 Average NSL Right 417.26 395.16 378.84 bank(m) Average NSL Left 418.9 393.22 359.34 bank(m) Link canal Patanpur to Mohanpura Length of canal (km) 55.37 Flow by gravity Type of lining P.C.C. Full supply level at head 411.0 (m) Full supply depth at 5.0 head(m) Bed width (m) 19.5 Side slope (H:V) 1.5:1 Bed slope 1 : 10000 199.3 Design discharge at head & tail (Cumec) Total No.of canal 39 structures (2 Aqueducts, 1 Tunnel, 3 Hume pipe culverts, 6 Super passages, 2 Drainage syphons, 1 Cross Regulator cum Escape, 6 Head Regulators, 1 Escape, 10 DRB, 6 VRB and 1 Railway bridge) 1.331 Velocity (m/s) Mohanpura to Kundaliya Length of canal (km) 73.17 Flow by gravity Type of lining P.C.C. Full supply level at head (m) 392.0 Full supply depth at head (m) 5.0 Bed width (m) 21.3 Side slope (H:V) 1.5:1 Bed slope 1 : 8000 Design discharge at head 238.0 & tail (Cumec) Total No.of canal 44 structures (3 Aqueducts, 2 Tunnels, 8 Hume pipe culverts, 5 Drainage syphons, 2 Super passages, 1 Cross Regulator cum Escape, 5 Head Regulators, 1 Escape, 13 DRB, 4 VRB) iii (k) 3.3 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) 3.4 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) 3.5 (a) (b) (c) Velocity (m/s) 1.502 Kundaliya to Rana Pratap Sagar Alt.(a) Length of canal (km) 115.08 Flow by gravity Type of lining P.C.C. Full supply level at head 368.7 (m) Full supply depth at head 4.0 (m) Bed width (m) 8.0 Side slope (H:V) 1.5:1 Bed slope 1:20000 Design discharge at 49.1 head & tail (Cumec) Total No.of canal 73 structures (7 Aqueducts, 2 Tunnels, 21 Hume pipe culverts, 2 Super passages, 4 Drainage syphons, 1 Canal Syphon, 1 Cross Regulator, 10 Head Regulators, 2 Cross Regulator cum Escapes, 2 Escapes, 14 DRB & 7 VRB) Velocity (m/s) 0.752 Kundaliya to Gandhi Sagar Alt.(b)-I Length of canal (km) 98.09 (Including pumping reach of 19.38 Km) Flow involving lift Type of lining P.C.C. Full supply level at head 412.00 (m) Full supply depth at head 3.4 (m) Bed width (m) 7.0 Side slope (H:V) 1.5:1 Bed slope 1:10000 Design discharge at 49.1 head & tail (Cumec) Total No.of canal 61 structures (2 Aqueducts, 7 Hume pipe culverts, 1 Super passage, 12 Drainage syphons, 1 Barrage, 12 Head Regulators, 2 Cross Regulator cum Escapes, 2 Escapes, 9 DRB , 12 VRB & 1 Railway Bridge) Velocity (m/s) 1.07 Kundaliya to Gandhi Sagar Alt.(b)-II Length of canal (km) 73.29 (Including pumping reach of 3.20 km and Barrage portion of 0.96 km.) Flow involving lift Type of lining P.C.C. iv (d) (e) (f) (g) (h) (i) (j) (k) 4.0 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) 5.0 6.0 (a) Full supply level at head 368.7 (m) Full supply depth at head 3.5 (m) Bed width (m) 9.0 Side slope (H:V) 1.5:1 Bed slope 1:13500 Design discharge at 49.1 head & tail (Cumec) Total No.of canal 50 structures (2 Aqueducts, 1 Tunnel, 9 Hume pipe culverts, 3 Super passages, 7 Drainage syphons, 1 Barrage, 12 Head Regulators, 1 Cross Regulator cum Escape, 1 Escape, 5 DRB, 7 VRB & 1 Railway Bridge) Velocity (m/s) 0.861 Pumping system Alt.(a) Alt.(b)-I Alt.(b)-II (No pumping) (Three stage (Single stage pumping) pumping) Ist stage pumping RL (m) 368.35 to 356.56 to 385.00 404.00 IInd stage pumping RL (m) 379.50 to 395.00 IIIrd stage pumping RL 394.00 to (m) 412.00 No. of Pumps 21 7 Av. Discharge per 7.43 cumec 6.0 cumec pipe (taking 6 pipe lines) Total design head (m) 59.07 62.41 Capacity of Pumps Ist stage pumping 2150 5000 (H.P.) IInd stage pumping (H.P.) 1750 IIIrd stage pumping (H.P.) 2000 Total electric power 22.38 18.1 required for pumping (MW) 2.4 2.1 Diameter of pipes (m) Length of pumping reach 19.74* 3.2 (km) * ( 1.55 km pipe line, 17.55 km canal & 0.64 km Res. Length) Utilisation of water Alt.(a) Alt.(b)-I Alt.(b)-II Total water utilization 1325.0 1368.0 1360.0 3 (Mm ) Details of seven dams proposed in Upper Chambal sub-basin Live storage Annual (Mm3) irrigation (ha) Major projects i) Chitabad dam 200.0 52957.0 v ii) Sonechiri dam iii) Padunia dam iv) Sewarkheri dam v) Sekri Sultanpura dam (b) 7.0 (a) (b) (c) 8.0 (a) (b) 9.0 10.0 Medium projects i) Ramwasa dam ii) Bachora dam 52.0 42.0 37.0 36.0 14359.0 11881.0 10066.0 10232.0 21.25 15.0 5778.0 4127.0 Annual irrigation Alt.(a) Alt.(b)-I (ha) Enroute 108739.0 118860.0 Upper Chambal 109400.0 109400.0 Ex- Kota barrage 2150.0 2150.0 Total 220289.0 230410.0 Estimated cost at 2002-03 price level (Rs. in lakh) Head works 112356.41 112356.41 Canal & Canalisation 186546.54 200190.36 including pumping station Total 298901.95 312546.77 Benefit Cost ratio 1.67 1.59 Internal Rate of Return 14% 14% vi Alt.(b)-II 117253.0 109400.0 2150.0 228803.0 112356.41 193473.29 305829.70 1.63 14%