SECTION 01 5600 - TEMPORARY BARRIERS AND ENCLOSURES PART 1 GENERAL 1.01 1.02 SUMMARY A. Section Includes: 1. Barricades 2. Construction fences 3. Security measures 4. Protection of adjacent property B. Referenced Sections: 1. Section 01 7419 Construction Waste Management and Disposal TEMPORARY BARRICADES A. Provide barriers and enclosures as needed to protect building facilities and adjacent properties from damage from construction operations. B. Public Rights-Of-Way and Public Access: 1. Pedestrian Walkways: a. Provide a walkway for pedestrian travel in front of Site unless authorities having jurisdiction authorize sidewalk to be fenced or closed. b. Provide walkways of sufficient width to accommodate pedestrian traffic, but in no case less than 4 feet in width. c. Provide walkways provided with a durable walking surface. d. Provide walkways accessible in compliance with applicable local codes and ordinances and designed to support imposed loads; in no case shall a design live load be less than 150 psf. 2. Directional Barricades: a. Protect pedestrian traffic by a directional barricade where walkway extends into street. b. Provide a directional barricade of sufficient size and construction to direct vehicular traffic away from pedestrian path. C. Adjacent to Excavations: 1. Do not permit trenches to remain open without adequate board coverings or fencing. 2. Enclose excavations on-site located 5 feet or less from street lot line with a barrier not less than 6 feet high. Where located more than 5 feet from street lot line, erect a barrier (when required by authorities having jurisdiction). Provide barriers of adequate strength to resist wind pressure as specified in building code. D. Provide temporary weather-tight closures of openings in exterior surfaces to provide acceptable working conditions, protection for materials, and to allow for temporary heating. E. Provide enclosures around piles of separated materials pursuant to Waste Management Plan; refer to Section 01 7419. Locate enclosures out of way of construction traffic. Provide adequate space for pick-up and delivery and convenience to subcontractors. MV+A Architects Temporary Barriers and Enclosures Northgate 20 May 2011 01 5600-1 1.03 1.04 1.05 TEMPORARY CONSTRUCTION FENCING A. Building area shall be enclosed inside a temporary, chain link construction fence. Provide temporary enclosures to prevent entry of unauthorized persons to construction areas. 1. Area contained within construction fencing shall be large enough to allow for construction activities, movement of materials, and storage of materials and equipment as needed. 2. Provide gates as needed for access and movement of materials, equipment, machinery, and personnel. B. Provide 11 gauge (0.120”), galvanized 2”, chain link fabric fencing 7’-0” high with galvanized steel pipe posts, 2.375” OD for line posts and 2.875” OD for corner posts unless otherwise indicated. Fencing shall comply with recommendations of Chain Link Manufacturers Institute for Light Industrial usage. SECURITY MEASURES A. Provide a security program and facilities to Protect Work from unauthorized entry, vandalism, and theft. B. Employ such services or measures as needed to properly protect and safeguard Work. Provide protection for materials, tools, and equipment employed on Project, including workmen’s tools. C. Owner shall not be held to have incurred any liability for loss of, and damage to, materials, tools, and equipment of Contractor, or of those employed by Contractor by contract or otherwise. Owner shall not in any way be liable or responsible for damage or loss to Work due to trespass or theft. PROTECTION OF ADJACENT PROPERTY A. Provide barriers and enclosures as needed to protect adjoining public and private property from damage during construction. 1. Provide protection for footings, foundations, party walls, chimneys, skylights and roofs. B. Provide written notice to owners of adjoining buildings advising them that an excavation is to be made and that adjoining buildings shall be protected. Deliver notification less than 14 days prior to scheduled starting date of excavation. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION MV+A Architects 01 5600-2 Northgate 20 May 2011 Temporary Barriers and Enclosures