GAUTRAIN FEEDER AND DISTRIBUTION SERVICES SYNOPSIS This technical report deals with the feeder and distribution element of the Gautrain. One of the factors that will be critical to the success of the Gautrain system is the effectiveness and efficiency with which potential passengers can travel from "door-to-door". The feeder and distribution system and effectiveness of its components will be a very important contributing aspect to the overall efficiency of the system. The purpose of the report is to discuss feeder and distribution solutions for passengers travelling to and from Gautrain stations, based on the origins and destinations, volumes and other perceived requirements of such passengers. Existing public transport services will play a role in feeding passengers to stations. In addition, a network of new road based feeder and distribution services have been developed. These services would provide high quality dedicated transport to and from Gautrain stations and should be operated under the direct control the concessionaire. Such services will have to be co-ordinated and integrated with the Gautrain services (i.e. tickets and information). The requirements for feeder and distribution infrastructure and facilities were determined, including parking for private vehicles at Gautrain stations, public transport facilities, vehicular access to stations, en route facilities, and pedestrian access. Cost-estimates were done for the operation of the dedicated feeder and distribution services, as well as the provision of feeder and distribution infrastructure and facilities. This report concludes with a short discussion on the implementation of feeder and distribution solutions. GAUTRAIN FEEDER AND DISTRIBUTION SERVICES TABLE OF CONTENTS 1 INTRODUCTION.........................................................................................................1-1 1.1 PURPOSE OF THE DOCUMENT ............................................................................1-1 1.2 SPECIFIC OBJECTIVES OF THE DOCUMENT ......................................................1-1 1.3 BACKGROUND.......................................................................................................1-1 1.4 DEFINITIONS..........................................................................................................1-2 1.5 INTERFACE WITH OTHER WORK DONE BY THE PROJECT TEAM .....................1-5 2 METHODOLOGY........................................................................................................2-1 2.1 APPROACH ............................................................................................................2-1 2.2 DEPARTURE POINTS ............................................................................................2-3 3 FEEDER AND DISTRIBUTION CONCEPTS ..............................................................3-1 3.1 FEEDER AND DISTRIBUTION SERVICES .............................................................3-1 3.1.1 Existing Public Transport Services....................................................................3-1 3.1.2 Dedicated Feeder services ...............................................................................3-2 3.1.3 Dedicated Distribution Services ........................................................................3-2 3.1.4 Light Rail ..........................................................................................................3-3 3.2 INFRASTRUCTURE AND FACILITIES WITHIN THE STATION PRECINCT............3-3 3.2.1 Parking .............................................................................................................3-4 3.2.2 Kiss-and-ride ....................................................................................................3-5 3.2.3 Loading and off-loading for existing public transport services (Non-dedicated road-based public transport services)..........................................................................3-5 3.2.4 Bus/Taxi Loading and Off-loading.....................................................................3-6 3.2.5 Pedestrian Facilities..........................................................................................3-6 3.2.6 Vehicle Access .................................................................................................3-7 3.3 INFRASTRUCTURE AND FACILITIES WITHIN THE STATION IMPACT AREA (OUTSIDE THE STATION PRECINCT) ..........................................................................3-7 3.3.1 Infrastructure and facilities en-route..................................................................3-7 3.3.2 Decentralised park-and-rides............................................................................3-8 3.4 GENERIC ISSUES ..................................................................................................3-8 3.4.1 Integrated payment for services........................................................................3-8 3.4.2 Integrated passenger information .....................................................................3-9 3.5 GENERAL ...............................................................................................................3-9 4 DEMAND FOR FEEDER AND DISTRIBUTION SERVICES.......................................4-1 4.1 INTRODUCTION .....................................................................................................4-1 4.2 MODELLING OUTPUTS..........................................................................................4-2 4.3 DISCUSSION ..........................................................................................................4-4 4.3.1 W ALKING AS A DISTRIBUTION MODE ........................................................................4-4 4.3.2 SUNNYSIDE STATION..............................................................................................4-4 5 FEEDER AND DISTRIBUTION NETWORKS .............................................................5-1 5.1 EXISTING PUBLIC TRANSPORT SERVICES.........................................................5-1 5.2 FEEDER AND DISTRIBUTION NETWORKS...........................................................5-1 5.2.1 Hatfield .............................................................................................................5-1 6 5.2.2 Pretoria.............................................................................................................5-3 5.2.3 Centurion..........................................................................................................5-3 5.2.4 Midrand ............................................................................................................5-6 5.2.5 Sandton............................................................................................................5-6 5.2.6 Johannesburg...................................................................................................5-9 5.2.7 Other Stations...................................................................................................5-9 DEDICATED FEEDER AND DISTRIBUTION SERVICES ..........................................6-1 6.1 INTRODUCTION .....................................................................................................6-1 6.2 APPROACH ............................................................................................................6-1 6.3 ASSUMPTIONS ......................................................................................................6-1 6.4 SERVICE REQUIREMENTS AND QUANTITIES .....................................................6-2 7 FEEDER AND DISTRIBUTION INFRASTRUCTURE AND FACILITIES ....................7-1 7.1 METHOD.................................................................................................................7-1 7.2 ASSUMPTIONS ......................................................................................................7-1 7.3 INFRASTRUCTURE AND FACILITIES....................................................................7-2 8 COSTING....................................................................................................................8-1 8.1 SERVICE PROVISION ............................................................................................8-1 8.2 INFRASTRUCTURE AND FACILITY PROVISION...................................................8-3 9 IMPLEMENTATION....................................................................................................9-1 9.1 FEEDER AND DISTRIBUTION SERVICES .............................................................9-1 9.1.1 Existing public transport services......................................................................9-1 9.1.2 Dedicated public transport services ..................................................................9-2 9.2 INFRASTRUCTURE, FACILITIES AND AMENITIES ...............................................9-3 9.2.1 Infrastructure and facilities within station precincts ...........................................9-3 9.2.2 Infrastructure and facilities outside station precincts .........................................9-3 10 CONCLUSIONS........................................................................................................10-1 10.1 FEEDER AND DISTRIBUTION SERVICES........................................................10-1 10.1.1 Existing Public Transport Services ..............................................................10-1 10.1.2 Dedicated New Feeder and Distribution Networks and Services .................10-2 10.2 PASSENGER VOLUMES ON DISTRIBUTION SERVICES ................................10-3 10.3 FEEDER AND DISTRIBUTION INFRASTRUCTURE AND FACILITIES .............10-4 10.4 FACILITY AND INFRASTRUCTURE PROVISION OUTSIDE STATION PRECINCTS.................................................................................................................10-4 10.5 ROAD CAPACITY ON ACCESS AND FEEDER ROUTES..................................10-4 10.6 INTEGRATED DEVELOPMENT ........................................................................10-5 11 RECOMMENDATIONS.............................................................................................11-1 11.1 11.2 FEEDER AND DISTRIBUTION SERVICES........................................................11-1 INFRASTRUCTURE AND FACILITIES ..............................................................11-2 LIST OF TABLES TABLE 4.1: AM PEAK HOUR BOARDINGS AND ALIGHTINGS PER STATION .............4-2 TABLE 4.2: AM PEAK HOUR BUS BOARDING AND ALIGHTING PER FEEDER...........4-3 TABLE 4.3: CHANGES IN ESTIMATED KEY INDICATORS RESULTING FROM ...........4-5 TABLE 4.4: AM PEAK HOUR BOARDINGS AND ALIGHTINGS PER STATION .............4-5 TABLE 6.1: OPERATIONAL REQUIREMENTS PER STATION.........................................6-2 TABLE 7.1: FEEDER & DISTRIBUTION QUANTITIES - PRIVATE VEHICLE..................7-2 TABLE 7.2: FEEDER & DISTRIBUTION QUANTITIES - PUBLIC TRANSPORT .............7-3 TABLE 7.3: FEEDER & DISTRIBUTION QUANTITIES - INFRASTRUCTURE ................7-3 TABLE 8.1: TARIFF USED TO CALCULATE FEEDER AND DISTRIBUTION .................8-1 TABLE 8.2: ASSUMPTIONS USED TO CALCULATE MONTHLY INCOME FROM.........8-2 TABLE 8.3: FEEDER AND DISTRIBUTION UNITS AND QUANTITIES .............................8-2 TABLE 8.4: SERVICE PROVISION: COST IMPLICATIONS (R) ........................................8-3 TABLE 8.5: FEEDER AND DISTRIBUTION INFRASTRUCTURE RATES AND ..............8-3 TABLE 8.6: FEEDER & DISTRIBUTION CAPEX - PRIVATE VEHICLE PARKING ..........8-4 TABLE 8.7: FEEDER & DISTRIBUTION CAPEX - PUBLIC TRANSPORT.......................8-4 TABLE 8.8: FEEDER & DISTRIBUTION CAPEX - FACILITIES OUTSIDE THE STATION PRECINCT (RM).........................................................................................................8-5 TABLE 8.9: TOTAL FEEDER & DISTRIBUTION CAPITAL EXPENDITURE ......................8-5 LIST OF FIGURES FIGURE 1.1: DEFINING KEY CONCEPTS .......................................................................1-3 FIGURE 2.1: APPROACH TO THE DEVELOPMENT OF FEEDER AND DISTRIBUTION SOLUTIONS ...............................................................................................................2-1 FIGURE 5.1 - HATFIELD ...................................................................................................5-2 FIGURE 5.3 - PRETORIA ..................................................................................................5-4 FIGURE 5.5 - CENTURION ...............................................................................................5-5 FIGURE 5.7 - MIDRAND ....................................................................................................5-7 FIGURE 5.9 - SANDTON ...................................................................................................5-8 FIGURE 5.11 - JOHANNESBURG 1 ................................................................................5-10 FIGURE 5.13 - JOHANNESBURG 2 ................................................................................5-11 GAUTRAIN FEEDER AND DISTRIBUTION SERVICES 1 INTRODUCTION This technical report deals with the feeder and distribution element of the Gautrain project, and forms part of the group of reports related to Routes and Civil Infrastructure. 1.1 PURPOSE OF THE DOCUMENT The purpose of this report is to discuss feeder and distribution solutions for passengers travelling to and from Gautrain stations, based on their origins and destinations, volumes and other perceived requirements. 