north addition office building - The Regents of the University of

advertisement
ATTACHMENT 2: PROJECT GRAPHICS
NORTH ADDITION OFFICE BUILDING
The Regents of the University of California
Committee on Grounds and Buildings
November 2015
1
NORTH ADDITION OFFICE BUILDING
LOCATION AT SACRAMENTO CAMPUS
UC DAVIS HEALTH SYSTEM
PROJECT
LOCATION
2
NORTH ADDITION OFFICE BUILDING
LOCATION AT SACRAMENTO CAMPUS
North Addition
North
UC DAVIS HEALTH SYSTEM
3
NORTH ADDITION OFFICE BUILDING
SITE & FIRST FLOOR PLAN
North/South
(to be
Demolished)
North
UC DAVIS HEALTH SYSTEM
4
NORTH ADDITION OFFICE BUILDING
TYPICAL FLOOR
Building Occupants
•
•
•
•
•
•
•
•
•
•
•
Heart & Vascular
Hospital
Administration
Infection
Prevention
Patient Care
Services
Neurology
Performance
Excellence
Pharmacy
Operations
PM&R Therapies
Surgery
Trauma
UC DAVIS HEALTH SYSTEM
Collaboration
North
5
NORTH ADDITION OFFICE BUILDING
SUSTAINABILITY GOALS
Water
Conservation
•
•
High efficiency
fixtures
Minimal, Valleywise landscaping
Mechanical
System
Performance
•
•
High performance
equipment &
controls
SMUD Savings by
Design
Efficient glazing
systems &
shading
Electrical System
Performance
•
•
LED lighting and
controls
SMUD Savings by
Design
Sustainability
Goals
•
•
•
Whole Building
Energy Model
LEED Gold
Baseline
LEED Platinum
Stretch goal
View From North
Integrated
lighting and
HVAC controls
Harvest
Daylighting in
interior spaces
UC DAVIS HEALTH SYSTEM
6
NORTH ADDITION OFFICE BUILDING
EXTERIOR IMAGES & MATERIALS
View From Northwest
Precast concrete & masonry
View From Southwest
Glazing & storefront
UC DAVIS HEALTH SYSTEM
Metal panel systems
Fenestration pattern & detail
7
NORTH ADDITION OFFICE BUILDING
View From North
UC DAVIS HEALTH SYSTEM
8
Download