Sl. No. 1 2 3 4 5 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7 7.1 7.2 7.3 7.4 7.5 7.6 8 9 10 11 12 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 12.1 12.11 12.12 12.13 12.14 13 14 15 16 17 DETAILS OF OPERATION AND MAINTENANCE EXPENSES Name of the Company: NTPC Ltd. Name of the Power Station: Simhadri Items 2008-09 Consumption of stores & spares 1997.90 Repair & Maintenance 1898.73 Insurance 136.65 Security 437.35 Water Charges 589.02 Administrative Expenses Rent 0.00 Electricity charges 82.75 Travelling & Conveyance 370.63 Communication Expenses 62.39 Advertising 6.06 Foundation Laying & Inaugration 0.00 Donation 0.00 Entertainment 21.37 Filing fee 2.10 Subtotal (Administrative Expenses) 545.30 Employee Cost - Salaries,Wages & Allowances 5139.79 - Staff Welfare expenses 849.64 - Incentive 308.35 - Expenditure on VRS 0.00 - Ex-gratia 0.00 - Performance Related Pay(PRP) 376.70 Sub Total (Employee Cost) 6674.48 Loss of Store 0.00 Provisions 2.31 Prior Period Expenses 0.00 Corporate Office expenses allocation 2494.48 Others Rates & Taxes 20.41 Water cess 103.85 Training & recruitment expenses 38.71 Tender Expenses 95.92 Guest house expenses 22.00 Education expenses 10.25 Community Development Expenses 26.39 Ash utilisation expenses 16.01 Books & Periodicals 1.05 Professional Charges 29.73 Legal expenses 22.44 EDP Hire & other charges 36.39 Printing & Stationery 27.80 Misc and other Expenses 426.94 Sub Total (Others) 877.89 (Total 1 to 12) 15654.13 Revenue / Recoveries 21.64 Net Expenses 15632.49 Capital spares consumed 77.95 Total O&M Cost 15710.44 Expenditure of Capital nature as per accounting practice not claimed/ disallowed in capital cost 368.00 Total O&M Cost incluidng Sl No. 17 above 16078.44 No. of Employee opting for VRS 0.00 Note: 1) Prior period expenses have been inculed in their natural head 2) Ex gratia has been incuded in PRP for the year 2008-09 3) Employee cost includes arrears 4) For 2012-13, data in respect of Sl No.17 shall be submitted later Annexure VI 2009-10 295.29 4253.70 229.40 903.47 712.54 2010-11 289.57 5119.93 281.98 652.25 495.45 (Rs. In Lakhs) 2011-12 2852.60 2957.52 331.76 977.11 697.26 2012-13 4064.76 4160.34 469.36 1187.02 1027.82 0.00 105.91 298.05 62.07 7.96 0.00 0.00 28.51 20.00 522.50 0.00 107.76 375.57 75.10 5.79 0.00 0.00 32.97 20.00 617.18 0.00 155.34 484.88 76.62 66.94 0.00 0.00 54.64 35.00 873.43 0.00 145.00 596.45 93.03 8.33 0.00 0.00 49.87 63.78 956.46 5263.54 661.68 221.48 0.00 71.14 585.43 6803.27 0.00 9.58 0.00 2264.81 6190.69 725.42 261.29 0.00 72.86 539.73 7790.00 0.00 1.28 0.00 2789.19 5954.97 638.11 286.61 0.00 77.36 931.50 7888.56 0.00 8.02 0.00 2992.52 8860.44 962.61 262.07 0.00 88.52 814.73 10988.37 0.00 16.81 0.00 4135.37 38.14 47.95 91.68 91.04 38.95 37.52 83.63 57.81 29.36 32.54 12.99 13.75 65.62 99.40 0.16 6.27 1.13 1.38 20.17 20.75 6.05 2.77 35.12 24.96 36.94 38.98 239.67 407.87 699.60 882.98 16694.16 18919.81 32.10 30.67 16662.06 18889.14 36.84 211.78 16698.90 19100.92 42.27 96.24 58.48 59.66 33.94 15.46 85.17 18.34 1.68 10.32 -9.08 32.31 34.04 470.50 949.32 20528.10 35.29 20492.81 150.62 20643.43 35.05 111.79 107.05 90.94 40.30 21.62 321.61 11.61 0.78 37.00 17.66 25.14 43.46 909.63 1773.64 28779.94 35.43 28744.51 320.28 29064.79 8100.00 4567.00 24798.90 23667.92 0.00 0.00 3485.00 24128.43 0.00 29064.79 0.00 ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 1 2 3 Particulars Name of Company Name of Station Installed Capacity and Configuration 4 Rated Steam Parameters (Also state the type of Steam turbine and Boiler 5 Type of BFP 6 Circulating Water System 7 Any other Site specific feature 8 8.1 Annual Allocation or/ and Requirement 8.1.2 Sources of supply/ procurement along with contracted quantity and grade of coal 8.2 2009-10 2010-11 2011-12 2012-13 NTPC Limited Simhadri Super Thermal Power Station 2000 MW(Stage-I= 2X500, Stage-II= 2X500) MW FSA Imported Bi- Lateral MOU