1.2 SPECIFIC OBJECTIVES OF THE DOCUMENT The specific objectives of this document are to: • • • briefly deal with a number of generic issues related to the feeder and distribution system; • • describe the feeder and distribution networks and services; To quantify the feeder and distribution infrastructure and facilities required at the respective Gautrain stations; To give an indication of the costs involved with the provision of feeder and distribution services, infrastructure and facilities; and To briefly discuss the implementation of the proposed feeder and distribution solutions, including institutional arrangements. • • 1.3 discuss certain departure points and the approach to the development of feeder and distribution solutions for passengers using the Gautrain; explain and motivate the broad concepts in developing such solutions; BACKGROUND The level of success with which effective feeder and distribution services to the Gautrain stations are provided will be one of the key factors in drawing passengers to the Gautrain and ensuring optimum door-to-door travel time for its patrons. Feeder and distribution services are seen as an integral part of the Gautrain solution and the planning of related services, infrastructure and facilities is, therefore, dealt with as such. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 1-1 Private vehicles will play an important role in feeding passengers to the Gautrain. Significant attention therefore has to be given to aspects such as park-and-ride, kissand-ride, and wait-and-ride (short-term parking) as part of the feeder and distribution systems. Consideration is also given to metered taxi, car hire, dial-and-rides, etc. Furthermore, it is accepted that existing road-based and public rail transport services, in their current form or with certain adaptations, will play a role in feeding passengers to the planned Gautrain Stations. However, given the market segmentation and profile of the passengers that is envisaged will be attracted to the Gautrain and their needs and requirements, it will be essential for the existing public transport services to be supplemented with dedicated feeder and distribution services. This report also deals extensively with these dedicated services. 1.4 DEFINITIONS A number of key definitions of aspects/concepts described in this report are supplied below to provide greater clarity and to avoid confusion. The illustration in Figure 1.1 serves to further explain these concepts. 10 km radius 5 km radius Legend: Rail Line & Rail Operational Area Station Precinct Dedicated Feeders Dedicated Distributor Existing PT Service Catchmentarea Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 1-2 FIGURE 1.1: DEFINING KEY CONCEPTS Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 1-3 Dedicated feeder and distribution services: Services operated to and from Gautrain stations with the primary aim of collecting passengers at the origin-end and distributing them at the destination-end of their journeys. These services are provided by the concessionaire or by an operator contracted to the concessionaire. Non-dedicated feeder and distribution services: Existing public transport services operated in the vicinity or passing close to Gautrain stations. These services do not serve primarily passengers of the Gautrain, and its stations are not necessarily the main destinations of such services. Catchment area: The area within which passenger trips start or terminate. catchment area could be up to 10km. The radius of the Impact area: The area that generates the "primary" riderships of the Gautrain. Influence area: The areas around the Gautrain stations, which could be influenced in terms of economic and land use development, and redevelopment and revitalisation stimulated. Land use and transport integration is an important consideration in this area, and it could be defined as an area with a radius of approximately 0,5km. Station precinct: The site or number of adjacent sites that accommodate all the activities, infrastructure, facilities, and amenities related to the Gautrain. Rail operational area: The area within the station precinct that accommodates all activities, facilities and amenities directly related to rail operations, including: • access control, • • • concourse and walkways, escalators and lifts, and platforms. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 1-4 1.5 INTERFACE WITH OTHER WORK DONE BY THE PROJECT TEAM The three most important interfaces between the feeder and distribution element, as described in this report, and work done by the Project Team, are with: • • • The demand modelling process; The development of station concepts; and Reports dealing with costing. Results from the demand modelling process constituted some of the key inputs to develop feeder and distribution systems to serve the respective stations and to quantify the infrastructure and facilities required at these stations. However, certain inputs on feeder and distribution systems and networks were required for the demand modelling process. This resulted in an iterative process, which is described in Chapter 2 of this report. The team responsible for the development of station concepts had to rely on outputs from the feeder and distribution systems development process, to conclude its work. These outputs related to the extent and quantities of feeder and distribution infrastructure and facilities at each of the respective stations. Cost-estimates were including in the reports dealing with income and costs. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 1-5 2 METHODOLOGY This chapter describes the method followed to develop feeder and distribution solutions. Certain broad departure points are also given in the following paragraphs. 2.1 APPROACH The approach to the development of feeder and distribution solutions for the Gautrain is illustrated in Figure 2.1. description of tasks Departure points & Approach Broad F & D Concepts Coarse network Frequencies Generic issues Fares Institutional Arrangements Demand modelling Refinement of concepts Broad F & D service designs Quantification of F & D Infrastructure and facilities Costs-implications Implementation FIGURE 2.1: APPROACH TO THE DEVELOPMENT DISTRIBUTION SOLUTIONS Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services OF FEEDER AND June 2001 Final 2-1 The development of feeder and distribution solutions for the Gautrain was initiated by agreement on a number of departure points and the approach to this process. These aspects are discussed further in this chapter of the report. Broad feeder and distribution concepts were then developed in terms of: • coarse feeder and distribution networks, • • frequencies; and fares. These concepts are discussed in Chapter 3 of this report. During the development of the broad feeder and distribution concepts, a number of generic issues which must also receive attention (ie integrated payment for services, pedestrian facilities, etc). were identified. These issues are briefly alluded to in the next chapter and more detailed attention is given to some of these issues in other reports. To plan efficient and cost-effective public transport systems a reasonable balance between supply and demand must be pursued. Broad feeder and distribution concepts were, therefore, discussed and further developed in conjunction with the Demand Forecasting element of the project. Outputs from the demand modelling and land-use element were considered in further planning and refinement of feeder and distribution services. A large number of network options were tested, as described in the report on demand modelling. However, feeder and distribution solutions were developed and costed for three network options. The first network option considered was the preferred network option, namely the direct rail alignment from Pretoria/Hatfield to Johannesburg via Sandton and Rosebank. Further options analysed were the network including Bruma, as well as an extension of the preferred option to include a station at Menlyn. It must be emphasised that the figures used for the calculations in this document were obtained from the base year modelling results, made available in November 2000. Discussion in subsequent chapters show that some refinements are still required, to obtain more realistic results, especially with regard to distribution of passenger volumes. This fine-tuning process may alter volumes, which will in turn necessitate the recalculation of all figures. Outputs from the demand model are given and discussed in Chapter 4. These outputs from the demand modelling process (base-year) were then used to design broad feeder and distribution services for the respective stations. The outputs were also used to quantify the feeder and distribution infrastructure, facilities and amenities to be provided at these stations. During the planning process, the focus was on conceptualisation of services rather than detail design. Service design was addressed with a view to feasibility. Determining accuracy and level of demand did not, in any case, warrant detail design. These issues are discussed in more detail in Chapters 5, 6 and 7. The feeder and distribution services, infrastructure and facility implications and quantities were used to determine costs. Chapter 8 provides more information on the cost-estimates. In conclusion, attention was also given to institutional arrangements and implementation proposals. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 2-2 2.2 DEPARTURE POINTS Given the present land-use characteristics within the Johannesburg-Pretoria corridor, development of a Gautrain and stations on their own would not make economic sense. From international experience, it is clear that our city densities do not support rail based or mass transit solutions in general. To make the high-speed rail system feasible and enable stations to be developed, such a system would have to be supported by an effective feeder and distribution system. The feeder and distribution services would make the high-speed rail system accessible beyond the area of walking distance at each station and would maximise the patronage of the Gautrain. Based on the profiles of existing commuters within the corridor between Johannesburg and Pretoria, a larger group of potential customers of the Gautrain would either be: • • captive to public transport, but could afford to choose the “best option”, or people that own private vehicles, but may opt to use public transport of a high quality. As a departure point it is accepted that the current public transport service (even if adapted) cannot totally fulfil the role of transporting larger groups of passengers to and from stations. The needs, requirements and perceptions of these commuters are such that they will generally not be satisfied with the quality of service and image provided by the existing public transport system, to travel to and from the Gautrain stations. Moreover, passengers being taken to Gautrain stations or distributed by existing public transport services may only be a portion of the total number of passengers being transported by such services. These stations may not, therefore, be major destinations or focus points for such services. This could result in a situation where operators of existing public transport services did not plan optimally for the needs and requirements of the Gautrain passengers. Existing public transport services will, therefore, have to be supplemented by an extensive network of new dedicated feeder and distribution services. These new dedicated services will generally also have to be of a higher quality than most (if not all) of the existing public transport services. The Gautrain operator or concessionaire must be able to control or significantly influence operational decisions (i.e. frequencies, area coverage, etc) related to these new dedicated services. Consideration should be given to the fact that dedicated public transport feeder and distribution services should be operated by the concessionaire, or in an integrated manner by operators contracted to it. The choice of modes to be employed for dedicated public transport feeder and distribution services should be based on demand per corridor and modal niches. It may also be a combination of modes and vehicle sizes. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 2-3 The Gautrain will compete directly with high quality taxi-type services for the same customer base (i.e. 18-seater vehicles to be phased in over the next five years as part of government's initiative to recapitalise the current mini-bus fleet in South Africa). Mechanisms should be pursued to include these taxi operators into an integrated system, to provide feeder and distribution services to stations, rather than operating in competition. It is accepted that the extent of dedicated feeder and distribution services will be such that not every trip origin or destination within the catchment area would be accessible by foot. It will simply not be affordable to provide such a widespread and all-embracing network of services. It is therefore taken that these dedicated services will be focused primarily on: • • • high-density employment, retail and commercial nodes; higher density residential areas, as well as satellite park-and-ride sites in lower density areas. Integrated ticketing co-ordinated schedules, as well as information services, will be an essential aspect to address as part of the integration of the Gautrain service and feeder and distribution services. Other users with trips originating within the lower density residential areas will use park-and-ride facilities at the Gautrain station. Initially such users will probably constitute the majority of Gautrain passengers. (This is confirmed by the demand model for the base year.) However, as densification around stations takes place, more people will be able to access the Gautrain on foot. Given the profile of Gautrain customers, park-and-ride facilitates will have to be provided at most, if not at all, stations. These must include integrated pricing/payment for parking and fares. Consideration should be given to contracting out the operation of park-and-ride facilities by the concessionaire. Some Gautrain passengers may find it convenient to use existing public transport services as feeders and distributors. Attention should therefore be given to the integration and restructuring of such services (bus and rail) to support the Gautrain. It is therefore very important to co-ordinate the development of the Gautrain with other processes that involve the provision of public transport services (i.e. rail concessioning, bus contracts and permission strategies). Depending on the percentage of infrequent (i.e. business people, social travellers and tourists) travelling customers and the costs related to providing such services (or profit to be made from them), attention should be given to providing the following at all or certain stations, probably through quality controlled concessions: • • • metered taxi services, dial-and-ride services, and car hire. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 2-4 Accommodation of hotel and corporate shuttle services should also be considered as part of feeder and distribution solutions. Schemes to encourage organisations to provide such services may also have merit. Land-uses surrounding stations must reduce feeder/distribution requirements over time and optimise pedestrian access to the rail system. The needs and requirements of "special needs passengers" (i.e. people with disabilities) must also be catered for in terms of services, infrastructure and facilities. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 2-5 3 FEEDER AND DISTRIBUTION CONCEPTS This chapter deals with the development of feeder and distribution concepts. In terms of the feeder and distribution services, both existing public transport and dedicated new services are considered. In the development of feeder and distribution concepts, a distinction is made between infrastructure and facilities within and outside the station precinct. This section concludes with a discussion on a number of generic issues related to feeder and distribution services. 3.1 FEEDER AND DISTRIBUTION SERVICES The recommended solution for feeder and distribution service requirements is based on a combination of existing public transport services (or non-dedicated services) and new dedicated public transport feeder and distribution services. The dedicated feeder and distribution services to be provided to the stations will consist mainly of road-based services (bus). However, the possibility of a light-rail system may be considered in the longer term. 3.1.1 Existing Public Transport Services In certain instances, existing public transport services and operators can provide feeder and, to a limited extent, distribution services. Such services specifically will play an important role in bringing passengers from the periphery of the catchment area, or outside this area, to Gautrain stations. This will include the following roadbased operators and services: • • • Combi-taxis; Bus services subsidised by the Gauteng Provincial Government through tendered bus contracts; and Municipal bus operators. In particular cases, existing commuter rail (Metrorail services) can provide feeder services to stations (i.e. Park Station in Johannesburg and Pretoria station). Amendments to the above-mentioned services may, however, be necessary to suit the needs of the Gautrain passengers. Road-based operators may have to change routes and schedules. However, in the case of Metrorail, this may include operating "first class trains" with a different livery on the Pretoria Gautrain System. The issue of safe and convenient transfers from existing taxi, bus and rail services to the Gautrain will have to be given attention. The issue of through-ticketing will also have to be addressed. The relevant authorities, operators and the Gautrain operator (concessionaire) will jointly have to consider the integration and co-ordination of the existing public transport services with Gautrain. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-1 3.1.2 Dedicated Feeder services New dedicated feeder bus services will be connecting important residential nodes within catchment areas with the respective Gautrain station. Such services will cover nodes within a maximum radius of 10km from stations. Decentralised parkand-ride facilities at nodes such as shopping centres and high-density residential developments will be tied into the dedicated feeder networks. They will follow a dedicated route, stopping at strategically determined points, to collect passengers at the origin-side of their journeys. HOV lanes will have to be provided on congested arterials to optimise travel time. As far as possible, such services should be operated at a maximum interval of 10 minutes in peak hours. These services may also distribute passengers on the return trips, where such a demand exists. The seated capacities of buses used to transport people will vary, depending on demand per route (i.e. 65 seater buses or 18 seater mini-buses). The parameters and assumptions used to determine the vehicle capacity, fleet size and frequency are: • • • rail passengers boarding the Gautrain from feeder buses in the morning peak hour as derived from the demand modelling process; average speed, of between 40 and 50 km/h depending on the type of vehicle and traffic conditions. The average speed also allows for acceleration, deceleration and stoppages; and route length. 3.1.3 Dedicated Distribution Services New dedicated road-based distribution services will take Gautrain passengers to major nodes (i.e. commercial, employment, education and entertainment) in close proximity to the respective stations. Such services will serve an area with a maximum radius of 5km from stations. Distribution will follow mainly circular routes, stopping at predetermined points, to drop passengers off at the destination-end of their journeys. Frequent stops will be provided along the route and the route will be determined to minimise walking distances. The existing road network will be shared with other traffic. However, priority measures will have to be provided for these services on congested arterials, to optimise travel time. Changes to local roads may be required and access roads to certain stations will have to be provided. As far as possible, such services will be operated at a maximum frequency of 5 minutes in peak hours. Smaller type buses with a seated capacity of 18 people will be used mainly for these services to optimise capacity utilisation and minimise waiting time. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-2 The parameters and assumptions used to determine the vehicle capacity, fleet size and frequency are the same as for feeder services and are: • • • rail passengers alighting from the Gautrain to be distributed by buses in the morning peak hour as derived from the demand modelling process; average speed of between 30 and 40 km/h depending on the type of vehicle and traffic conditions; and route length. Major corporate organisations located within the vicinity of Gautrain stations will be encouraged to provide "shuttle services" through incentive schemes to and from stations for their employees. Depending on the success of such schemes, this will reduce the need for and extent of the dedicated distribution services. 3.1.4 Light Rail With a Gautrain alternative alignment via Bruma, travel between Sandton and Johannesburg Station is affected. The possibility of a light rail system as a feeder and distribution service for Sandton and Johannesburg Station was investigated. The link between Sandton and Johannesburg Station proved to generate a significant number of passengers to the Gautrain. It also serves the western parts of Johannesburg, not directly served by the Gautrain system. A similar situation may be found at Menlyn in the Pretoria area, with the Gautrain system terminating in Hatfield. A light-rail link between Menlyn and Hatfield may attract a significant number of passengers to the Gautrain. However, as part of the further consideration of light rail systems, the function of such system should be contemplated in terms of the following: • • • feeder and distribution of Gautrain passengers vs alternative public transport links for local users not intending to use the Gautrain; regional mobility vs inter city transport; and desire lines of light rail users. The above-mentioned issues will give an indication with respect to the parties/ authorities that should take the responsibility for "providing" such services. 3.2 INFRASTRUCTURE AND FACILITIES WITHIN THE STATION PRECINCT The feeder and distribution infrastructure and facilities within the station precinct provides the physical link for passengers between Gautrain and the modes/services that will transport them to and from the Gautrain stations. The following infrastructure and facilities will, in the case of most stations, be provided within the station precinct: • • • • • • parking; kiss-and-ride; loading and off-loading for existing public transport services; facilities for dedicated feeder and distribution services pedestrian facilities; and vehicle access to the road network surrounding stations. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-3 The infrastructure and facilities within the rail operational area are excluded from this report and are addressed in the report dealing with this element of the project. The above-mentioned infrastructure and facilities have to be planned to ensure effective transfers and in such a manner that passengers experience a high level of service during transfers. The following principles have to be considered: • • • • • • • shared vs separate access to the site for different modes and services; separate parking for modes and services; optimising site vehicle circulation and egress; accommodation of existing road-based public transport services on- or off the street; positions and layout of facilities to minimise walking distances and simplify pedestrian movements; safety, comfort and convenience of pedestrians; and conflict points between movements. The various elements are dealt with separately below. 3.2.1 Parking Parking will be one of the most significant infrastructure elements within the station precinct. (a) Park-and-ride As previously stated, a significant proportion of the users of the Gautrain will require park-and-ride facilities at the origin-end of their trips. A large portion of passengers using park-and-ride facilities, are expected to do so for a full day, eg arriving in the morning, using the train to get to work, and returning in the afternoon. An isolated and demarcated part of the facility will be made available for sub-letting to car hire companies where applicable. (b) Collect-and-ride/short-term parking Rail passengers that kiss-and-ride on their origin-end of their trips will typically have to be collected on their return trips. People meeting such passengers will usually require parking for a period of 5 to 10 minutes while waiting. A need for collect-and-ride or short-term parking will, therefore exist at most stations, if not all stations. Consideration must be given to either providing a separate facility for shortterm parking or separate space will have to be reserved within the park-andride facility for this purpose. Depending on available space and whether a parkade is provided for park-and-ride, the short-term parking facility should preferably be independent of park-and-ride spaces. This facility should have easier access and need not be covered. Such facilities should be provided in close proximity to the egress points from the rail operational area. Utilisation of park-and-ride and collect-and-ride parking will have to be regulated by fares and time limits. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-4 (c) Other parking needs Parking may also be required for other modes and services at stations, which could include: • • • • • metered taxis; car pools; vehicles provided by employers for collection and distribution of their own employees (corporate shuttles); dial-&-ride services; and car hire services (at selected stations only). Such parking may be planned and made available as dedicated areas within the park-and-ride facilities, or as separate facilities. (d) General Normal parking standards should be used for the design of parking facilities. Available space, number of bays required, and costs will determine whether a parkade (structured parking), covered surface parking, or both will be provided at the respective Gautrain stations. Availability of parking to be shared with other developments in the immediate vicinity of the stations will also be taken into consideration. A typical example would be parking at a shopping centre, which could be used for park-and-ride during the week, when shopping demand is low. Over weekends, when the demand from shopping is high, the demand for park-and-ride is low. Development of the parking facility will take place as part of the station development. These operations can be contracted out to a private company. 