PROJECT PROFILE SUPERVISORY CONTROL SYSTEM FOR NORTH-SOUTH, EAST-WEST MRT LINES, SINGAPORE CUSTOMER Land Transport Authority of Singapore (previously known as MRTC Singapore) GENERAL Singapore Technologies Electronics Ltd, together with its French consortium partner, was awarded the contract in 1984 to provide a Supervisory Control System (SCS) for the North-South, East-West (N-S/E-W) Mass Rapid Transit (MRT) Lines. The N-S/E-W lines form the backbone of Singapore's rail transportation system. Covering a total route length of 83km and 48 stations, the MRT system transports over one million passengers daily. The SCS was designed to enable the railway to operate smoothly and efficiently while ensuring the best conditions for safety and comfort. The system provides facilities for integrated, centralized and local control and supervision of Electrical & Mechanical (E&M) sub-systems remotely located at stations, depots, tunnels and etc. The completion of this milestone project is testimony to ST Elect's capability in offering turnkey solutions on an integrated platform for rail systems. It further underscores ST Elect's strength and ability to take on and successfully complete large and complex electronic engineering projects. N12 Yishun N11 Khatib N10 Yio Chu Kang N9 Ang Mo Kio N8 Bishan N7 Braddell N6 Toa Payoh B1 Choa Chu Kang W12 Boon Lay W11 Lakeside E11 Tampines N4 Newton B3 Bukit Batok W10 Chinese Garden W9 Jurong East W8 Clementi E12 Pasir Ris N5 Novena B2 Bukit Gombak N3 Orchard N2 Somerset N1 Dhoby Ghaut W7 Buona Vista W6 Commonwealth W5 Queenstown E10 Simei E9 Tanah Merah E6 Eunos E5 Paya LebarE8 Bedok E4 Aljunied E7 Kembangan E3 Kallang E2 Lavender E1 Bugis C2 City Hall W4 Redhill W3 Tiong Bahru W2 Outram Park W1 Tanjong Pagar C1 Raffles Place Phase I & IA (1987/ 88) M1 Marina Bay Phase II (1990) North Line South Line East Line West Line It is responsible for the overall supervision of the entire E&M subsystems of the Mass Rapid Transit Network. It is equipped with a hot standby computer system, consoles, programmer terminals, printers, workstation operators' dialogue terminals for System Controller, Power Controller, Environmental Control System and Tunnel Ventilation System and Information Controller. SYSTEM OVERVIEW The SCS system is configured using hierarchical computer architecture. The Master computer is configured with hot standby to improve on the overall SCS System Availability. Data acquired from the RTU are updated in real-time on both the master and hot-standby computer allowing the seamless fail-over from the Master Computer. b) Data Transmission (DTS) To allow for the further autonomy of operations, the control intelligence is distributed or decentralized to the Remote Terminal Unit (RTU) located at the Stations, On-line Stations and Depot. The RTU is responsible for the SCADA acquisition and control functionality and to manage all interfaces at the Plant level. System The DTS between the Plant Management System (PMS RTUs) and the CCS is via a dedicated PCM channel. A modem in the RTU will be connected to the PCM channel to provide data communication for data acquired from the RTU and command sent from the Master Computer in the Operations Control Centre (OCC). SYSTEM CONFIGURATION The SCS is structured into three levels consisting of the following components. These are: c) Plant Management (PMS) FUNCTIONS PERFORMED • Basic Remote Control and Monitoring Time Schedule Program Reaction Program Fault Statistics Instruction List Tunnel Congestion and Emergency Inhibition/Validation Avalanche Filtering Report Generation Trending Reaction Program Time Keeper Decision Support Peak load Supervision and load shedding. • • • • • • • • • System SCOPE OF WORK The PMS consisting of the RTU is responsible for data acquisition and executing of control commands sent from the CCS at the OCC. a) Central Computer System (CCS) It is responsible to manage all serial and hardwired interfaces at the Plant levels in the Passenger Stations, On-Line Substations and Depots. The CCS is located at the Mass Rapid Transit Operations Control Centre. • • • • • • Design Supply Project Management Installation Testing & Commissioning Warranty CONTROL ROOM Printers Information Desk System Controller Console Power Supervisor Console ECS Console Color Graphic Printer Power System Fire Safety Alarm E.C.S Mimic Controller EQUIPMENT ROOM 132MB y 67MB From Computer A From Computer B Central Computer A 9.5MB Disk A Central Computer B 9.5MB Watchdog 132MB y 67MB Disk B Programmer’s Console Programmer’s Console Modem 1 Modem 8 Modem CTS Interface OCC/ Local STATION SCR Modem Modem Modem Modem RTU 1 RTU 7 RTU 1 RTU 8 Station 7 Subsystem Subsystem 1 N Station 1 Subsystem Subsystem 1 N Station 8 Subsystem Subsystem 1 N Station 1 Subsystem Subsystem 1 N Group No 1 of 7 RTU (Part of Phase I/ IA of 30 RTU) SCR SCR Group No 8 of 8 RTU (Part of Phase IIA/ IIB of 29 RTU) System Configuration Diagram SINGAPORE TECHNOLOGIES ELECTRONICS LIMITED 24 ANG MO KIO STREET 65 SINGAPORE 569061 TEL: (65) 6481 8888 FAX: (65) 6482 1803 WEBSITE: www.stee.stengg.com (Regn. No.: 196900084E ) SCR Modem MMS Provision for Connection to Maintenance Management System