Spot Market/e auction Transportation Distance of the station from the sources of supply Mode of Transport Maximum Station capability to stock main fuel Closed Cycle NDCT type Cooling Tower Coal MT Annual allocation through FSA =9.82 MMT (2000MW), (FSA for 4.62 MMT signed recently) Annual requirement =12.79 MMT Annual contracted quantity of 9.82 MMT MT MT MT km Days & MT Grade of coal as per FSA is E- F 5.90 4.59 4.82 5.62 0.46 0.34 0.62 1.11 0.00 0.98 0.46 0.94 0.00 0.00 0.00 0.00 610 IR 30 days & 8.25 Lac MT 6.90 1.48 0.82 0.02 Secondary Fuel: klitre 8.2.3 8.2.4 8.2.5 Transportation Distance of the station from the sources of supply Mode of Transport Maximum Station capability to stock secondary fuels Km 15768 HPCL Vizag 40 Road LDO :1000 KL/ HFO :2000 KL klitre Cost of Spares: 9.1 Cost of Spares capitalized in the books of accounts (St-I) Cost of Spares capitalized in the books of accounts (St-II) (Rs. Lakh) (Rs. Lakh) 63 484 9.2 Cost of spares included in capital cost for the purpose of tariff (St-I) (Rs. Lakh) 0 0 Cost of spares included in capital cost for the purpose of tariff (StII) 10.1 10.1.1 Requirement has been worked out for 90% PLF FSA signed with Mahanadi Coal fields Limited (MCL) Annual Requirement Sources of supply 10 Basis of information/ methodology Stage-I: Steam Pr 170 ata, MS/HRH Temp: 537/537 deg C, Stage-II : Steam Pr: 170 ata, MS/HRH temp :537/565 deg C BHEL make KWU design Steam Turbine, BHEL make CE design Boiler Two Steam Driven(2*50%) + 1 Motor Driven( 50%) 8.2.1 8.2.2 9 2008-09 Fuels: Main Fuel: 8.1.1 8.1.2.1 8.1.2.2 8.1.2.3 8.1.2.4 8.1.3 8.1.4 8.1.5 Units 854 5748 0 (Rs. Lakh) 532 2012-13 data to be submitted later 0 5748 Generation Actual Gross Generation at generator terminals (Commercial Satge wise) Stage-1 MU 8533.10 8520.70 8416.82 8163.98 7706.49 ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 12 12.1 12.2 13 Particulars Name of Company Name of Station Stage-2 Actual Net Generation Ex-bus Stage-1 Stage-2 Scheduled Generation Ex-bus Stage-1 Stage-2 Average Declared Capacity (DC) Stage-1 Stage-2 Actual Auxiliary Energy Consumption including colony consumption Stage-1 Stage-2 Actual Energy supplied to Colony from the station 14 14.1 Main Fuel: Consumption : 1 2 10.1.2 10.2 10.2.1 10.2.2 10.3 10.3.1 10.3.2 11 11.1 11.2 14.1.1 14.1.2 14.2 14.2.1 14.2.2 14.2.3 14.2.4 14.2.5 14.3 14.3.1 14.3.2 14.3.3 14.3.4 14.4 Domestic Coal (Linked mine/ Other mines/e-auction/spot) Imported Coal* Gross Calorific Value (GCV): Domestic Coal (As received) (As fired) Imported Coal (As received) Spot market/e-auction coal (As received) Weighted Average Gross Calorific value (As received) Weighted Average Gross Calorific value (As fired) Units MU MU MU MU 2008-09 8080.3 Basis of information/ methodology 2010-11 2011-12 2012-13 NTPC Limited Simhadri Super Thermal Power Station 2133.3 4956.71 2009-10 8050.84 7230.29 4669.02 7523.37 1992.70 7171.66 4630.24 884.04 422.03 824.75 354.47 459.28 293.61 6.837 8009.35 MW MW 914.37 MU MU MU 449.79 6.059 6.961 6.482 461.14 116.29 6.830 MT MT 5895227 239197 5566196 406944 5315485 688018 6401318 1168937 7714979 1437117 5628 5532 5379 5634 5589 3215 3271 3269 914.12 464.89 3348 7668.79 7684.47 2015.04 MU MU kCal/kg kCal/kg kCal/kg kCal/kg kCal/kg kCal/kg 7973.54 7947.95 914.43 458.22 3291 Price of Coal: Weighted Average price of Domestic coal Weighted Average price of imported coal Weighted Average price of spot market/ e-auction coal Weighted Average price of all the Coals (as received) (Rs/MT) (Rs/MT) (Rs/MT) (Rs/MT) 1224 6219 1606 5718 1531 6231 1894 7590 2085 5274 1586 1886 2070 2763 2586 Blending: % and MT 14.4.1 14.4.2 14.4.3 Blending ratio of imported coal with domestic coal Proportion of e-Auction coal in the blending Actual Average stock maintained % 3.9% 6.8% 11.5% 15.4% 15.7% Imported/ Total Coal Consumption MT 82684 155354 156946 222717 94861 Average of monthly closing stock 14.5 14.5.1 