3.2.2 Kiss-and-ride A fair percentage of passengers accessing the Gautrain by means of private vehicles are expected to be dropped off at stations. The need for kiss-and-ride "drop-off" zones or areas must be provided for at all stations. Such facilities should be in close proximity to access points to the rail operational area. Facilities for off-loading should be designed to avoid vehicle queues. To ensure this a conservative service frequency of 3-minute intervals should be assumed. All vehicles arriving within any 3-minute interval would be able to off-load immediately. Utilisation of kiss-and-ride areas will have to be regulated by maximum time limits. 3.2.3 Loading and off-loading for existing public transport services (Non-dedicated road-based public transport services) A limited number of Gautrain passengers are expected to use non-dedicated public transport to travel to and from stations. Non-dedicated public transport in the current scenario comprises of existing public transport services not under contract to the concessionaire, transporting passengers not only to and from the Gautrain stations, but also to other destinations. This will apply to some proposed stations (i.e. Hatfield, Pretoria and Johannesburg Park stations). Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-5 To minimise competition and conflict between operators providing dedicated and non-dedicated services, it is desirable that separate on-street loading and off-loading facilities be created along the streets within or adjacent to the station precinct. Such facilities should include lay-byes and shelters with pedestrian access to stations by means of well-lit and paved walkways. It can be argued that the provision of these facilities will be the responsibility mainly of the applicable local authority. Regulatory and control measures will have to be instituted and their operation enforced by the local authority, to safeguard the quality of the environment within and around the station precinct. 3.2.4 Bus/Taxi Loading and Off-loading Separate facilities will be provided within the station precincts for dedicated public transport feeder and distribution services. Provision will have to be made for different types of vehicles. It is foreseen that such services will be provided mostly by either 18-seater midi-buses and/or 60-seater buses. Due to differences between the characteristics of these two types of vehicles (i.e. size and turning radius), separate facilities may have to be provided. As far as possible, loading and off-loading areas should be located separately. Typically, a bus/midi-bus will enter the precinct, off-load close to the rail operational area, and then proceed to an area where it will either hold or load. Loading areas must also be positioned fairly close to the rail operational area, and pedestrian links should be covered and well lit. Ingress and egress must take place with the least amount of manoeuvring, especially reversing. Minimum holding of vehicles will be allowed within the precinct, and vehicles not operational especially in the off-peak, should rather be parked at the operator(s) depot(s). It is foreseen that the loading and off-loading facilities will be developed in conjunction with the rest of the station building under the same ownership. Management of operations must be the responsibility of the operators using the facilities. This function must be incorporated within the institutional framework for the management of stations. 3.2.5 Pedestrian Facilities Pedestrian movement within the station precinct will be significant and will have to receive high priority. Attention will be given to minimise vehicle-pedestrian conflict. At points were pedestrian flows intersect with other traffic, the pedestrian movements will always have priority, and signalling may be required. The normal design standards for the planning and design of pedestrian facilities will be used considering the following human elements: • convenience - easy access; - integrate with other uses and services (i.e. pedestrian malls). Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-6 • • • information and directional signage; comfort - temperature; - lighting; - seating; - shelter; - cleanliness. Safety - walking surfaces; - adequate lighting; - railings and grade changes; - warning signs. Facilities will be planned to guide pedestrians as quickly as possible to or from the rail operational area. Allowance will be made for persons with disabilities. 3.2.6 Vehicle Access Access from the street network will be shared by all road-based modes. Once inside the station precinct modes will be separated and directed by clear and unambiguous signage. In exceptional cases, separate access and egress arrangements will be considered to contribute to more effective traffic circulation within the station precinct. As part of the development of the respective stations with reference to the traffic impact study and for approval by the local authority, the following should receive consideration:, • • • • • • • • • 3.3 site circulation; parking requirements; site layout; position and geometric design of accesses; trip generation; trip distribution; traffic assignment; improvements to the road network to improve/provide access; and traffic control. INFRASTRUCTURE AND FACILITIES WITHIN THE STATION IMPACT AREA (OUTSIDE THE STATION PRECINCT) 3.3.1 Infrastructure and facilities en-route Attention needs to be given to infrastructure and facilities along feeder and distribution routes, including: • • • • lay-byes; shelters; information boards; and other amenities at larger stops. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-7 It is essential that Gautrain passengers experience the same levels and quality of service throughout their journeys. In the case of a passenger using a feeder service, a specific bus stop is the first point of access to the system. The same goes for the point where the passenger leaves the system. In cases where major arterials are used as dedicated feeder routes, travel time may be compromised as a result of traffic conditions during peak periods. To make feeder services more attractive to Gautrain passengers and improve their travel times, attention needs to be given to priority measures, such as HOV lanes. 3.3.2 Decentralised park-and-rides In certain cases provision will have to be made for decentralised park-and-ride facilities at major nodes (i.e. shopping centres) within the respective catchment areas of stations, to feed passengers to the Gautrain. The number of bays to be provided at a decentralised park-and-ride are determined on the basis of the following assumptions: • • • 3.4 Of passengers transported by feeder service, 70% will make use of a park-andride facility. Vehicle occupancy is 1,2 passengers per car. A multiplier of 2 is used to determine the total number of bays. GENERIC ISSUES The following generic issues were identified and are important to all feeder and distribution services and are also relevant to the Gautrain system and station development: • • • • • • integrated payment for services integrated passenger information passenger safety at stations pedestrian facilities (convenience, continuity and safety) dial-and-ride, metered taxis and car-hire services at stations lay-bys and facilities along dedicated feeder and distribution routes Some of the above issues are dealt with as part of other reports (i.e. Station Development, Telecommunications and Safety and Security). Others are discussed below. 3.4.1 Integrated payment for services The following issues will have to be developed to facilitate the integration of payment: • • • • institutional arrangements; operation of service (by whom, will a clearing house be required); standards; smartcards vs integrated ticketing; Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-8 • • • open vs closed system; cost-related to the implementation and operation of systems; internet facilities for bookings and payment. These issues will be discussed more extensively in a subsequent report dealing exclusively with these topics. 3.4.2 Integrated passenger information It is foreseen that this could be dealt with to a large extent through integrated ticketing, and fare infrastructure and facilities. However, issues that should, however, receive further consideration are: • • • • • 3.5 information desks (kiosks); information booklets; electronic information boards; information signs; and “Info on the Web”. GENERAL It should be acknowledged that the nature and extent of feeder and distribution services might change significantly over time. This will be due to the envisaged changes in land-use developments and densification at and around the Gautrain stations, which will enable far greater pedestrian accessibility. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 3-9 4 DEMAND FOR SERVICES 4.1 INTRODUCTION FEEDER AND DISTRIBUTION Feeder and distribution solutions discussed in subsequent chapters of this document are based on demand estimations from a 2000-base year morning peak hour EMME/2 model. The demand figures were obtained in November 2000. The demand modelling must still be further refined. The existing public transport system and service (mainly bus and rail, were coded into the network of the demand model) on a coarse level. In addition, coarse new dedicated feeder and distribution networks serving the Gautrain stations were developed to supplement the existing public transport services. This was also used as input to the demand modelling process. Frequencies and operational speeds given as part of the discussion in the previous chapter were also used as input to the model. The following assumption on fares provided further input: • • R0,30 per kilometre, and a minimum fare of R2,50. Results from the demand modelling process were used to conceptualise the feeder and distribution services. However, an interactive and iterative process whereby inputs from a feeder and distribution perspective were used to calibrate the model. The feeder and distribution links were coded into the model. These results were also used as inputs for costing calculations for feeder and distribution services. The stated preference analysis indicated that a bus bias exists. This aversion for using the bus as a feeder mode was represented in the model by penalising the bus commuter with a 27-minute penalty. This, in turn, represented generalised cost in the calculation of the trips. The penalty was effected only on bus-users at the rail boarding side of the journey during the morning peak hour. A total number of 28 network options were tested as part of the demand modelling process. The Project Review Committee eventually decided that a network option consisting of the following alignments and stations was the preferred option and that planning should be focussed on thereon: (i) (ii) a rail line from Hatfield to Johannesburg CBD Park Station via Pretoria CBD, Centurion, Midrand, Marlboro, Sandton and Rosebank, as well as an airport rail link from Sandton to JIA via Rhodesfield.(also referred to as the "Base Case". Feeder and distribution solutions were developed for this network option). In addition, feeder and distribution services were developed for one other network alternative and one likely extension to the preferred network option, i.e.: Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 4-1 (i) (ii) the Bruma Alternative Network - A rail alignment from Hatfield to Johannesburg CBD via Pretoria CBD, Centurion, Midrand, and Bruma Lake, as well as an airport link from Sandton to the JIA, and a station at Menlyn - An extension to the preferred network alternative to the east of Pretoria. However, the work done as part of the development of feeder and distribution services for the above-mentioned two alternative network options is not discussed further reported on in this technical report. 4.2 MODELLING OUTPUTS Information obtained from the demand modelling process on passengers boarding and alighting at each station, is summarised in Table 4. TABLE 4.1: AM PEAK HOUR BOARDINGS AND ALIGHTINGS PER STATION PER MODE Station Boardings Walk Car Bus Alightings Rail Total Walk Bus Rail Total 188 411 165 217 28 32 95 91 103 29 2609 1117 0 2962 42 487 101 176 405 - 34 109 48 1294 3 105 65 - 628 498 0 32 62 - 3459 2135 213 4473 73 624 293 267 570 29 14 334 108 237 1157 460 2647 2693 249 651 5 42 4 180 9 1957 1154 - 4 123 18 76 12 - 23 499 130 417 1166 2417 3877 2693 261 651 Total 1359 7899 1658 1220 12136 8550 3351 233 12134 Modal share 11% 65% 14% 10% 100% 70% 28% 2% 100% Hatfield Mears Pretoria Centurion Midrand Sandton Johannesburg Rosebank Rhodesfield JIA TOTAL 12100 12100 The modelling process also provided information on boarding and alighting for the bus mode on all major feeder and distribution routes (refer to Chapter 5). This information was used as a basis to plan the dedicated feeder and distribution service. This information is given in Table 4.2. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 4-2 TABLE 4.2: AM PEAK HOUR BUS BOARDING AND ALIGHTING PER FEEDER AND DISTRIBUTION ROUTE/SERVICE Bus Service Boarding Alightings Hatfield Silverton 34 1 Waverley 0 4 34 5 Les Marais 109 22 Rietfontein 0 21 109 43 Clairemont 33 2 Wespark 15 2 TOTAL 48 4 656 31 68 48 279 25 Monumentpark P & R 1 & 2 59 11 Wierdapark Dist 80 21 Wierdapark P & R 1 & 2 85 32 Pierre van Ryneveld 68 13 1295 181 Midrand distributor 3 9 TOTAL 3 9 TOTAL Mears TOTAL Pretoria Centurion Garsfontein P & R 1 & 2 Lyttelton Distributor Menlyn P & R TOTAL Midrand Sandton Bond Road P & R 1 & 2 12 105 Cresta P & R 1 & 2 6 400 Hill Fox P & R 1 & 2 8 128 North Gate P & R 1 & 2 10 105 Fourways P & R 1 & 2 31 794 Paulshof P & R 1 & 2 14 287 Sandton Dist 1 0 7 Sandton Dist 2 11 37 Sandton Dist 3 TOTAL 14 94 106 1957 Johannesburg Aucklandpark P & R 6 691 Glenvista P & R 28 259 Kirlarney P & R 0 7 Alberton P & R 3 41 Bellevie P & R 22 144 Jhb Dist 1 0 0 Jhb Dist 2 7 12 66 1154 TOTAL Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 4-3 4.3 DISCUSSION 4.3.1 Walking as a Distribution Mode When considering the figures obtained from the model and given in Tables 4.1 and 4.2, "walking" as a distribution mode seems to be too attractive. A good example of this is that only nine passengers out of a total of 1 166 passengers arriving at Midrand Station in the peak hour choose to travel further by distributor bus and 1 157 walk. Given the location of the Midrand Station and the extent of Midrand's commercial and light industrial areas, it is clear that the end destination of many passengers' trips will not be within reasonable walking distance from the station. Similarly, most of the other dedicated distributors attract fairly low volumes of passengers in comparison to the number of passengers walking to their end destination. Given the market segment of commuters/travellers for which the Gautrain will cater, the current lack of adequate pedestrian facilities, and perceptions about "on-street safety and security", it can safely be said that dedicated distribution services will be far more attractive than that depicted by the demand modelling process predicts. Therefore, the modelling process will have to be refined, paying specific attention to the attractiveness of dedicated public transport distribution services and making walking less appealing. Refinement or remodelling is expected to change figures used as a basis for the development of feeder and distribution services and facilities described in the following chapters. These figures will have to be reworked during the further development and refinement for when drafting a "Request for Proposal" document. 4.3.2 Sunnyside Station The demand modelling results made available in November 2000 included a station in Sunnyside. Approval by Gauteng Cabinet in April 2001 concerning the rail alignment and station areas did not include a station in Sunnyside. Subsequently, the status of this station was discussed by the Project Review Committee. The preferred network option was remodelled without a station in the Sunnyside vicinity. Results of the remodelling process indicated that the contribution of a station in Sunnyside to the Gautrain system was not as significant as originally supposed. This is illustrated in Table 4.3 below. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 4-4 TABLE 4.3: CHANGES IN ESTIMATED KEY INDICATORS RESULTING FROM THE EXCLUSION OF MEARS STREET STATION Description Peak hour passenger trips Daily passenger trips Peak hour passenger kilometres Annual revenue (R million) 12 100 9 500 60 500 47 500 442 000 437 000 304.6 298.6 7.9% 7.9% 1.2% 1.0% Base Case Network Without Mears Str Station Decrease Based on the above-mentioned indications the Project Committee decided that the Sunnyside Station should initially be excluded from the preferred network, but considered as a secondary station at a later stage. The corresponding volumes without Sunnyside Station (April 2001) are shown below. TABLE 4.4: AM PEAK HOUR BOARDINGS AND ALIGHTINGS PER STATION PER MODE (WITHOUT SUNNYSIDE STATION) Station Boardings Walk Car Bus Alightings Rail Total Walk Bus Rail Total Hatfield Pretoria Centurion Midrand Sandton Rosebank Johannesburg Rhodesfield JIA 137 108 179 18 28 67 72 91 23 2250 582 2376 29 456 175 99 383 - 26 37 1103 2 92 56 - 1085 27 44 - 3498 726 3658 49 576 242 254 518 23 15 108 215 1131 486 2652 2626 248 649 2 59 3 547 410 - 162 32 129 11 - 177 142 274 1134 1033 2652 3164 258 649 Total 723 6350 1316 1156 9 544 8130 1021 334 9 483 Modal share 8% 67% 13% 12% 100% 86% 11% 3% 100% TOTAL 9 500 9 500 A comparison of figures in Tables 4.1 and 4.4 shows that the total morning peak hour patronage decreased and that Pretoria Station became to a large extent the access/egress station for passengers in the absence of a station in the vicinity of Mears Street. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 4-5 Due to the fact that demand-forecasting figures that exclude a station in Sunnyside became available only in April 2001, the planning of dedicated feeder and distribution services and resultant calculations are based on the November 2000 forecasts. Dedicated feeder and distribution services planned in the following chapters are, however, robust enough to accommodate the above changes. The feeder and distribution route network and services proposed for Pretoria Station would largely be able to accommodate passengers, who would have utilised Sunnyside Street Station in the earlier network scenario. Similarly, the planning of feeder and distribution infrastructure and facilities was based on the modelled figures made available in November 2000. However, subsequent to receiving the new-modelled figures in April 2001, the planned station at Sunnyside and related capital expenditure were excluded. A check was done to ensure that the feeder and distribution infrastructure and facilities planned at Hatfield and Pretoria Stations could accommodate the passengers, as per Table 4.4. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 4-6 5 FEEDER AND DISTRIBUTION NETWORKS 5.1 EXISTING PUBLIC TRANSPORT SERVICES Existing public transport services will act as feeder services and to a lesser extent, as distributors to and from the following Gautrain stations: • • • Hatfield Pretoria Park (Johannesburg) In the case of Hatfield and Pretoria Stations, the Metrorail services and those provided by Pretoria City Transport, as well as taxi services between the Pretoria suburbs and the CBD are considered. However, for Metrorail and taxi services to play a significant role in feeding passengers to the Gautrain system, these services will have to be restructured and upgraded to meet the requirements of the passengers. Similarly, services of Metrorail, the Johannesburg Metropolitan Bus Service and taxi operators will play a role in feeding passengers to the Johannesburg Station. The existing public transport services were taken into account in the development of feeder and distribution networks. This is discussed in Chapter 6. 5.2 FEEDER AND DISTRIBUTION NETWORKS The feeder and distribution services and networks are discussed separately for each station. 5.2.1 Hatfield A station in Hatfield will attract passengers from the East, Waverley and North Eastern suburbs of Pretoria. People boarding at Hatfield Station are expected to mainly park-and-ride with access from the N1 and N4 freeways. This Station can also be used to link the Pretoria Ring Rail System (Metrorail services), with the Gautrain and to act as a feeder service. The planned dedicated feeder services, as shown in Figure 5.1, will run on routes from the following areas: • • Silverton Waverley. Passengers arriving at this station on the Gautrain service are expected mainly to walk to the end destination of their trips (i.e. Hatfield node, University of Pretoria, Loftus). However, a distribution route along Lynnwood Road is envisaged. The "reverse feeders" can also distribute passengers. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-1 FIGURE 5.1 - HATFIELD Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-2 5.2.2 Pretoria The station in the Pretoria CBD, located at the Pretoria Station used by Metrorail, will act as a destination station for the Gautrain in the morning peak. A significant number of passengers arriving at this station will walk to their end destinations. However, attention will have to be paid to adequate distribution by road-based distribution services. As shown in Figure 5.2, quite an extensive two-directional dedicated distribution system is envisaged for the Pretoria Inner City area, which also includes Sunnyside. It is proposed that this distribution network be further extended eastwards into Arcadia to cater for non-commuter trips (ie to hotels, the Union Buildings, and various embassies). This proposed distribution network is in line with the ISDF developed for the Pretoria Inner City. A limited number of passengers boarding at Pretoria Station are expected to arrive by private car. Limited park-and-ride facilities are, therefore, planned. As shown in Figure 5.2, dedicated road-based feeder services are envisaged to start from: • • • Rietfontein/Mayville Claremont West Park/Danville. However, the above-mentioned feeder services correlate to a large extent with commuter services provided by the Metropolitan Bus Operator (Pretoria City Transport (PCT). The possibility of restructuring PCT services on applicable routes to provide these services in a semi-dedicated manner should be considered. The demand modelling process accommodated a station located in the vicinity of the Mears Street Metrorail Station to accommodate transfers between Gautrain services operated from Hatfield to Centurion and from Pretoria CBD to Centurion. From Table 4.2 it can be seen that a limited demand also exists for passengers to be fed to and distributed from this station. However, the status and location of this station still has to be finalised. The feeder and distribution requirements for a station along Mears Street in Sunnyside are, therefore, taken care of by tying this in with the above network for Pretoria CBD. 5.2.3 Centurion The function of the Centurion Station depends on the alignment of the Gautrain towards Pretoria and the east of Pretoria. With no station at Menlyn, the Centurion station will serve passengers from the east of Pretoria by means of decentralised park-and-ride. A number of residents from Centurion will also use the station to travel to Pretoria, Midrand, Sandton and Johannesburg. This station is also expected to serve as a destination station for the lake development. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-3 FIGURE 5.2 - PRETORIA Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-4 FIGURE 5.3 - CENTURION Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-5 Distributor services to the areas of Lyttelton, Wierdapark and Pierre van Ryneveld are planned. Feeder services with park-and-ride facilities are planned from Garsfontein, Menlyn, Monumentpark and Wierdapark. These feeder and distribution routes, as well as the decentralised park-and-rides are shown in Figure 5.3. 5.2.4 Midrand The station at Midrand will serve mainly as a destination station with trips in the morning, ending in the commercial and light industrial areas on both sides of the N1, between the N1 and the R101, as well as the CBD, developments at Gallaghar Estate and the proposed Zonkizizwe development. For this reason, a distributor network is planned, as shown in Figure 5.4. 5.2.5 Sandton Sandton is seen as a destination station for Sandton CBD and its adjoining activity node, including international visitors from the JIA. Three distributor services are planned for Sandton. These routes are in the area of Sandton CBD and are shown in Figure 5.5. However, a significant number of people will also travel by means of feeder services to the Sandton Station to access the Gautrain from activity nodes to the west and north of the station. The following feeder services are provided with park-and-ride facilities at the starting points. • • • • • • Bond Road Cresta Hill Fox North Gate Fourways Paulshof. The routes are also shown in Figure 5.5. Depending on the demand and volumes, Light Rail may be considered in the longer term as a solution to link the western suburbs of Johannesburg with the Sandton Station, replacing some or all of the proposed road-based feeder routes. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-6 FIGURE 5.4 - MIDRAND Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-7 FIGURE 5.5 - SANDTON Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-8 5.2.6 Johannesburg Integration of the Johannesburg Gautrain Station with Park Station will enable existing public transport modes and services to play a feeder and distribution role (i.e Metrorail services from the East Rand, Soweto, Roodepoort, etc., as well as existing bus and taxi operations). Over-and-above the existing public transport services, a demand for additional dedicated feeders is expected. Figure 5.6 shows the main feeder routes required to serve the Johannesburg station from the following areas: • • • • • Auckland Park/RAU/SABC Killarney/Parktown (also covering Braamfontein) Bellevue Glenvista Alberton. Services operated along the above-mentioned routes will also serve as distributors to areas such as Auckland Park, Braamfontein and Parktown. Two new dedicated distribution routes within the inner city of Johannesburg are shown in Figure 5.7. These distribution routes and services should be integrated with or may even be replaced by the shuttle service planned by the Johannesburg Inner City Office for the CBD. Consideration should be given in future to tying the Newtown precinct, located to the west of this station, into this network as development progresses. 