Sr. No. 1 2 3 4 5 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7 7.1 7.2 7.3 7.4 7.5 7.6 8 9 10 11 12 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 12.1 12.11 12.12 12.13 12.14 13 14 15 16 17 DETAILS OF OPERATION AND MAINTENANCE EXPENSES Name of the Company: NTPC Ltd. Name of the Power Station: Singrauli STPS Items 2008-09 2009-10 Consumption of stores & spares 4698.16 5775.03 Repair & Maintenance 3226.15 3832.68 Insurance 287.80 484.41 Security 977.51 1152.82 Water Charges 717.86 770.64 Administrative Expenses Rent 0.00 0.00 Electricity charges 266.63 302.09 Travelling & Conveyance 486.15 479.43 Communication Expenses 72.90 70.27 Advertising 7.92 6.05 Foundation Laying & Inaugration 0.00 0.00 Donation 0.00 0.00 Entertainment 23.64 19.04 Filing fee 0.00 40.00 Subtotal (Administrative Expenses) 857.24 916.88 Employee Cost - Salaries,Wages & Allowances 14895.68 12534.93 - Staff Welfare expenses 1388.00 1667.32 - Incentive 653.37 899.77 - Expenditure on VRS 0.00 0.00 - Ex-gratia 0.00 470.40 - Performance Related Pay(PRP) 893.02 804.76 Sub Total (Employee Cost) 17830.08 16377.18 Loss of Store 0.32 0.52 Provisions 135.63 1.38 Prior Period Expenses 0.00 0.00 Corporate Office expenses allocation 4988.89 4527.94 Others Rates & Taxes 13.25 9.07 Water cess 457.65 468.29 Training & recruitment expenses 87.29 51.52 Tender Expenses 70.07 81.67 Guest house expenses 36.04 37.76 Education expenses 149.26 154.39 Community Development Expenses 59.15 26.64 Ash utilisation expenses 1.00 5.08 Books & Periodicals 1.30 14.03 Professional Charges 6.22 20.37 Legal expenses 11.40 14.24 EDP Hire & other charges 62.38 52.95 Printing & Stationery 27.11 30.67 Misc and other Expenses 229.98 250.17 Sub Total (Others) 1212.10 1216.85 (Total 1 to 12) 34931.74 35056.33 Revenue / Recoveries 290.85 305.39 Net Expenses 34640.89 34750.94 Capital spares consumed 900.94 1724.39 Total O&M Cost 35541.83 36475.33 Expenditure of Capital nature as per accounting practice not claimed/ disallowed in capital cost 536.92 1922.41 Total O&M Cost incluidng Sl No. 17 above 36078.75 38397.74 No. of Employee opting for VRS 0.00 0.00 Note: 1) Prior period expenses have been inculed in their natural head 2) Ex gratia has been incuded in PRP for the year 2008-09 3) Employee cost includes arrears 4) For 2012-13, data in respect of Sl No.17 shall be submitted later Annexure VI 2010-11 5859.96 4311.85 540.54 1212.93 770.64 (Rs. In Lakhs) 2011-12 6297.05 5154.75 592.43 1503.23 770.64 2012-13 7457.19 5873.22 590.00 1685.62 770.64 0.00 380.71 548.52 89.33 5.09 0.00 0.00 40.61 40.00 1104.26 0.00 402.73 680.62 95.55 3.64 0.00 0.00 32.50 40.00 1255.03 0.00 345.58 693.52 116.94 12.99 0.00 0.00 33.57 80.00 1282.60 16320.45 1363.18 769.40 0.00 488.41 760.13 19701.57 0.00 0.95 0.00 5578.09 15298.17 1074.74 631.06 0.00 496.93 1208.53 18709.43 0.48 24.99 0.00 5256.63 17449.83 1660.22 801.71 0.00 455.65 1142.45 21509.87 0.35 36.46 0.00 5145.79 21.42 487.01 81.93 61.95 41.32 148.75 64.19 4.03 4.62 39.53 12.52 40.64 51.59 1053.62 2113.12 41193.91 320.23 40873.68 1250.57 42124.25 6.59 447.51 78.05 47.55 41.55 12.38 194.17 0.97 4.84 20.58 18.08 45.71 64.56 597.44 1579.97 41144.63 315.02 40829.60 1802.86 42632.46 14.63 466.28 54.50 46.48 81.34 29.42 250.30 9.75 3.72 40.09 13.18 35.02 46.69 689.88 1781.29 46133.03 319.98 45813.05 3512.72 49325.77 1446.52 43570.76 0.00 1365.03 43997.49 0.00 49325.77 0.00 ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 1 2 3 4 5 6 7 8 8.1 Particulars Name of Company Name of Station Installed Capacity and Configuration Rated Steam Parameters (Also state the type of Steam turbine and Boiler 8.1.2 Sources of supply/ procurement along with contracted quantity and grade of coal 8.2 8.2.1 8.2.2 8.2.3 8.2.4 8.2.5 9 2009-10 2010-11 2011-12 NTPC Ltd. Singrauli Super Thermal Power Station 2000 (200X5+500X2) Steam Parameters Steam Turbine Boiler 200MW 130/535 500MW FSA Imported Spot Market/e auction Transportation Distance of the station from the sources of supply Mode of Transport Maximum Station capability to stock main fuel 170/537 Coal MT MT MT MT Annual allocation through FSA =11.00MMT (2000 MW) Annual requirement = 11.20 MMT Northern Coal fields Limited (NCL) Annual contracted quantity of 11.00 MMT (2000 MW) Grade of coal as per FSA is C- E 11.47 11.10 11.79 10.92 11.39 0.00 0.00 0.33 0.19 0.00 0.00 0.00 0.00 0.00 0.00 Requirement has been worked out for 90% PLF NCL- 10 KM km MGR 27 days & 8.4 Lac MT Days & MT HFO Oil klitre 5000 IOCL 1000 Rail 17000 km klitre Cost of Spares: 9.1 Cost of Spares capitalized in the books of accounts (Rs. Lakh) 2802 5632 2839 1854 9.2 Cost of spares included in capital cost for the purpose of tariff (Rs. Lakh) 0 0 0 0 10 Generation 15893.43 14762.98 14662.76 14693.06 1677.29 16264.42 15098.42 14979.28 15021.97 1714.84 16913.15 15692.62 15514.67 15816.88 1805.58 15584.51 14467.80 14336.46 14590.91 1661.08 10.1 10.2 10.3 11 11.1 Basis of information/ methodology BHEL/RUS 500MW BHEL/KWU BHEL/CE 500MW BHEL/CE 200MW: Electrical Driven / 500MW Steam Driven Open cycle CW Pumping distance of 1.5km; New Ash Dyke distance 20km Secondary Fuel: Annual Requirement Sources of supply Transportation Distance of the station from the sources of supply Mode of Transport Maximum Station capability to stock secondary fuels 2012-13 200MW 200MW Fuels: Main Fuel: Annual Allocation or/ and Requirement 8.1.3 8.1.4 8.1.5 2008-09 MW Type of BFP Circulating Water System Any other Site specific feature 8.1.1 8.1.2.1 8.1.2.2 8.1.2.3 Units Actual Gross Generation at generator terminals (Station Total) Actual Net Generation Ex-bus Scheduled Generation Ex-bus Average Declared Capacity (DC) Average Declared Capacity (DC) MU MU MU MU MW 2012-13 data to be submitted later 16193.94 15035.84 15003.95 Based on REA 15283.36 Based on REA 1744.68 ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 Actual Auxiliary Energy Consumption including colony consumption 12 MU 1130.45 1166.00 1220.53 1116.71 1158.10 13 Actual Energy supplied to Colony from the station MU 24.02 25.25 25.12 25.01 26.11 14 14.1 14.1.1 14.1.2 Main Fuel: Consumption : Coal Coal 11313300 11313300 0 11298712 11298712 0 MT MT 14.2.2 14.2.3 14.2.4 Domestic Coal (Linked miine/ Other mines/e-auction/spot) Imported Coal Gross Calorific Value (GCV): Domestic Coal (As received) (As fired) Imported Coal (As received) Spot market/e-auction coal (As received) Weighted Average Gross Calorific value (As received) 14.2.5 Weighted Average Gross Calorific value (As fired) kCal/kg 3358 Weighted Average price of Domestic coal Weighted Average price of imported coal Weighted Average price of spot market/ e-auction coal Weighted Average price of all the Coals (as received) (Rs/MT) (Rs/MT) (Rs/MT) (Rs/MT) Blending: % and MT 14.4.1 14.4.2 14.4.3 Blending ratio of imported coal with domestic coal Proportion of e-Auction coal in the blending Actual Average stock maintained % 14.5 14.5.1 Actual Transit & Handling Losses for coal/Lignite Pit- Head Station (%) 14.5.1.1 Transit loss from linked mines Transit loss from non-linked mines including e-auction coal 14.5.1.2 mines. 