Actual Transit & Handling Losses for coal/Lignite Pit- Head Station % 14.5.1.1 Transit loss from linked mines MT 14.5.1.2 Transit loss from non-linked mines including e-auction coal mines. MT 14.5.1.3 Transit loss of imported coal MT 14.5.2 Non-Pit Head station MT ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 Particulars 1 Name of Company 2 Name of Station 14.5.2.1 Transit loss from linked mines Units MT 14.5.2.2 Transit loss from non-linked mines including e-auction coal mines. MT 14.5.2.3 Transit loss of imported coal MT 15 15.1 15.2 15.3 15.4 16 16.1 16.2 16.3 16.4 16.4.1 16.4.2 16.4.3 17 17.1 17.2 17.3 17.4 19 19.1 19.2 19.3 19.4 19.5 Basis of information/ methodology 2010-11 2011-12 2012-13 NTPC Limited Simhadri Super Thermal Power Station 0.53% 0.61% 0.74% 0.71% 0.72% 2008-09 2009-10 0.29% 0.10% 0.14% 0.14% 0.18% 853.9 549.8 304.1 9798.0 27792.4 45682.3 34164.2 1900.4 1236.1 664.3 9788.0 28327.3 43888.4 33767.0 750.0 491.7 258.3 9784.0 29299.3 44934.9 34684.5 2159.1 663.3 1495.9 9628.0 36665.0 58834.7 52024.0 5295.5 1354.9 3940.6 9301.0 49577.0 70505.0 65151.0 802.6 193.2 802.6 193.2 705.3 244.0 600.6 229.8 442.3 229.8 395.0 83.0 4 4 1 3 0 338.7 153.4 11 11 1 7 3 388.7 129.2 8 8 1 5 2 282.7 98.7 20 20 1 8 11 645.6 332.3 30 30 8 10 12 42-105 1185-1324 217-311 47-113 1125-1451 204-398 NA NA 50 40-112 1002-1369 256-554 54-114 1089-1325 250-355 47-111 1150-1575 275-425 Secondary Fuel Oil : Consumption HFO Consumed LDO Consumed Weighted Average Gross Calorific value (As received) Weighted Average Price (HFO) Weighted Average Price (LDO) Weighted Average Price (Combined) Actual Average stock maintained HFO Average Stock LDO Average Stock klitre klitre klitre kCal/litre (Rs Per KL) (Rs Per KL) (Rs Per KL) klitre klitre klitre Average of monthly closing stock Weighted average duration of outages Scheduled Outages Forced Outages Number of Outages Number of start-ups : Cold Start-up Warm Start-up Hot start-up MU MU No No No No No NOx , SOx ,and other particulate emission in : Design value of emission- NOx Design value of emission- SOx Design value of emission- SPM Actual emission (SPM) Actual emission (SOx) Actual emission (NOx) mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 Detail of Ash utilization % of fly ash produced Quantity Produced (Lakh MT) 23.64 22.18 21.92 28.16 32.25 % 18.45 19.27 16.12 16.76 11.21 % % 0.58 37.56 0.11 7.84 1.55 3.83 6.10 0.07 0.07 0.00 % 13.51 13.73 35.54 22.99 28.74 0.11 0.92 0.66 3.98 6.70 Conversion of value added product(Issue to Cement, RMC & Brick /block industries) For making roads & embarkment Land filling Used in plant site in one or other form or used in some other site (Mine filling & Ash dyke raising) Any other use , Please specify (Agriculture, Bottom ash cover etc.) Qty. (Lakh M T) and usage No norm; not considered in design No norm; not considered in design ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 Particulars Name of Company Name of Station Units 1 2 20 21 22 Cost of spares actually consumed Average stock of spares Number of employees deployed in O&M Rs Lakhs Rs Lakhs 22.1 22.2 22.3 23 Executives Non Executives Corporate office Man-MW ratio 2008-09 Basis of information/ methodology 2009-10 2010-11 2011-12 2012-13 NTPC Limited Simhadri Super Thermal Power Station 2026.9 6251.0 2169.6 6268.0 2737.9 6856.3 2897.5 7710.8 310 194 3205 0.50 348 189 3272 0.54 392 188 3298 0.39 427 180 3354 0.3 4220.7 8484.1 455 226 3170 Total Corporate Man Power 0.34 Excluding Corporate Man Power Note: From Oct/ Nov 2012 onwards payment to coal companies is being made on the basis of GCV as received at plant boundary. As per FSA, payment is to be made as per the quality assessed at mine end . Accordingly substantial amount billed by Coal companies are yet to be paid. Prices indicated above reflect the payment being made to Coal Companies. GCV of Domestic Coal as received is being measured only from Oct/Nov 2012