5.2.7 Other Stations Public transport feeder and distribution networks and services to serve the following stations were analysed in less detail: • • • • Marlboro Rosebank Rhodesfield JIA. Marlboro Station Passengers boarding and alighting at Marlboro Station will originate from the area surrounding this station. Currently, effective services are provided in this area by mini-bus taxis. Such services could easily be adapted to accommodate the demand for feeder and distribution services. Rosebank Station The density of the commercial developments in Rosebank is such that the bulk of passengers travelling to and from this station will be able to walk to their respective end destinations. This is supported by the demand modelling process. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-9 FIGURE 5.6 - JOHANNESBURG 1 Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-10 FIGURE 5.7 - JOHANNESBURG 2 Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-11 Rhodesfield Station The purpose of Rhodesfield Station is to act primarily as a park-and-ride facility for passengers coming from the East Rand via the freeway system. In terms of the demand modelling process, no passengers will be arriving at this station by means of road-based public transport. JIA Station The JIA Station revolves around air passengers and people working at the airport. There will, therefore be no need for feeder and distribution services to this station as it will be located within close proximity to the respective terminal buildings. However, a significant portion of the passengers may be served more efficiently from Rhodesfield Station. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 5-12 6 DEDICATED FEEDER AND DISTRIBUTION SERVICES 6.1 INTRODUCTION The demand modelling process provides for morning peak hour passenger volumes for the road-based feeder and distribution routes for the base year (as discussed in Chapter 4 of this report). More detailed planning was done with regard to feeder and distribution services, based on volumes obtained from the model. The concept "feeder and distribution services" in this section of the report means new road-based public transport services, providing dedicated services to the Gautrain stations. In terms of the modelling process, the role of Metrorail as a provider of feeder and/or distribution services has already been quantified (Table 4.1). 6.2 APPROACH In areas such as Pretoria and Johannesburg existing scheduled bus services and more specifically, services provided by municipal operators (Pretoria City Transport and Metro Bus Service) were considered during the planning of feeder and distribution services. However, due to uncertainty with regard to the possibilities of restructuring such services to meet the requirements of the potential Gautrain passengers (i.e. in terms of frequencies and routes), it was assumed that these services will cater for only 5% of the feeder demand in the morning peak hour. In areas such as Centurion and Sandton, all feeding and distributing will have to be done by means of new dedicated services. The role of the current taxi industry and its potential contribution as part of the feeder and distribution service network is dealt with in Section 9 of this document. 6.3 ASSUMPTIONS The following departure points and assumptions were used for the more detailed planning of the dedicated feeder and distribution services: • • • • Vehicle sizes: a combination of 60-seater (standard buses) and 18-seater midibuses, in line with the National Land Transport Transitional Act, 2000; Frequency on feeder routes during peak period: at least 20 minutes and in most cases much less; Frequency on distribution routes during peak period: in most cases 10 minutes or less; Vehicle size per route: dependent on demand per route and reasonable frequencies; Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 6-1 • • • • 6.4 Average vehicle occupancy per trip for feeder services: in the order of 60%; Average vehicle occupancy per trip for distribution services: ranging from 80 to 90%; Operational speeds for feeders: 20 - 30km/h Operational speeds for distributors and "reverse feeders": 30 - 40km/h due to lower levels of congestion in CBDs and on arterial roads in the contra-peak direction. SERVICE REQUIREMENTS AND QUANTITIES The feeder and distribution service requirements and quantities for the respective stations are summarised below: TABLE 6.1: OPERATIONAL REQUIREMENTS PER STATION No. 1. 2. 3. 4. 5. Total Station Pretoria area* Centurion Midrand Sandton Johannesburg AM peak hr pax Std. bus Fleet Midi-bus Fleet (per day) Live km's (per day) Trips 339 1 476 12 2 063 1 863 29 20 11 11 16 1 25 20 64 168 3 177 207 884 4 059 54 4 986 2 874 5 753 60 73 619 12 857 * The Pretoria area includes stations within the CBD and at Hatfield Detail calculations are attached in Annexure A. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 6-2 7 FEEDER AND DISTRIBUTION AND FACILITIES INFRASTRUCTURE Feeder and distribution infrastructure and facility requirements at each of the Gautrain stations are discussed below. 7.1 METHOD Outputs from the demand model (passengers per mode boarding and alighting at the respective stations) were used to determine the quantities of various feeder and distribution infrastructure components/facilities required. 7.2 ASSUMPTIONS Parking will be the major feeder and distribution infrastructure element within the respective station precincts. The demand modelling process indicated that a significant proportion of rail users would make use of park-and-ride facilities. The majority of these passengers will park for a full day, eg arriving in the morning, using the train to go to work and returning in the afternoon. The number of park-and-ride parking bays were determined on the basis of the following assumptions: • • • Of passengers arriving at stations by car in the morning peak, 80% will make use of the park-and-ride facility. Vehicle occupancy is 1,2 passengers per car. Based on peak demand, a multiplier of 2 is used to determine the total parking demand per day (i.e. number of bays per station). An isolated and demarcated part of parking facilities should be made available for sub-letting to car-hire companies, where applicable. Accommodation for this has been made at stations in Johannesburg, Pretoria and Sandton. Normal parking standards will be used for the design of parking facilities. Space available and the number of bays required will determine whether a parkade will be provided or covered surface parking. The availability of parking to be shared in the immediate vicinity of the stations is to be taken into consideration. A typical example would be parking at a shopping centre, which can be used for park-and-ride during the week when the demand from shopping is low. Over weekends when the demand from shopping is high the demand for park-and-ride is low. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 7-1 Allowance is made for separate facilities to accommodate kiss-and-ride and shortterm parking (i.e. wait-and-ride). Assumptions used to determine the number of short-term parking bays are: • • • Rail passengers boarding in the morning peak period and arriving at the stations by car but not making use of park-and-ride facilities will be met by someone in the afternoon peak using the short-term parking; Average waiting time is 10 minutes; Vehicle occupancy is 1,2 passengers per car. Provision must also be made for the upgrading of the existing road network to create adequate road access to the stations. Provision has been made for accommodating existing public transport services on the perimeter of the stations. Pedestrian facilities include amenities like toilets, shelters, lighting, benches and information signs. The following areas were assumed per type of vehicle to allow for parking, manoeuvring and circulation: • • • private vehicle parking midi-buses (dedicated new services) standard buses (dedicated new services) - 25 m² per bay, 45 m² per bay, and 90 m² per bay. An additional area of 150 m² (2,5m x 60m) was allowed at each station for on-street parking for existing public transport services and vehicles. 7.3 INFRASTRUCTURE AND FACILITIES The various proposed feeder and distribution infrastructure and facility components per station, as well as quantities are given in Table 7.1 below. TABLE 7.1: Stations Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank* Jhb Park Rhodesfield JIA FEEDER & DISTRIBUTION QUANTITIES - PRIVATE VEHICLE PARKING Parkade Kiss-&ride (bays) Short-term parking (bays) Car hire (bays) Surface parking (bays) 1 200 450 1 350 50 50 300 0 100 100 0 1 000 50 1 560 150 150 0 0 100 210 0 19 4 16 1 2 3 0 2 3 0 38 8 32 1 3 6 0 3 5 0 0 10 0 0 0 20 0 15 0 0 (bays) * Given the high degree of developm ent in the vicinity of the proposed Rosebank Station and the availability of parking, it is assumed that all passengers arriving at this station by means of private vehicles will use such facilities and that no additional parking facilities will be required. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 7-2 The public transport infrastructure, facilities and quantities per station are given in Table 7.2. TABLE 7.2: Stations Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank Jhb Park Rhodesfield JIA FEEDER & DISTRIBUTION QUANTITIES - PUBLIC TRANSPORT FACILITIES Std. bus terminus (bays) Midi-bus terminus (bays) Other loading Holding (m) (bays) 0 0 2 0 0 3 0 3 0 0 1 4 5 1 1 6 0 7 1 0 60 60 60 60 60 60 0 60 60 0 1 2 4 1 0 3 0 3 0 0 Table 7.3 gives the infrastructure and facility requirements outside the station precinct related to feeder and distribution services (including private vehicle access). TABLE 7.3: Stations Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank Jhb Park Rhodesfield JIA * ** FEEDER & DISTRIBUTION QUANTITIES - INFRASTRUCTURE AND FACILITIES OUTSIDE THE STATION PRECINCT Road upgrading (km) Access (m²) En-route facilities (km*) Pedestrian facilities (m² **) 6 2 10 2 1 4 0 4 10 0 1 000 1 000 1 000 1 000 1 000 1 000 0 1 000 1 000 0 26 42 95 20 10 133 0 132 0 0 190 170 4 900 1 250 500 3 000 900 2 600 850 2 000 Quantity of en-route facilities based on feeder & distribution route kilometres, one lay-bye per 5km route and 37,5 m² area per lay-bye. Provision of pedestrian facilities based on quantity of pedestrians/AM peak hour Detailed calculations are shown in Annexure B. (In certain cases the figures given in Annexure B have been rounded off for practical reasons.) Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 7-3 8 COSTING Cost-estimates were done for the operation of road-based feeder and distribution services dedicated to the Gautrain system, as well as the provision of essential feeder and distribution infrastructure, facilities and amenities. The following aspects are covered as part of the discussion on costs related to the provision of feeder and distribution services, infrastructure and facilities: • • • 8.1 Assumptions used for estimating costs, Quantities, and Cost-estimates itself. SERVICE PROVISION The description of the feeder and distribution services are described, and calculation of quantities is discussed in Chapter 6. Rates and tariffs related to feeder and distribution services are as follows: TABLE 8.1: No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. TARIFF USED TO CALCULATE FEEDER AND DISTRIBUTION SERVICE COSTS Item Tariff Motivation Fuel (Diesel) Tyres & tubes Lubricants Spares & units Vehicle instalments Vehicle licences Vehicle insurance Salaries: • Drivers • Maintenance • Operate/admin • Management Rent of facilities Water & lights Insurance General expenses Service vehicles R1.22/veh. km R0.28/veh. km R0.06/veh. km R0.73/veh. km R11500/veh/month R2 500/veh/month R300/veh./month Based on year 2 000 costs in the bus industry. Unit costs are given for Std. buses. Two-thirds of these costs were assumed for midibuses. R3 500/month R4 500/month R5 500/month R10 000/month R15 000/month R7 000/month R30 000/month R15 000/month R3 000/veh./month Per depot Dedicated feeder and distribution services will have an income stream, which will reduce the operational cost-implications related to the provision of these services. The assumptions used to calculate monthly income from fares are given in Table 8.2. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 8-1 TABLE 8.2: No. 1. 2. 3. 4. ASSUMPTIONS USED TO CALCULATE MONTHLY INCOME FROM FARES Item Assumption Daily passengers Non rail users Average fare Operator profit 3 x AM peak-hour volumes* 15% R3.00 10% * Daily passengers on rail service system are assumed to be 5 x AM peak-hour volumes. However, it was assumed that the off-peak demand for dedicated feeder and distribution services would be such that it would not be viable to provide high frequency services on all routes. The trip purpose and type of passenger are also expected to differ from the peak hour and the modal preference for public transport will be lower. A multiplying factor of three was, therefore, used. The feeder and distribution units and quantities for the respective stations are given below: TABLE 8.3: FEEDER AND DISTRIBUTION UNITS AND QUANTITIES Station Pretoria area* Centurion Midrand Sandton Johannesburg AM peak hr pax Std. Bus Fleet Midi-bus Fleet Std. Bus Live km's (per day) Midi-bus Live km's (per day) 339 1476 12 2063 1863 29 20 11 11 16 1 25 20 2610 2361 1278 884 1449 54 2625 1596 * The Pretoria area includes stations at Hatfield and the CBD From an operational point of view and in order to achieve economies of scale, it is assumed that all dedicated road-based feeder and distribution services will be operated out of three operational centres, namely Pretoria, Sandton and Johannesburg. All the stations within the Pretoria area, including Centurion, will be served from the Pretoria operational centre. Similarly, the Sandton operational centre will serve Sandton and Midrand Stations. Feeder and distribution operational cost-implications can be split into income, expenditure and nett expenditure (subsidy). The monthly income and costimplications resulting from dedicated feeder and distribution services operational centre is shown in Table 8.4. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 8-2 TABLE 8.4: SERVICE PROVISION: COST IMPLICATIONS (R) Operational Centre Pretoria Sandton Johannesburg Total Annual Total Cost (per month) Income from fares (per month) (per month) R1 376 276 R626 175 R750 101 55% R1 106 874 R466 875 R639 999 58% R715 334 R419 175 R296 159 41% R3 198 484 R1 512 225 R1 686 259 53% R38.4 million R18.1 million R20.2 million 53% Nett cost Subsidy Level * 10% profit of operator(s) included Detailed calculations per operational centre and network option are attached in Appendix C. 8.2 INFRASTRUCTURE AND FACILITY PROVISION The major component of the capital cost-related feeder and distribution infrastructure and facilities revolves around pavement construction for parking, loading bays, accesses and lay-bys. The other major capital costs are related to public transport facilities and providing access to stations as well as facilities along major feeder and distribution routes (outside the respective station precincts). The following tariffs and rates were used to determine capital expenditure: TABLE 8.5: FEEDER AND DISTRIBUTION INFRASTRUCTURE RATES AND TARIFFS Item Rate/tariff Construction cost of structure parking (parkades) Construction cost of paving (private vehicles) Shelter (private vehicles) Shelters and amenities (public transport en-route) Pedestrian facilities Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services R1 100 per m², R215 per m², R250 per unit, R5 000 per lay bye, R165 per AM peak hour pedestrian. June 2001 Final 8-3 The capital expenditure related to the provision of private vehicle parking infrastructure and facilities is shown below. TABLE 8.6: FEEDER & DISTRIBUTION CAPEX - PRIVATE VEHICLE PARKING (RM) Stations Parkade Surface parking Parking equip. Kiss-&ride Sortterm parking Car hire Total Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank Jhb Park 33,00 12,38 37,13 1,38 1,38 8,25 0 2,75 2,75 0 8,50 0,43 13,26 1,28 1,28 0 0 0,85 1,79 0 0,75 0,50 0,75 0,13 0,13 0,5 0 0,25 0,25 0 0,10 0,02 0,09 0 0,01 0,02 0 0,01 0,01 0 0,20 0,04 0,17 0 0,02 0,03 0 0,02 0,03 0 0 0,05 0 0 0 0,1 0 0,08 0 0 42,55 13,42 51,39 2,79 2,80 8,91 0 3,96 4,83 0 Rhodesfield JIA The capital expenditure related to the provision of public transport facilities is given below. TABLE 8.7: Stations Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank Jhb Park Rhodesfield JIA FEEDER & DISTRIBUTION CAPEX - PUBLIC TRANSPORT FACILITIES (R THOUSAND) Bus terminus Midi-bus terminus Other loading Holding Total 0 0 39 0 0 58 0 58 0 0 9 39 48 9 9 58 0 67 9 0 52 52 52 52 52 52 0 52 52 0 5 11 22 5 0 16 0 16 0 0 70 100 160 70 060 180 50 190 60 0 Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 8-4 Table 8.8 gives the capital expenditure related to facilities outside the respective station precincts. TABLE 8.8: Stations Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank Jhb Park Rhodesfield JIA FEEDER & DISTRIBUTION CAPEX - FACILITIES OUTSIDE THE STATION PRECINCT (RM) Road upgrading Access En-route facilities Pedestrian facilities Total 12,00 4,00 20,00 4,00 2,00 8,00 0 8,00 20,00 0 0,22 0,22 0,22 0,22 0,22 0,22 0 0,22 0,22 0 0,18 0,29 0,65 0,14 0,07 0,91 0 0,90 0 0 0,03 0,03 0,81 0,20 0,08 0,50 0,16 0,44 0,14 0,33 14,02 7,10 27,49 5,78 2,98 17,78 0,16 17,64 20,35 0,33 The total capital expenditure related to the feeder and distribution component of the Gautrain system is summarised below. TABLE 8.9: TOTAL FEEDER & DISTRIBUTION CAPITAL EXPENDITURE Stations Hatfield Pretoria Centurion Midrand Marlboro Sandton Rosebank Jhb Park Rhodesfield JIA Parking Public tp facilities Outside Station Total 44,55 13,42 51,39 2,79 2,80 8,91 0 3,96 4,83 0 0,07 0,10 0,16 0,07 0,06 0,18 0,05 0,19 0,06 0 14,02 7,10 27,49 5,78 2,98 17,78 0,16 17,64 20,35 0,33 56,6 20,6 79,0 8,6 5,8 26,9 0,2 21,8 25,2 0,3 Grand total 245,2 Detailed calculations of capital costs given in the tables above are attached in Annexure D. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 8-5 9 IMPLEMENTATION A number of broad proposals are made in this chapter with regard to the implementation of the feeder and distribution system forming an integral part of the Gautrain. Some suggested actions resulting from these proposals need to commence sooner rather than later, in order to facilitate the smooth implementation and to pave the way for successful establishment of the concessionaire. 9.1 FEEDER AND DISTRIBUTION SERVICES 9.1.1 Existing public transport services Discussions and negotiations will have to take place with institutions, authorities and operators responsible for the provision of existing public transport services. The outcome and success of such discussions will influence the need for and extent of new dedicated feeder and distribution systems to be instituted as part of the Gautrain system. This will also lessen the burden to some extent for the concessionaire. It may also extend the market served by existing operators and services, improving their viability. Institutions and authorities to be engaged include: • • • • SARCC (Commuter rail service) Gauteng Department of Transport and Public Works: Directorate Public and Urban Transport (Subsidised bus contracts); Local authorities (Public Transport Plans and Operating License Strategies, as well as taxi liaison structures); and Gauteng Permit Board (Amendment of existing and issuing of new operating licenses). Operators to be contacted are: • • • • Metrorail; Private bus operators contracted to the Gauteng Province; Municipal bus operators (Pretoria City Transport and Johannesburg Metropolitan Bus Service); and Taxi associations. Such discussions and negotiations are required to: • • • Restructure and amend their route networks (road-based services) to tie in with the Gautrain to minimise walking distances; Co-ordinate their timetables to optimise the convenience and travel times of passengers transferring from existing services to the Gautrain; and Upgrade and improve the quality of their services to better meet the demands and requirements of Gautrain passengers. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 9-1 Ticketing and payments systems used by operators of existing public transport services, as well as systems envisaged for implementation in the near future (i.e. EMS system for the taxi recapitalisation project) will have to be considered. This is important with a view to integrate the Gautrain fare and payment system with such systems. Passengers using existing public transport services to travel to and from Gautrain stations, should be able to use a common payment mechanism (i.e. smart cards). As far as possible, the ticket system should also be integrated so that a passenger can purchase a through ticket. However, this will not always be possible as a result of the varying levels of sophistication of existing public transport operations. 9.1.2 Dedicated public transport services The following are a few broad proposals related to the implementation of new dedicated feeder and distribution services: • • • • Dedicated feeder and distribution services should be operated under direct control of the concessionaire. Therefore, such services should be provided either by the concessionaire or by an operator, or group of operators, contracted to the concessionaire. It is believed that the latter may be more desirable. Operators contracted to the concessionaire should, as far as possible, be sourced from the existing "pool of operators" within the areas adjacent to the specific stations. This "pool of operators" may include existing taxi operators. This would reduce potential resistance and conflict, as well as over-trading of an area. It may also encourage existing operators not to compete with the Gautrain system, but to integrate with it. All services should be operated under a uniform livery and the quality of service should conform to certain minimum specifications and requirements. This should be monitored by the concessionaire. Integrated payment and through-ticketing, linked to integrated information on all services, should be an essential link between the dedicated services and the Gautrain service. In terms of the National Land Transport Transitional Act, 2000 the authority required to provide road-based public transport services in South Africa is an operating licence awarded by a provincial operating licence board. Decisions concerning the award of operating licences are based on operating licence strategies (OLSs) compiled annually by planning authorities (i.e. local authorities). In the case of dedicated feeder and distribution services for the Gautrain, operating licences for the provision of such services will be awarded by the Gauteng Operating Licence Board, which will base its decisions concerning the award of operating licences on the OLSs of the respective local authorities responsible for the areas within which the dedicated feeder and distribution services are operated. It will, therefore, be essential to timeously have discussions with such authorities in this respect. In conjunction with the respective OLSs, national government's initiative to recapitalise the existing taxi vehicle fleet must also be taken to account and as far as possible, accommodated in terms of the provision of dedicated feeder and distribution services. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 9-2 Discussions will have to take place with the business sector to consider incentive schemes to encourage major corporate companies and other organisations to introduce shuttle services to and from stations for their employees. 9.2 INFRASTRUCTURE, FACILITIES AND AMENITIES 9.2.1 Infrastructure and facilities within station precincts The provision of infrastructure, facilities and amenities related to feeder and distribution systems will have to be dealt with in an integrated manner, as part of the development of the respective Gautrain stations. This will also form part of the scope of the Gautrain project. However, the provision of facilities and amenities used by existing public transport services that are on-street and within a station precinct will have to be discussed with the relevant local authority. 9.2.2 Infrastructure and facilities outside station precincts Infrastructure and facilities outside the station precincts will be related mainly to enroute amenities along feeder and distribution routes. These facilities and amenities are discussed in Chapter 3. In general, it is the responsibility of the relevant local authority to provide public transport facilities and amenities. However, experience has shown that budget constraints have limited the extent to which local authorities involve themselves with the provision and maintenance of such facilities and amenities. As mentioned previously in this document, the feeder and distribution service "bus/train stop" will be the first point of access for many Gautrain passengers. If these facilities do not conform to a certain quality level, such passengers will be deterred from using the Gautrain system. It will be important, therefore, to engage in discussion with the relevant local authorities to negotiate, determine and establish the extent and quality of en-route facilities and amenities to be provided. This will be specifically relevant to the route networks of dedicated feeder and distribution services. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 9-3 10 CONCLUSIONS One of the factors that will be critical to the success of the Gautrain Rapid Rail Link will be the effectiveness and efficiency with which potential passengers will be able to travel from "door-to-door" (not so much station-to-station). The feeder and distribution system and the effectiveness of its components will be a very important contributing factor to this. A number of key conclusions and considerations related to the feeder and distribution systems are given in the following paragraphs. These conclusions may not only have an impact on the feasibility of the Gautrain project as such, but may also allude to further technical work to be done and processes to be followed. Some of these aspects will also have to receive further consideration, taking into account the development of a request for proposal/tender. 10.1 FEEDER AND DISTRIBUTION SERVICES 10.1.1 Existing Public Transport Services Existing public transport services were taken into account in the development of feeder and distribution networks. The solutions given in this document rely to an extent on existing public transport services and operators to feed passengers to Gautrain stations. Existing scheduled public transport services can act as feeders, and to a lesser extent as distributor services, to and from the following Gautrain stations: • • • Hatfield Station; Pretoria Station; and Park (Johannesburg) Station. In the case of Hatfield and Pretoria Stations, the Metrorail services and those services provided by Pretoria City Transport, as well as taxi services between the Pretoria suburbs and the CBD are considered. However, for Metrorail and the taxi services to play a significant role in feeding passengers to the Gautrain system, these services will have to be restructured and upgraded to meet the requirements of the passengers. Similarly, the services of Metrorail, Johannesburg Metropolitan Bus Service, and taxi operators will play a role in feeding passengers to Johannesburg Station. However, discussions and negotiations will have to take place with institutions, authorities and operators responsible for the provision of existing public transport services. The outcome and success of such discussions will influence the need for and extent of new dedicated feeder and distribution systems to be instituted as part of the Gautrain system. This will also lessen the burden to some extent for the concessionaire. It may also extend the market served by existing operators and services and improve its viability. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 10-1 Minibus taxis are providing unscheduled services within the areas surrounding the proposed Gautrain stations. Given the market segment targeted by the Gautrain, the taxi industry in its current form will not be able to make a significant contribution to feeding and distributing of passengers. However, it is strongly believed that the taxi operator should be included in the provision of dedicated services, as discussed in Section 10.1.2 below. 10.1.2 Dedicated New Feeder and Distribution Networks and Services Feeder and distribution route networks, which would, in the majority of cases, consist of new dedicated public transport services, were planned for the following stations: • • • • • • • Hatfield, Pretoria, Centurion, Midrand, Sandton, Johannesburg, and Rhodesfield. The new dedicated feeder and distribution services should be characterised by: • • • • • • Minimum frequencies on feeder routes of 20 minutes in the peak period, Minimum frequencies on distribution routes of 10 minutes in the peak period, Modern, convenient, 18 and/or 65 seater buses, clearly identifiable by a livery similar to that of the Gautrain, Integrated payment with the rail fares (through-ticketing), Integrated information, Co-ordinated timetables with the Gautrain services. It is concluded that new dedicated feeder and distribution services should be implemented based on the following: • • • • Dedicated feeder and distribution services should be operated under direct control of the concessionaire. Operators contracted to the concessionaire should, as far as possible, be sourced from the existing "pool of operators", within the areas adjacent to the specific stations, including existing taxi operators. Discussion with local authorities and the Gauteng Operating Licence Board must take place to facilitate the award of operating licences to operators. National Government's initiative to recapitalise the current taxi vehicles should be accommodated. No specific attention was paid to public transport feeder and distribution networks to and from the following stations: • • • • Marlboro, Rosebank, Rhodesfield, and JIA. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 10-2 Passengers boarding and alighting at Marlboro Station will be originating from the areas surrounding the station. Currently, effective services are provided in these areas by mini-bus taxis. Such services could easily be adapted to accommodate the demand for feeder and distribution services. The density of commercial developments in Rosebank is such that the bulk of passengers travelling to and from this station will be able to walk to their respective end destinations. The purpose of Rhodesfield Station is to act primarily as a park-and-ride facility for passengers coming from Kempton Park and the East Rand via the freeway system. This area is too fast to serve it by means of dedicated services. The JIA station revolves around air passengers and people working at the airport. There will, therefore, be no need for feeder and distribution services to this station, as the station will be located within close proximity to the respective terminal buildings. The dedicated feeder and distribution services could be provided from three operational centres located in Pretoria, Johannesburg, and one located somewhere in between. Such services will comprise of 66 standard buses, 80 mini-buses, 620 trips per day and 15 000 kilometres per day. It is estimated that it would cost R38,4 million per month to operate such services. The income from fares is estimated at R18,2 million per month, resulting in a nett cost of R20,2 million, requiring a 53% level of subsidisation. The nature and extent of feeder services may change significantly during the concessioning period. This will be due to the envisaged changes in land-use developments and densification at and around the Gautrain stations, which will enable far greater walking accessibility to the rail system. The development and implementation of incentive schemes to encourage major corporate companies and other organisations to introduce shuttle services for their employees should be pursued to reduce the demand for dedicated distribution services. 10.2 PASSENGER VOLUMES ON DISTRIBUTION SERVICES Volumes on dedicated distribution services obtained from the demand estimation process indicate that "walking", as a distribution mode, is far too attractive. Most of the dedicated distribution services attract fairly low volumes of passengers in comparison to walking volumes. The feeling is that dedicated distribution services will be far more attractive than the demand modelling process predicts based on: • • • • the market segment of commuters/travellers on the Gautrain (more upmarket passengers will not be prepared to walk long distances); the "spread" of commercial and light industrial activities around stations; the current lack of adequate pedestrian facilities; and the perceptions about "on-street safety and security". The modelling process will, therefore, have to be refined, paying specific attention to the attractiveness of dedicated public transport distribution services, or making walking less appealing. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 10-3 10.3 FEEDER AND DISTRIBUTION INFRASTRUCTURE AND FACILITIES Parking for private vehicles, including park-and-ride, kiss-and-ride and short-term parking should be provided at all the Gautrain stations, with the exception of those at JIA and Rosebank. Available parking facilities in the vicinity of the proposed station in Rosebank should be sufficient to accommodate parking related to the rail system. Facilities (i.e. lay-byes) for existing public transport services are also proposed at all stations, also with the exception of the above two stations. Based on the demand estimation model, it is estimated that structured parking facilities consisting of 3 600 bays and surfaced parking of 3 220 bays will have to be provided in total at all the respective stations. Facilities for dedicated road-based feeder and distribution services, including areas for off-loading, loading and holding, are to be provided at all stations, except for those where such services are not proposed (ie Rosebank, Rhodesfield and JIA). Attention must be given to vehicular access and pedestrian facilities at all stations. It is estimated that the total cost related to the provision of feeder and distribution infrastructure and facilities will be R245 million. 10.4 FACILITY AND INFRASTRUCTURE PROVISION OUTSIDE STATION PRECINCTS No formal discussions have taken place with local authorities regarding to their role and preparedness to take responsibility for the upgrading, provision and maintenance of infrastructure, facilities and amenities required outside the respective station precincts, including: • • • Lay-byes; Shelters and other amenities at stops; and Priority measures. If the local authorities are not prepared to play a significant role, or their budgets limit their role, a considerable additional capital and operational load will be added to the project and possibly to the concessionaire. 10.5 ROAD CAPACITY ON ACCESS AND FEEDER ROUTES ___________________________________________________________________ Road capacity, road access to stations, and congestion along feeder routes to stations have not received the level of attention necessary for inclusion into a request for proposal/tender. This would also include aspects such as priority measures along routes to reduce travel time on feeder services. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 10-4 10.6 INTEGRATED DEVELOPMENT To promote transport planning co-ordination, as well as land-use and transportation integration, the proposed feeder and distribution solutions will have to be accommodated in local plans (i.e. Integrated Transport Plans, Land Development Objectives and Integrated Development Plans). Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 10-5 11 RECOMMENDATIONS 11.1 FEEDER AND DISTRIBUTION SERVICES (1) The following is recommended with regard to feeder and distribution services in general: • A system of high-quality feeder and distribution services should be developed to transport passengers to and from the Gautrain stations, thereby offering them an effective "door-to-door" service. • Existing public transport services should be amended/restructured where necessary to form part of the feeder services for passengers travelling to Hatfield, Pretoria and Johannesburg Stations. • New dedicated road-based feeder and distribution services of a high quality should be introduced to and from Hatfield, Pretoria, Centurion, Midrand, Sandton and Johannesburg Stations. (2) A number of broad proposals related to the implementation of new dedicated feeder and distribution services are: • Dedicated feeder and distribution services should be operated under direct control of the concessionaire. Such services should be provided either by the concessionaire or by an operator or group of operators contracted to the concessionaire. • Operators contracted to the concessionaire should, as far as possible be sourced from the existing "pool of operators", within the areas adjacent to the specific stations. This "pool of operators" may include existing taxi operators. • All services should be operated under a uniform livery and the quality of service should conform to certain minimum specifications and requirements. • The concessionaire should be responsible for the quality of dedicated feeder and distributions services (i.e. vehicle standards, frequency, punctuality and reliability). (3) The concessioning contract should make allowance for changes in the demand for dedicated feeder and distribution services during the concessioning period, as well as amendments to these services to meet the changes in demand. (4) The implementation of incentive schemes to encourage major corporates and other organisations to introduce shuttle services for their employees should be pursued. (5) Integrated payment and through-ticketing, linked to integrated information on all services, should be an essential link between the dedicated services and the Gautrain service. More work should be done on the ticketing and payment system taking cognisance of: • International practices. • Current developments in South Africa on smartcards. (6) Inclusion of the new dedicated feeder and distribution systems into the relevant Operating Licence Strategies for the Year 2006 should be discussed with the relevant local authorities and the Gauteng Operating Licence Board. This will be necessary to facilitate the award of operating licences to operators before commencement of the rail service. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 11-1 (7) The national government's initiative to recapitalise the existing ageing taxi fleet should, as far as possible, be accommodated as part of the development and implementation process of the new dedicated feeder and distribution services. (8) The modelling process will have to be refined, paying specific attention to the attractiveness of dedicated public transport distribution services or to make walking less appealing. (9) Discussions will have to take place with operators and institutions/authorities responsible for the provision of existing public transport services within the impact areas of the respective Gautrain stations. Ideally "memorandums of understanding" should be signed with such operators. 11.2 (10) Feeder and distribution fare levels will have to be in line with the per kilometre rail tariffs such that it does not place an excessive subsidy burden on the concessionaire. (11) Feeder and distribution solutions should be accommodated in local plans (i.e. Integrated Transport Plans, Land Development Objectives and Integrated Development Plans) to promote transport-planning co-ordination, as well as land-use and transportation integration. INFRASTRUCTURE AND FACILITIES (1) Dedicated parking infrastructure and facilities for private vehicles should be provided at all Gautrain stations, with the exception of Rosebank and JIA Stations. (2) Off-loading, loading and holding facilities should be provided for dedicated feeder and distribution services at stations served by such services. (3) Attention should be given to vehicular access to stations, as well as pedestrian facilities. (4) A process of discussion with local authorities should be initiated to determine their responsibilities regarding the upgrading, provision and maintenance of infrastructure and facilities outside the respective station precincts, and along feeder and distribution routes. The end result of such discussions should be agreements (commitments if possible) in this regard, which could then be incorporated into the request for proposal/tender. Gautrain: Planning and Implementation Study Volume 2 Document 2.2: Feeder and Distribution Services June 2001 Final 11-2