14.5.1.3 Transit loss of imported coal MT 14.2 14.2.1 14.3 14.3.1 14.3.2 14.3.3 14.3.4 14.4 14.5.2 kCal/kg kCal/kg kCal/kg kCal/kg kCal/kg Coal Coal Coal 12006983 11031140.05 11684866 10844821 322117 186319 11313665 11313665 0 6264 6039 3441 3367 3371 3418 1192.23 NIL NIL 1192.23 1344.67 NIL NIL 1344.67 1519.8 8825.37 NIL 1710.44 1546.79 6088.32 NIL 1680 1429.69 NIL NIL 1429.69 0.00% 0.00% 2.68% 1.69% 218155.1 565995.2 191940.2 384415.5 0.12% 0.14% 0.19% 0.02% 0.18% 0.12% Price of Coal: MT MT MT 0.00% Imported/ Total coal Consumption 341148.0 Average of monthly closing stock 0.20% Non-Pit Head station 14.5.2.1 Transit loss from linked mines MT 14.5.2.2 Transit loss from non-linked mines including e-auction coal mines. MT 14.5.2.3 Transit loss of imported coal MT 15 15.1 15.2 15.3 15.4 16 16.1 16.2 Secondary Fuel Oil : Consumption Weighted Average Gross Calorific value (As received) Weighted Average Price Actual Average stock maintained klitre kCal/kg(litre) Rs/ Kl k litre 4682 9979 36006 3485 3850 9980 30552 3366 4098 9978 31347 3270 10177 9980 41904 3070 3381 9981 44120 3802 Average of monthly closing stock MU MU 1021.1 881.4 1066.7 617.7 533.0 366.5 1050.7 736.8 1159.1 425.5 Weighted average duration of outages Scheduled Outages Forced Outages ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 16.3 Number of trippings No 20 21 13 34 28 16.4 Number of start-ups : No 52 60 45 71 59 16.4.1 Cold Start-up No 31 42 37 50 31 16.4.2 Warm Start-up No 8 3 4 4 10 ANNEXURE-I Pro-forma furnishing Actual annual performance/operational data for the coal /lignite based thermal generating stations for the 5 year period from 2008-09 to 2012-2013 16.4.3 Hot start-up No 13 15 4 17 18 17 17.1 17.2 17.3 17.4 17.2 17.3 17.4 19 19.1 19.2 19.3 19.4 19.5 20 21 22 22.1 22.2 22.3 23 NOx , SOx ,and other particulate emission in : Design value of emission- NOx Design value of emission- SOx Design value of emission- SPM (St-I) Design value of emission- SPM (St-II) Actual emission (SPM)-St-I Actual emission (SOx) Actual emission (NOx) Actual emission (SPM)- St-II Actual emission (SOx) Actual emission (NOx) Detail of Ash utilization % of fly ash produced Conversion of value added product(Issue to Cement, RMC & Brick /block industries) For making roads & embarkment Land filling Used in plant site in one or other form or used in some other site (Mine filling & Ash dyke raising) Any other use , Please specify (Agriculture, Bottom ash cover etc.) Cost of spares actually consumed Average stock of spares Number of employees deployed in O&M Executives Non Executives Corporate office Man-MW ratio mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 Quantity Produced (Lakh MT) 99-136 711-860 402-465 120-143 745-893 409-508 116-137 703-829 401-450 118-141 707-805 389-439 NA NA 300 367.5 119-138 703-829 318-442 123-139 708-838 310-486 37.29 35.84 40.49 37.93 37.77 % 8.92 10.25 9.22 8.24 8.70 % % 0.00 6.57 0.00 39.17 0.00 32.15 0.00 26.59 0.00 0.38 % 0.00 9.17 0.00 0.66 33.53 1.68 5.16 7.55 9.78 6.57 5487.31 14664 7366.00 15093 6478.26 13553 7959.55 13493 10784.02 13875 474 1142 3205 0.81 472 1097 3272 0.78 480 1033 3298 0.76 484 972 3354 0.73 Qty. (Lakh MT) and usage Rs Lakh Rs Lakh No norm; not considered in design No norm; not considered in design 112-134 705-780 401-443 118-139 707-776 412-449 120-137 700-763 400-467 123-139 707-770 400-436 477 875 3170 Total Corporate Man Power 0.68 Excluding Corporate Man Power Note: From Oct/ Nov 2012 onwards payment to coal companies is being made on the basis of GCV as received at plant boundary. As per FSA, payment is to be made as per the quality assessed at mine end . Accordingly substantial amount billed by Coal companies are yet to be paid. Prices indicated above reflect the payment being made to Coal Companies. GCV of Domestic Coal as received is being measured only from Oct/Nov 2012